Eagle Harbor Township Zoning Permit Instructions and Application Where to Apply and Get Information: Eagle Harbor Township – Zoning Administrator 321 Center Street Eagle Harbor, MI 49950 (906) 289-4407 www.eagleharbortwp.org
ALL APPLICATIONS WILL BE SUBMITED TO THE ZONING ADMINISTRATOR (EHT Zoning Ordinance Article 18.5.1).
APPLICATION MATERIALS AND FEES ARE DUE PRIOR TO PERMIT APPROVAL AND COMMENCEMENT OF ANY WORK (EHT Zoning Ordinance Article 18.7) All applications must be made with full knowledge and written consent of all owners of the property in question. This requirement shall include, but is not limited to, the consent of a land contract seller to the relief sought by a land contract purchaser. All applications must be signed by all property owners. What Constitutes A Complete Submittal (EHT Zoning Ordinance Article 18.8)? The following shall be required to be submitted to the Township Zoning Administrator: 1. Completed Application Form (Attached) 2. Supplemental information or Permits that may be required Building Permit Application Septic Permit or septic field review Well Permit Soil Erosion Permit 911 Address Culvert Permit MI DEQ Permits Other Permits or Information as required by the Zoning Administrator 3. Four (4) copies of a complete Site Plan (See Below) 4. Once the application, site plan, and all other permits are deemed complete and accurate by the Zoning Administrator and all fees are paid in full, you will be contacted by the Zoning Administrator. Fees are nonrefundable. Site Plan Requirements (EHT Zoning Ordinance Article 18.8.2) 1. Minimum Site Plan Submittal shall be based on a mortgage survey or land survey prepared by a registered land surveyor or registered engineer. 2. The plan must be drawn to scale. 3. The plan must include property lines and dimensions, all structures and buildings (existing and proposed), all setback dimensions, driveways, easements, and right of ways. Building Permit Applications 1. One copy of the Building Permit Application, elevation drawings, floor plans and other drawing as required by the building inspector for building permit applications will be submitted with the zoning application. The Parcel I.D. Number can be found on your tax bill and zoning can be found at the Township web site at www.eagleharbortwp.org on the Eagle Harbor Township Zoning Map. When to Apply Thirty (30) days prior to the start of construction. If a variance is required, additional time will be needed for a Zoning Board of Appeals Hearing. Duration of Approval (EHT Zoning Ordinance Article 18.7.12) The Zoning Permit once approved is valid for one (1) year. Please Note: Submission of this signed application conveys the right to the Zoning Administrator and Staff of Eagle Harbor Township and/or their designees, to enter and access the subject property and to request access to any and all structures on the subject property. See Eagle Harbor Township Zoning Application Fee Schedule ALL COSTS ARE THE RESPONSIBILITY OF THE APPLICANT. Additional fees may be required for consulting, hearings or other services. Rev 3
Eagle Harbor Township Zoning and Building Permit Process EHT Zoning Ordinance Article 18.7 – 18.10
START HERE
Obtain Zoning Packet
Pre-submittal Meeting Optional
Zoning Permit Application
Possible Supporting Information
with Site Plan and other required Supporting Information
Septic Permit Well Permit Soil Erosion Permit 911 Address Permit
Plans Reviewed
Culvert Permit Submit Revisions and /or Fees
Plans Approved and No Fees Paid?
DEQ Permits Building Permit Application and required drawings
Yes
ZBA Appeal
Zoning Denied
Zoning and/or Building Permit Issued Yes
Perform Work Perform Corrections
Zoning and/or Building Inspections Passed No Yes
Certificate of Occupancy and/or Zoning Compliance Issued
Rev 3
EAGLE HARBOR TOWNSHIP SPECIAL LAND USE PERMIT APPLICATION 321 Center Street • Eagle Harbor, MI 49950 • (906) 289-4407 • FAX (906) 289-4462 Date
Parcel ID Number
ALL INFORMATION IS REQUIRED
Property Owner(s) Name
Applicant(s) Name
Mailing Address
Mailing Address
City
State
Day Phone
Zip Code
City
Evening Phone
State
Day Phone
Zip Code
Evening Phone
THIS APPLICATION MUST BE SIGNED BY THE PROPERTY OWNER(S) OR THE OWNER(S) MAY PROVIDE A LETTER AUTHORIZING THE APPLICANT TO ACT ON THEIR BEHALF (EHT ZONING ORDINANCE ARTICLE 18.7.1). Current Zoning of Property
Property Address
Total Acreage Road.
Location of Property:
side of
Between
Roads.
and
List below or attach legal description of property.
List below or attach all Deed restrictions on property.
AN APPROVED ZONING PERMIT IS REQUIRED FOR ALL WORK AND BEFORE ANY WORK COMMENCES (EHT ZONING ORDINANCE ARTICLE 18.8.1). AN APPROVED ZONING PERMIT MUST BE ISSUED PRIOR TO APPLYING FOR A BUILDING PERMIT. Describe change or work to be performed. (Note: Deviation from the described work constitutes a zoning violation.)
A SURVEY OR SCALE DRAWING SHOWING ALL PARCEL DIMENSIONS, ADJACENT ROADS, EXISTING BUILDINGS, PROPOSED WORK AND STRUCTURES AND SETBACKS MUST ACCOMPANY THIS APPLICATION (EHT ZONING ORDINANCE ARTICLE 18.8.2). I certify the information on and accompanying this application to be complete, true and correct under penalty of perjury by the laws of the State of Michigan. I also hereby grant permission for members of the Planning Commission and township staff to enter the above described property for the purpose of gathering information related to this application. Authorized Signature(s) & Date (Letter of authorization required if other than property owner):
DO NOT WRITE BELOW THIS LINE – EAGLE HARBOR TOWNSHIP USE ONLY Date Received
Case Number
Application Fee
Receipt Number
Septic Permit Number
Well Permit Number
Soil Erosion Permit Number
Culvert Permit Number
Critical Dune Permit Number
DEQ Permit Number
911 Address Number
Other
PLANNING COMMISSION RECOMMENDATION APPROVED APPPROVED WITH CONDITIONS DENIED
TOWNSHIP BOARD APPROVAL APPROVED APPROVED WITH CONDITIONS DENIED
Zoning Administrator Signature
Zoning Administrator Signature
Date
Date
Rev 3
APPROVED SPECIAL LAND USE PERMIT IS VALID FOR ONE (1) YEAR
Eagle Harbor Township Special Land Use Permit Application.pdf ...
Page 3 of 4. Eagle Harbor Township Special Land Use Permit Application.pdf. Eagle Harbor Township Special Land Use Permit Application.pdf. Open. Extract.
321 Center Street ⢠Eagle Harbor, MI 49950 ⢠(906) 289-4407 ⢠FAX (906) 289-4462. Date Parcel ID Number ALL INFORMATION IS REQUIRED. Property Owner(s) Name Applicant(s) Name. Mailing Address Mailing Address. City State Zip Code City State Zip C
Page 1 of 3. Rev 2.2. Eagle Harbor Township. Zoning Permit Instructions and Application. Where to Apply and Get Information: Eagle Harbor Township â Zoning Administrator. 321 Center Street. Eagle Harbor, MI 49950. (906) 289-4407. www.eagleharbortwp
:â______ âZip:â______. Phone: Fax: E-Mail Address: Applicant:â Name:â. Address: City: State: ______ Zip: ______. Phone:â. âFax: E-Mail Address: Contact Person and Information: Date of Event and time: ... Business License Verification: F
The Land Use staff and County Commissioners value comments from individuals and referral agencies. Please check the appropriate response below or send a letter. Late responses will be reviewed as the process permits; all comments will be made part of
numbers to radiances, the 6S atmospheric radiative transfer model to derive apparent ... generally located around the edge of clouds where minor atmospheric ...
Abstract. Even where adequate land is available for urban development, there can be high persistent land prices, and high-rise buildings. Why? Are high prices always related to bubbles? This paper examines these questions. It reconsiders whether high
For TIER II SWPPPs, NOIs must be sent to the Kentucky Division of Water (KDOW) at the following address: Section Supervisor. Permit Support Section. Surface Water Permit Branch, KDOW. Frankfort Office Park. 200 Fair Oaks Lane, 4th Floor. Frankfort, K
RN - Special or Student Permit Application.pdf. RN - Special or Student Permit Application.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying RN ...
7(d)(1) Special Exceptions Permit David Gardner.pdf. 7(d)(1) Special Exceptions Permit David Gardner.pdf. Open. Extract. Open with. Sign In. Main menu.
Land Court strikes down permit for Hatfield solar project - highlights.pdf. Land Court strikes down permit for Hatfield solar project - highlights.pdf. Open. Extract.
the Board), to any person from another state or territory of the United States or a foreign country who is in this state for. special training or for observation of ...
May 19, 2016 - Dr. Isoye has two doctorate degrees (educational administration and ... degrees (education and curriculum/instruction) and a bachelor's degree ...
9:00. 12:45. 1:45. State Districts/Boundary Amendments: - DLNR & Land Use Permits ..... However, outlets are limited so please bring your laptop fully charged.
Tom Ward. Oasis Center. Sheila Calloway. Metropolitan Public Defender's Office (Former). Gary Gaston. Nashville Civic Design Center. Van Pond. Van Pond ...
Doug Sharp. Gresham Smith and Partners. Cindy Stanton / Jarron Springer (sub). Greater Nashville Association of Realtors. Paul Johnson. The Housing Fund ... Sheila Calloway. Metropolitan Public Defender's Office (Former). Gary Gaston. Nashville Civic
JAMES A. COON LOCAL GOVERNMENT TECHNICAL SERIES. - January 1999. NEW YORK STATE. George E. Pataki. Governor. DEPARTMENT OF STATE. Alexander F. Treadwell ... From Other Police-Power Moratoria . . . . . . 3. âGrowth-Cappingâ ..... Department of Env