Division of Professions and Occupations Examining Board of Plumbers

GAS PIPING PERMIT APPLICATION (Separate permit required for plumbing)  Original permit

Add Fee for permit #

Application for permit by:  Plumbing Contractor reg. #_____________  Homeowner * (see clause below)  Gas Pipe Installer Complete this form. Incomplete applications will be returned for missing information. Permit applicant mailing address:

Job Site / Property address: If a designated numbered address is not available use lot, block, filing, or subdivision. Attach a map.

Name _____________________________________________________ Company / contractor OR Homeowner* __________________________________________________________ Address __________________________________________________________ City State Zip Code

_________________________________________________________ Property Owner _________________________________________________________ Job Address

Phone # (________)_________________________________

_________________________________________________________ City (that mail is postmarked from) County Job site contact phone number (required)_______________________

Cell # (_________)__________________________________

Directions: ________________________________________________

Fax # (_________)__________________________________ Must have a separate (dedicated) phone line for fax

_________________________________________________________ _________________________________________________________

Email: ____________________________________________________

Check mark (√ ) ALL boxes that best describe the gas piping installation. Describe work below:  Residential  Manufactured/Mobile/Modular homes (gas only)  Commercial  (CSST Cert # if CSST is used)  Replacement/Other (describe installation) Briefly describe work being performed: * HOMEOWNER CLAUSE: The Colorado Revised Statutes provide a homeowner the opportunity to perform Fuel Gas Piping installation provided the following conditions are true: You are the property owner and this property is not for sale, resale, or is not rental property. You reside or intend to reside at this property as your sole place of residence. You are doing the permitted work yourself and have a reasonable enough knowledge of fuel gas piping codes for a proper installation. By my signature below I attest the above statements are true. I understand that my homeowners insurance may not cover damages to my home due to construction accidents. SIGNATURE: ____________________________________ Date ____________ Fee enclosed $ ______________ By applicant performing work: Contractor or authorized representative / Homeowner * Fee calculated from page 2 MAKE CHECKS PAYABLE TO: STATE OF COLORADO – Do not staple the check to the application. NOTE: MAILED OR HAND-DELIVERED PERMITS MAY TAKE 5-7 WORKING DAYS TO PROCESS AFTER RECEIPT AND WILL BE MAILED, EMAILED, OR FAXED ACCORDING TO THE INFORMATION PROVIDED. PLEASE ENSURE THAT THE FEE IS CORRECT. PERMITS EXPIRE ONE YEAR FROM THE DATE ISSUED. NO REFUNDS WILL BE PROCESSED AFTER SIX MONTHS OF PERMIT ISSUE DATE. The content of this application must not be changed under penalty of Colorado Law.

1560 Broadway, Suite 1350 Fax 303.894.2310

Denver, Colorado 80202 www.dora.state.co.us

Phone 303.894.2300 V/TDD 711

GAS PIPING PERMIT FEES Fee Schedule effective: April 1, 2016 Fees are computed according to the appropriate chart below Residential Gas Piping Installations (Separate permit required for plumbing) (new construction, remodel, addition) Fuel Gas Piping System (by number of outlets i.e. furnace, water heater, fireplace, dryer, stove, etc.) + Base Fee Fuel Gas Service Line (After distribution point) + Base Fee Mobile home hook up inspection, pay base fee only Gas test for meter reset or LP turn on (No Base Fee) Base Fee (Waived when combined with plumbing permit ) Total fee

Nmb. of Outlets

x $24.00 x $32.00 x $104.00 $50.00 $ 104.00 $

Commercial Installation Gas Piping (Separate permit required for plumbing) (new construction, remodel, addition) Valuation (Total Contract Amount) of labor & materials: $ Commercial Installation – Work Sheet Less than $2,000.00 More than $2,000.00 ($28.00 per thousand)

Number (per thousand rounded up to the next thousand)

Fee

Sub Total

.00 (each thousand, ) x $28.00

.00

$

Base Fee (waived when combined with plumbing permit, secure plumbing permit first) Total fee

$

$ 104.00 $

Example: Valuation is $8,400 (rounded up to $9,000). Then 9 x $28.00 = $252.00 + $104.00 Base Fee = $356.00 Total Fee RE-INSPECTION FEE ($50): A re-inspection fee may be assessed when additional inspections are required when the job is not ready for inspection (if 5 or more correction items are cited), access is not provided, violations from the last inspection are not completed, etc. ADDITIONAL FEE: Additional fees will be assessed when: 1) Residential: Outlets not noted on the original permit application are discovered – fee is calculated per outlet. 2) Commercial: Additional work is added to the project – fee is calculated by additional valuation.

Permit fees are reviewed occasionally and may be adjusted as necessary.

PLEASE NOTE: Applicants should be prepared to do the following: • Use the online permit system to request an inspection when the job is ready. • Ensure that the work is completed within the time limitation of the permit. • Install piping according to the currently adopted edition of the Colorado Fuel Gas Code as amended. • Request a gas piping installation inspection prior to covering and a final inspection prior to occupancy.

1560 Broadway, Suite 1350 Fax 303.894.2310

Denver, Colorado 80202 www.dora.state.co.us

Phone 303.894.2300 V/TDD 711

Gas Piping Permit Application.pdf

Residential Manufactured/Mobile/Modular homes (gas only). Commercial (CSST Cert # if CSST is used). Replacement/Other (describe installation).

122KB Sizes 5 Downloads 224 Views

Recommend Documents

Read PDF Oil and Gas Pipelines and Piping Systems: Design ...
Systems: Design, Construction, Management, and ..... pdf new book review Oil and Gas Pipelines and Piping Systems: Design, Construction, Management, and ...

Read Oil and Gas Pipelines and Piping Systems ...
Read Oil and Gas Pipelines and Piping Systems: Design, Construction, Management, and. Inspection Full Download. Books detail. Title : Read Oil and Gas ...

Piping
Sep 15, 2011 - Primary Examiner * Walter D Gri?in. (30). Foreign Application Priority Data. ASSiSZllI'lZ Examiner i LessaneWork Seifu. (74) Attorney, Agent, or ...

PDF Oil and Gas Pipelines and Piping Systems
PDF Oil and Gas Pipelines and Piping Systems: Design, Construction, Management, and. Inspection Read online By #A#. Books detail. Title : PDF Oil and Gas ...

PDF DOWNLOAD Oil and Gas Pipelines and Piping Systems: Design ...
PDF DOWNLOAD Oil and Gas Pipelines and Piping. Systems: Design, Construction, Management, and Inspection Read Unlimited eBooks and. Audiobooks By ...

PDF Oil and Gas Pipelines and Piping Systems
PDF Oil and Gas Pipelines and Piping Systems: Design, Construction, Management, and. Inspection Best Book By #A#. Books detail. Title : PDF Oil and Gas ...

Homeowner's Guide for Plumbing and Gas Piping Installations.pdf ...
Examining Board of Plumbers. 1560 Broadway, Suite 1350 Denver, Colorado 80202 Phone 303.894.2300. Fax 303.894.2310 www.dora.state.co.us V/TDD 711.

PDF Oil and Gas Pipelines and Piping Systems: Design ...
PDF Oil and Gas Pipelines and Piping Systems: Design, Construction, Management, and. Inspection Full Review. Books detail. Title : PDF Oil and Gas Pipelines ...

PERMIT FEES
PERMIT FEES. Total Valuation. Fee x 0.65. $1.00 to 1,100.00. $ 36.00. $1,101.00 to 1,200.00. $ 38.50. $1,201.00 to 1,300.00. $ 41.25. $1,301.00 to 1,400.00.

Process Piping -
bellows expansion joints, estimating service life, submittal of Inquiries, aluminum flanges, and quality control in the 1990, 1993, 1999, and 2002 Editions, all designated as ASME B31.3. In a program to clarify the application of all Sections of the

CITY OF MESQUITE PERMIT #
Unit. Owner. Phone Number ( ) ... Use □ Single Family Detached □ Single Family Attached □ Multi-Family ... Permittee is to build according to above description and to the approved plans and specifications of the Building Code and to submit.

Wall/Fence Permit Process
Permit Package includes but is not limited to: 1. 2 site plans showing location of wall on property. 2. 2 engineered wall details or 1 copy of City Wall Standards. 3. 1 soils report (if required for retaining wall). 4. 1 signed permit application. 5.

Permit Applicaton.pdf
Applicant Name: Business Name: Email: Phone Number: Project Address: Block: Lot: Project Valuation: $ Project Sq. Ft : A/C:______ Non-A/C:______.

Reactor Piping Systems
oscillations in a nuclear reactor cavity, startup or stoppage of a centrifugal pump, ... fully understood so that a proper design of pipeline system can be ..... Streeter, V.L. e Wylie, E.B., Hydraulic Transients, McGraw-Hill Company, USA, 1967.