FIELD REPORT Project Project Name:
73 Sumner Street
Project Address:
73 Sumner Street, San Francisco, California
MCA Job No:
14075.00 FR
Report By:
Anna Villalobos
Report Date:
30 November 2015
Dates of Site Visit:
5 November 2015
Environmental Conditions Date of Site Visit Temperature 5 November 2015 63º F Personnel Company Everest Waterproofing (Everest) McGinnis Chen Associates, Inc. (MCA)
Report Number:
Time:
Humidity 49%
Job Description General Contractor Waterproofing Consultant
11
9:15 AM to 11:00 AM
Weather Partly Cloudy
Person(s) at Site Namgyal Tsering Anna Villalobos Derek Bigard
People 4 2
Observations MCA visited the Project site at 73 Sumner Street in San Francisco on November 5, 2015 to observe the work in progress by Everest Waterproofing. Observations were as follows:
Rausch Courtyard Elevation Spall Repair At the time of MCA’s site visit, Everest began making repairs of the concrete spall damage at the corner of the building on the Rausch Elevation. According to Namgyal (Everest), all of the rebar that showed corrosion was cleaned and coated with Sika Armatec 110, to protect the metal from further corrosion. Everest also attached wire lath and anchors along the opening where the spalled concrete was either removed or missing, to be used for strengthening the patch (Photos 1-3). MCA recommended that the existing metal flashing between the corner and the adjacent building remain in place, and that a sealant joint be installed between the new concrete patch and the metal flashing. Rausch Courtyard Elevation Window Frames Everest continued to prep the steel window frame where corrosion occurred in order to install new sealant (Photos 4-5). No exceptions were taken.
McGinnis Chen Associates, Inc. 415.986.3873
1019 Mission Street San Francisco, CA 94103
14075 – 151105 FR 11 Page 1 of 5
FIELD REPORT Photos Photo 1: Rausch Elevation, corner spall with coated re-bar and lath set into patch area for reinforcement.
Photo 2: Rausch Elevation, corner spall with lath set into patch area for reinforcement.
McGinnis Chen Associates, Inc. 415.986.3873
1019 Mission Street San Francisco, CA 94103
14075 – 151105 FR 11 Page 2 of 5
FIELD REPORT Photos Photo 3: Rausch Elevation, corner spall with lath set into patch area for reinforcement.
Photo 4: Rausch Elevation steel window frame sections with anticorrosion primer.
McGinnis Chen Associates, Inc. 415.986.3873
1019 Mission Street San Francisco, CA 94103
14075 – 151105 FR 11 Page 3 of 5
FIELD REPORT Photos Photo 5: Rausch elevation steel window frame sections with anticorrosion primer.
McGinnis Chen Associates, Inc. 415.986.3873
1019 Mission Street San Francisco, CA 94103
14075 – 151105 FR 11 Page 4 of 5
FIELD REPORT Attachments None. Distribution Lee Richardson, HOA -
[email protected] Susana MacKenzie, PMCHOA Management -
[email protected] Peter Vorhees, Everest Waterproofing & Restoration, Inc. –
[email protected] Namgyal Tsering, Everest Waterproofing & Restoration, Inc. –
[email protected] Jeff Chen, McGinnis Chen Associates, Inc. –
[email protected] Derek Bigard, McGinnis Chen Associates, Inc. –
[email protected]
End of Field Report If you have any comments or revisions regarding this report, please forward them to McGinnis Chen Associates, Inc. in writing within five (5) working days. AV:DB:sr
McGinnis Chen Associates, Inc. 415.986.3873