UPCOMING IMPACT NOTICE FOR IMMEDIATE DISTRIBUTION
* * Please distribute to the affected department personnel * *
Location (BUILDING OR AREA): Karl Miller Center (KMC) Duration of Impact: 3/16 Project Information: Describe Project:
Skanska will be installing a 1/8" joint at the wood landings between the concrete floor and the steel stairs. This will occur at the bottom landing of stair 2-3, top landing of stair 3-4, and top and bottom landing of stair 4-5.
Project Benefits:
Installation of the joints will repair landings that bridge from the concrete slab to the steel stairs.
Project Impacts:
(Impact Coordinators are encouraged to attach explanatory sketches and/or project schedules)
Describe Impacts:
On March 16th, Skanska will be closing down the atrium stairs to complete the work described above. Skanska will close down a single set of stairs at a time. Access to all floors will still be available from the Elevators or the North Renovation, South Renovation and Pavilion Stairwells. This work will create minimal noise. The work area will be taped off and there will be signage directing access to the elevators and stairwells. Accessibility Impacts:
Atrium stairs will be closed. Access to all floors will remain available from the elevators and other stairwells. For coordination or clarification prior to project: Name:
Phone:
Email
Mark Fujii
5.4968
[email protected]
If coordinator(s) unavailable please contact: Emergencies call Campus Public Safety:
503-725-3738 503-725-4407