Commissioning status of the Virgo interferometer

Bas Swinkels European Gravitational Observatory

on behalf of the Virgo collaboration B. Swinkels – Virgo commissioning status –8, Amaldi Amaldi June82009,

1 Columbia University

Commissioning timeline ●

May '07 - Sep '07

First Virgo Science Run (VSR1)



Oct '07 - May '08

Commissioning



Scattered light mitigation: replaced brewster window by cryotrap



TCS installation, mirror magnets strength reduction



9 May '08

Vacuum viewport failure



May - Oct '08

Virgo+ shutdown





Injection system, infrastructure and electronics upgrade



NE payload recovery, replacement of all viewports

Oct '08 - now

Commissioning



Remaining electronics upgrade



Commissioning with more input power and TCS



Baffle problems



7 Jul '09

Start Second Virgo Science Run (VSR2)



2010

Monolithic suspension upgrade? B. Swinkels – Virgo commissioning status – Amaldi 8

This talk

2

Incident recovery



Caused by weak design of view-port, identified and tested safer model



Replaced about 90 view-ports throughout whole interferometer



Cleaned and tested North-End tower



New payload at North-End: coating of already polished spare mirror B. Swinkels – Virgo commissioning status – Amaldi 8

3

Interferometer restart



Interferometer no longer showed bi-stability during lock acquisition



Different working point: modulation frequency changed by 700 Hz



Maybe caused by slightly different radius of curvature of new mirror B. Swinkels – Virgo commissioning status – Amaldi 8

4

Virgo+ upgrade: injection system ●

New laser amplifier: up to 60 W (25 W at interferometer input)



New pre-mode-cleaner



Remotely tunable in-vacuum Faraday Isolator



Heavier input-mode-cleaner end-mirror



See poster by E. Genin

B. Swinkels – Virgo commissioning status – Amaldi 8

5

Virgo+ upgrade: electronics



Replaced real-time fiber links: more flexible signal routing



Replaced old RIOs by real-time PC: much more computing power



New ADCs: from 16 to 18 bit



New quadrants read-out electronics for alignment B. Swinkels – Virgo commissioning status – Amaldi 8

6

Virgo+ upgrade: infrastructure ●

Replaced complete wiring of main power and grounding in central building



Replaced and doubled UPS



Replaced 15 kV transformer



New hot water pipes



Lowered speed of airconditioning

B. Swinkels – Virgo commissioning status – Amaldi 8

7

Thermal Compensation System





Annulus and central spot from CO2 laser on both input mirrors Essential for compensating thermal lensing in input mirrors when working with high input powers



Not yet stabilized in amplitude, some evidence for introduced noise



See poster by A. Rocchi B. Swinkels – Virgo commissioning status – Amaldi 8

8

Phase camera field amplitude

phase between fields



Beam scanned on pinhole detector, signal demodulated to separate carrier and sidebands



Located on dark fringe before output-mode-cleaner (B1p)



Extensively used, but more as 'amplitude camera'





TCS fine alignment, 'cold interferometer' experiments



Mirror cool-down experiments to measure coating absorption

See presentation by R. Day on Thursday B. Swinkels – Virgo commissioning status – Amaldi 8

9

High power operation ●

Power increased in steps from 8 W (VSR1) to 17 W now –

limited by mismatching of reference cavity due to thermal effects



No major problems with interferometer stability



Some alignments loops more critical



Quadrature signals (B1_ACq or B5_ACq) kept close to zero using slow servos on TCS power



Currently about 1.5 W on both mirrors: interferometer similar to 8W



'Cold interferometer' with about 2x 6W –

More optical gain, ideal frequency stabilization TF, but TCS too noisy

without TCS B. Swinkels – Virgo commissioning status – Amaldi 8

with TCS 10

Scattering from baffles (1)



Sensitivity was spoiled up to 400 Hz after vacuum intervention



Caused by scattering from suspended baffle, already installed year ago



Probably moved by a few mm during vacuum intervention B. Swinkels – Virgo commissioning status – Amaldi 8

11

Scattering from baffles (2)



Several failed vacuum interventions to fix problem



Root cause: reflection of uncoated output window



Problem finally solved by absorbing glass on suspended bench B. Swinkels – Virgo commissioning status – Amaldi 8

12

Noise budget ●





Low frequency –

Some environmental



Some scattering



Laser bench resonances



Actuator noise



No control noise!

Medium frequency –

Coating thermal noise



Detection bench resonances



TCS radiation pressure?

High frequency –

B. Swinkels – Virgo commissioning status – Amaldi 8

Shot noise

13

Sensitivity

May 2007: ~3 Mpc May 2009: ~8 Mpc

B. Swinkels – Virgo commissioning status – Amaldi 8

14

Future work ●





Before the run –

Damp external bench resonance (sorbothane)



TCS power stabilization?



Bellow between turbo pump and tower



New phase-camera on B5 beam (beam-splitter pick-off)?



Noise hunting

During the run (commissioning breaks) –

Replace detection output window, with AR coating?



More noise hunting



Stabilization of 'etalon effect'

Long term –

Monolithically suspended mirrors, finesse 50 -> 150

B. Swinkels – Virgo commissioning status – Amaldi 8

15

Concluding ●



Robust interferometer –

81 hour lock during Easter



WSR13/E14: 95% duty cycle

Stable horizon: 8-8.5 Mpc –

fluctuating with input mirror etalon effect



Low glitch rate: factor 10 lower than VSR1



Almost ready to start VSR2



Preparing for installation of monolithic suspensions

B. Swinkels – Virgo commissioning status – Amaldi 8

16

End

B. Swinkels – Virgo commissioning status – Amaldi 8

17

Commissioning status of the Virgo interferometer

Jul 7, 2009 - Concluding. ○. Robust interferometer. – 81 hour lock during Easter. – WSR13/E14: 95% duty cycle. ○. Stable horizon: 8-8.5 Mpc. – fluctuating with input mirror etalon effect. ○. Low glitch rate: factor 10 lower than VSR1. ○. Almost ready to start VSR2. ○. Preparing for installation of monolithic suspensions ...

1MB Sizes 1 Downloads 158 Views

Recommend Documents

Evaluation of the Integrated Personal Commissioning Programme.pdf ...
Page 3 of 43. 3. INTRODUCTION. 1. The Department of Health (DH), in partnership with NHS England (NHSE), wishes to. commission a summative evaluation ...

Site Commissioning Guidelines.pdf
6) Permission: a. To take digital pictures and video ... 6) Fire Alarm Systems. 7) Door Access ... zones (including time clock tone, night/loud ring, emergency, etc.).

Site Commissioning Guidelines.pdf
The integrator and all responsible parties should have requested a list of network. requirements and any other information ... To take digital pictures and video. b. To connect an unrestricted laptop, ... If automatic volume controls are used verify

Radio interferometer calibratability and its limits - GitHub
BIG computer. 2". How. Close? Tobia Carozzi ..... where ∆V is thermal noise in data and ∆J is the imprecision in the Jones matrix. (These results are given in ...

Stroboscopic Imaging Interferometer for MEMS ... - IEEE Xplore
Here, we report a novel stroboscopic interferometer test system that measures nanometer-scale displacements of moving MEMS devices. By combining video ...

virgo laminates catalogue pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. virgo laminates ...

Phase switching in a voltage-biased Aharonov-Bohm interferometer
Apr 18, 2008 - the state, an electron can acquire phase 0 or π, additional to the other phases acquired when traversing the interferometer. This results in AB ...

Horóscopo Virgo- Junio 2015.pdf
Download. Connect more apps... Try one of the apps below to open or edit this item. Horóscopo Virgo- Junio 2015.pdf. Horóscopo Virgo- Junio 2015.pdf. Open.

Status of applicability of various trainings to the students - ICSI
Computer Training Seventy Hours. Not Applicable. Not Applicable. Student Induction. Programme (SIP). Seven days. (to be undergone after taking registration in.

Inalienable possession: the status of the definite article
RUNNING HEAD: Inalienable possession ... In order to meet the first challenge, we will work out an analysis of .... possessor DP outside the nominal domain.

Uploading the Complete list of admitted students and the status ...
Page 1 of 2. f. Phone : 25367030 .. 25367033, 25367035, 25367036. ~ :25367030,25367033,25367035,25367036. Telegrams : MEDCONCIND, New Delhi.

SCWR Status
Feb 28, 2013 - Evolutionary development from current water cooled reactors. • Cooled .... Technology development ongoing with a focus on GIF objectives of ...

Phase switching in a voltage-biased Aharonov-Bohm interferometer
Apr 18, 2008 - the state, an electron can acquire phase 0 or π, additional to the other phases acquired when traversing the interferometer. This results in AB ...