Business and Inspections Branch State Electrical Board
Professional Engineer’s Certification of Induction-Based Hydroelectric Facility I, _____________________________________ (state your name), a Colorado-licensed professional engineer in active status and good standing, have reviewed the installation for the induction-based hydroelectric energy facility, including the turbine, induction generator, and control panel, [and] ___________________________________________________________________________ (insert other elements of the facility the professional engineer specifically reviewed, if any), located at __________________________________________________________ (give address or appropriate location description). Pursuant to section 12-23-104(2)(II)(B), C.R.S., I certify that the installation of such hydroelectric energy facility: (a) is designed to have a generation capacity of 100 kW or less; and (b) meets the design criteria set forth in the applicable edition of Institute of Electrical and Electronics Engineers’ Standard 1547 for interconnecting distributed resources with electric power systems. Signature
________________________________
Date
________________________________
PE Stamp
1560 Broadway, Suite 1350, Denver, CO 80202 P 303.894.7800
F 303.894.2310 www.dora.colorado.gov/professions
2015 PE Hydroelectric Certification Form.pdf
such hydroelectric energy facility: (a) is designed to have a generation capacity of 100 kW or less; and. (b) meets the design criteria set forth in the applicable ...