Department of Public Works and Highways (DPWH)
Contract ID Contract Name
: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National High School (Bldg. 1) Location of the Contract: City of Mati, Davao Oriental
CONTRACT AND AGREEMENT
THIS AGREEMENT, made this 2]th day of December. 2017 between, CYNTHIA GRACE C. TIU, OIC - District Engineer, Department of Public Works and Highways, Davao Oriental 2nd District Engineering Office, Mati, Davao Oriental (hereinafter called the "Entity") and ALEX H. ABELlDO, Proprietor, Legacy Construction Corporation, with business address at No. 604 Mancup Road Calasiao, Pangasinan ,(hereinafter called the "CONTRACTOR"). WHEREAS, the ENTITY is desirous that the CONTRACTOR execute the works under the onstruction of 2 Storey Workshop Building, Libudon National High School Idg. 1) City of Mati, Davao Oriental and the Entity has accepted the Bid for the execution and completion of such works calculated in the unit prices shown in the attached Nine Million Five Hundred Seventy Seven Bill of Quantities, a total Bid price of Thousand Four Hundred Twenty Five Pesos (P 9,577,425.00) to be completed within One Hundred Twenty(120) calendar days.
• NOW THIS CONTRACT AGREEMENT WITNESSETH AS FOLLOWS: 1. In this CONTRACT AGREEMENT, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to. 2. The following documents shall be attached, deemed to form, and be read and construed as part of this CONTRACT AGREEMENT: a. Bidding Documents for the Contract (Annex "An) (1) (2) (3) (4) (5) (6) (7) (8)
10f8
General Conditions of Contract Special Conditions of Contract Drawings Specifications Invitation to Bid Instructions to Bidders Bid Data Sheet
SupplementallBid Bulletins (Addenda)
1
Department of Public Works and Higbways (DPWH)
~
ContractID o Contract Name
-g
S -E WO
: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National High School (Bldg. 1) Location of the Contract: City of Mati, Davao Oriental
(1)0
b. CONTRACTOR'S Calculated Bid in the Form of Bid including its technical and Financial Proposal (Annex "8") c. CONTRACTOR'S LeUer of Intent for eligibility and Contractor's Information from the OPWH Registry (Annex ·C") d. Notice of Award of Contract and the CONTRACTOR's ·conforme' (Annex "0") e. Performance Security (Annex "E")
~
c
iljW
en
Q) Q)..c:.
f. Credit Line certificate (Annex "F")
r::_
~a u..
g. PERT/CPM Diagram and 8ar Chart with S-Curve, Manpower & equipment Utilization Schedule (Annex "G") h. Construction Methods i. Construction Safety and Health Program duly approved by the DOtE
3.
20f8
In consideration of the payments to be made by the ENTITY to the CONTRACTOR as hereinafter mentioned, the CONTRACTOR hereby covenants with the ENTITY to execute and complete the Works and remedy any defects therein in conformity with the provisions of the CONTRACT AGREEMENT in all respects.
2
Department of Public Works and Highways (DPWH) : 17LG0144 : Construction of2 Storey Workshop Building, Libudon National ....a High School (Bldg. 1) ~u Location of the Contract: City of Mati, Davao Oriental Contract ID Contract Name
:::d~ a
C!) c
,..i~ u
The fol/owing are the quantities and items of Work included in the scope of work
UC!) ~ o:::
t-
wl:! ~~
DESCRIPTION
A. 1. 1.3
Construction of Field Office for the Engineer (6 x 6m)
1.00
B.3
Permits and Clearances
to
B.5
Project Billboard/Signboard
I fIJ
B.7 B.9
o~
0::
w
::')
-c
~r:z: ~ !! w ~"i ~ .s.... ~
1.5.
31,200.00
31.200.00
1.00
1.5.
27,276.00
27,276.00
1.00
each
3,314.40
3,314.40
Occupational Safety and Health Program
2.63
mo.
17,268.13
45.415.18
Mobilization 8. Demobilization (Hauling Cost)
1.00
I.s.
75,628.80
75,628.80
40.72
8,703.90
196.98
cU.m .
263.72
51,947.56
105.37
cU.m.
361.75
38,117.59
111.83
cU.m.
746.67
83,500.10
Gravel Fill
33.92
cU.m.
1,013.95
34,393.18
900 (1) c2
Structural Concrete (Footings and Slab on Fill), Class A. 28 days
50.71
cU.m.
6,927.24
351,280.34
900 (1) c3
Structural Concrete (Footing Tie Beams), Class A. 28 days
17.28
cU.m.
7.197.91
124,379.88
900 (1) c4
Structural Concrete (Columns). Class A, 28 days
25.89
cU.m.
7,676.47
198,743.80
900 (1) c5
Structural Concrete (Suspended Slab), Class A,28days
27.61
cU.m.
7,596.76
209.746.54
900 (1) c6 Structural Concrete (Beams), Class A, 28 da~
30.44
cU.m .
7,481.31
227,731.07
Clearing and Grubbing
803 (l)a Structure Excavation Embankment from Structure Excavation
804 (l)b Embankment (selected borrow) 804 (4)
0
-=1~ ~
.~
~
~. .:c a u
=ss
..J
«
i' "Cl
.1!l r.:::
TOTAL COST
sq.m.
~~ ~04 (1) a
C
UNIT COST
213.75
800 (2)
(I)
0 I.L
QUAN1'ITY
ITEM NO,
(I)
U)
902 (1) al Reinforcing Steel, Grade 40
~
27,248.42
kgs.
83.93
2,286,959.89
1.00
I.s.
446,506.80
446,506.80
0. (I)
0::
\
2 ..
1-0> .~
903 (2)
Forms and Falseworks
1000(1)
Soil Poisoning
115.00
liters
1,070.73
123.133.95
1046 (2) a1
loomm CHB Non load Bearing (Ind Reinforcing Steel)
88.00
sq.m.
871.36
76,679.68
1046 (2) a2
150mm CHB Non load Bearing (Incl. Reinforcing Steel)
400.00
sq.m.
1.260.79
504,316.00
6.40
m.
2,805.75
17,956.80
4.00
piece
7,032.96
28,131.84
1004(2) a locksets
8.00
set
1,935.00
15,480.00
l004(2)c Bolts
5.00
sets
336.00
1,680.00
loo4(2)e Knobs
5.00
sets
2,220.00
11,100.00
0·Ol
1? CII a.
'Pi>.
wc
,~
iL:..o (I)"Cl
.t:.l!! -r.:::
-(I)
011)
~e!
ClIO. a. (I) ~O::
~
::z::
tZ
> 0
w U ·c
-
Ii O
1002 (3) a8 100 mm dia. G.!. Pipe - (Exit Staircase) 1003 (9)
30f8
Carpentry and Joinery Works (Black:boa;;;Jl
3
Department of Public Works and Highways (DPWH) 5 Contract ID
: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National High School (Bldg. 1) Location of the Contract: City of Mati, Davao Oriental
~
NContract Name
w
8
5c
d-
w ~ The following are the quantities and items of Work included in the scope of work
~~ ....
Q~
DESCRIPTION
ITEM NO.
r t~ -....
c: !! c:
m
::".:) ::l
~~~~§« Q)
--
Handles
10.00
sets
72.00
720.00
lOO4(2)g
Hinges
pc.
l004(2)i
Grab Bar
85.00 1.00
unit
108.98 3,960.00
9263.30 3,960.00
100511)
Steel Casement Window
48.96
sq.m.
3,243.07
158}80.70
1005(5)
Window Grilli
252.00
kgs.
130.12
32}90.24
Jalousie Window
24.05
sq.m.
1,253.98
30,158.21
Flush Door
12.21
sq.m.
3,368.98
15.12 sq.m.
6,371.77
41"T35.241 96,341.16
~01O(2) b Wood Panel 1021!J)c Plain Cement Finish with Floor Hardener 1027(1)
:\~
C~
.... 0
t) ~
C
()
-' «
"
Plain Cement Plaster Rnish
1053(3)al 38mm dia. G.I. Pipe Railings
0
1053 (3)a2
5Omm0 G.!. Pipe Handrail Fully Welded on Vertical Railing on 19mm bar
l003[I)al Fiber Cement Board on Metal Frame Reflective Insulation
103811) 1018(1]
Glazed TIles &. Trims
1018(2)
Unglazed Tiles
1032(1)a
Painting Works (Masonry/Concrete)
103211)b
Painting Works (Wood)
1032 (1) c Painting Works (Steel) ::l j:: ....
,0)
o~ "0> c:
kCi« ~
~ (f)
!!:! Q..
~
w t)
~
. I :E ()
Z (5 0
UNIT COST TOTAL COST
1004(2)f
lOO9(1)a ~-~ '1010 (2)a
0
QUANTITY
424.17
sq.m.
329.71
139,853.09
1,699.22
sq.m.
179.50
305,009.99
132.00
kgs.
138.20
18,242.40
398.00
kgs.
243.09
96,149.82
237.86
sq.m.
964.12
229,325.58
315.48
sq.m.
217.04
68,471.77
83.92 sq.m. 28.92 sq.m.
2,221.05
186,390.51
1,206.82
34.901.23
1.239.81
sq.m.
217.01
269,051.16
50.15
sq.m.
509.18
25,535.37
611.84
sq.m.
209.47
128.162.12
•
1014(IJb2
Prepainted Metal Sheets, Long Span, O.40mm thk.
290.20
sq.m.
764.91
221.976.88
1013(2)a
Fabricated Metal Roofing Accessory (Ridge Roll, 0.6mm thk)
24.20
m.
585.44
14,167.64
1013(2)b
Fabricated Metal Roofing Accessory (Flashing, 0.6mm thk)
2621
m.
570.17
14.944.15
10 13(2)c
Fabricated Metal Roofing Accessory (Gutter, 0.6mm thk)
47.80
m.
784.64
37,505.79
>
40f8
4
Department of Public Works and Higbways (DPWH) ContractID Contract Name
: 17LG0144 o : Construction of2 Storey Workshop Building, Libudon National ~g High School (Bldg. 1) ::l i§ Location of the Contract: City of Mati, Davao Oriental
C)o
wu
U)
0
C)(/)
he following are the quantities and items of Work included in the scope of work
w(/) >~
~~ ~----~--------------------~----------~----~--------~
DESCRIPTION
ITEM NO. /~ =
1047(1)0 Structural Steel. Trusses
Vf3 E
I
c:: I\::lS ~ ~ § ~ ~ ~~ .i::'
~~
I::gs.
115.51
770}93.60
1003[11Jb Fascia Board
20.00
pcs.
549.60
10/992.00
1001 (6)bl Catch Basin
1.00
Is.
10,128.24
10,128.24
1.00
Is.
33,440.40
33,440.40
Storm Drainage and Downspout
1.00
Is.
113,854.80
113,854.80
Plumbing Fixtures
1.00
Is.
148.938.00
148,938.00
1002 (28) Cold Water Line Works
1.00
Is.
10,902.54
10,902.54
1201 [1]
1.00
Is.
437,743.2~
437,743.20
1202 (23) Fire Hose Cabinet
1.00
set
112,218.00
112,218.00
1100 (19) Conduits, Boxes and Fittings
1.00
Is.
43,525.20
43,525.20
1001 (8) Sewer Line WorKs
..J 1002(8)
~
),8
~
Z
o~_~
m u c(~
.;::I------+--------------------+------t-----t----.....,~-----__;
§~ (.------=-.....::::::-:::::::-...;;)I*o~8i:ri-ll01 (18) =:-go ' - . ~ 0
-:ic(
>.
z :g..a
8~~
do~
~ ~~ :l ~~ "'-'"
Is.
133,306.80
133,306
1102 (1) b1 Panelboard with Main & Branch BreaKer
1.00
Is.
34,243.20
34,243.20
1102 (10) b Pole Mounted Transformer (Olsq
1.00
Is.
409.200.00
409 /200.00
1103 [1) Lighting Fixtures
1.00
Is.
68,568.01
68,568.01
1210 (1) Fire Alarm System
1.00
Is.
52,811.36
52.811.36
oj ~
'::1.
~~~
O~~~ ::I:f:-< l?
~
I, ..
z-'-~
~~i~
~r.t:l-oq) ~
IJ)
~o=:~l!! 1\'1 Q. o ~ e::.~
v
g
UJ
~tU ~
~
Wires and Wiring Devices
GRAND TOTAL
i=Cil
o-l ~ r.t:l
IJ;.I
1.00
::>
~
....
Water Pumping System
~ 0 ~~~~--------------------~----~----~----~--------~
8 t;
UNIT COST TOTAL COST
6,672.96
~,'\ 1001(9]
__ §
QUANTITY
9,577,425.00
~---~-------------------~----+-----+----~-------~ ~----~--------------------~----~----~----~~------~
c(c;
:::t:u
1-
zO > 0
50f8
5
Department of Public Works and Highways (DPWH) Contract ID Contract Name
: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National High School (Bldg. 1) Location of the Contract: City of Mati, Davao Oriental
4. The ENTITY hereby covenants to pay the CONTRACTOR in consideration of the execution and completion of the Works, the unit prices in the CONTRACTOR'S calculated bid as applied to the actual quantities accomplished as certified by the PROCURING ENTITY under the provisions of the CONTRACT AGREEMENT at the times and in the manner prescribed by this CONTRACT AGREEMENT.
5 . The Contractor warrants that he has not given nor promised to give any money or
..i!:
gift any employees of the ENTITY (or any Philippine Government Instrumentality) to secure this contract.
:.;::l
c:
iJjW !Jl CIl
CIl.s:;;
£ ..... ~5 IL
~ ---"'"
~
0 Il.. r:::: 0
u
Z
•
9'2
g
~"O
tfjO>"
z5;.o
o CIl"O U:5.!!l (J ....o
c: CIl
!Jl
~ ~ \!! roc.. ""o..CIl ....l-a:::
60f8
6
IN WITNESS whereof the parties thereto have caused this CONTRACT AGREEMENT to be executed the day and year first before written.
Signed, sealed, delivered by CYNTHIA GRACE C. TIU the OIC - District Engineer DPWH 2nd DEO Mati, Davao Oriental (for the Procuring Entity) Signed, sealed, delivered by ALEX H. ABELIDO the Proprietor
Legacy Construction Corporation (for the Contractor)
Binding Signature of PROCURING ENTITY
DAVE G SEGURA Office
Approved this ___day of _ _ _ _ _ _, 2017.
70f8
7
Department of Public Works and Highways (DPWH)
....o Contract ID
: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National i2~ Contract Name :::;).l::; High School (Bldg. 1) OC O W Location of the Contract: City of Mati, Davao Oriental (/)~ ·0 "
ACKNOWLEDGEMENT
Republic of the Philippines)
Davao OrientaL .............. )
Before me, A Notary Public for and in the Province of Davao Oriental personally ppeared:
z
o ~
NAME:
~
CYNTHIA GRACE C. TIU
~
ALEX H. ABELIDO
DATE/PLACE ISSUED
COMM. TAX CERT. NO.
~;a
•
0 .......
~
'5i -=::=~;:!;W~Known to me and to me known to be the same persons who executed the foregoing
g~ ~ 8 ..
~ 3l ~
struments which consists of eight (8) pages including this page on which this acknowledgment is written and acknowledge to me that the same is their free and voluntary act and deed.
0G,l'O
~=~ U 3l
0
23~~ j;tla..Q) ,...l_a:::
WITNESS MY HAND AND S
at_o__
~
day of _.::..;~..;..0_c_ _-,--,2017
Doc. No. _--::::":'0=-+__ Page No. ---;.;j...'r.--
Book No. __0-:-1"'"'-7__
Series of _--,-).....::.ffl.!...!....-_
8of8
8