Contract ID Contract Name

: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National High School (Bldg. 1) Location of the Contract: City of Mati, Davao Oriental

CONTRACT AND AGREEMENT

THIS AGREEMENT, made this 2]th day of December. 2017 between, CYNTHIA GRACE C. TIU, OIC - District Engineer, Department of Public Works and Highways, Davao Oriental 2nd District Engineering Office, Mati, Davao Oriental (hereinafter called the "Entity") and ALEX H. ABELlDO, Proprietor, Legacy Construction Corporation, with business address at No. 604 Mancup Road Calasiao, Pangasinan ,(hereinafter called the "CONTRACTOR"). WHEREAS, the ENTITY is desirous that the CONTRACTOR execute the works under the onstruction of 2 Storey Workshop Building, Libudon National High School Idg. 1) City of Mati, Davao Oriental and the Entity has accepted the Bid for the execution and completion of such works calculated in the unit prices shown in the attached Nine Million Five Hundred Seventy Seven Bill of Quantities, a total Bid price of Thousand Four Hundred Twenty Five Pesos (P 9,577,425.00) to be completed within One Hundred Twenty(120) calendar days.

• NOW THIS CONTRACT AGREEMENT WITNESSETH AS FOLLOWS: 1. In this CONTRACT AGREEMENT, words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to. 2. The following documents shall be attached, deemed to form, and be read and construed as part of this CONTRACT AGREEMENT: a. Bidding Documents for the Contract (Annex "An) (1) (2) (3) (4) (5) (6) (7) (8)

10f8

General Conditions of Contract Special Conditions of Contract Drawings Specifications Invitation to Bid Instructions to Bidders Bid Data Sheet

SupplementallBid Bulletins (Addenda)

1

Department of Public Works and Higbways (DPWH)

~

ContractID o Contract Name

-g

S -E WO

: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National High School (Bldg. 1) Location of the Contract: City of Mati, Davao Oriental

(1)0

b. CONTRACTOR'S Calculated Bid in the Form of Bid including its technical and Financial Proposal (Annex "8") c. CONTRACTOR'S LeUer of Intent for eligibility and Contractor's Information from the OPWH Registry (Annex ·C") d. Notice of Award of Contract and the CONTRACTOR's ·conforme' (Annex "0") e. Performance Security (Annex "E")

~

c

iljW

en

Q) Q)..c:.

f. Credit Line certificate (Annex "F")

r::_

~a u..

g. PERT/CPM Diagram and 8ar Chart with S-Curve, Manpower & equipment Utilization Schedule (Annex "G") h. Construction Methods i. Construction Safety and Health Program duly approved by the DOtE

3.

20f8

In consideration of the payments to be made by the ENTITY to the CONTRACTOR as hereinafter mentioned, the CONTRACTOR hereby covenants with the ENTITY to execute and complete the Works and remedy any defects therein in conformity with the provisions of the CONTRACT AGREEMENT in all respects.

2

Department of Public Works and Highways (DPWH) : 17LG0144 : Construction of2 Storey Workshop Building, Libudon National ....a High School (Bldg. 1) ~u Location of the Contract: City of Mati, Davao Oriental Contract ID Contract Name

:::d~ a

C!) c

,..i~ u

The fol/owing are the quantities and items of Work included in the scope of work

UC!) ~ o:::

t-

wl:! ~~

DESCRIPTION

A. 1. 1.3

Construction of Field Office for the Engineer (6 x 6m)

1.00

B.3

Permits and Clearances

to

B.5

Project Billboard/Signboard

I­ fIJ

B.7 B.9

o~

0::



::')

-c

~r:z: ~ !! w ~"i ~ .s.... ~

1.5.

31,200.00

31.200.00

1.00

1.5.

27,276.00

27,276.00

1.00

each

3,314.40

3,314.40

Occupational Safety and Health Program

2.63

mo.

17,268.13

45.415.18

Mobilization 8. Demobilization (Hauling Cost)

1.00

I.s.

75,628.80

75,628.80

40.72

8,703.90

196.98

cU.m .

263.72

51,947.56

105.37

cU.m.

361.75

38,117.59

111.83

cU.m.

746.67

83,500.10

Gravel Fill

33.92

cU.m.

1,013.95

34,393.18

900 (1) c2

Structural Concrete (Footings and Slab on Fill), Class A. 28 days

50.71

cU.m.

6,927.24

351,280.34

900 (1) c3

Structural Concrete (Footing Tie Beams), Class A. 28 days

17.28

cU.m.

7.197.91

124,379.88

900 (1) c4

Structural Concrete (Columns). Class A, 28 days

25.89

cU.m.

7,676.47

198,743.80

900 (1) c5

Structural Concrete (Suspended Slab), Class A,28days

27.61

cU.m.

7,596.76

209.746.54

900 (1) c6 Structural Concrete (Beams), Class A, 28 da~

30.44

cU.m .

7,481.31

227,731.07

Clearing and Grubbing

803 (l)a Structure Excavation Embankment from Structure Excavation

804 (l)b Embankment (selected borrow) 804 (4)

0

-=1~ ~

.~

~

~. .:c a u

=ss

..J

«

i' "Cl

.1!l r.:::

TOTAL COST

sq.m.

~~ ~04 (1) a

C

UNIT COST

213.75

800 (2)

(I)

0 I.L

QUAN1'ITY

ITEM NO,

(I)

U)

902 (1) al Reinforcing Steel, Grade 40

~

27,248.42

kgs.

83.93

2,286,959.89

1.00

I.s.

446,506.80

446,506.80

0. (I)

0::

\

2 ..

1-0> .~

903 (2)

Forms and Falseworks

1000(1)

Soil Poisoning

115.00

liters

1,070.73

123.133.95

1046 (2) a1

loomm CHB Non load Bearing (Ind Reinforcing Steel)

88.00

sq.m.

871.36

76,679.68

1046 (2) a2

150mm CHB Non load Bearing (Incl. Reinforcing Steel)

400.00

sq.m.

1.260.79

504,316.00

6.40

m.

2,805.75

17,956.80

4.00

piece

7,032.96

28,131.84

1004(2) a locksets

8.00

set

1,935.00

15,480.00

l004(2)c Bolts

5.00

sets

336.00

1,680.00

loo4(2)e Knobs

5.00

sets

2,220.00

11,100.00

0·Ol

1? CII a.

'Pi>.

wc

,~

iL:..o (I)"Cl

.t:.l!! -r.:::

-(I)

011)

~e!

ClIO. a. (I) ~O::

~

::z::

tZ

>­ 0

w U ·c

-

Ii O

1002 (3) a8 100 mm dia. G.!. Pipe - (Exit Staircase) 1003 (9)

30f8

Carpentry and Joinery Works (Black:boa;;;Jl

3

Department of Public Works and Highways (DPWH) 5 Contract ID

: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National High School (Bldg. 1) Location of the Contract: City of Mati, Davao Oriental

~

NContract Name

w

8

5c

d-

w ~ The following are the quantities and items of Work included in the scope of work

~~ ....

Q~

DESCRIPTION

ITEM NO.

r t~ -....

c: !! c:

m

::".:) ::l

~~~~§« Q)

--

Handles

10.00

sets

72.00

720.00

lOO4(2)g

Hinges

pc.

l004(2)i

Grab Bar

85.00 1.00

unit

108.98 3,960.00

9263.30 3,960.00

100511)

Steel Casement Window

48.96

sq.m.

3,243.07

158}80.70

1005(5)

Window Grilli

252.00

kgs.

130.12

32}90.24

Jalousie Window

24.05

sq.m.

1,253.98

30,158.21

Flush Door

12.21

sq.m.

3,368.98

15.12 sq.m.

6,371.77

41"T35.241 96,341.16

~01O(2) b Wood Panel 1021!J)c Plain Cement Finish with Floor Hardener 1027(1)

:\~

C~

.... 0

t) ~

C

()

-' «

"

Plain Cement Plaster Rnish

1053(3)al 38mm dia. G.I. Pipe Railings

0

1053 (3)a2

5Omm0 G.!. Pipe Handrail Fully Welded on Vertical Railing on 19mm bar

l003[I)al Fiber Cement Board on Metal Frame Reflective Insulation

103811) 1018(1]

Glazed TIles &. Trims

1018(2)

Unglazed Tiles

1032(1)a

Painting Works (Masonry/Concrete)

103211)b

Painting Works (Wood)

1032 (1) c Painting Works (Steel) ::l j:: ....

,0)

o~ "0> c:

kCi« ~

~ (f)

!!:! Q..

~

w t)

~

. I­ :E ()

Z (5 0

UNIT COST TOTAL COST

1004(2)f

lOO9(1)a ~-~ '1010 (2)a

0

QUANTITY

424.17

sq.m.

329.71

139,853.09

1,699.22

sq.m.

179.50

305,009.99

132.00

kgs.

138.20

18,242.40

398.00

kgs.

243.09

96,149.82

237.86

sq.m.

964.12

229,325.58

315.48

sq.m.

217.04

68,471.77

83.92 sq.m. 28.92 sq.m.

2,221.05

186,390.51

1,206.82

34.901.23

1.239.81

sq.m.

217.01

269,051.16

50.15

sq.m.

509.18

25,535.37

611.84

sq.m.

209.47

128.162.12



1014(IJb2

Prepainted Metal Sheets, Long Span, O.40mm thk.

290.20

sq.m.

764.91

221.976.88

1013(2)a

Fabricated Metal Roofing Accessory (Ridge Roll, 0.6mm thk)

24.20

m.

585.44

14,167.64

1013(2)b

Fabricated Metal Roofing Accessory (Flashing, 0.6mm thk)

2621

m.

570.17

14.944.15

10 13(2)c

Fabricated Metal Roofing Accessory (Gutter, 0.6mm thk)

47.80

m.

784.64

37,505.79



40f8

4

Department of Public Works and Higbways (DPWH) ContractID Contract Name

: 17LG0144 o : Construction of2 Storey Workshop Building, Libudon National ~g High School (Bldg. 1) ::l i§ Location of the Contract: City of Mati, Davao Oriental

C)o

wu

U)

0

C)(/)

he following are the quantities and items of Work included in the scope of work

w(/) >~

~~ ~----~--------------------~----------~----~--------~

DESCRIPTION

ITEM NO. /~ =

1047(1)0 Structural Steel. Trusses

Vf3 E

I

c:: I\::lS ~ ~ § ~ ~ ~~ .i::'

~~

I::gs.

115.51

770}93.60

1003[11Jb Fascia Board

20.00

pcs.

549.60

10/992.00

1001 (6)bl Catch Basin

1.00

Is.

10,128.24

10,128.24

1.00

Is.

33,440.40

33,440.40

Storm Drainage and Downspout

1.00

Is.

113,854.80

113,854.80

Plumbing Fixtures

1.00

Is.

148.938.00

148,938.00

1002 (28) Cold Water Line Works

1.00

Is.

10,902.54

10,902.54

1201 [1]

1.00

Is.

437,743.2~

437,743.20

1202 (23) Fire Hose Cabinet

1.00

set

112,218.00

112,218.00

1100 (19) Conduits, Boxes and Fittings

1.00

Is.

43,525.20

43,525.20

1001 (8) Sewer Line WorKs

..J 1002(8)

~

),8

~

Z

o~_~

m u c(~

.;::I------+--------------------+------t-----t----.....,~-----__;

§~ (.------=-.....::::::-:::::::-...;;)I*o~8i:ri-ll01 (18) =:-go ' - . ~ 0

-:ic(

>.

z :g..a

8~~

do~

~ ~~ :l ~~ "'-'"

Is.

133,306.80

133,306

1102 (1) b1 Panelboard with Main & Branch BreaKer

1.00

Is.

34,243.20

34,243.20

1102 (10) b Pole Mounted Transformer (Olsq

1.00

Is.

409.200.00

409 /200.00

1103 [1) Lighting Fixtures

1.00

Is.

68,568.01

68,568.01

1210 (1) Fire Alarm System

1.00

Is.

52,811.36

52.811.36

oj ~

'::1.­

~~~

O~~~ ::I:f:-< l?

~

I, ..

z-'-~

~~i~

~r.t:l-oq) ~

IJ)

~o=:~l!! 1\'1 Q. o ~ e::.~

v

g

UJ

~tU ~

~

Wires and Wiring Devices

GRAND TOTAL

i=Cil

o-l ~ r.t:l

IJ;.I

1.00

::>

~

....

Water Pumping System

~ 0 ~~~~--------------------~----~----~----~--------~

8 t;

UNIT COST TOTAL COST

6,672.96

~,'\ 1001(9]

__ §

QUANTITY

9,577,425.00

~---~-------------------~----+-----+----~-------~ ~----~--------------------~----~----~----~~------~

c(c;

:::t:u

1-­

zO > 0

50f8

5

Department of Public Works and Highways (DPWH) Contract ID Contract Name

: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National High School (Bldg. 1) Location of the Contract: City of Mati, Davao Oriental

4. The ENTITY hereby covenants to pay the CONTRACTOR in consideration of the execution and completion of the Works, the unit prices in the CONTRACTOR'S calculated bid as applied to the actual quantities accomplished as certified by the PROCURING ENTITY under the provisions of the CONTRACT AGREEMENT at the times and in the manner prescribed by this CONTRACT AGREEMENT.

5 . The Contractor warrants that he has not given nor promised to give any money or

..i!:­

gift any employees of the ENTITY (or any Philippine Government Instrumentality) to secure this contract.

:.;::l

c:

iJjW !Jl CIl

CIl.s:;;

£ ..... ~5 IL

~ ---"'"

~

0 Il.. r:::: 0

u

Z



9'2

g

~"O

tfjO>"

z5;.o

o CIl"O U:5.!!l (J ....o

c: CIl

!Jl

~ ~ \!! roc.. ""o..CIl ....l-a:::

60f8

6

IN WITNESS whereof the parties thereto have caused this CONTRACT AGREEMENT to be executed the day and year first before written.

Signed, sealed, delivered by CYNTHIA GRACE C. TIU the OIC - District Engineer DPWH 2nd DEO Mati, Davao Oriental (for the Procuring Entity) Signed, sealed, delivered by ALEX H. ABELIDO the Proprietor

Legacy Construction Corporation (for the Contractor)

Binding Signature of PROCURING ENTITY

DAVE G SEGURA Office

Approved this ___day of _ _ _ _ _ _, 2017.

70f8

7

Department of Public Works and Highways (DPWH)

....o Contract ID

: 17LG0144 : Construction of2 Storey Workshop Building, Libudon National i2~ Contract Name :::;).l::; High School (Bldg. 1) OC O W Location of the Contract: City of Mati, Davao Oriental (/)~ ·0 "­

ACKNOWLEDGEMENT

Republic of the Philippines)

Davao OrientaL .............. )

Before me, A Notary Public for and in the Province of Davao Oriental personally ppeared:

z

o ~

NAME:

~

CYNTHIA GRACE C. TIU

~

ALEX H. ABELIDO

DATE/PLACE ISSUED

COMM. TAX CERT. NO.

~;a



0 .......

~

'5i -=::=~;:!;W~Known to me and to me known to be the same persons who executed the foregoing

g~ ~ 8 ..

~ 3l ~

struments which consists of eight (8) pages including this page on which this acknowledgment is written and acknowledge to me that the same is their free and voluntary act and deed.

0G,l'O

~=~ U 3l

0

23~~ j;tla..Q) ,...l_a:::

WITNESS MY HAND AND S

at_o__

~

day of _.::..;~..;..0_c_ _-,--,2017

Doc. No. _--::::":'0=-+__ Page No. ---;.;j...'r.--­

Book No. __0-:-1"'"'-7__

Series of _--,-).....::.ffl.!...!....-_

8of8

8

Department of Public Works and Highways (DPWH)

1000(1) Soil Poisoning. 115.00 liters. 1,070.73. 123.133.95 loomm CHB Non load Bearing (Ind. 1046 (2) a1. 88.00 sq.m. 871.36. 76,679.68. Reinforcing Steel). 150mm CHB Non load Bearing (Incl. 1046 (2) a2. 400.00 sq.m. 1.260.79. 504,316.00. Reinforcing Steel). 1002 (3) a8 100 mm dia. G.!. Pipe - (Exit Staircase). 6.40.

402KB Sizes 0 Downloads 308 Views

Recommend Documents

Town of Canmore Public Works Department
As part of the treatment process, biosolids are dewatered to 10-33% solids using a belt filter press. ..... of route analysis and milder winter weather conditions. .... A hazard tree is a tree that is in poor health and poses a risk to public safety,

ANNEXURE I DEPARTMENT OF PUBLIC WORKS The Department of ...
Jan 27, 2012 - BSc/ Masters Degree in Architecture (4years minimum study in design), Drivers .... Degree or B-Tech qualification in Town Planning, Candidate ...

Town of Canmore Public Works Department
fleet including the Fire Service units. In-house ..... 4 vault washroom facilities (Quarry Lake, Mountain Shadows, Eagle Terrace, Cougar Creek). • Gates and ...

Public Works Department - Environment Clearance
authorities to prevent downdrift erosion and to maintain channel free from siltation. Later, discontinuing of sand bypassing due to various technical reasons, lead to erosion on ... Protection Measures through Pilot project", with financial support f

WHATCOM COUNTY PUBLIC WORKS DEPARTMENT Jon Hutchings ...
Apr 5, 2018 - The Whatcom County Public Works Department will close Hovander Road beginning at the 5300 block running to the junction with West Smith ...

TOWN OF HAMILTON DEPARTMENT OF PUBLIC WORKS Summer ...
Apr 10, 2018 - The Town of Hamilton, MA is seeking applicants for 2018 seasonal employment positions with the Department of Public Works. Primary ...

Department of Public Works Services: Labor Day ... - City of Milwaukee
Sep 5, 2016 - to 6:00 a.m.), Sunday night into Monday morning (September 5 from 2:00 to ... The Milwaukee Water Works Customer Service Center will be ...

New Durham Department of Public Works 10 ... - New Durham NH
American 11DRA RH wing 10' front cable post rear hydraulic. • Force America Patrol Commander Ultra spreader and plow controls. • Rear Wing Slide Option ...

City of Mobile Public Works Department SCHEDULE FOR HOLIDAY ...
Public Works Department. SCHEDULE FOR HOLIDAY SOLID WASTE/TRASH PICK-UP. Monday, July 4, 2016 – Closed. SOLID WASTE (garbage): No trash routes being run,. Make-up day, Wednesday, July 6, 2016. TRASH: No trash routes being run, No make-up day,. Next

Department of Public Works Services for the November 24-27 ...
Nov 27, 2016 - services will be available for limited hours of operation and certain parking ... Customers can pay their Municipal Services Bill online at ...

Public Works Department of Maharashtra Recruitment For 80 Junior ...
Public Works Department of Maharashtra Recruitment For 80 Junior Engineer Post Application Form 2016.PDF. Public Works Department of Maharashtra ...

Public works - Town of Arlington
During the year the Division maintains Town trees, including ... Thompson Elementary students plant a tree on Arbor Day with the help of Arlington Public Works ...

Public Works Funds - Hampton.gov
35.1%. Steam Plant. 17.7%. Stormwater. Management. 23.9%. Wastewater. Management. 23.3%. City Manager's Office - Budget Division. City of Hampton ...

Public Works Funds
Roads Planning Commission payments and various other stormwater projects or studies. Also included is a transfer to the Clean. City Commission in the amount of $52,281. Plans Review & Permit Issued. $200,039. Provide erosion and sediment control insp

PUBLIC WORKS COMMITTEE AGENDA
Apr 4, 2018 - Call to order and acknowledgement that the press and public were duly notified of the meeting in accordance with the Freedom of Information ...

PUBLIC INFORMATION OFFICE Public Works and Transportation to ...
Aug 1, 2016 - Media Inquiries: Tony Jones, Public Information Officer ... Imagine helping a child to read, an adult succeed at his/her job, a senior maintain ...

Public Works - City of Long Beach
Class II & III bikeway facility over an 8.4 mile along Pacific Ave., San Antonio Dr., Del Amo Blvd. and Harding ..... Call Center Operations, Work Order. System & ...

FAYETTEVILLE PUBLIC WORKS COMMISSION ... - FAYPWC.COM
and submitted electronically through our website. Please go to ... Who can I contact for assistance, if I have problems completing the Vendor Application?

public works committee agenda - City of Isle of Palms
Apr 4, 2018 - meeting in accordance with the Freedom of Information Act. 2. Election of Chair and Vice Chair. 3. Approval of Previous Meeting's Minutes.

OFFICE OF PUBLIC WORKS CITY OF SPRINGFIELD, ILLINOIS
The City of Springfield Office of Public Works has announced that starting Monday, August 22, the following streets will be under construction to remove and ...

public works committee agenda - City of Isle of Palms
Apr 4, 2018 - Department Reports for March 2018 – Director Pitts ... service demands ... Review of FY19 Public Works Budget for additions and deletions to be ... foreman now with duties he once did not have, such as beach cleaning ... and to open t

Veterans Workplace Preference - Public Works Contracts
Signature. Date. E-mail address. Phone Number. Subscribed to and sworn before me. My commission expires: this ____ day of. , 20 . X. Notary Public Signature.