Injection system, infrastructure and electronics upgrade
–
NE payload recovery, replacement of all viewports
Oct '08 - now
Commissioning
–
Remaining electronics upgrade
–
Commissioning with more input power and TCS
–
Baffle problems
●
7 Jul '09
Start Second Virgo Science Run (VSR2)
●
2010
Monolithic suspension upgrade? B. Swinkels – Virgo commissioning status – Amaldi 8
This talk
2
Incident recovery
●
Caused by weak design of view-port, identified and tested safer model
●
Replaced about 90 view-ports throughout whole interferometer
●
Cleaned and tested North-End tower
●
New payload at North-End: coating of already polished spare mirror B. Swinkels – Virgo commissioning status – Amaldi 8
3
Interferometer restart
●
Interferometer no longer showed bi-stability during lock acquisition
●
Different working point: modulation frequency changed by 700 Hz
●
Maybe caused by slightly different radius of curvature of new mirror B. Swinkels – Virgo commissioning status – Amaldi 8
4
Virgo+ upgrade: injection system ●
New laser amplifier: up to 60 W (25 W at interferometer input)
●
New pre-mode-cleaner
●
Remotely tunable in-vacuum Faraday Isolator
●
Heavier input-mode-cleaner end-mirror
●
See poster by E. Genin
B. Swinkels – Virgo commissioning status – Amaldi 8
5
Virgo+ upgrade: electronics
●
Replaced real-time fiber links: more flexible signal routing
●
Replaced old RIOs by real-time PC: much more computing power
●
New ADCs: from 16 to 18 bit
●
New quadrants read-out electronics for alignment B. Swinkels – Virgo commissioning status – Amaldi 8
6
Virgo+ upgrade: infrastructure ●
Replaced complete wiring of main power and grounding in central building
●
Replaced and doubled UPS
●
Replaced 15 kV transformer
●
New hot water pipes
●
Lowered speed of airconditioning
B. Swinkels – Virgo commissioning status – Amaldi 8
7
Thermal Compensation System
●
●
Annulus and central spot from CO2 laser on both input mirrors Essential for compensating thermal lensing in input mirrors when working with high input powers
●
Not yet stabilized in amplitude, some evidence for introduced noise
●
See poster by A. Rocchi B. Swinkels – Virgo commissioning status – Amaldi 8
8
Phase camera field amplitude
phase between fields
●
Beam scanned on pinhole detector, signal demodulated to separate carrier and sidebands
●
Located on dark fringe before output-mode-cleaner (B1p)
●
Extensively used, but more as 'amplitude camera'
●
–
TCS fine alignment, 'cold interferometer' experiments
–
Mirror cool-down experiments to measure coating absorption
See presentation by R. Day on Thursday B. Swinkels – Virgo commissioning status – Amaldi 8
9
High power operation ●
Power increased in steps from 8 W (VSR1) to 17 W now –
limited by mismatching of reference cavity due to thermal effects
●
No major problems with interferometer stability
●
Some alignments loops more critical
●
Quadrature signals (B1_ACq or B5_ACq) kept close to zero using slow servos on TCS power
●
Currently about 1.5 W on both mirrors: interferometer similar to 8W
●
'Cold interferometer' with about 2x 6W –
More optical gain, ideal frequency stabilization TF, but TCS too noisy
without TCS B. Swinkels – Virgo commissioning status – Amaldi 8
with TCS 10
Scattering from baffles (1)
●
Sensitivity was spoiled up to 400 Hz after vacuum intervention
●
Caused by scattering from suspended baffle, already installed year ago
●
Probably moved by a few mm during vacuum intervention B. Swinkels – Virgo commissioning status – Amaldi 8
11
Scattering from baffles (2)
●
Several failed vacuum interventions to fix problem
●
Root cause: reflection of uncoated output window
●
Problem finally solved by absorbing glass on suspended bench B. Swinkels – Virgo commissioning status – Amaldi 8
12
Noise budget ●
●
●
Low frequency –
Some environmental
–
Some scattering
–
Laser bench resonances
–
Actuator noise
–
No control noise!
Medium frequency –
Coating thermal noise
–
Detection bench resonances
–
TCS radiation pressure?
High frequency –
B. Swinkels – Virgo commissioning status – Amaldi 8
Shot noise
13
Sensitivity
May 2007: ~3 Mpc May 2009: ~8 Mpc
B. Swinkels – Virgo commissioning status – Amaldi 8
14
Future work ●
●
●
Before the run –
Damp external bench resonance (sorbothane)
–
TCS power stabilization?
–
Bellow between turbo pump and tower
–
New phase-camera on B5 beam (beam-splitter pick-off)?
Page 3 of 43. 3. INTRODUCTION. 1. The Department of Health (DH), in partnership with NHS England (NHSE), wishes to. commission a summative evaluation ...
6) Permission: a. To take digital pictures and video ... 6) Fire Alarm Systems. 7) Door Access ... zones (including time clock tone, night/loud ring, emergency, etc.).
The integrator and all responsible parties should have requested a list of network. requirements and any other information ... To take digital pictures and video. b. To connect an unrestricted laptop, ... If automatic volume controls are used verify
BIG computer. 2". How. Close? Tobia Carozzi ..... where âV is thermal noise in data and âJ is the imprecision in the Jones matrix. (These results are given in ...
Here, we report a novel stroboscopic interferometer test system that measures nanometer-scale displacements of moving MEMS devices. By combining video ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. virgo laminates ...
Apr 18, 2008 - the state, an electron can acquire phase 0 or Ï, additional to the other phases acquired when traversing the interferometer. This results in AB ...
Download. Connect more apps... Try one of the apps below to open or edit this item. Horóscopo Virgo- Junio 2015.pdf. Horóscopo Virgo- Junio 2015.pdf. Open.
Computer Training Seventy Hours. Not Applicable. Not Applicable. Student Induction. Programme (SIP). Seven days. (to be undergone after taking registration in.
RUNNING HEAD: Inalienable possession ... In order to meet the first challenge, we will work out an analysis of .... possessor DP outside the nominal domain.
Feb 28, 2013 - Evolutionary development from current water cooled reactors. ⢠Cooled .... Technology development ongoing with a focus on GIF objectives of ...
Apr 18, 2008 - the state, an electron can acquire phase 0 or Ï, additional to the other phases acquired when traversing the interferometer. This results in AB ...