BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2nd

3rd

ACCOMPLISHMENT 4th

Total

1st

6 1 1 1 1 1 1

6 1 1 1 1 1 1

2nd

3rd

Variance 4th

Total

A. Physical and Financial Report of Operation MFO 1 ECOSYSTEM POLICY SERVICES A.03.a Formulation and Monitoring of ENR Sector Policies, Plans, Programs, and Projects 1. Coordination, formulation and integration of plans, programs and activities including the review and updating of existing plans

- Conduct of consultative meeting

2. Monitor and evaluate implementation of ENR programs and projects including compliance with ENR policies and agreements

FY 2016 Proposed Physical and Financial plans prepared and submitted (no.)

Regional Total Regional Office P- Occ. Mindoro P- Or. Mindoro P-Marinduque P-Romblon P-Palawan

FY 2016 Work and Financial Plan prepared and submitted (no.)

Regional Total Regional Office P- Occ. Mindoro P- Or. Mindoro P-Marinduque P-Romblon P-Palawan

Meetings/ consultations conducted (no.)

Regional Total Regional Office Prov'l. Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

4 1 3

Regional Total Regional Office Prov'l. Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

Validation of programs/ projects accomplishments conducted (no.)

6 1 1 1 1 1 1 6 1 1 1 1 1 1

6 1 1 1 1 1 1 21 4 17 3 3 2 4 5 80 20 60 12 12 4 4 28

5 1 4 1 1

1 2

6 1 5 1 1 1 1 1

1 1

6 1 5 1 1 1 1 1

20 5 15 3 3 1 1 7

20 5 15 3 3 1 1 7

20 5 15 3 3 1 1 7

20 5 15 3 3 1 1 7

10 4 6 3 1 1 1

6 1 1 1 1 1 1

5 1 4

5 1 4

1 1 1 1

1 1 1 1

26 4 22 3 7 1 1 10

36 8 28 6 8 2 1 11

(5) (1) (4) (1)

(1) (2) (4) (2) (2)

(1) (3)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO

Monthly reports prepared and submitted (no.)

Regional Total Regional Office Prov'l. Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

Semi-annual reports prepared and submitted (no.)

Regional Total Regional Office Prov'l. Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

ACCOMPLISHMENT

1st

2nd

3rd

4th

Total

1st

2nd

63 3 60 12 12 6 6 24

63 3 60 12 12 6 6 24

69 4 65 13 13 7 7 25

63 3 60 12 12 6 6 24

258 13 240 48 48 24 24 96

63 3 60 12 12 6 6 24

63 3 60 12 12 6 6 24

6 1 5 1 1 1 1 1

6 1 5 1 1 1 1 1

Annual reports prepared and distributed (no.)

Regional Total Regional Office Prov'l. Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

6 1 5 1 1 1 1 1

6 1 5 1 1 1 1 1

watershed characterized (no.) (ha.)

Regional Total Regional Office Caguray Watershed, San Jose, Occi. Mdo.

1

1

Forest Management Policy Preparation and Updating of Climate resilient Plans 1. Watershed Management Planning 1.a Watershed Characterization cum vulnerability assessment

Vulnerability assessment Milestone targets - primary data gathered

3rd

Variance 4th

Remarks

Total

126 6 120 24 24 12 12 48

/

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2nd

3rd

ACCOMPLISHMENT 4th

Total

Regional Total Occidental Mdo.

1

1

Regional Total Palawan C-Roxas C-Brooke's Point

2 2 1 1

2 2 1 1

1st

2nd

3rd

Variance 4th

Remarks

Total

(% completed) -secondary data gathered (% completed) -report preparation (% completed) 1.b Preparation of Integrated Watershed Management Plan (IWMP)(including NGP areas)

IWMP prepared and submitted (name & location of watershed) (no./ha)

Patrick-Rayusan Watershed, Occ. Mindoro

Milestone targets -drafting of IWMP (% completed) -submission of plan

2. Forest Land Use Planning 2.a Preparation of FLUP (1st year)

FLUP prepared/drafted (no.)

Activities: 1. Preparatory activities including capability buidling (Complete Staff Work of DENR)

DENR Technical Assistance Team created and mobilized (no.) action plan prepared (no.)

2. Data Gathering, Mapping, and Validation

2 2

2 2

2 2

2 SOs were created last May 29 & June 26, 2015

GIS Validated map (no.) Data matrix of biophysical and socio-economic data prepared (no.)

3. Conduct Situation Analysis

2 2

2

workshop reports prepared (no.)

2

2

2

2

(2)

land use allocation map developed (no.) 4. Plan Formulation stage

FLUP drafted (no.)

5. Finalization and adoption of plan (2nd year) continuing activity

FLUP finalized and adopted by the Sangguniang Bayan (no.)

2 Regional Total Regional Office

3 3

2 3 3

3 3

3 3

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Forest Data Management 1. Operation/Maintenance of Forestry Information System (maintenance of database)

Performance Indicators

TARGET

PENRO/CENRO

ACCOMPLISHMENT

1st

2nd

3rd

4th

Total

1st

2nd

3rd

Variance 4th

Total

forest tenure record assessed and validated and integrated (no.)

Regional Total Regional Office

3 3

3 3

3 3

3 3

3 3

3 3

3 3

3 3

forest tenure record assessed and validated database (no.)

Prov'l. Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

15 3 3 3 3 3

15 3 3 3 3 3

15 3 3 3 3 3

15 3 3 3 3 3

15 3 3 3 3 3

15 3 3 3 3 3

15 3 3 3 3 3

15 3 3 3 3 3

forest tenure record created/ updated (no.) (1 tenure = 1 record)

Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

3 3 3 3 3

3 3 3 3 3

3 3 3 3 3

3 3 3 3 3

3 3 3 3 3

3 3 3 3 3

3 3 3 3 3

3 3 3 3 3

CENRO TOTAL

45

45

45

45

45

45

45

45

C-Mamburao C-Sablayan C-San Jose

3 3 3

3 3 3

3 3 3

3 3 3

3 3 3

3 3 3

3 3 3

3 3 3

C-Calapan C-Socorro C-Roxas

3 3 3

3 3 3

3 3 3

3 3 3

3 3 3

3 3 3

3 3 3

3 3 3

C-Boac

3

3

3

3

3

3

3

3

C-Odiongan

3

3

3

3

3

3

3

3

C-Puerto Princesa C-Roxas C-Taytay C-Coron C-Narra C-Brooke's Point C-Quezon

3 3 3 3 3 3 3

3 3 3 3 3 3 3

3 3 3 3 3 3 3

3 3 3 3 3 3 3

3 3 3 3 3 3 3

3 3 3 3 3 3 3

3 3 3 3 3 3 3

3 3 3 3 3 3 3

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2. Relocation and re-measurement of Forest Resources Assessment (FRA) tracts

FRA tracts relocated and re-measured (no.)

3. Conduct of Socio-Economic and Environmental (SEE)/Impact Study in CBFMA areas

SEE/Impact study report validated and endorsed to CO (no.)

4. Forest products utilization and price monitoring '-price monitoring of forest products

consolidated price data by PENRO submitted to FMB quarterly with monthly breakdown price data gathered, processed and summarized (no.) 12 reports

consolidated price data by CENRO submitted to RO monthly

Establishing Partnership and Collaboration with Stakeholders (e.g. MFPC, NCI, PO's, etc.) (consultation to CSO, RDC, NGO's, etc.)

groups created/strengthened (no.)

2nd

Regional Office

ACCOMPLISHMENT

3rd

4th

Total

1

1

2

1

1

Regional Office

1st

2nd

3rd

Variance 4th

Total

Regional Office

3

3

3

3

12

3

3

6

Prov'l. Total Occidental Mdo. Palawan

6 3 3

6 3 3

6 3 3

6 3 3

24 12 12

6 3 3

6 3 3

12 6 6

Prov'l. Total Occidental Mdo. Palawan

6 3 3

6 3 3

6 3 3

6 3 3

24 12 12

6 3 3

6 3 3

12 6 6

CENRO TOTAL

30

30

30

30

120

30

30

60

C-Mamburao C-Sablayan C-San Jose

3 3 3

3 3 3

3 3 3

3 3 3

12 12 12

3 3 3

3 3 3

6 6 6

C-Puerto Princesa C-Roxas C-Taytay C-Coron C-Narra C-Brooke's Point C-Quezon

3 3 3 3 3 3 3

3 3 3 3 3 3 3

3 3 3 3 3 3 3

3 3 3 3 3 3 3

12 12 12 12 12 12 12

3 3 3 3 3 3 3

3 3 3 3 3 3 3

6 6 6 6 6 6 6

1 1

1

1

1 1

1 1

1

1

3 1 2

Regional Total Regional Office Occidental Mdo.

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2nd

3rd

ACCOMPLISHMENT 4th

Total

1st

2nd

3rd

Variance 4th

Total

Protected Area, Wildlife Coastal & Marine Management Policy 1. Policy Formulation/ Review

inputs to draft policy provided Drafting of PA bills (name of policy) (MGGNP- Romblon)

Regional Office

2. Database Management a. Conduct of baseline assessment on biological diversity in priority PAs (includes Invasive Alien Species and priority species) including database development

Population baselines established/' updated with population survey 'report submitted to BMB Pawikan Philippine crocodile Dugong

Regional Office

PA profile with map submitted to FMB (no.) (name of PA)

Regional Office MIBNP- Occ. Mdo

PAs surveyed with consolidated SRPAO results and maps submitted to BMB (no.) (name of PA)

Regional Total

1

1

Regional Office

1

Prov'l. Total Occidental Mdo MIBNP-TCP Oriental Mdo NLNP Marinduque MWS Romblon CALSANAG Palawan MMPL

1

3. Survey and Registration of PA occupants

PAs surveyed with SRPAO results (100%) and map submitted to RO (no.) (name of PA)

4. Delineation of Protected Area Boundaries

Official list of tenured migrants and certificates of recognition issued (no.)

Regional Office MGGNP MMPL

PA delineated with map report submitted to the Secretary - km/ PA - number of PA - name of PA

Regional Office

Occ. Mindoro MIBNP- 41.0 km.

1

1

1

1

3

3

1 1 1

1 1 1

1

1

1

2

5

1

1

2

1

1

2

5

1

1

2

1

1

2

5

1

1

1

1

1

1 1

1

1 1

1

1

1

1 41

(1)

(1)

1

1

2 1 1

2 1 1

2 1 1

1

2

1

1 41

2 1 1 1

2

1 41

1 41

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

PA zoned (strict protection and multiple use zone)

Romblon CALSANAG-44.0 km.

2nd

1 44

Regional Office Occ. Mindoro MIBNP- 41.0 km.

(Central Office Based Fund) (remaining undelineated boundary of Mts. Iglit-Baco National Park

3rd

ACCOMPLISHMENT 4th

Total

1st

1 44

1 44

1 49

1 49

945,000

10,106,131 4,560,500 1,168,000 1,845,500 1,547,000

616,000

3,250,631 252,700 595,064 2,402,867

606,000 207000 312,000 87,000

2nd

3rd

Variance 4th

Total

1 44

MAJOR FINAL OUTPUT 2 Ecosystem Management Services A.03.b Forest Development, Rehabilitation and Protection 1. Seedling Production

seedling procured/ produced (no.)

Regional Total Occidental Mdo C-Mamburao C-Sablayan C-San Jose

1,625,684

Oriental Mdo C-Calapan C-Socorro C-Roxas

1,625,684 126,350 297,900 1,201,434

7,535,447 4,560,500 1,168,000 1,845,500 1,547,000 1,624,947 126,350 297,164 1,201,433

Marinduque

475,000

Palawan C-Roxas C-Taytay C-Narra C-Brooke's Point C- Quezon C-Coron

875,000 175,000 300,000 50,000 50,000 50,000 250,000

945,000

1,420,000 875,000 175,000 300,000 50,000 50,000 50,000 250,000

10,000 10,000

8,399,117 4,565,741 1,224,070 1,844,671 1,497,000

9,015,117 4,565,741 1,224,070 1,844,671 1,497,000

(146,014)

2,549,576 45,700 188,009 2,315,867

3,155,576 252,700 500,009 2,402,867

(95,055)

627,900

627,900

655,900 165,000 300,000 55,000 50,000 32,500 53,400

665,900 175,000 300,000 55,000 50,000 32,500 53,400

(829) (50,000)

(95,055)

(209,100)

(17,500) (196,600)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2. Plantation establishment -Social mobilization *site preparation

area planted (ha.) site prepared (ha.)

4th

Total

1st

2nd

182

12,869

3,272

16,323

2,549

2,351

4,900

5,924

2,273.8

2,274.7

4,549

568

23

59

82

252 43 200

18 9 5

270 52 200 5

10 100

710 150 200 100 100 60 100

4

13

16,223 9,121 5,824 568 710

16,223 9,121 5,824 568 710

Regional Total Occidental Mindoro

16,223 9,121

16,223 9,121

C-Mamburao C-Sablayan C-San Jose

2,336 3,691 3,094

2,336 3,691 3,094

Oriental Mindoro

5,824

5,824

C-Calapan C-Socorro C- Roxas

551 1,158 4,115

551 1,158 4,115

568

568

Regional Total Occidental Mdo. C-Mamburao C-Sablayan C-San Jose

9,121 2,336 3,691 3,094

Oriental Mdo.

2,912 182

3. Maintenance and protection of established plantations 1st year (2015)

Regional Total Occidental Mdo. Oriental Mdo. Marinduque Palawan area maintained and protected (ha.)

Marinduque

16,223 9,121 5,824 568 710

16,223 9,121 5,824 568 710

16,223 9,121 5,824 568 710

4th

Total

9,121 2,336 3,691 3,094 3,012

386 450 100 100 100 100 50

Palawan C-Roxas C-Taytay C-Narra C-Brooke's Point C- Quezon C-Coron

3rd

Variance

3rd

Marinduque

*IEC

ACCOMPLISHMENT

2nd

260 50 100

9

(100)

(16,223) (9,121) 5,824

5,824

5,824

5,824

5,824 (568) (710)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2nd year (2014)

3rd year (2013)

2nd

3rd

ACCOMPLISHMENT 4th

Total

Palawan

710

710

C-Roxas C-Taytay C-Narra C-Brooke's Point C- Quezon C-Coron

150 200 100 100 60 100

150 200 100 100 60 100

1st

2nd

3rd

Variance 4th

Total

52

52

100

100

19,159

Regional Total

19,159

19,159

19,159

19,159

19,159

19,159

19,159

Occidental Mindoro Oriental Mindoro Palawan

13,291 5,748 120

13,291 5,748 120

13,291 5,748 120

13,291 5,748 120

13,291 5,748 120

13,291 5,748 120

13,291 5,748 120

13,291 5,748 120

13,291 5,748 120

13,291 5,748 120

Regional Total

15,891

15,891

15,891

15,891

15,891

15,891

15,891

15,891

15,891

15,891

Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

5,484 6,550 959 959 1,939

5,484 6,550 959 959 1,939

5,484 6,550 959 959 1,939

5,484 6,550 959 959 1,939

5,484 6,550 959 959 1,939

5,484 6,550 959 959 1,939

5,484 6,550 959 959 1,939

5,484 6,550 959 959 1,939

5,484 6,550 959 959 1,939

5,484 6,550 959 959 1,939

148 4 144 73 56 4 3 8

148 4 144 73 56 4 3 8

148 4 144 73 56 4 3 8

148 4 144 73 56 4 3 8

148 4 144 73 56 4 3 8

148 4 144 73 56 4 3 8

148 4 144 73 56 4 3 8

12 3 3 3 1 1 1

12 3 3 3 1 1 1

12 3 3 3 1 1 1

4. Hiring of Extension Officers (Regular)

Extension Officers hired (no.)

Regional Total Regional Office Prov'l. Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

(Central Office Based Fund)

Extension Officers hired (no.)

Regional Total Regional Office Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

148 4 144 73 56 4 3 8

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2nd

3rd

ACCOMPLISHMENT 4th

Total

Mangrove and Beach Forest Development Project (MBFDP) 1.Site Validation and assessment

2. Social Mobilization Community Consultation

site validated and assessed (ha.) (Mangrove & Beach)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

8,095 1,450 1,900 245 800 3,700

Mangrove area (ha.)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

Beach Forest area (ha.)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

PO/Community consulted (no.)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

120

295 58 82 35

Site preparation

area of planting site cleared and prepared (ha.)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

8,095 1,450 1,900 245 800 3,700

Plantation establishment (Mangrove and Beach)

total area planted (ha.)

Regional Total Occidental Mindoro Oriental Mindoro

8,095 1,450 1,900

1st

2nd

3rd

Variance 4th

Total

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st Marinduque Romblon Palawan

2nd

3rd

ACCOMPLISHMENT 4th

Total 245 800 3,700

Mangrove

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

Beach

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

no. of seedlings planted

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

18,987,500 3,625,000 3,500,000 612,500 2,000,000 9,250,000

Propagules

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

4,400,000

potted

Beach forest seedlings

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan Regional Total Occidental Mindoro Oriental Mindoro

2,800,000 1,600,000

550,000 350,000 200,000

550,000 350,000

1st

2nd

3rd

Variance 4th

Total

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st Marinduque Romblon Palawan

2nd

3rd

ACCOMPLISHMENT 4th

Total

200,000

3. Nursery establishment

nursery established (no.)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

9 2 2 1 1 5

4. Planting materials production

seedlings raised/procured (no.)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

18,987,500 3,625,000 3,500,000 612,500 2,000,000 9,250,000

propagules procured (no.)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

2,800,000

mangrove seedlings procured (no.)

beach forest seedlings procured (no.)

mangrove seedlings raised (no.)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan Regional Total Occidental Mindoro Oriental Mindoro

2,800,000

1,950,000 350,000 1,600,000

350,000 350,000

200,000

1st

2nd

3rd

Variance 4th

Total

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st Marinduque Romblon Palawan

beach forest seedlings raised (no.)

5. Cash for work

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

2nd

3rd

ACCOMPLISHMENT 4th

Total

200,000

200,000

200,000

jobs generated

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

Beneficiaries (men)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

Beneficiaries (women)

Regional Total Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

seedlings produced/procured (no.)

Regional Total

1,900,000

Occidental Mindoro Oriental Mindoro

1,900,000

Mechanized and Modernized Forest Nurseries (Central Office Based Fund) 1. Number of seedlings produced/ procured

1st

2nd

3rd

Variance 4th

Total

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2. Number of seedlings planted

3.Number of hectares planted

4. Number of planters

total number of seedlings planted (no.)

total area planted (ha.)

total number of beneficiaries (no.)

2nd

3rd

ACCOMPLISHMENT 4th

Total

Regional Total

2,900,000

Occidental Mindoro Oriental Mindoro

1,900,000 1,000,000

Regional Total

2,900

Occidental Mindoro Oriental Mindoro

1,900 1,000

1st

2nd

425 73 60 10 9 273

1,048 186 182 30 19 631

3rd

Variance 4th

Total

Regional Total Occidental Mindoro Oriental Mindoro

Soil and Water Conservation and Watershed Management (Central Office Based Fund) Establishment of Soil and Water Conservation Structural Measures Construction of Small Water Impounding Structure (SWIS)

SWIS constructed (cu.m.)

Occidental Mindoro

Patents issued (no.) and (ha.)

Regional Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

52

63

115

507 147 242 66 52

2048 1,062 308 269 409

4000 1,468 764 375 489 904

A.03.c Land Survey, Disposition and Records 1. Land Disposition/ Distribution 1.1 Residential (disposed under RA 10023 or residential free patent)

425 73 60 10 9 273

1020 186 154 30 19 631

1,473 259 242 40 28 904

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

(ha.)

* Agricultural

Patents issued (no.)

(ha.)

1.2 Lot Survey

Lot Surveyed (no.)

(ha.)

1.3 Other Patent Issuances (MSA, Sales Applications) (Commercial, Industrial)

Patents issued (no.) and (ha.)

2nd

3rd

ACCOMPLISHMENT 4th

Total

1st

Regional Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan Regional Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

1,982 323 540 74 95 950

1,194 198 183 37 776

1,324 549 367 19 389

4,500 1,070 1,090 130 1,260 950

471 51 19 36 365

Regional Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan Regional Total Occidental Mdo Oriental Mdo Marinduque Romblon Palawan

30 30

491 45 40 180 20 206

492 45 40 170 30 207

237 30

1,250 150 80 350 50 620

207

41 41

14 3 3 2 1 5

11 3 3

5

25 6 6 2 1 10

3rd

Variance 4th

Total

5

5

5

5

1,105 152 55 55 44 799

1,576 203 55 74 80 1,164

90

90

410 80 80

451 121 80

(406) (120) (485) (15)

(70)

(180) (20)

Regional Total Occidental Mdo Oriental Mdo Marinduque Romblon Palawan Regional Total Occidental Mdo Oriental Mdo Marinduque Romblon Palawan

2nd

10

10

250

250

38

38

3

13

3

3

10

38

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2. Titling of sites for public or quasipublic uses

Draft proclamation prepared & endorsed to LMB (no.)

Regional Total Regional Office Prov'l. Total Occidental Mdo Oriental Mdo Marinduque Romblon Palawan

4. Inspection, Verification and Approval of Survey (IVAS) for isolated

ACCOMPLISHMENT 4th

Total

1st

2nd

16 8 8 1 1 1 1 4

4 2 2 1

2

2

4

2

1

20 10 10 2 1 1 1 5

2 2

Regional Office

1

3

1

5

CSW for issuance of special patent prepared (no)

Regional Total

1

4

1

6

1 1

1

2 1 1 1 1

1 1 1

Regional Total Regional Office Prov'l. Total Occidental Mdo Oriental Mdo Marinduque Romblon Palawan

2 1 1

12 1 11

1

3 1 1 6

5

survey returns verified and approved (ha.)

Regional Office

1,000

1,000

1,000

Land Records Computerized

Regional Office

22,000

Land Disputes/ Cases Resolved (no.)

9 1 8 3

1 1

'-Encoding of LDCs of newly approved

4th

Total

(1)

1

2

3

1 1

1 1 1

1

24 4 20 3 3 1 1 12

5

7

12

5

7

12

2

1

3

1,000

4,000

205

44,291

66,291

5. Adoption/Implementation of a functional Land Administration and Management Systems (LAMS) 5. 1. Computerization of Land Records 5.1.1 Data Capture '-encoding

2

3rd

Variance

3rd

Special patent issued (no.)

Occidental Mdo Oriental Mdo Marinduque Romblon Palawan 3. Resolution of Land Disputes/ Cases

2nd

3

3 1,907

2,112

(2) (2)

(1) (1) (4)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

5.2 Quality Assurance 5.2.1 Validation of Encoded Data Under PRS'92

-Encoded data validated (no)

Regional Office

5.2.2 Validation of Scanned Images from 2012-2014 under LAMS and LAMSLITE

Scanned images of Survey Records validated (no.)

Regional Office

6. Survey and Mapping of Foreshore

Area surveyed and mapped (ha.)

Regional Total Occidental Mdo Oriental Mdo Marinduque Romblon Palawan

100 100

2nd

437 437

ACCOMPLISHMENT

3rd

4th

Total

133,402

108,386

241,788

251,921

251,921

5,480 425 366 770 560 3,359

593 225 368

6,610 1,187 734 770 560 3,359

1st

2nd

3rd

Variance 4th

target is set on Dec. as per memo of LMB Dir. 679 41 112

679 41 112

526

526

1

2

(496)

A.03.d Management of Protected Areas,Wildlife, Coastal and Marine Resources/ Areas A.03.d.1 Protected Areas Development and Management 1. Management of Protected Areas a . Preparation/ Updating of PA management plans

PAs zoned with map submitted to BMB (1:50000) (name of PA) (kilometers/zone/ PA) (area in hectare per zone) PA management plans approved by PAMB and endorsed to BMB (no.)/(name of PAs) PA management plans 'reviewed and endorsed to PAMB (no.) (name of PAs)

Regional Office CALSANAG- Romblon

1

1

1

3

1

Regional Office

1

1

1

3

1

1

1

1

1

Prov'l. Total Occidental Mdo. MCWS Romblon CALSANAG Palawan UIGRBS

1

1 1

1

Remarks

Total

1

(1)

1

1

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

draft updated PA management plans reviewed and endorsed to PAMB (no.)(name of PA)

Report on the highlights of PAMB implementation status submitted to BMB (no) (name of PAs) b. Operationalization/ Strengthening of PAMB

Approved PAMB resolution 's adopting the recommended action/s endorsed to BMB (no of resolutions) (name of Pas) (area coverage/ PA (ha.) recommended actions forwarded to PAMB with report submitted to RO (name of PAs) (area coverage/ PA (ha.)

Occidental Mdo. MIBNP Palawan MMPL

2nd

3rd

ACCOMPLISHMENT 4th

1

Regional Office ARNP- Occ. Mdo

Total

1st

Variance 4th

Total

1

1

(1)

1

1

1

3

1

16

18

18

18

70

17

Prov'l. Total Occidental Mdo MCWS MIBNP ARNP Oriental Mdo. NLNP Marinduque MWS Romblon CALSANAG MGGNP Palawan ENTMRPA MSPLS RIWS UIGRBS MMPL

17 9 1 5 3 4 4

19 9 1 5 3 6 6 1 1

19 10 1 6 3 6 6

19 11 1 6 4 6 6

74 39 4 22 13 22 22 1 1 2 1 1 10 2 2 2 2 2

16 7

Regional Total

3

Occidental Mdo MCWS- 2,230 ha. MIBNP- 28,252.228 ha.

3 1

3

1 1

1 1 1

10

10

10

10

10

2 1 1

2 1 1

2 1 1

2 1 1

2 1 1

1

1

3rd

1

Regional Office

2 1 1 2

2nd

2 1 1

7 8 8 2 2

1 1

1

17

34

16 7

9 9

(20) (11) (2) (10)

7 17 17 2 2

1 1

(2) (1) (1) (4) (1) (1) (1) (1)

c. PA Protection c.1. Implementation of Biodiversity Monitoring System

implementation of BMS status of approved PAMB resolutions forwarded to PASu (no.) (name of PAs) (area coverage/ PA (ha.)

3

(17) (4) (2) (2)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

Brigade/volunteers hired and mobilized (no.)

ACCOMPLISHMENT

2nd

3rd

4th

Total

1st

2nd

1 1 1 1 2 1 1 4 1

1 1 1 1 2 1 1 4 1

1 1 1 1 2 1 1 4 1

1 1 1 1 2 1 1 4 1

1 1 1 1 2 1 1 4 1

1 1

1 1

3

3

1

1

1

1

1

1

1

(1)

2 1 1

2 1 1

2 1 1

2 1 1

2 1 1

2 1 1

2 1 1

(2) (1) (1)

Regional Total

125

125

125

125

125

82

82

(168)

Occidental Mdo MIBNP Occidental Mdo MCWS Oriental Mdo. NLNP Marinduque MWS Romblon CALSANAG MGGNP Palawan C-Brooke's/Quezon MMPL C-Narra RIWS C-Brooke's UIGRBS C- Taytay ENTMRNP MSPLS

23

23

23

23

23

23

23

7

7

7

7

7

7

7

7

7

7

7

7

7

5

5

5

5

5

7

14 1 13 69 33

14 1 13 69 33

14 1 13 69 33

14 1 13 69 33

14 1 13 69 33

12

12

12

12

8

8

8

16 8 8

16 8 8

16 8 8

7

3rd

Variance

1st Oriental Mdo. NLNP- 7,350.334 ha. Marinduque MWS- 5,760.372 ha. Romblon CALATRAVA- 968 ha. MGGNP- 13,846.804 ha. Palawan C-Brooke's/Quezon MMPL- 70,000 ha. C-Narra RIWS- 940 ha. C- Taytay ENTMRPA MSPLS c.2 Engaging biodiversity green/blue brigades/volunteers (1000-1500/mo/bri)

TARGET

PENRO/CENRO

4th

Total 2 2 (2) (2) (4) (2) (2) (5) (2)

7 7

38

38

12

12

12

8

8

10

10

16 8 8

16 8 8

16 8 8

16 8 8

(14) (1) (13) (31) (33)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

c.3 Putting up signages within PAs

c.4 Conduct of IEC and advocacy campaigns

Performance Indicators

Signages set installed (no.)

IEC/campaigns conducted (no.)

TARGET

PENRO/CENRO

Prov'l. Total Occidental Mdo MCWS Occidental Mdo MIBNP Oriental Mdo. NLNP Marinduque MWS Romblon CALSANAG MGGNP Palawan C-Brooke's/Quezon MMPL C-Narra RIWS C-Taytay ENTMRNP MSPLS

Prov'l. Total Occidental Mdo MCWS Occidental Mdo MIBNP Oriental Mdo. NLNP Marinduque MWS Romblon CALSANAG MGGNP Palawan C-Brooke's/Quezon MMPL C-Narra RIWS

ACCOMPLISHMENT

1st

2nd

3rd

4th

Total

1st

2nd

9

40 4

11

1

61 4

10

10

12

8

8

1

1

Total 20

3 1 1 2

4 2 2

1

1

16 4 12 13 3 3 6

8

8 8

2 2

2

8

4 2

(16) (4) (12) (5) (2) (3)

4 2 2

2 2

2 2

(2) (2)

8

6

6

1

1

3

3

1

1

1

1

1

1

(1)

1

1

(1)

1

2

(1)

2 1

2 1

2 1

2 1

1

1

1

1

1

3

(29) (4) (12)

8

5

Variance 4th

12 8

16 4 12 8 2 2 2

3rd

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

c. 5 Establishment and Maintenance of permanent vegetation monitoring plot/s

d. Ecotourism Site Development

ACCOMPLISHMENT

3rd

4th

Total

Prov'l. Total

5

13

1

19

(5)

Occidental Mdo MCWS Occidental Mdo MIBNP Oriental Mdo. NLNP Marinduque MWS Romblon CALSANAG MGGNP

1

1

(1)

1

1

(1)

ecotourism management plan approved by PAMB (no.) (name of PA)

Regional Office MWS

1

1

1

1

1

1

ecotourism management plan reviewed and endorsed to PAMB (no.)(name of PA)

Marinduque

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Vegetation plots monitored, established and maintained (no.)

site assessment '- ecotourism plan dev't. - ecotourism site dev't. in partnership with LGUs, NGOs, PO's -Capacity building/training of DENR/ PA staff & Community/POs - Ecotourism Promotion (dev't of promotional materials) Ecotourism Area Assessed Ecotourism planning conducted

infrastructure maintained with report endorsed to BMB (no.) (identify infrastructure) - Renovation of MIBNP station and Magawang station

12 1

1

1

1 1

1

1

1

2nd

3rd

4th

Total

12

2 1 1

Palawan C-Brooke's/Quezon MMPL

Regional Office

1

1st

Variance

2nd

3

(1)

2 1 1

(2) (1) (1)

1 1

1

1

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

- Establishment of of Visitor's Center Structures Maintenance & furnishing

infrastructure constructed based on DAO 2009-09 with report evaluated and submitted to RO (no.) (identify infrastructure) - Visitor's ecotourism center

Marinduque MWS

partnerships forged in the implementationof business/ enterprises with signed MOA submitted to BMB (no. of MOA)

Regional Office

Impact monitoring

infrastructure maintained with report endorsed to RO (no.) (identify infrastructure) - View deck, wharf, kiosk

Oriental Mdo. NLNP

1

Attendance to REC meetings

REC meetings attended

Regional Office

1

POs/LGUS provided technical assistance on ecotourism enterprise with report submitted to BMB (no)

Regional Office

1

CRMP affirmed by the RED with copy submitted to BMB (no.) (name of PA)

Regional Office CALSANAG- Romblon

f. Preparation/Publication of Coffee Table Book Apo Reef Natural Park

Camera ready draft of Coffee Table Book with report submitted to BMB

Regional Office

g. Management of caves and cave resources

caves recommended for classification (no.), (name of cave and class)

e .Community-Based Program (CBP)

Regional Total Regional Office

cave assessed with recommended Prov'l. Total classification reviewed and endorsed to Occidental Mdo PENRO/ RO (no.) (name of cave) Onoda cave, Looc & Lubang Island

2nd

3rd

ACCOMPLISHMENT 4th

1

Total

1st

2nd

3rd

Variance 4th

Total

1

1

1

1

1

1

1

1

1

1

1 1

1

(1)

1

4

1

2

2

1

4

1

1 1

1

2

1

1

2

1

1

3 3

2 2

1 1

6 6

5 5

5 5

3

2

1 1

6 1

5

5

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st Oriental Mdo. San Rafael 3 & San Rafael 4 Marinduque Camarines cave, Bintakay, Mogpog Talao cave, Gasan Romblon Bunyag Cave

Cave management plans approved by the RD (no.) (name of cave) Cave management plans reviewed & endorsed to PENRO/ RO (no.) (name of caves)

Report on the highlights of implementation status of cave management plans submitted to BMB (no.) ,(name of caves) Report on the highlights of implementation status of cave mgt plans submitted to RO (no.) (name of caves) Showcase of Cave Management Model

Model cave identified and developed (no.)

Capability Building

Capability Building conducted (no.)

2nd

3rd

ACCOMPLISHMENT 4th

2

Total

2nd

3rd

Variance 4th

Total

2

3

3

2 1 1

2 1 1

2

2

1

1

Regional Office

1

4 2 1

4 2 1

1

1

Marinduque Camarines cave, Bintakay,Mogpog Talao cave, Gasan

2 1 1

2 1 1

Regional Office

1

1

1

1

1

Marinduque Bagumbungan cave

1

1

1

1

1

1

1

Regional Office Bagumbungan Cave, Marinduque

1

(1) (1) (1)

1

Prov'l. Total Occidental Mdo C-San Jose Alibog cave and Lagoon C-San Jose Purnaga cave

Regional Office

1st

1

(1)

1

1

1

1

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2nd

1 1

3rd

ACCOMPLISHMENT 4th

Total

1st

2nd

2 2

3 3

1 1

1 1

2

3

1

1

3rd

Variance 4th

Total

h. Conservation of Inland Wetlands Inland wetlands assessed with reports reviewed and endorsed to BMB (no.) (name of wetlands) (area-ha.) Inland wetlands assessed with reports submitted to RO (no.) (name of wetlands) (area (ha.)

Inland wetland management plans approved by the stakeholders and endorsed to the OSEC thru BMB (no.)(name of wetlands), area (ha.)

i. Establishment/Management of Critical Habitats (DAO 2007-02) (DAO 2007-02)

Regional Total Regional Office

Prov'l. Total 1 Oriental Mdo. Kisluyan, Bgy. Villa Cerveza, Victoria Romblon Tinagong dagat, Calatrava 1 Palawan Lake Manguao, Taytay

2 2

(3) 1

1

1 1

Regional Office

2

Inland wetland management plan prepared in consultation with stakeholders and endorsed to PENRO/RO (no.) (name of of wetlands); area (ha.)

Oriental Mdo. Kisluyan, Brgy. Villa Cerveza, Victoria Walang Langit Falls Palawan

2 1

Report on the highlights of implementation of status of inland wetlands management plans submitted to BMB (no.) (name of wetlands)

Regional Office

1

Implementation of inland wetland management plans monitored and regular report submitted to RO (no.) (name of wetlands)

Oriental Mdo.

1

MOA/Regional S.O. approved and copy provided to BMB number of MOA/SO name of critical habitat corresponding hectarage/CH

Regional Office

1

(1)

1

1

1

3

1

1

2 1

1

1

1 1

1

1

1 1

1

3

1

1

2

1

1

3

1

1

2

1

1

1

(1) (1)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2nd

1. Development of CH Management plan

Draft CH management plan reviewed and endorsed to Regional Office (no.) name of critical habitat

Occidental Mdo C- San Jose Philippine teak

j. Protection and Maintenance of Tubbataha Reef Natural Park

PA maintained and protected TRNP (97,030 has.)

Palawan PENRO

k. Operation and Maintenance of Wildlife Rescue Centers (WRC)

rescue center maintained (no.) Bonliw, Torrijos

Marinduque

1

1

l. Project Management and Supervision

Project management supervised (no.)

Regional Office

3

3

Conduct of annual population tamaraw count in Mt. Iglit Baco National Park

conducted tamaraw count (no.)

Regional Office

Population surveys in other known tamaraw habitats in the island of Mindoro 'Updating of distribution map

population survey conducted (no.)

3rd

ACCOMPLISHMENT 4th

1

Total

1st

1

2nd 1

3rd

Variance 4th

Total 1

1 1

1 1

1

1

1

1

3

3

12

3

1

1

1

Regional Office

1

1

Reports on conservation activities reviewed and endorsed to RO (no)

Oriental Mdo.

1

1

1

1

4

1

1

2

no. of threatened species protected and maintained (tamaraw - 1; crocodile - 1; others)

Occidental Mdo. Oriental Mdo. C-Roxas

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

genepool tamaraw habitat improved & protected (ha.)

Occidental Mdo.

20,280

20,280

20,280

20,280

20,280

20,280

20,280

20,280

1

3

6

A.03.d.2 Protection and Conservation of Wildlife 1. Conservation and Protection of Wildlife 1.1 Conservation and protection of wildlife 1

(1)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

Celebration of the Tamaraw Month (October)

2nd

3rd

ACCOMPLISHMENT 4th

Total

1

2

2 100 50

2 100 50

1st

2nd

3rd

Variance 4th

Total

report submitted

Regional Office

IEC materials produced and distributed (no.)

Regional Office

IEC materials produced and distributed (no.)

Oriental Mdo. PENRO

Improvement, maintenance and operation of the established tamaraw station office

no. of structures, vehicles and equipment maintained (report submitted)

Occidental Mdo. TCP office in San Jose, Occ. Mdo. 1

1

1

1

1

2

4

6

(structures, vehicles, equipment)

(report submitted)

Oriental Mdo. C-Roxas

1 1

1 1

1 1

1 1

1 1

1 1

1 1

2 2

1.2 Marine turtles

reports on conservation activities reviewed and endorsed to BMB (no.)

Regional office 1

1

1

1

4

1

1

Regional WRCs maintainedwith report submitted to BMB (no.)

Regional office

1

1

2

1

1

rescue center maintained ( no.)

Occidental Mndoro Bgy. Manoot, Rizal Marinduque Bonliw, Torrijos

1

1

1

1

1

1

1

1

1

1

1

1

Production and Distribution tarpaulin t-shirt bags

2. Operation and Maintenance of Wildlife Rescue Centers (WRC)

1

5,300

5,300

A.03.d.3 Management of Coastal and Marine Resources/Areas 1. Sustainable Management of Coral Reef Ecosystems a.Habitat and vulnerability assessment for NIPAS MPAs

Area of habitat and resources mapped and assessed (ha.) ; with report submitted to BMB

Regional Office Romblon

1,000

(1)

1,000

1

1 1

(1)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

b. Coral reef Management and Protection

Report on the status of coral reef protected and managed (ha.)

Regional Office ENTMRPA MSPLS

Stock enhancement and marine species

Stock enhancement report (no.)

Palawan ENTMRPA

c. Social Mobilization

No. of PO members and local communities organized & mobilized

Regional Total Palawan C- Taytay ENTMRPA MSPLS

2nd

3rd

1

1

ACCOMPLISHMENT 4th

10,000 7,000 3,000 1 1

Total

1st

2nd

3rd

Variance 4th

Total

2

(1)

10,000 7,000 3,000

(10,000) (7,000) (3,000)

1 1

1

1

1 1 1

1 1 1

1 1 1

1 1 1

d. Marine Protected Area Strengthening and Networking

Area of proposed MPA (ha.) - include draft MOA on MPA networking

Regional office

-MPA networks establishment and management

Area of proposed MPA (ha.) Technical assistance

Palawan C- Taytay ENTMRPA MSPLS

PAMB resolutions approved

Regional office

Assistance provided on establishment of sustainable livelihood or enterprise

Regional Total

2

2

Palawan C- Taytay ENTMRPA MSPLS

2 2 1 1

2 2 1 1

. Conduct of training

training conducted (no.)

Palawan C- Taytay

1 1

1 1

f. Creation and Operation of Regional Coral Rehabilitation Assessment Team (RCRAT)

RCRAT created (no.)

Regional Office

1

1

(1)

'- Capability Building

Capability Buidling conducted

Regional Office

1

1

(1)

e. Sustainable Livelihood interventions

2

2

(2)

10,000 10,000 7,000 3,000

10,000 10,000 7,000 3,000

(10,000) (10,000) (7,000) (3,000)

1

1

1 1

1 1

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

ACCOMPLISHMENT

2nd

3rd

4th

Total

3

3

3

9

1st

2nd

3rd

Variance 4th

Total

2. Provision of Technical Assistance in Integrated Coastal Management a. Participatory Coastal Resource Assessment for LGUs without ICM Plans

b. Formulation of ICM Plans

technical assistance in the preparation of Municipal Coastal Environment Profile (MCEP)

Occidental Mdo.

Number of LGUs provided with technical assistance in the preparation of ICM Plan

Palawan ENTMRPA MSPLS

c. Updating of outdated ICM Plan/ Upscaling Number of updated/upscaled ICM plans develop with report submitted to BMB (no.)

2 1 1

Regional Total Oriental Mdo. - Calapan

d. Strengthening of Bantay Dagat thru Capability Building

workshop conducted (no.pax,)

Oriental Mdo. PENRO

e. Survey of existing mangrove areas

area surveyed and mapped (no.) Calapan City

Oriental Mdo. C-Calapan

3. Establishment of Marine Protected Areas/ Critical habitat/ Other Conservation Areas

LGUs provided with technical assistance in the establishment of marine sanctuaries/protected

Regional Total Palawan MSPLS

monitoring report on MPA sanctuaries established/managed submitted to BMB

Regional Office

2 1 1

1 1

1

1 1

(1) (1)

1

(1)

1 1

1 1

1

(3)

1 1 1

1 1 1

1

2

1 1

1 1

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO

ACCOMPLISHMENT 3rd

Variance

1st

2nd

3rd

4th

Total

1st

2nd

4th

Total

34

34 36 30

34

34

136 36 30

34

34 36 50

68 36 50

2

3 3 1 1 1

1

2

2

1 1

1 1

1

6 3 1 1 1 1 1 1

7

8

2

2

7 1 1 1 1 1 1

1 7 1 1 1 1 1 1

1 1

1 1

1

1

MAJOR FINAL OUTPUT 3 Ecosystem Regulation Services Enforcement of Laws, Rules and Regulations A.03.g.1 Permit Issuance and Monitoring of Forest and Forest Resource Use 1. Forest Products and Utilizatiion and Land Use Regulation 1.c CSC Assessment

CSC assessed with categorical recommendation (no.)

Regional Office Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

Forest communities involved in forest protection (no.)

Regional Total Oriental Mdo. C-Calapan C-Socorro C-Roxas Marinduque Romblon Palawan

2. Forest Protection Program Menu 3. Active collaboration and involvement of forest communities and other stakeholder's in forest protection and law enforcement undertakings 3.1 Involve forest communities including Indigenous Cultural Communities/ Indigenous Peoples (ICCs/IP's) in forest protection efforts either as bantay gubat or forest protection officers

3.2 Activate/revitalize Multi-Sectoral Forest Protection Committees (MFPCs) individuals and / or group volunteers in the localities and deputize them

MFPCs activated/revitalized (no.) Forest area protected (ha.) (8,636.84 ha.) (633,990.325 ha.)

1 1

Regional Total

1

Marinduque Palawan PPCity Roxas Taytay Narra Brooke's Pt. Quezon

1

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

2nd

3rd

Coron

ACCOMPLISHMENT 4th

Total

1st

2nd

1

1

3 3

4 4

4 4

1

3rd

Variance 4th

Total

Menu 5. Sustained a well planned Information, Education and Communication (IEC) campaign region-wide down to CENRO level 5.1 IEC Campaign CENRO level meetings, consultations, orientations, seminars, symposium

IEC,meetings,consultations, orientations, seminars, symposium conducted (no. of meetings) (no. of pax)

Regional Total Palawan

1 1

1 1

1 1

identified, surveyed, mapped and monitored fire prone areas (no.) and (ha.) Forest area protected (ha.) (307,831.376 ha.)

Regional Total Occidental Mdo. C-Mamburao C-Sablayan C-San Jose

6 3 1 1 1

6 3 1 1 1

6 3 1 1 1

6 3 1 1 1

6 3 1 1 1

(192,163.634 ha.)

Oriental Mindoro C-Socorro C-Roxas

2 1 1

2 1 1

2 1 1

2 1 1

2 1 1

(15,628.609 ha.)

Romblon

1

1

1

1

1

Forest Protection Officers hired (no.)

Regional Total Regional Office Occidental Mindoro Oriental Mindoro Marinduque Romblon Palawan

30

94 4 16 29 8 7 30

103 4 18 31 10 8 32

103 4 18 31 10 8 32

8 8

Menu 7. Effective Forest Fire, Pest and Disease 7.1 Identification, survey, mapping and monitoring of fire prone areas

Hiring of Forest Protection Officers (COBF)

13 5 6 6

1

(5) (3) (1) (1) (1) (2) (1) (1)

1

1

(30) (13) (5) (6) (6)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO

ACCOMPLISHMENT

1st

2nd

3rd

4th

Total

1st

Prov'l. Total Regional Office

5 3

9 4

12 5

14 5

40 17

3

Prov'l. Total Occidental Mdo. Oriental Mdo. Marinduque Romblon Palawan

2

9 7 1

1

1 2

7 1 1 2 1 2

23 2 4 2 3 5

3

1

5 1 1

59 8 51 18

51 8 43 17

35 1 34 6

6 27

6 20

216 25 191 69 1 23 98

2nd

3rd

Variance 4th

Total

A.03.g.2 Permit Issuance and Monitoring of Land and Land Resource Use 1. Management of Foreshore Areas

2. Valuation / re-appraisal of Foreshore Leases, friar lands, patrimonial lands and other government assets and properties including the establishment and mainteance of corresponding database e.g. fees and other charges

3. Collection of Revenues

draft permits/lease contracts reviewed and endorsed to LMB (no.) and (ha.) application reviewed & endorsed to RO (no.); (ha.)

appraisal report reviewed and endorsed to LMB (no.) appraisal report reviewed and endorsed to region (no.)

Regional Total Regional Office Prov'l. Total Oriental Mdo. Marinduque Romblon Palawan

Revenues collected

Palawan

wildlife permits issued (no. of permits/type) Wildlife Farm and Collector's Permit (no.) GratuitousPermit (no.) Wildlife Export Certification (no.) Wildlife permits issued (no.)

Regional Office Regional Office Regional Office Marinduque

47 4 43 17 5 21

59 5 54 17 1 6 30

1

3

(11) (7) (4)

1

3 3 1

2

2

3

(1)

(3)

28

69 8 58 39

104 9 92 45

19

47

3 159

3 209 60

(2) (5) (1) (11) (4)

140,000

A.03.g.3 Issuance of Protected Areas Community-Based Resource Management Agreement and Monitoring of Protected Areas , Wildlife, Coastal and Marine Resources 1. Enforcement of PA, Wildlife and Cave Laws, Coastal and Marine Rules and Regulations

2 2 125 50

125 50

125 50

125 50

2 2 500 200

(2) 50 60

(41) (40)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

a. Regulation of wildlife collections and trade

Performance Indicators

TARGET

PENRO/CENRO

ACCOMPLISHMENT

1st

2nd

3rd

4th

Total

1st

2nd

3rd

Variance 4th

Total

wildlife permit holders monitored with compliance monitoring report submitted to BMB (no.)

Regional Total

16

16

16

16

64

6

6

(26)

Regional Office

1

1

1

1

4

1

1

(1)

monitoring report endorsed to RO (no.)

Marinduque

15

15

15

15

60

5

5

(25)

Regional Total Regional Office Marinduque

2 1 1

2 1 1

2 1 1

2 1 1

8 4 4

1

1

1

1

(3) (2) (1)

consultation meeting with WFP/WCP holders (no.)

b. Marine turtle monitoring and protection as reported

turtle tagged (no.) turtle rescued (no.) turtle tagged (no.) report submitted (no.) turtle tugged (no.)

Oriental Mdo

turtle tagged (no.) turtle rescued (no.) turtle tagged (no.) report submitted (no.) turtle tugged (no.)

Marinduque

as reported

turtle tagged (no.) turtle rescued (no.) turtle tagged (no.) report submitted (no.) turtle tugged (no.)

Palawan

as reported

Biodiversity-related cases reported and acted upon (no.)

Regional Total Or. Mindoro Marinduque Romblon Palawan C-Taytay C-Brooke's Point C-Quezon

3

6

9

4

1 as reported as reported

5

2

2

(2)

4 2 1 1

1

5 2 1 2

2 2

2 2

(2)

1

(1) (1)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st

Deputation/Renewal of Wildlife Enforcement Officers (no.)

2. Issuance of Tenurial Instruments within Protected Areas

Regional Office

Apprehension/surveillance conducted with report submitted to BMB (no.)

Regional Office

PACBRMA/SAPA applications endorsed to BMB name/no. of PA beneficiaries No. of PACBRMA per PA

Regional Office

No. of Resolution approved and adopted (meeting conducted & support to anti- illegal logging ) operations

Prov'l. Total Occidental Mdo. C- Mamburao C-Sablayan C-San Jose Oriental Mdo. C-Calapan C-Socorro C-Roxas Marinduque Romblon Palawan PENRO C-PPCity C-Roxas C-Taytay C-Narra C-Brooke's Point C-Quezon C-Coron

ACCOMPLISHMENT

3rd

4th

Total

1st

1

1

1

3

1

1

1

1

1

1

1

2nd

3rd

Variance

2nd

4th

Total

1

A.03.g.4 Operations Against Illegal Environment and Natural Resources Activities 1. Implementation of Forest Protection Plan a. Implementation of Multi-sectoral resolutions in Forest Protection

Forest Protection group or individual created

Romblon Palawan C-PPCity

24 11 6 1 4 3 1 1 1 1 1 8 1 1 1 1 1 1 1 1

24 11 6 1 4 3 1 1 1 1 1 8 1 1 1 1 1 1 1 1

24 11 6 1 4 3 1 1 1 1 1 8 1 1 1 1 1 1 1 1

24 11 6 1 4 3 1 1 1 1 1 8 1 1 1 1 1 1 1 1

96 44 24 4 16 12 4 4 4 4 4 32 4 4 4 4 4 4 4 4

1 7 1

2

3

6 7 1

20 9 8 1 3 1 1 1 1

15 12 9 2 1 3 1 1 1

35 21 17 3 1 6 2 2 2 1

7 2 1 1 1

7 2 1 1 1

1

1

1

1 6 7 1

6 7 1

(13) (1)

(7)

(1) (2) (9) (1) (1) (1) (2) (1) (2) (1)

Remarks

BAR Form No. 1 QUARTERLY PHYSICAL REPORT OF OPERATION As of Second Quarter CY 2015 Department: Environment and Natural Resources Agency: Region IV- B MIMAROPA Operating Unit: Organization Code (UACS): PHYSICAL PERFORMANCE Code

Program/Project/ Activity (PPA)

Performance Indicators

TARGET

PENRO/CENRO 1st C-Roxas C-Taytay C-Narra C-Brooke's Point C-Quezon C-Coron

b . Strengthening of Multi-Sectoral Participation in Forest Protection Program (IEC)

Prepared by: Marilyn R. Limpiada Chief, Planning and Mangement Division

2nd

3rd

ACCOMPLISHMENT 4th

1 1 1 1 1 1

Total 1 1 1 1 1 1

Inventory of apprehended/ confiscated/ forfeited Forest Products, conveyance, tools, equipment and other implements being used illegally report (no.)

Regional Office

3

Meeting of Regional Anti-Illegal Logging Task Force (RAILTF) and Regional Multi- Sectoral Forest Protection Committee (RMFPC) meeting report (no.)

Regional Office

1

2

In coordination with: Ruby C. Bautista Chief, Finance Division

1st

2nd

3rd

Variance 4th

1 1 1 1 1

Total 1 1 1 1 1 (1)

5

1

Approved by: Oscar C. Dominguez Regional Director

Remarks

2nd qtr 2015 BAR No1.pdf

P- Occ. Mindoro 1 1 1 1. updating of existing plans P- Or. ... Oriental Mdo. 1 1 1 3 1 1. Marinduque 1 1 2 1 .... C-Calapan 3 3 3 3 3 3 3 3. C-Socorro 3 3 3 3 3 3 3 3.

190KB Sizes 2 Downloads 197 Views

Recommend Documents

Region 5 2nd Qtr 2015 Accomp.pdf
1,200 122 507 153.35 528.6020 30% 44%. Sorsogon 420 36 170 88 201 48%. (ha.) 420 36 170 300.2000 71%. applications processed. and forwarded to PENRO. (no./has) Total 3,600 333 1,440 455 1,560 32% 43%. 4,100 387.0000 1,634.0000 411.2653 2,002.3810 25%

04 2nd qtr profit loss.pdf
Page 1 of 1. Account Programs Administrative Fundraising Total YTD. Income (includes FY2011 receivables). A1 Contributions 124300 5820 0 130120. A3 Program Services - Earned Income 92189 3075 0 95264. Interest Income 0 0 0 0. 22 Cash Assets (carry-ov

2015 3rd Qtr. (income).pdf
1 2 3 4 5 6 7 8=(4+5+6+7) 9 10 11=(9+10) 12=(8-3) 13=(12/3) 14 ... Remarks. VARIANCE. Remittance to. BTR. Deposited with. AGDB. Total Amount %.

Watch Bar Kamikaze Gomakashi doraibu (2015) Full Movie Online ...
Watch Bar Kamikaze Gomakashi doraibu (2015) Full Movie Online Free.MP4.pdf. Watch Bar Kamikaze Gomakashi doraibu (2015) Full Movie Online Free.MP4.

2017 3rd Qtr RES.pdf
Page 1 of 14. CAR Regional Economic Situationer | 1. Third Quarter 2017. Cordillera Administrative Region. ASSESSMENT OF LEADING ECONOMIC. INDICATORS. Leading economic indicators showed a mix picture of. the regional economy for the quarter. Compared

Rly Qtr Aplication.pdf
Camotes Sea, on the west by the Bohol Strait, and on the. south by the Mindanao Sea. Capital Tagbilaran City. Land Area ... Cost of Doing Business. LABOR RATES: Tagbilaran City Municipalities. Non-Agri ... MESSENGERIAL (DHL) US Japan Middle East Fran

Serai qtr EBook.pdf
NED University of Engineering and Technology. A Research Project Sponsored by the Ministry of Culture, Government of Sindh. © Department of Architecture ...

11ARTS Gr10 TG - Qtr 4 (10 Apr 2015).pdf
Loading… Page 1. Whoops! There was a problem loading more pages. Retrying... 11ARTS Gr10 TG - Qtr 4 (10 Apr 2015).pdf. 11ARTS Gr10 TG - Qtr 4 (10 Apr 2015).pdf. Open. Extract. Open with. Sign In. Main menu. Displaying 11ARTS Gr10 TG - Qtr 4 (10 Apr

NTP - Procurement of Office Supplies 1st Qtr 2015.pdf
There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. NTP - Procurement of Office Supplies 1st Qtr 201

Grace Bar - Bar Menu.pdf
Page 1. Whoops! There was a problem loading more pages. Retrying... Grace Bar - Bar Menu.pdf. Grace Bar - Bar Menu.pdf. Open. Extract. Open with. Sign In.

4MUSIC Gr10 TG - Qtr 1 (10 April 2015).pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... 4MUSIC Gr10 ... il 2015).pdf. 4MUSIC Gr10 T ... ril 2015).pdf. Open.

Invitation to Bid - Procurement of Cleaning Materials 1st Qtr 2015.pdf ...
Page 3 of 3. Invitation to Bid - Procurement of Cleaning Materials 1st Qtr 2015.pdf. Invitation to Bid - Procurement of Cleaning Materials 1st Qtr 2015.pdf. Open.

Report 2015-2nd edition.pdf
Sign in. Page. 1. /. 60. Loading… Page 1 of 60. Annual Report. Page 1 of 60. Page 2 of 60. 03. Introduction. Contents. 40. Special. Events. 18. Medical. Missions. 48. Huda Al Masri. Pediatric Cancer. Dept. 10. Treatment Abroad. Cases. 44. Budget fo

2nd AIBBC 2015 PROGRAM.pdf
(Purdue University, USA) KN7 The complexity of advanced Cell Analysis ... 19:00 END OF ALL CONFERENCE ACTIVITIES AIRPORT TRANSFERS. Friday ...

Results Jan 2nd 2015.pdf
24 KIVEN KOSHY THUNDER IHCC 8 52.73. 26 ABRAR AL AZMI ... 5 ABDULAZIZ AL AJEEL WICHITA KRC 0 61.71. 6 DALIA AL ... Results Jan 2nd 2015.pdf.

10ARTS Gr10 TG - Qtr 3 (10 Apr 2015).pdf
For 'What to Process' activity: Any device available to the. students that can take photographs (digital camera, mobile. phone, android phone, tablet, etc.).

11ARTS Gr10 TG - Qtr 4 (10 Apr 2015).pdf
11ARTS Gr10 TG - Qtr 4 (10 Apr 2015).pdf. 11ARTS Gr10 TG - Qtr 4 (10 Apr 2015).pdf. Open. Extract. Open with. Sign In. Main menu.Missing:

6MUSIC Gr10 TG - Qtr 3 (10 April 2015).pdf
Have them watch the following video clips on YouTube: a. Larawan and Mayon Fantasy by Francisco Buencamino performed. by Cecille Licad, international ...

4MUSIC Gr10 TG - Qtr 1 (10 April 2015).pdf
4MUSIC Gr10 TG - Qtr 1 (10 April 2015).pdf. 4MUSIC Gr10 TG - Qtr 1 (10 April 2015).pdf. Open. Extract. Open with. Sign In. Main menu.

Quarterly Report of Operation 1st Qtr 2017.pdf
o. 3. Page 1 of 1. Quarterly Report of Operation 1st Qtr 2017.pdf. Quarterly Report of Operation 1st Qtr 2017.pdf. Open. Extract. Open with. Sign In. Main menu.

7MUSIC Gr10 TG - Qtr 4 (10 April 2015).pdf
Page 1 of 28. DEPED COPY. Quarter IV: 20th and 21st Century Multimedia Forms. 61. Quarter IV. 20TH AND 21ST CENTURY. MULTIMEDIA FORMS. CONTENT STANDARDS. The learner demonstrates understand of... 1. Characteristic features of 20th and 21st century op

NOA - Procurement of Office Supplies 1st Qtr 2015.pdf
There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. NOA - Procurement of Office Supplies 1st Qtr 201

NTP - Procurement of Electrical Supplies 1st Qtr 2015.pdf
There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. NTP - Procurement of Electrical Supplies 1st Qtr

Bar Complaint.pdf
Page 3 of 928. Page 3 of 928. Bar Complaint.pdf. Bar Complaint.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Bar Complaint.pdf. Page 1 of 928.