Administrative​ ​Procedure​ ​542

FACILITIES​ ​CONSTRUCTION Background Facility​ ​construction​ ​may​ ​be​ ​required​ ​if​ ​the​ ​number​ ​and​ ​type​ ​of​ ​facilities​ ​owned​ ​by​ ​the​ ​district are​ ​determined​ ​by​ ​the​ ​district​ ​to​ ​be​ ​insufficient​ ​to​ ​meet​ ​educational​ ​and/or​ ​recreational​ ​goals​ ​set for​ ​the​ ​community.​ ​This​ ​procedure​ ​is​ ​applicable​ ​when​ ​the​ ​district​ ​assumes​ ​responsibility​ ​for construction​ ​of​ ​facilities. Procedures 1. Construction​ ​Costs,​ ​Estimates​ ​and​ ​Determinations 1.1

Before​ ​commencement​ ​of​ ​construction​ ​of​ ​facilities,​ ​the​ ​district​ ​shall​ ​endeavour​ ​to compile​ ​complete​ ​estimates​ ​of​ ​costs​ ​relating​ ​to​ ​the​ ​project.​ ​The​ ​district​ ​shall determine​ ​these​ ​costs​ ​by​ ​any​ ​manner​ ​deemed​ ​acceptable​ ​to​ ​the​ ​district​ ​in​ ​view​ ​of the​ ​project​ ​under​ ​consideration.

2. Appointment​ ​of​ ​Prime​ ​Consultant​ ​for​ ​Building​ ​Services 2.1 2.2

The​ ​chief​ ​superintendent,​ ​will​ ​approve​ ​the​ ​commission​ ​of​ ​a​ ​prime​ ​consultant​ ​for building​ ​services​ ​for​ ​each​ ​approved​ ​construction​ ​project. The​ ​standard​ ​form​ ​of​ ​agreement​ ​between​ ​the​ ​Board​ ​and​ ​prime​ ​consultant​ ​will include​ ​the​ ​following​ ​conditions: 2.2.1

2.2.2

Notwithstanding​ ​anything​ ​herein​ ​to​ ​the​ ​contrary​ ​contained,​ ​the​ ​prime consultant​ ​hereby​ ​represents​ ​and​ ​warrants​ ​to​ ​the​ ​Board​ ​that​ ​by​ ​competent, economical​ ​design​ ​of​ ​structure​ ​and​ ​building​ ​services​ ​including​ ​a​ ​careful selection​ ​of​ ​all​ ​equipment​ ​and​ ​materials,​ ​the​ ​prime​ ​consultant​ ​shall endeavour​ ​to​ ​contain​ ​the​ ​total​ ​cost​ ​of​ ​construction​ ​or​ ​the​ ​project​ ​(inclusive​ ​of the​ ​fee​ ​paid​ ​the​ ​prime​ ​consultant​ ​hereunder)​ ​to​ ​an​ ​amount​ ​which​ ​will​ ​be contributed​ ​towards​ ​such​ ​cost​ ​by​ ​the​ ​Government​ ​of​ ​the​ ​Province​ ​of​ ​Alberta in​ ​accordance​ ​with​ ​the​ ​applicable​ ​regulations​ ​established​ ​pursuant​ ​to​ ​the provisions​ ​of​ ​the​ ​School​ ​Buildings​ ​Act​ ​(or​ ​any​ ​similar​ ​legislation​ ​hereinafter enacted​ ​in​ ​lieu​ ​thereof.)

In​ ​the​ ​event​ ​it​ ​shall​ ​appear​ ​from​ ​the​ ​final​ ​cost​ ​estimate​ ​prepared​ ​by​ ​the​ ​prime consultant​ ​and​ ​submitted​ ​to​ ​the​ ​Board​ ​at​ ​least​ ​two​ ​weeks​ ​prior​ ​to​ ​calling​ ​of tenders​ ​that​ ​such​ ​total​ ​cost​ ​of​ ​construction​ ​will​ ​be​ ​exceeded,​ ​and​ ​following assurances​ ​to​ ​the​ ​satisfaction​ ​of​ ​the​ ​Board​ ​that​ ​the​ ​design​ ​was​ ​in​ ​accordance with​ ​clause​ ​2.2.1​ ​above,​ ​the​ ​prime​ ​consultant​ ​upon​ ​acceptance​ ​of​ ​the​ ​prime consultant’s​ ​final​ ​cost​ ​estimate​ ​by​ ​the​ ​Board​ ​shall​ ​proceed​ ​with​ ​the​ ​calling​ ​of tenders​ ​on​ ​behalf​ ​of​ ​the​ ​Board.

3. Construction​ ​Contracts

Calgary​ ​Roman​ ​Catholic​ ​Separate​ ​School​ ​District​ ​No.​ ​1 Administrative​ ​Procedures​ ​Manual

April​ ​2016 Page​ ​1​ ​of​ ​3

3.1

3.2

The​ ​Board​ ​will​ ​advertise​ ​publicly​ ​for​ ​tenders​ ​for​ ​school​ ​building​ ​construction.​ ​Tenders submitted​ ​for​ ​construction​ ​of​ ​school​ ​buildings​ ​will​ ​be​ ​opened​ ​by​ ​a​ ​representative​ ​of the​ ​district​ ​administration​ ​in​ ​the​ ​presence​ ​of​ ​contractors,​ ​and​ ​recommendation​ ​will subsequently​ ​be​ ​approved​ ​by​ ​the​ ​chief​ ​superintendent. Construction​ ​contracts​ ​entered​ ​into​ ​in​ ​accordance​ ​with​ ​the​ ​School​ ​Act​ ​provisions​ ​will set​ ​out​ ​the​ ​following​ ​requirements: 3.2.1 3.2.2 3.2.3

3.2.4

3.2.5

A​ ​performance​ ​bond​ ​for​ ​50​ ​percent​ ​of​ ​the​ ​contract​ ​price.

A​ ​labour​ ​and​ ​materials​ ​payment​ ​bond​ ​for​ ​50​ ​percent​ ​of​ ​the​ ​contract​ ​price​ ​at the​ ​district's​ ​discretion. Evidence​ ​of​ ​compliance​ ​with​ ​the​ ​requirements​ ​of​ ​the​ ​provincial​ ​Workers Compensation​ ​Act​ ​and​ ​Proof​ ​or​ ​Certificate​ ​of​ ​Recognition​ ​with​ ​Provincial Safety​ ​Program.

Evidence​ ​(certified​ ​copy)​ ​of​ ​maintenance​ ​by​ ​the​ ​contractor​ ​of​ ​comprehensive liability,​ ​elevators​ ​(if​ ​applicable),​ ​contractor's​ ​contingency​ ​liability,​ ​and automobile​ ​liability​ ​insurance​ ​(owned​ ​and​ ​unowned​ ​or​ ​hired​ ​units);​ ​such insurance​ ​to​ ​be​ ​maintained​ ​until​ ​final​ ​completion​ ​of​ ​the​ ​work,​ ​including making​ ​good​ ​of​ ​faulty​ ​work​ ​or​ ​materials,​ ​coverage​ ​of​ ​completed​ ​operations liability,​ ​which​ ​will​ ​be​ ​maintained​ ​for​ ​a​ ​12-month​ ​period​ ​following​ ​the​ ​date​ ​of substantial​ ​completion​ ​as​ ​certified​ ​by​ ​the​ ​prime​ ​consultant. A​ ​certified​ ​true​ ​copy​ ​of​ ​fire​ ​insurance​ ​with​ ​standard​ ​extended​ ​coverage endorsement​ ​in​ ​the​ ​joint​ ​names​ ​of​ ​the​ ​owner​ ​and​ ​contractor​ ​to​ ​a​ ​total​ ​of​ ​the total​ ​value​ ​of​ ​work​ ​done​ ​and​ ​materials​ ​delivered​ ​to​ ​the​ ​site,​ ​payable​ ​to​ ​the district​ ​and​ ​the​ ​contractor​ ​as​ ​their​ ​respective​ ​interests​ ​may​ ​appear. 3.2.5.1

In​ ​the​ ​event​ ​of​ ​occupancy​ ​of​ ​the​ ​building​ ​prior​ ​to​ ​completion,​ ​any increase​ ​in​ ​insurance​ ​cost​ ​will​ ​be​ ​at​ ​the​ ​owner’s​ ​expense.​ ​All​ ​such insurance​ ​will​ ​be​ ​maintained​ ​until​ ​a​ ​date​ ​10​ ​days​ ​after​ ​issue​ ​by​ ​the prime​ ​consultant​ ​of​ ​a​ ​certificate​ ​of​ ​completion.

4. Supervision​ ​of​ ​Construction 4.1 4.2

The​ ​district​ ​may​ ​assign​ ​employees​ ​or​ ​contract​ ​professional​ ​services​ ​to​ ​supervise​ ​the construction​ ​of​ ​any​ ​district-owned​ ​facilities. Buildings​ ​undergoing​ ​major​ ​changes​ ​where​ ​contractors​ ​are​ ​on​ ​the​ ​job​ ​will​ ​have​ ​no changes​ ​made​ ​in​ ​the​ ​plans​ ​or​ ​any​ ​additions​ ​made​ ​to​ ​old​ ​rooms​ ​except​ ​on​ ​the approval​ ​of​ ​the​ ​Director,​ ​Facilities.

5. Inspection​ ​and​ ​Acceptance​ ​of​ ​New​ ​Facilities 5.1 5.2

The district shall provide for an inspection, by competent employees or contracted professional​ ​staff,​ ​of​ ​any​ ​new​ ​facility​ ​prior​ ​to​ ​acceptance​ ​of​ ​the​ ​facility. Acceptance by the district will be conditional on a written inspection report being developed​ ​for​ ​the​ ​facility.

6. Public​ ​Dedication​ ​of​ ​New​ ​Facilities

Calgary​ ​Roman​ ​Catholic​ ​Separate​ ​School​ ​District​ ​No.​ ​1 Administrative​ ​Procedures​ ​Manual

April​ ​2016 Page​ ​2​ ​of​ ​3

6.1

The district recognizes and encourages the interest of the public in district facility development. The district, therefore, encourages public dedication of new facilities to inform​ ​and​ ​acquaint​ ​the​ ​public​ ​with​ ​district​ ​activities​ ​and​ ​facilities.

7. Memorials 7.1

No individual or group of individuals shall be permitted to erect any memorial or other structure of any kind in a school building or upon school grounds except by special permission​ ​of​ ​the​ ​Board.

Approval​ ​Date:

April​ ​12,​ ​2016

Reference:

Section​ ​20,​ ​60,​ ​61,​ ​113,​ ​152​ ​School​ ​Act Occupational​ ​Health​ ​and​ ​Safety​ ​Act Builder’s​ ​Lien​ ​Act Worker’s​ ​Compensation​ ​Act Funding​ ​Manual​ ​for​ ​School​ ​Authorities Policy​ ​and​ ​Requirements​ ​for​ ​School​ ​Board​ ​Planning​ ​and​ ​Reporting School​ ​Authorities​ ​Planning​ ​and​ ​Reporting​ ​Reference​ ​Guide

Calgary​ ​Roman​ ​Catholic​ ​Separate​ ​School​ ​District​ ​No.​ ​1 Administrative​ ​Procedures​ ​Manual

April​ ​2016 Page​ ​3​ ​of​ ​3

FACILITIES​ ​CONSTRUCTION

Administrative​ ​Procedure​ ​542 ... Administrative​​Procedures​​Manual .... The district, therefore, encourages public dedication of new facilities to.

85KB Sizes 1 Downloads 48 Views

Recommend Documents

facilities planning
Apr 12, 2016 - The Superintendent, Support Services will conduct audits of all district facilities annually. This audit will include: 2.1. Enrollment and capacity ...

7000 FACILITIES DEVELOPMENT.pdf
3. Furnishes or guarantees a performance or payment bond for other contractors on the. project. A construction management services contract to such a construction manager may only be. awarded though a competitive bid process. Under this policy, the t

Facilities Improvement Estimate.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Facilities ...

Facilities Check List
Comments. Apparatus checks completed & vehicles washed. Clean all restrooms. Clean dishes / kitchen Area. Sweep and mop floors/vacuum carpets. Clean and organize work stations. Bag all trash & recyclables (put out on pick-up day). Sweep and wash bay

Facilities-Use-Application.pdf
Sign in. Page. 1. /. 2. Loading… Page 1 of 2. Page 1 of 2. Page 2 of 2. Page 2 of 2. Facilities-Use-Application.pdf. Facilities-Use-Application.pdf. Open. Extract.

Use of Facilities Guidelines.pdf
Page 1 of 3. Use of Facilities Guidelines. St. Andrew's Presbyterian Church. 130 Clergy Street East. Kingston, Ontario, K7K 3S3. (613) 546 – 6316.

Postsecondary Education Facilities Inventory and ...
We are confident that this edition will have the same value and utility as its predecessors. ... Commission. Charleston, WV ...... boards (both public and private), state-level postsecondary education administrators, and campus administrators.

Cow Fish Facilities Mgr.pdf
There was a problem loading this page. Whoops! There was a problem loading this page. Cow Fish Facilities Mgr.pdf. Cow Fish Facilities Mgr.pdf. Open. Extract.

defense nuclear facilities safety board
Oct 16, 2007 - solutions to these significant and persistent safety issues. .... TGHS shall be designed and built to Performance Category (PC)-2 performance ... ton doors; (4) the backup hydraulic hand pump would not be capable of shutting ...