Plymouth Regional High School Career and Technical Center Renovations Plymouth Regional High School seeks your vote at town meeting in March of 2017, to approve the 75% State of New Hampshire Funded renovations to the School’s Career and Technical Center. Built in 1982, the Center has not been renovated or expanded in more than 30 years and yet must handle the critically important task of providing educational opportunities for students to explore and develop the skills required to succeed in a rapidly changing modern work force. In support of this mission, the Center provides opportunities and guidance for students to excel through secondary education, apprenticeships and jobs. With your support, the proposed renovations will reshape, revitalize and provide an exceptional learning environment for a new generation of students over the next 30 years. Career and Technical Center Programs Include: Automotive Technology, Health Science Technology, Digital Media, Culinary Arts, Marketing Education and Drafting Technology PRHS Renovations Include: • Special Education* • Art and Media Lab* • Administration and Facilities* *Renovations to these facilities provides greater student safety, access to specialized education and accommodates CTC renovations

Key Project Elements: • 75% State Funded • Classroom and Lab integration • New state-of-the-art digital medial classroom with recording studio • Expanded automotive facilities with attached classroom • Six (6) automotive lifts with exhaust ventilation system • Integrated drafting and technology classroom • Student work and collaboration space within each program • Daylighting in health science classroom • New energy efficient CTC exterior walls – eliminating 30-year-old failed glass walls • Energy efficient and code compliant culinary kitchen • Strategically located administration offices to aid in building security and safety • New ventilation and lighting throughout entire CTC • Facility design for the next 30 years of career and technical education • Code compliant egress stairs and ADA restrooms Schedule: To limit classroom disruption, the design and construction team will work over the next year to plan and detail the building renovations. Construction will begin during Spring break 2018 and be completed in August 2018 for the fall school opening. The construction schedule has been designed to reduce the overall building schedule, reduce costly phased construction and overall disruptions. Design and Engineering: 9 Months (April 2017–December 2017) Construction: 5 months (April 2018–August 2018) Budget: The State of New Hampshire will Fund 75% of the Career and Technical Center Renovations. With limited education funding available, the State of New Hampshire offers Career and Technical Centers a one-time subsidy every 25–30 years to assure each of the 30 centers are offering a state-of-the-art education. One of the last of 30 centers throughout the entire State to take advantage of the state aid, SAU 48 will pay for only 25% of all CTC renovations. Included in the project, will be renovations to the Special Education Programs including an expanded classroom and specialty spaces to accommodate a growing need for Special Education services. State Funding: $5.3 million Local Contribution: $3.1 million Total Project Cost: $8.5 million

L

Lower Level Plan

REST

REST

A: 181 SF

A: 180 SF

A: 1425 SF

A: 1664 SF

A: 1691 SF

PREP

STORAGE

A: 242 SF

A: 238 SF

PREP ROOM A: 410 SF

BALANCE ROOM A: 154 SF

STORAGE A: 916 SF

DIGITAL MEDIA A: 1858 SF

ATHLETIC DIRECTOR

PHYSICS CLASSROOM A: 1485 SF

TOOL STORAGE A: 155 SF

A

A: 208 SF

AUTOMOTIVE LAB

ELECT. A: 87 SF

A: 3615 SF

TEAM ROOM A: 359 SF

STORAGE

SCIENCE CLASSROOM A: 867 SF

A: 1481 SF

A: 254 SF

A: 2611 SF

DIGITAL STUDIO

LOBBY

A: 625 SF

A: 2721 SF

CORRIDOR A: 1911 SF

GIRLS LOCKER

BOYS LOCKER

A: 1126 SF

A: 1076 SF

TRAINER A: 320 SF

A: 995 SF

STORAGE

STORAGE

A: 147 SF

A: 167 SF

PHYSICAL EDUCATION / WELLNESS A: 1798 SF

STORAGE

CLASSROOM A: 1420 SF

ELEV A: 46 SF

A: 936 SF

HEALTH OCCUPATIONS LAB

C

A: 71 SF

CORRIDOR

A: 140 SF

SCIENCE LAB

TOOL STORAGE

WOOD SHOP

D

CONTROL ROOM

A: 401 SF

B

UP

A: 191 SF

CORRIDOR

LOBBY A: 1958 SF

A: 322 SF

CORRIDOR

A: 307 SF

B A: 457 SF

EGRESS STAIR

DISH ROOM

A: 1465 SF

MECHANICAL

A: 1168 SF

28' - 0"

CHEM CLASSROOM

A

KITCHEN

VESTIBULE

C

CHEM CLASSROOM

A: 878 SF

A: 418 SF

A: 914 SF

BIO CLASSROOM

SERVING

A: 4219 SF

A: 278 SF

HEALTH OCCUPATIONS CLASSROOM

BIO CLASSROOM

CAFETERIA

STAIR - 2 A: 150 SF MECHANICAL UP

A: 561 SF

FACILITIES OFFICE A: 182 SF

A: 169 SF

STORAGE A: 135 SF

D

D E

BOILER A: 1008 SF

C

E

A

B

C

D

E

Automotive Auto Shop and Classroom

Digital Media Recording Studio, Classroom and Computer Lab

Health Occupations Simulation Lab and Classroom

Athletic Director Director Office and Equipment Storage

Facilities Director Office and Storage

F

First Floor Plan ART ROOM

ART ROOM

A: 1142 SF

A: 1135 SF

CHORUS ROOM

BAND ROOM

A

A: 1923 SF

A: 1210 SF

GYM STORAGE A: 383 SF

LOCKERS

VENT HOOD

A: 69 SF

THEATRE ARTS

CULINARY CLASSROOM

A: 1833 SF

W D

A: 1066 SF

MEDIA CENTER

LAUNDRY

B

COOK LINE

A: 74 SF

A: 4937 SF

DRY GOODS

GYMNASIUM

A: 42 SF

KITCHEN

OFFICE

A: 8631 SF

A: 49 SF

A: 1892 SF

LOBBY

STAGE A: 1604 SF

AUDITORIUM

A: 2836 SF

DRY GOODS A: 107 SF

A: 3826 SF

PRINT / COPY A: 208 SF

DINING ROOM

OFFICE

A

A: 1640 SF

A: 354 SF

STORAGE STORAGE

A: 134 SF

A: 103 SF

JANITOR A: 82 SF

RECEPTION A: 385 SF

CLASSROOM A: 749 SF

STAIR A: 366 SF

CLASSROOM

CLASSROOM

A: 736 SF

A: 743 SF

GUIDANCE RECEPTION A: 356 SF

OFFICE

VESTIBULE

RECEPTION

A: 520 SF

A: 806 SF

MARKETING CLASSROOM NURSE

A: 1475 SF

UP

A: 409 SF MARKETING STORE

A: 290 SF

A: 395 SF

A

B

Culinary Classroom, Kitchen and Dining Room

Marketing Classroom, Lab and School Store

B

SE

Second Floor Plan

A ELEVATOR A: 44 SF

B.

RESOURCE

RESOURCE A: 233 SF

A: 243 SF

SMALL GROUP

STAIR - 3

A: 87 SF

A: 254 SF

CLASSROOM A: 1030 SF RESTROOM A: 48 SF

BOILER

BATHROOM A: 63 SF RESTROOM

REF

A: 674 SF

A: 50 SF

OPEN TO BELOW

OPEN TO BELOW

PRINT / COPY

REF

A: 99 SF

RESTROOM

LIFE SKILLS A: 215 SF

A: 77 SF

OFFICE A: 176 SF

AUDITORIUM A: 5339 SF

SPECIAL EDUCATION OFFICE

LOBBY

CONFERENCE

A: 256 SF

A

C.

A: 238 SF

A: 2405 SF

C

CORRIDOR

MECHANICAL ROOM

SMALL GROUP

CORRIDOR

ELEV

A: 596 SF

JANITOR

JAN A: 109 SF

CLASSROOM

CLASSROOM

A: 681 SF

A: 744 SF

REST A: 136 SF

STORAGE

STAIR - 1 A: 638 SF

CLASSROOM A: 704 SF

A: 142 SF

A: 1015 SF

A: 196 SF

A: 388 SF

A: 1857 SF

CLASSROOM

?

A: ?

STAIR - 2

ART CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

A: 1303 SF

A: 749 SF

A: 753 SF

A: 742 SF

A: 772 SF

A: 697 SF

A: 627 SF

A: 73 SF

A: 46 SF

STORAGE A: 178 SF

POWER & ENERGY

DRAFTING LAB A: 1327 SF

A: 1276 SF

B

REST A: 123 SF

A

B

C

Special Education Office, Classrooms, and Resource Rooms

Drafting Classroom and Lab

Media Classroom, Computer Lab and Studio

CTE-PROPOSED-RENOVATION-PLAN.pdf

There was a problem previewing this document. Retrying... Download. Connect more apps... CTE-PROPOS ... N-PLAN.pdf. CTE-PROPOSE ... ON-PLAN.pdf.

3MB Sizes 6 Downloads 203 Views

Recommend Documents

No documents