AHEAD Multiprimer Floor Advanced water based primer For sealing of porous concrete and for sealing of the ZEBRA anode

Description AHEAD Multiprimer Floor is a primer, based on a mild, water-based epoxy resin with high penetration into concrete and other mineralic substrates. AHEAD Multiprimer Floor is used as a primer for AHEAD Levelling Layer and AHEAD Ax/ECH. AHEAD Multiprimer Floor ensures good adhesion between the individual layers and does not implicate the cathodic protection processes. AHEAD Multiprimer Floor is permeable to water vapor. Areas of application Water-based, low on emissions (VOC), 2-component primer for adhesion promotion on ZEBRA Conductive paint for subsequent AHEAD Levelling Layer or AHEAD Ax/ECH application. For floor slabs in combination with quartz sand broadcasting (necessary). Preparation Concrete The substrate, coated with the ZEBRA Conductive paint must be dry and free from adhesion inhibiting substances. The sheet resistance of ZEBRA Conductive paint may not be higher, than 50 Ohm / sqm. Tensile strength of the prepared concrete substrate from 1.5 N / mm​2​ in middle must be demonstrated. Mixing ratio Stir component A and component B slowly. With a slow running mixer, both components at 300 rpm, mix for about 3 minutes slow. Then re-pott into a clean container and mix again. The temperature must not fall below 15​ ​o​C when mixing. Processing time At +10°C: approx. 60 min At +20°C: approx. 45 min At +30°C: approx. 30 min Application AHEAD Multiprimer Floor can be rolled or sprayed on surface. AHEAD Multiprimer Floor is processed with a consumption of 0.3 - 0.5 l / sqm. Consumption depending on ground conditions. The ZEBRA anode shall be at least 2-3 days old, (dependent of on-site temperature and environment), dry, clean and ​checked for adhesive tensile strength. The electrical conductivity of the ZEBRA Conductive Paint must be proved in accordance with the specifications. The whole surface must be primed with AHEAD Multiprimer Floor. In fresh condition, AHEAD Multiprimer Floor must be broadcasted with quartz sand 0.2 - 0.5mm in excess. It is important to ensure that no smooth, non-sanded areas remains! On the following day, the non-bonded quartz sand, must be removed!

Rev 1 - Aug 2015 Page 1 of 2

Pot life Curing Over-coatable as primer with water-based EP resins At 10°C: approx. 16 h At 20°C: approx. 4 h At 30°C: approx. 2 h Cleaning and storage AHEAD Multiprimer is waterbased. Clean with water in wet condition, do not leave to dry. The container must be stored in a frost free environment, avoid direct sunlight. Technical data Tensile strenght ​after 28 days​ ​> 2.0 MP.a Viscosity ​800 - 1,200 mPa.s Approx. consumption ​0.30 - 0.50 kg/m2 Base ​Water based, epoxy resin emulsion Colour​ Light Blue Density​ 1.48 - 1,52 g/cm​3 Min. working temp.​ 8 °C Max. working temp. ​ 25 °C Packing size Component A 10 kg Component​ ​B 2 kg

Rev 1 - Aug 2015 Page 2 of 2

AHEAD Multiprimer Floor

Description. AHEAD Multiprimer Floor is a primer, based on a mild, water-based epoxy resin with high penetration into concrete and other mineralic substrates.

219KB Sizes 0 Downloads 267 Views

Recommend Documents

AHEAD Multiprimer Floor
Areas of application. Water-based, low on emissions (VOC), 2-component primer for adhesion promotion on ZEBRA. Conductive paint for subsequent AHEAD Levelling Layer or AHEAD Ax/ECH application. For floor slabs in combination with quartz sand ... Clea

ahead multiprimer floor
Carbon dioxide permeability sd >50 m. EN 1504-2:2004. Crack bridging ability. NPD. EN 1504-2:2004. The performance of the product conforms with the declared performance. This declaration of performance is issued under the sole responsibility of the m

AHEAD Multiprimer
AHEAD Multiprimer is mainly for use on soffits and walls, concrete subbases without rolling cargoes. Preparations. Concrete. The concrete subbase to be treated ...

FLOOR MAP.pdf
T05 E01 E06 E12 E17 C13 E24 G10 G29 G34 S05 T02. T06 E02 E07 E13 E19 C12 G01 ... FLOOR MAP.pdf. FLOOR MAP.pdf. Open. Extract. Open with. Sign In.

Floor plans.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Floor plans.pdf.

CAGE VS FLOOR MANAGEMENT
More pullets may be housed in a given house ... Stand-by generators & alarm systems a ... and a minimum of 10 lux (0.93fc) maintained throughout the house ...

FLOOR MAP.pdf
FLOOR MAP.pdf. FLOOR MAP.pdf. Open. Extract. Open with. Sign In. Details. Comments. General Info. Type. Dimensions. Size. Duration. Location. Modified.

Vail floor plan.pdf
Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Vail floor plan.pdf. Vail floor plan.pdf. Open. Extract. Open with.

Hayworth floor plan.pdf
Page 1 of 3. FIRST FLOOR PLAN. FOYER. PORCH. WH. COATS. PANTRY. STUDY OPT. BEDROOM 5. DINING. COVERED. PATIO. KITCHEN. NOOK.

Kaibab floor plan.pdf
TWO-CAR. GARAGE. ONE-CAR. GARAGE. OPT. DOOR. Innovation Park at Eastmark: Kaibab. 877-Ask-Meritage (275.6374) | meritagehomes.com | 9735 E.

run ahead of God
learn that when we try to help or hurry God, we can make a mess of things. ..... or call USA 1-800-772-8888 • AUSTRALIA +61 3 9762 6613 • CANADA ...

run ahead of God
Open your Bible and read Genesis 16 to get the flow of the story. If you wish, .... plan and the highbrow society ladies would have nodded in support, God disapproved. .... or call USA 1-800-772-8888 • AUSTRALIA +61 3 9762 6613 • CANADA ...

AHEAD EC Levelling Layer
AHEAD EC Levelling Layer will, when applied on Zebra Anode, act as an alkaline ... 2-3 hours. No. of coats required on ZEBRA normally one coat at 1 mm ...

24th Floor plan.pdf
24th Floor plan.pdf. 24th Floor plan.pdf. Open. Extract. Open with. Sign In. Details. Comments. General Info. Type. Dimensions. Size. Duration. Location.

Sierra floor plan.pdf
Page 1 of 3. FLOOR PLAN. FOYER. PORCH. WH. OPT. MULTI-SLIDE DOOR. OPT. MULTI-SLIDE DOOR. AT COVERED PATIO EXTENSION 3 OPT. DOOR.

Aster floor plan.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Aster floor plan.

floor mat specifications
goods or services provided to the Town, will be made within 30 days of the receipt of a proper billing or the ..... Are manufacturing employees free to speak up about working conditions without fear of reprisals? ... Customer Svc: 207-797-4006.

Arapaho floor plan.pdf
Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more ...

wall & floor tilling.pdf
Page 1 of 1. Page 1 of 1. wall & floor tilling.pdf. wall & floor tilling.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying wall & floor tilling.pdf.

ground floor plan -
LOCKER. ROOM. 5'71. 2"x6'41. 2". D1. D. STORE-1. 5'-6"X17'1. 1. 2. " OFFICE. 28'-0"X23'-1. 1. 2. " D1. HALL. 59'6"X29'. PASSAGE 31'3"X4'9" WIDE. DINING.

323 floor plan.pdf
Loading… Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 323 floor plan.pdf. 323 floor plan.pdf. O

Lakeside Floor Plans.pdf
dw. w. d. wic. entry. balcony. bedroom. 9 '11" × 9'3". kitchen / living / dining. 1 6'0" × 9'9". bath. Whoops! There was a problem loading this page. Retrying.

325 floor plan.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 325 floor plan.