SIGNED MOA (As of March 31, 2016) NO. NAME OF PROJECT 1 Concreting of Sugod- Tuka I 2 Concreting of Ampao - Raya 3 Concreting of Picalilangan Baguingen Road Binidayan 4 Construction of Bubonga ranao Water System Level III, Binidayan 5 Concreting of Pantaon-Inudaran-Luguna Road, Calanogas 6 Improvemet of Access Road and Tourism Development of Sheik, Makhdum Cultural Center, Simunul 7 Concreting of Road Ibotegen-Panatan Boundary Pigcawayan, Sultan Kudarat 8 a. Concreting of Macabiso-Namuken-Tereken Road (Phase II), Sultan Mastura b. Concreting of Solon - Limakaso Road, Sultan Mastura c. Construction of Simuay Seashore Fish Port, Sultan Mastura 9 Concreting of Mother Barira - Sitio Kalilangan Sitio Madalum, Nabalawag Road, Barira, Maguindanao 10 Concreting of Liong - Mother Barira Road, Barira Maguindanao 11 Concreting of Edcor - Dinganen - Pigkawayan Road (Phase I) Buldon 12 Construction of Sapad - Kidama Coastal Road, Matanog 13 Development of Marayag Lake for Irrigation and Eco-Tourism Project, Matanog 14 Concreting of Brgy. Balintad A - Brgy. Paggaoalupa Road, Ganassi 15 Concreting of Brgy. Lumbac - Brgy. Madaya Road, Ganassi, 16 Concrete Widening of Brgy. Madaya - Brgy. Tabuan Road, Ganassi 17 Concreting of Brgy. Pagalongan - Brgy. Barit Road, Ganassi 18 Construction of Brgy. Poblacion Water System Level III, Ganassi 19 Construction of Flood Control Brgy. Poblacion, Taganonok Macabao and Compongaraya, Ganassi

LGU Bacolod, Kalawi Bacolod, Kalawi

PROJECT AMOUNT 28,000,000.00 12,000,000.00

Date Feb. 22, 2016 Feb. 22, 2016

Binidayan

12,000,000.00

Feb. 22, 2016

Binidayan

5,000,000.00

Feb. 22, 2016

Calanogas

12,000,000.00

Feb. 16, 2016

Simunul, Tawi-Tawi

80,000,000.00

Feb. 22, 2016

Sultan Kudarat

48,000,000.00

Feb. 22, 2016

Sultan Mastura

10,000,000.00

Feb. 16, 2016

Barira

69,600.00

Feb. 16, 2016

Barira

108,000,000.00

Feb. 16, 2016

Buldon

Feb. 16, 2016

Matanog

96,000,000.00

Feb. 16, 2016

Matanog

20,000,000.00

Feb. 16, 2016

Ganassi

12,000,000.00

Feb. 16, 2016

Ganassi

12,000,000.00

Feb. 16, 2016

Ganassi

6,000,000.00

Feb. 16, 2016

Ganassi

10,000,000.00

Feb. 16, 2016

Ganassi

10,000,000.00

Feb. 16, 2016

Ganassi

6,000,000.00

Feb. 16, 2016

SIGNED MOA (As of March 31, 2016) 20 Concreting of Kabamakawan -Tabuan - Bayanga Road, Kapatagan 21 Concreting of Bongabong Proper-Bowan Road (New) Kapatagan 22 Concreting of Pinantao Road (Plasen - Lower Itil Section ), Kapatagan 23 Completion of Katotongan-Milaya-Boot Road Wao 24 Concreting of Linindingan Dimapara Road, Pagawayan 25 Construction of Ngirngir Water System Level II 26 Concreting of Ihan Proper Road, Piagapo, LDS 27 Concreting of Udalo - Palacat Road, Piagapo, LDS 28 Concreting of Gacap - Tawaon Road (WatoPantaorogat Road) Piagapo 29 Conc. Of Bohe Lebung Tipo-Tipo Cambug, AlBarka, Basilan 30 Conc. Of Borona - Lumbayao Road, Balindong, LDS 31 Conc. Of Abaga Road 32 Conc. Of Talob-Dagandal 33 Conc. Limbo Road, Wato 34 Const. Of Lalabuan Water System Level III 35 Const. Of Salipongan-Bantogawato Cadayunan Water System Lever II 36 Conc. Of Lower Sinangkapan Upper Sinangkapan Road 37 Conc. Caddayan - Lower Batobato (Masilung) Road Akbar 38 Concreting from Singkapa upper Singkapan Road 39 Conc. From Bohe-Bakung - Mangalut Manggaso Road 40 Conc.from Lantawan Highway - Campo Barnes Lantawan 41 Conc. Of Tipo-Tipo National Highway Badja-Banit Road 42 Conc. Of Pipil-Kamamburingan Road 43 Conc. From Ungkaya Pukan Highway - Bohe PahuLamaburingan-Pipil Road, (Phase I) 44 Conc. From Bagundan - Silangkan Matata Road

Kapatagan

36,000,000.00

Feb. 16, 2016

Kapatagan

14,000,000.00

Feb. 16, 2016

Kapatagan

12,000,000.00

Feb. 16, 2016

Wao

48,000,000.00

Feb. 16, 2016

Pagawayan

12,000,000.00

Feb. 16, 2016

Pagawayan

5,000,000.00

Feb. 16, 2016

Piagapo

12,000,000.00

Feb. 16, 2016

Piagapo

12,000,000.00

Feb. 16, 2016

Piagapo

60,000,000.00

Feb. 16, 2016

Al-Barka

28,000,000.00

Feb. 16, 2016

Balindong

6,000,000.00

Feb. 16, 2016

Balindong Balindong Balindong Balindong

6,000,000.00 6,000,000.00 6,000,000.00 5,000,000.00

Feb. 16, 2016 Feb. 16, 2016 Feb. 16, 2016 Feb. 16, 2016

Balindong

5,000,000.00

Feb. 16, 2016

Akbar

28,000,000.00

Feb. 16, 2016

Akbar

19,600,000.00

Feb. 16, 2016

Akbar

14,000,000.00

Feb. 16, 2016

Akbar

28,000,000.00

Feb. 16, 2016

Lantawan

14,000,000.00

Feb. 16, 2016

Tipo-Tipo

28,000,000.00

Feb. 16, 2016

Tipo-Tipo

56,000,000.00

Feb. 16, 2016

Tipo-Tipo

28,000,000.00

Feb. 16, 2016

Tipo-Tipo

14,000,000.00

Feb. 16, 2016

SIGNED MOA (As of March 31, 2016) 45 Conc. From Giong Sahaya Bohebato Road 46 Conc. Of Circumferencial Road, Brgy. Sarmiento 47 Conc. Of Brgy. Timbangan-Magsaysay Road 48 Cons. Of Litayin Seaport (Phase II), Bongao Island 49 Conc. Of Marogong Malabang Road (Road Opening), Marogong 50 Const. Of Marogong Water System level II (Bagumbayan, Mantaiwco, Cabasaran Chera) 51 Conc. Of Bayang - Marogong - Malabang Road (Phase II) 52 Conc. Of Tairan Lawila Road, 53 Conc. From Tuburan Calut Road, Tuburan 54 Conc. Form Katipunan - Lower Sinangkapa Road 55 Conc. Of Tablas Usen- Lower Tablas 56 Conc. Of Lower Sinangkapan - Katipunan Road 57 Conc. Of Tuburan Highway-Brgy Bohe Tambis Road 58 Conc. From Sinulatan-Bato-Babag-Tambutambo 59 Conc. Of Tuburan Highway-Brgy Bohe Tambis Road (Phase I) 60 National Road, Tipo-Tipo-Brgy. Bohe Bessey 61 Conc. Of Brgy. Bohe Bessey 62 Conc. Of Brgy. Baimbing-Brgy.Balobo 63 Conc. Of Brgy. Campo - Brgy. Balogo 64 Conc. Of Lamitan City to Palm Beach (T-Type) 65 Const. Of Lamitan Highway-Baas-Lebbah Road 66 Conc. From Lamitan Highway Ubit-Bohe YawasLumuton Road 67 Conc. From Lamitan highway Limook-BaloboBulingan Road (Phase II) 68 Conc. From Lamitan Highway-Parang BasakBalimbing-Cabobo Road 69 Conc. Of Brgy. Luksumbang - Brgy. Balumo Isabela City 70 Conc. From Tuburan Highway Mahawi - Calut Road 71 Conc. From Katipunan - Lower Sinangkipan Road

Sumisip

25,200,000.00

Feb. 16, 2016

Parang

12,000,000.00

Feb. 16, 2016

Parang

24,000,000.00

Feb. 16, 2016

Parang

5,000,000.00

Feb. 16, 2016

Marogong

18,000,000.00

Feb. 16, 2016

Marogong

10,000,000.00

Feb. 16, 2016

Marogong

12,000,000.00

Feb. 16, 2016

Basilan Pandag

21,000,000.00 35,000,000.00

Feb. 16, 2016 Feb. 16, 2016

Tuburan

16,800,000.00

Feb. 16, 2016

Tuburan

14,000,000.00

Feb. 16, 2016

Tuburan

28,000,000.00

Feb. 16, 2016

Tuburan

28,000,000.00

Feb. 16, 2016

Tuburan

28,000,000.00

Feb. 16, 2016

Tuburan

14,000,000.00

Feb. 16, 2016

Lamitan City Lamitan City Lamitan City Lamitan City

28,000,000.00 28,000,000.00 28,000,000.00 28,000,000.00

Feb. 16, 2016 Feb. 16, 2016 Feb. 16, 2016 Feb. 16, 2016

Lamitan City

7,000,000.00

Feb. 16, 2016

Lamitan City

28,000,000.00

Feb. 16, 2016

Lamitan City

14,000,000.00

Feb. 16, 2016

Lamitan City

54,000,000.00

Feb. 16, 2016

Lamitan City

28,000,000.00

Feb. 16, 2016

Lamitan City

42,000,000.00

Feb. 16, 2016

Tuburan

35,000,000.00

Feb. 16, 2016

Tuburan

16,800,000.00

Feb. 16, 2016

SIGNED MOA (As of March 31, 2016) 72 Conc. Of Tablas Uen - Lower Tablas 73 Conc. Of Lower Sinangkapan-Katipunan Road 74 Conc. Of Tuburan Highway-Brgy. Bohe Tambis Road 75 Conc. From Simulation-Bato Babag-Tambutambo 76 Conc. Of Tuburan Highway-Brgy. Bohe Tambis Road (Phase I) 77 Completion of Poona Bayabao Water System, Poona

Tuburan

14,000,000.00

Feb. 16, 2016

Tuburan

28,000,000.00

Feb. 16, 2016

Tuburan

28,000,000.00

Feb. 16, 2016

Tuburan

28,000,000.00

Feb. 16, 2016

Tuburan

14,000,000.00

Feb. 16, 2016

Bayabao

15,000,000.00

Feb. 16, 2016

MARCH 2016.pdf

29 Conc. Of Bohe Lebung Tipo-Tipo Cambug, Al- Barka, Basilan Al-Barka 28,000,000.00 Feb. 16, 2016. 30. Conc. Of Borona - Lumbayao Road, Balindong, LDS ...

250KB Sizes 1 Downloads 409 Views

Recommend Documents

Monday, March 21, 2016 Tuesday, March 22, 2016 Wednesday ...
Mar 23, 2016 - Off-site. COLL, GRAD. Wednesday, March 23, 2016. Thursday, March 24, 2016 .... 2:20 PM. The Internet of Things. BCEC 106. PCI. 1:30 PM. 2:30 PM ..... Technical Talk Series: Social Networking Across Technologies.

1 USABO SEMIFINAL EXAMINATION March 13 to March 22, 2013 ...
vein that supplies blood to the stomach in half.” There was a biology error in the report. What is it? A. The colon and ..... 28. 98. In spring, indigo buntings migrate from the southern states to the northern states. Which mechanism is involved? A

March 2007
Mar 1, 2007 - Sunday. Monday. Tuesday. Wednesday. Thursday. Friday. Saturday. 1. K-Bar. 2. 3. 4. Teacher. Workday. 5. 6. Reading Test. 7. 8. K-Bar. 9. 10. 11. Brantley's. Birthday!! 12. 13. 14. Project Due. 15. K-Bar. 16. 17. 18. Spring. Break. 19. S

Monday, March 21, 2016 Tuesday, March 22, 2016 Wednesday ...
Mar 23, 2016 - 10:00 AM. 12:00 PM. MATHCOUNTS .... (HOC) Walking Tour*. Off-site. COLL, GRAD. Wednesday, March 23, 2016. Thursday, March 24, 2016 ..... Technical Talk Series: Social Networking Across Technologies. BCEC 153 AB.

LatticeGrid March 2011
How to get LatticeGrid. • About: http://wiki.bioinformatics.northwestern.edu/index.php/ ... All reports are available as pdf, word or excel and fully hyperlinked.

March 2008
Juniors – Georgia. High School. Graduation Test. Juniors – Georgia. High School. Graduation Test. Juniors – Georgia. High School. Graduation Test. Juniors – ...

160318_BTB MARCH Calendar_Updated_3.18.16_docx.pdf ...
Mayor's Cup 8:00 a.m. – 3:00 p.m. RFK Community Schools. March 8 MS UNIT – Track ... Silence 9:00 a.m. – 11:00 a.m. RSG Office, RSG North Office. March 11 YDP ... March 12 ES UNIT – District Wide Softball ... March 12 MS UNIT – MTAC College

28 March 2006 - Sites
But I can make my theory of Magical. Medicine completely consistent with the evidence (like a conspiracy theory). • e.g. I ascribe different maladies to the.

march 2013
Please email. Diana at ufladligroup.gmail.com with your suggestions. ... http://ufladligroup.blogspot.com/. Note: These are for the UFLA ... http://www.ixl.com/. 2 of 2. LeVcia Heredia Le cia Heredia is an amaizing 1st grade teacher from Cuernavaca,

March 2009
Mar 1, 2009 - GHSGT Review /. Pre-Lab. Formal Solubility. Lab. Copper Sulfate + ammonia lab / concentration vs. temperature. Colligative. Properties. 22. 23. 24. 25. 26. 27. 28. Mid term Review. Packet (GHSGT). Mid term Review. Packet (GHSGT). Mid te

21 March: Sharpeville Day
Mar 21, 2015 - In 1946 in South Africa the great, hundred-thousand-strong African Mineworkers' ... Day Stay-away and Anti-Pass Campaign of the late 1950s, each major ..... At the beginning of 1961, the decision was taken to launch ...

Moratorium expires March 16
Mar 14, 2016 - The company has several programs to help Hoosiers manage costs. ... Customers are also encouraged to apply for all residential (home ...

March edition.pdf
from an African proverb. Thought for the. month... “Sail”. Ella Wheeler Wilcox. But to every ... Fourth Annual Five Town Special Olympics School ... Summer Camp Opportunity!!! ... consider summer camp for your students. ... March edition.pdf.

March 2010
How much would it cost? 7 READ an e-Book Week begins today. Don't have an e-reader? Download the free BLIO e- reader and start enjoying your e-books. 9. 10 CREATE an illustrated journal page using paints, photos, words and/or letters from newspapers/

march meeting
Experimental loophole-free violation of a Bell inequality ... Communication is limited to speed of light. 2. Settings a,b can ... addressed = “loophole-free” Bell test.

Moratorium expires March 16
Mar 14, 2016 - payments to be made in smaller increments over several months. Vectren also has a wide offering of energy efficiency programs for customers.

March Lunch.pdf
at lunch everyday. 25 26. Strawberry Pop Tart. Chicken Tenders. 27. Blueberry Muffin. Orange Chicken. 28. French Toast. Pizza. 29. Egg & Cheese Sliders. Popcorn Chicken. 30. Chewy Apple/. Cinnamon Bar. Bean & Cheese. Burrito. 31. March 2018. Page 1 o

march 2016
Mar 1, 2016 - Township Beautiful. Wednesday, March 23rd. 7:00 - 8:00 P.M.. Join us for this family-friendly presentation. Refreshments will be serviced. St. Patrick's Day Craft. Make your own candy dish o' gold. Saturday, March 12th. 1:00 pm. One fre

March Elementary.pdf
3) PBJ Sandwich*. Glazed Carrot Coins. Vegetable Tray. Applesauce. Mini Ice Cream Sandwich. Snack: Watermelon. 23. 1) Pancakes* with Sausage Links.

MARCH cal.pdf
Daylight Saving. Time- turn. clocks –turn. clocks ahead! CD C. Leader of the. Week: Emily. Page 1. MARCH cal.pdf. MARCH cal.pdf. Open. Extract. Open with.

March Madness.pdf
Page 1 of 2. Prairie du Chien Parent Teacher Organization. President ~ Diane Zahara Vice President/ Secretary ~ Karen Moris Treasurer ~ Chris Kotte. 1. March Madness. Let's take a break from Door to Door sales. Instead of doing our Spring Pastry Puff

March Newsletter.pdf
child does something mean to their sibling, you can ask if they are being a bucket filler. or dipper? If they are dipping, ask what they can do to fill up their sibling's bucket in- stead. If you want to check out this book and many others, please vi

March Newsletter.pdf
Hypnotics are drugs used to induce sleep. There are multiple. drug classes that possess the ability to cause hypnosis either as. a secondary or primary action.

March 2010
http://ed.sc.gov [email protected]. 27 What's in a name? It's National Joe. Day! Have everyone call you “Joe” or “Josephine”. Write a newspaper article about your ... Henry's biography. 23 Begin the day with the newspaper, and increase your