Estimation of the Total Cost of Bridge Construction In Accelerated Bridge Construction Selection Decisions Author Jianmin Jia, Ph.D. Candidate Mohamed Ibramim, Ph.D. Candidate Mohammed Hadi, Ph.D., P.E. Wallied Orabi, Ph.D., P.E. Ali Mostafavi, Ph.D., P.E. Yan Xiao, Ph.D., P.E. Florida International University January 2016
• Road User Costs Important aspect of the decision process
Source: FHWA, 2011
Framework
Construction Costs A total of 65 projects were collected form 29 states. • • • •
Bridge location Bridge type AADT No. of spans
Construction Costs Bridge Location 26 39 Urban
# of Projects
Bridge Types
Rural
15 50
# of Projects
ADT
# of Projects 25 20 15 10 5 0
Concrete
Steel
# of Projects 35 30 25 20 15 10 5 0 1
# of Spans
2
3
4
5
06-10
Mobility • Mobility assessment mainly includes travel delay, speed, travel time and queue. • Could be assessed using sketch planning tools, HCM facility procedures, simulation, and/or assignment (SHRP 2 R11); depending on analysis level 𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀 = 𝑉𝑉𝑉𝑉𝑉𝑉 ∗ 𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇 ∗ 𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉𝑉
Reliability • Reliability is a measure of how consistent or predictable travel times are over time. • Could be assessed based on sketch level (SHRP 2 L03) or more detailed simulation-based DTA (SHRP 2 L04) 𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅 = 𝑉𝑉𝑉𝑉𝑉𝑉 ∗ 𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵
Case Study I-4/Graves Avenue, Orlando Work zone with 3 lanes Detour route with 2 lanes AADT:67,000 vehicles per day Rural area close to Orlando, FL
Lane Closure Alternatives ABC Method Requires I-4 to close one outside lane from 21:00 to 24:00 for only 4 nights detour; 8- month closure for Graves Avenue.
Conventional Method I –Hypothetical Alternative Requires I-4 to close two outside lanes from 21:00 to 24:00 for 48 nights; 12- month closure for Graves Avenue.
Conventional Method II – Actual Alternative Requires I-4 to close all the lanes from 21:00 to 24:00 for 32 nights; 12- month closure for Graves Avenue.
Results
Results
Construction
+
Mobility
Total Costs Construction
Conclusion • Mobility, reliability, safety and emission costs are important to incorporate in estimation ABC costs. • ABC method can have a higher construction cost than conventional methods but become more cost effective when considering user cost. • Further and more detailed analysis of ABC construction costs, indirect costs and agency costs is currently being conducted.
utilizes the Analytical Hierarchy Process (AHP) to help make decisions between. accelerated and conventional bridge construction methods. The study developed a. comprehensive list of criteria for use in these decisions. However, the assessments of. t
Date: 1/18/2009. Estimate #. 08-54. Town of Underhill. Chris Murphy, Sherri Morin. 12 Pleasant Valley Rd. Underhill, VT 05490. Prices valid for 30 days. Ashton Thermal, LLC | 1463 Taylor Road East Fairfield, Vermont 05448 | 802-849-2908 | www.ashtont
Name & Address of the Hospital: 2. Name of Patient : 3. Address : (as per hospital records) ... Age: 5. Name of Father/Mother/Husband: 6. Registration No.
Kenmore home appliance service Scottsdale, AZ. Page 3 of 5. Estimate For Appliance Repair Scottsdale.pdf. Estimate For Appliance Repair Scottsdale.pdf.
paquidermática de Malassezia. Figura 4. Vista otoscópica de mudanças hiperplásticas. iniciais dentro do canal auditivo externo. Whoops! There was a problem loading this page. Retrying... ABC Calendar.pdf. ABC Calendar.pdf. Open. Extract. Open wit
Download. Connect more apps... Try one of the apps below to open or edit this item. ABC information.pdf. ABC information.pdf. Open. Extract. Open with. Sign In.
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. ABC book.pdf.
Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. ABC Countdown PDF.pdf. ABC Countdown PDF
Page 2 of 22. Introduzindo... A está para Atitude; sem esta, não há como querer,. poder, ousar, nem saber calar... B, para Belta(i)ne, um dos mais importantes ...
David R. Musser/Gillmer J. Derge/Atul Saini, STL Tutorial and Reference Guide, Second Edition: Page 14 ... offer guidance on network programming for beginners as well as professionals, for those developing new ... Presenting this material in a Unix-o
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 02 ABC dBase.