LAHORE RING ROAD PROJECT, (REVISED ALIGNMENT / SOUTHERN LOOP) INVITATION FOR INSTALLATION OF CONCRETE ROW PEGS All registered Survey & Mapping companies are hereby invited to submit their competitive quotations for Lahore Ring Road Project, (Revised Alignment / Southern Loop) for the following Scope of Works in accordance with attached Specifications / sketch:1) Setting out of centre line / ROW Limits at 25 m intervals including main points of curves i.e. TS/PC/ST/PT for a length of approx. 60 km. 2) Fixing of ROW concrete pegs

~5000 Nos.

The rates for setting out of centre line / ROW Limits plus fixing of ROW concrete pegs shall include compensation for supply, transportation of all material, fixing of precast ROW concrete pegs including excavation / backfilling (compacted) and salary of staff, costs of labour, tools, profit, overhead, taxes and incidental charges necessary to complete the work in all respect to the entire satisfaction of Nespak. All survey activities shall be supervised by Nespak Surveyors at no extra cost to the Contractor. The item one is optional and it may be carried out by Nespak surveyors depending upon the availability of staff. Sealed quotation will be received on the following address by June 1, 2009 at 10:30 hours and will be opened on the same date at 11:30 hours..

Vice President, H&TE Division, NESPAK House, 1-C, Block-N, Model Town Extension, Lahore. (Download) Invitation for fixing of ROW Concrete Pegs for Lahore Ring Road Project, (Revised Alignment / Southern Loop) and sketch

SETTING OUT OF CENTER LINE / ROW LIMITS AND INSTALLATION OF CONCRETE ROW PEGS ON LAHORE RING ROAD PROJECT ALONG REVISED ALIGNMENT AND SOUTHERN LOOP (~ 60 KM) 1.0

SPECIFICATIONS

1.1

General The setting out of center line and subsequently ROW limits shall be the basic requirement for installation of concrete ROW pegs at 25m intervals and main points (i.e. start and end points) of all curves. Nespak desires to hire the services of reputed and experienced registered private parties (Contractors / Survey Company (ies). The work shall be carried out using modern instruments operated by experienced surveyors and assisted by other technical staff to fix the quality concrete Pegs. The setting out of center line is optional and it may be carried by Nespak surveyors. All field works shall be carried out under the supervision of Nespak surveyor(s) at no extra cost to the Contractor.

1.2

Location of Project The project alignment follows an entirely new route in the suburb of Lahore metropolis. The location map is attached for guidance of the bidders to acquaint themselves with the project area and check the accessibility of site.

1.3

Scope of Works The required Scope of Works shall mainly comprise the following items:♦

Setting out of centre line & ROW limits / boundaries at 25 m intervals including main points of curve i.e. PC and PT for a length of approx. 60 km.



Fixing of ROW concrete pegs of the required concrete Nos. strength of 2400 psi

~5,000

Note: - The project shall be executed in stages according to finalized design of different packages comprising each about 10 to 20 km each. If there is some delay in finalization of design of any package, no extra cost towards mobilization / demobilized (if any) shall be entertained for such temporary stoppage of work.

1.4

Methodology of Work The procedure to be adopted by the Contractor / Surveying Company for Scope of Works shall require the following tasks:

1.4.1

Setting out of Centerline and Fixing of Concrete Pegs The setting out of centerline and ROW limits shall be carried out by using modern equipment in accordance with setting out data of horizontal alignment of the project utilizing horizontal controls. The Contractor / Survey Company will set out center line and fix ROW limits with wooden pegs at site or alternatively location of pegs may be provided by Nespak Surveyor. The Contractor shall replace the wooden pegs with precast concrete Pegs as per given Sketch / Plate No.1. The area around concrete peg shall be filled back with common material and compacted well to the satisfaction of the supervisor.

1.4.2

Handing over of Concrete Pegs The completed work of concrete pegs shall be handed over to PMU’s Representative on weekly basis or as agreed at site. The concrete pegs with defects in fabrication or installation shall be removed and replaced with accepted one at no extra cost to NESPAK.

1.4.3

Remedy of Defective Work and Maintenance of Concrete Pegs The Contractor shall be responsible for all defective work and to replace Peg(s) if required. The Contractor shall maintain his work for a period of one month from the last date of handed over all the pegs are to PMU’s Representative. At the time of final handing over, any concrete peg if found missing shall again be installed by the Contractor at his own cost.

1.5

Payment of Advance No advance payment shall be made.

1.6

Mode of Payment The following payments will be made for ROW concrete pegs installed and accepted by the Employer’s Representative:-

-

1.7

On completion of work of any Package (may be comprised 10 to 20 km each) i.e. No of concrete pegs fixed at site and accepted / approved by the Consultant / Client in accordance with agreed rate.

90%

On issuance of completion Certificate

10%

Performance Bond The successful bidder shall have to submit performance bond from any scheduled bank of Pakistan equivalent to 10% of the contract value.

1.8

Certificate of Site Visit A statement in writing shall be submitted by the bidder certifying that he has visited the site and familiarized himself with all conditions which may affect his quotation / bid and that he has no query whatsoever such as access to site, etc.

1.9

Document to be Submitted with the Bid

1.

Registration Certificate of the company

2.

Details of available technical / non-technical staff

3.

List of similar Jobs completed and in-hands

4.

Rate analysis along with break up calculations

1.10

Bill of Quantities Item

Description

Unit

Quantity

No. 1

Setting out of center line /

km

60

N0.

5,000

Rate

Amount

Rs.

Rs.

Row limits @ 25 m intervals + main points of curve. 2

Installation of concrete pegs along ROW limits at 25 m intervals as per attached Sketch / Plate No.1

Note: Item No.1 is optional and it may or may not be awarded as part of the Scope of Work.

LAHORE RING ROAD PROJECT - MarkMail

concrete pegs including excavation / backfilling (compacted) and salary of staff, costs of labour, tools, profit, overhead, taxes and incidental charges necessary to complete the work in all respect to the entire satisfaction of Nespak. All survey activities shall be supervised by Nespak Surveyors at no extra cost to the. Contractor ...

3MB Sizes 7 Downloads 198 Views

Recommend Documents

Rangers Officer's Mess Lawns, Zarar Shaheed Road, Lahore Cantt ...
Tel: 042 99220779. Directions: Green filled circle --------- point B on the map. Blue line showing the way if you are coming from mall road. You can take the.

Road construction planning and project management.pdf ...
Road construction planning and project management.pdf. Road construction planning and project management.pdf. Open. Extract. Open with. Sign In.

US Platform - Installation Guide - MarkMail
Mar 3, 2010 - Java version – jdk 1.6. Microsoft Visual C++ 2005 Service Pack 1 Redistributable Package ATL Security Update. R10 TAFC. R10 Model Bank ...

Final Interview List Lahore upload.pdf
Final Interview List Lahore upload.pdf. Final Interview List Lahore upload.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Final Interview List ...

THE UNIVERSITY OF LAHORE Computer Science & IT ...
Computer Networks & Telecommuniction (Major). Sub-Areas: ... Pervasive computing → Network Security ... Cloud Computing→Adoption Issues & Strategies,.

Verifiable Ring Signature
considers a ring authentication scheme that accepts variety of public-keys and a .... During the above scheme, Rivest et al. define a family of keyed combining.

Industrial Open House & Career Fair University of ... - Lahore - iohcf
Closing Ceremony. Yes along with shield. Yes along with shield. Shield only. -. Event Directory and. Graduates Resume CD. 10 copies. 5 copies. 3 copies.

Ring of Honor.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Ring of Honor.

ADS-Ring Curr
Sign on. SAO/NASA ADS Astronomy Abstract Service. · Reads History ... mhtml:file://C:\Users\rmmc\Documents\pub_www\pubs\ADS-Ring Current Decay Time .

Controllable Ring Signatures
modularly derived from the paradigm [5]. Here we omit the proof from scratch. Fact 3. SSign /SVerify is transformed from the identification protocol based DLP.

Hailey College Lahore 13 Sep 2015 Result.pdf
... Sadiq Muhammad Sadiq Khan 35202-3083493-2 63. 47 39009 AMIR RAZZAQ ABDUL RAZZAQ 34102-3443972-9 63. 48 39106 Nimra Batool Munir Ahmad ...

Mosquée Wazir Khan Lahore - Pakistan.pdf
Mosquée Wazir Khan Lahore - Pakistan.pdf. Mosquée Wazir Khan Lahore - Pakistan.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Mosquée ...

Verifiable Ring Signature
Abstract: We introduce a verifiable ring signature that not only has all the properties of a ... Keywords: Public-key cryptography, Digital signature, Ring signature.

Borromean Ring Signatures - Semantic Scholar
Jun 2, 2015 - We call f an admissibility function; then an admissible set V of verification keys is one .... efficient protocols, ACM Conference on Computer and Communications Security, 1993, pp. ... 20Cryptology/HTML/PDF/C89/239.PDF. 11.

Double-Ring Infiltrometer - Humboldt Mfg
Attach 3/8" ID tubing to fittings as shown in mariotte tube layout diagram after driving tubes into ground. ... Fax: 1.708.456.0137. Email: [email protected].

jewelry-ring-sizing.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

the ring ma.pdf
Thering 4shared.comdownload free 2. You shall bethefellowship ofthering bymurr maing on deviantart. Street performer isaac hou doesa. routineto prove heis ...

M80 RING RD -
MERLYNSTON CREEK. ANDERSON RD. M. C. B. R. Y. D. E. S. T. M80 RING RD. GREENSBOROUGH. JUKES RD. CAMP RD. MAJOR RD. LYNCH RD. S. A. G.