Plymouth Regional High School Career and Technical Center Renovations Plymouth Regional High School seeks your vote at town meeting in March of 2017, to approve the 75% State of New Hampshire Funded renovations to the School’s Career and Technical Center. Built in 1982, the Center has not been renovated or expanded in more than 30 years and yet must handle the critically important task of providing educational opportunities for students to explore and develop the skills required to succeed in a rapidly changing modern work force. In support of this mission, the Center provides opportunities and guidance for students to excel through secondary education, apprenticeships and jobs. With your support, the proposed renovations will reshape, revitalize and provide an exceptional learning environment for a new generation of students over the next 30 years. Career and Technical Center Programs Include: Automotive Technology, Health Science Technology, Digital Media, Culinary Arts, Marketing Education and Drafting Technology PRHS Renovations Include: • Special Education* • Art and Media Lab* • Administration and Facilities* *Renovations to these facilities provides greater student safety, access to specialized education and accommodates CTC renovations
Key Project Elements: • 75% State Funded • Classroom and Lab integration • New state-of-the-art digital medial classroom with recording studio • Expanded automotive facilities with attached classroom • Six (6) automotive lifts with exhaust ventilation system • Integrated drafting and technology classroom • Student work and collaboration space within each program • Daylighting in health science classroom • New energy efficient CTC exterior walls – eliminating 30-year-old failed glass walls • Energy efficient and code compliant culinary kitchen • Strategically located administration offices to aid in building security and safety • New ventilation and lighting throughout entire CTC • Facility design for the next 30 years of career and technical education • Code compliant egress stairs and ADA restrooms Schedule: To limit classroom disruption, the design and construction team will work over the next year to plan and detail the building renovations. Construction will begin during Spring break 2018 and be completed in August 2018 for the fall school opening. The construction schedule has been designed to reduce the overall building schedule, reduce costly phased construction and overall disruptions. Design and Engineering: 9 Months (April 2017–December 2017) Construction: 5 months (April 2018–August 2018) Budget: The State of New Hampshire will Fund 75% of the Career and Technical Center Renovations. With limited education funding available, the State of New Hampshire offers Career and Technical Centers a one-time subsidy every 25–30 years to assure each of the 30 centers are offering a state-of-the-art education. One of the last of 30 centers throughout the entire State to take advantage of the state aid, SAU 48 will pay for only 25% of all CTC renovations. Included in the project, will be renovations to the Special Education Programs including an expanded classroom and specialty spaces to accommodate a growing need for Special Education services. State Funding: $5.3 million Local Contribution: $3.1 million Total Project Cost: $8.5 million
L
Lower Level Plan
REST
REST
A: 181 SF
A: 180 SF
A: 1425 SF
A: 1664 SF
A: 1691 SF
PREP
STORAGE
A: 242 SF
A: 238 SF
PREP ROOM A: 410 SF
BALANCE ROOM A: 154 SF
STORAGE A: 916 SF
DIGITAL MEDIA A: 1858 SF
ATHLETIC DIRECTOR
PHYSICS CLASSROOM A: 1485 SF
TOOL STORAGE A: 155 SF
A
A: 208 SF
AUTOMOTIVE LAB
ELECT. A: 87 SF
A: 3615 SF
TEAM ROOM A: 359 SF
STORAGE
SCIENCE CLASSROOM A: 867 SF
A: 1481 SF
A: 254 SF
A: 2611 SF
DIGITAL STUDIO
LOBBY
A: 625 SF
A: 2721 SF
CORRIDOR A: 1911 SF
GIRLS LOCKER
BOYS LOCKER
A: 1126 SF
A: 1076 SF
TRAINER A: 320 SF
A: 995 SF
STORAGE
STORAGE
A: 147 SF
A: 167 SF
PHYSICAL EDUCATION / WELLNESS A: 1798 SF
STORAGE
CLASSROOM A: 1420 SF
ELEV A: 46 SF
A: 936 SF
HEALTH OCCUPATIONS LAB
C
A: 71 SF
CORRIDOR
A: 140 SF
SCIENCE LAB
TOOL STORAGE
WOOD SHOP
D
CONTROL ROOM
A: 401 SF
B
UP
A: 191 SF
CORRIDOR
LOBBY A: 1958 SF
A: 322 SF
CORRIDOR
A: 307 SF
B A: 457 SF
EGRESS STAIR
DISH ROOM
A: 1465 SF
MECHANICAL
A: 1168 SF
28' - 0"
CHEM CLASSROOM
A
KITCHEN
VESTIBULE
C
CHEM CLASSROOM
A: 878 SF
A: 418 SF
A: 914 SF
BIO CLASSROOM
SERVING
A: 4219 SF
A: 278 SF
HEALTH OCCUPATIONS CLASSROOM
BIO CLASSROOM
CAFETERIA
STAIR - 2 A: 150 SF MECHANICAL UP
A: 561 SF
FACILITIES OFFICE A: 182 SF
A: 169 SF
STORAGE A: 135 SF
D
D E
BOILER A: 1008 SF
C
E
A
B
C
D
E
Automotive Auto Shop and Classroom
Digital Media Recording Studio, Classroom and Computer Lab
Health Occupations Simulation Lab and Classroom
Athletic Director Director Office and Equipment Storage
Facilities Director Office and Storage
F
First Floor Plan ART ROOM
ART ROOM
A: 1142 SF
A: 1135 SF
CHORUS ROOM
BAND ROOM
A
A: 1923 SF
A: 1210 SF
GYM STORAGE A: 383 SF
LOCKERS
VENT HOOD
A: 69 SF
THEATRE ARTS
CULINARY CLASSROOM
A: 1833 SF
W D
A: 1066 SF
MEDIA CENTER
LAUNDRY
B
COOK LINE
A: 74 SF
A: 4937 SF
DRY GOODS
GYMNASIUM
A: 42 SF
KITCHEN
OFFICE
A: 8631 SF
A: 49 SF
A: 1892 SF
LOBBY
STAGE A: 1604 SF
AUDITORIUM
A: 2836 SF
DRY GOODS A: 107 SF
A: 3826 SF
PRINT / COPY A: 208 SF
DINING ROOM
OFFICE
A
A: 1640 SF
A: 354 SF
STORAGE STORAGE
A: 134 SF
A: 103 SF
JANITOR A: 82 SF
RECEPTION A: 385 SF
CLASSROOM A: 749 SF
STAIR A: 366 SF
CLASSROOM
CLASSROOM
A: 736 SF
A: 743 SF
GUIDANCE RECEPTION A: 356 SF
OFFICE
VESTIBULE
RECEPTION
A: 520 SF
A: 806 SF
MARKETING CLASSROOM NURSE
A: 1475 SF
UP
A: 409 SF MARKETING STORE
A: 290 SF
A: 395 SF
A
B
Culinary Classroom, Kitchen and Dining Room
Marketing Classroom, Lab and School Store
B
SE
Second Floor Plan
A ELEVATOR A: 44 SF
B.
RESOURCE
RESOURCE A: 233 SF
A: 243 SF
SMALL GROUP
STAIR - 3
A: 87 SF
A: 254 SF
CLASSROOM A: 1030 SF RESTROOM A: 48 SF
BOILER
BATHROOM A: 63 SF RESTROOM
REF
A: 674 SF
A: 50 SF
OPEN TO BELOW
OPEN TO BELOW
PRINT / COPY
REF
A: 99 SF
RESTROOM
LIFE SKILLS A: 215 SF
A: 77 SF
OFFICE A: 176 SF
AUDITORIUM A: 5339 SF
SPECIAL EDUCATION OFFICE
LOBBY
CONFERENCE
A: 256 SF
A
C.
A: 238 SF
A: 2405 SF
C
CORRIDOR
MECHANICAL ROOM
SMALL GROUP
CORRIDOR
ELEV
A: 596 SF
JANITOR
JAN A: 109 SF
CLASSROOM
CLASSROOM
A: 681 SF
A: 744 SF
REST A: 136 SF
STORAGE
STAIR - 1 A: 638 SF
CLASSROOM A: 704 SF
A: 142 SF
A: 1015 SF
A: 196 SF
A: 388 SF
A: 1857 SF
CLASSROOM
?
A: ?
STAIR - 2
ART CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
A: 1303 SF
A: 749 SF
A: 753 SF
A: 742 SF
A: 772 SF
A: 697 SF
A: 627 SF
A: 73 SF
A: 46 SF
STORAGE A: 178 SF
POWER & ENERGY
DRAFTING LAB A: 1327 SF
A: 1276 SF
B
REST A: 123 SF
A
B
C
Special Education Office, Classrooms, and Resource Rooms
Drafting Classroom and Lab
Media Classroom, Computer Lab and Studio
CTE-PROPOSED-RENOVATION-PLAN.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... CTE-PROPOS ... N-PLAN.pdf. CTE-PROPOSE ... ON-PLAN.pdf.