No. NHSRCL/Vacancy Notice-28/2017 National High Speed Rail Corporation Limited (NHSRCL), is a joint sector company of Govt. of India and Participating State Governments formed for implementation of High Speed Train Corridor Project in India. It is one of the most ambitious project in rail infrastructure sector, to give economy a boost and to build first ever high-speed rail corridor of India, between MumbaiAhmedabad. The corporation is planning to position itself as one of the best employers by adopting modern HR practices and is designing an employee’s friendly HR policy. To work with NHSRCL will not only give exposure to its employees in terms of best in class technology but will also provide other benefits. The company invites application from the regular/contractual officers/managers working in Central Public Sector Undertakings (or SPVs)/Metro Railways for the post of Manager (Signal Design) on absorption/deputation basis in its Project Office at Ahmedabad:Organisation NHSRCL Title of post-No Manager (Signal Design) – 1 of vacancies Place of posting
Ahmedabad
Scale
E3 (24900-50500)
Education Qualification
Diploma or B. Tech/B.E (Electronics and Telecommunication/Computer Engg/Information Technology) from any recognized university
Eligibility criteria For the post of Manager for absorption (A) Minimum 5years work experience (B) The candidate should have experience of at least 2 years of working in the areas detailed in job description of the post Eligibility Criteria for Deputation
(A)
(B)
Minimum 5 years work experience and open to Officers/Managers working in analogous grade or working in grade Rs 20600-46500 (IDA E2) The candidate should have experience of at least 2 years of working in the areas detailed in job description of the post Deputation would be for a period of 5 years.
Mode of Selection
1. Shortlisted candidates would be required to make a small presentation on the jobs handled by them and their experience in the areas detailed in the job description of the post. 2. Interview The officer will be expected to perform following functions :- Assist the NHSRC team at Corporate office in (i)
Job Description
Study and review of basic and detailed design of Signalling and Telecommunication systems. (ii) Study and Review of Yard Plans, track alignments etc. (iii) Study and Review of Signalling Plans, Block Sections and preparation of Signalling Interlocking tables etc. (iv) Study and Review of detailed circuit designs. (v) Study and Review of Audio frequency track circuit plans for the project. (vi) Study and Review of Automatic Train Control System Data. (vii) Study and Review of Automatic Train Supervision and other related systems. (viii) Testing and Commissioning of Interlocking and Automatic Train Control Equipments. (ix) Any other job as assigned by Management
How to apply
For Absorbees :- The candidates applying for absorption should submit their application to General Manager/HR as per enclosed application form. For Deputationists :- The candidate applying for deputation should submit their application through proper channel to General Manager/HR as per enclosed application form requesting their parent organisation to forward their application along with NOC, D&AR and Vigilance Clearance and APARs ratings for the preceding 03 years to NHSRCL. For proper appreciation of APAR, as applicable, the organisation should forward their guidelines for determining the rating criteria. The envelope containing the application should be superscripted “Application for the post of Manager (Signal Design). The application should be addressed to General Manager(HR), National High Speed Rail Corporation Limited, Asia Bhawan, Road-205, Sector-9 Dwarka, New Delhi-110077. Last date of Application reaching the addressee either by post or by hand is 29.09.17.
Diploma or B. Tech/B.E (Electronics and. Telecommunication/Computer Engg/Information Technology) from. any recognized university. Eligibility criteria.
Page 3 of 130. Whoops! There was a problem loading this page. 2017 high-speed-rail-in-ontario-final-report.pdf. 2017 high-speed-rail-in-ontario-final-report.pdf.
... and delivery models; and seeking financial approvals. I wish to thank you and your colleagues for your cooperation throughout the mandate and wish. the Government well in delivering its bold commitment to create Canada's first High Speed Rail. se
... Control, Fare Collection, and Rolling Stock. Page 2 of 2. Main menu. Displaying Dallas to Houston High-Speed Rail Draft Environmental Impact Statement.pdf.
You can also use a smartphone barcode app to scan the block to the left to access the registration webpage. Credit: SF Gate. Credit: SF Gate. Credit: CHSRA.
There was a problem loading this page. Retrying... Whoops! There was a problem loading this page. Retrying... Revenue sharing mechanisms for airline-High Speed Rail cooperation under congested hubs.pdf. Revenue sharing mechanisms for airline-High Spe
Page 1 of 2. 1. Advt. No: MMRCL/HR-Intern (W)./2017-18 Date: 28th November 2017. MMRCL Notification for Winter Internship -2017-18. Mumbai Metro Rail Corporation Limited a Joint Venture company of Govt. of India and Govt. of Maharashtra is implementi
Mumbai Metro Rail Corporation Limited.pdf. Mumbai Metro Rail Corporation Limited.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Mumbai ...
ADVT NO: NMRCL/HR/03/2017 DATED: 16/01/2017. REQUIREMENT OF EXPERIENCED EMPLOYEES FROM GOVT.METRO RAIL / GOVT. ORGANIZATION/ ... Metro). 13500-. 25500. Graduate. from a Govt. Recognized. University/. nstt. Minimum 1 year Experience in. Govt. Metro Ra
4 AM(HR) â E1 02. (1 for NGP. Metro and 1. for Pune. Metro. 20600-46500 Full time. MBA(HR) or. Master Degree. in personnel. Management. with 60% Marks.
6 days ago - (2 semesters completed). Environ- Graduate in. MUMBAI METRO RAIL CORPORATION LIMITED. (A JV company of Govt. of India and Govt. of Maharashtra). NaMTTRI Building, Plot # R-13, 'E' Block, Bandra-Kurla Complex, Bandra (E),. Mumbai - 400 05
Whoops! There was a problem loading this page. Retrying... Bangalore-Metro-Rail-Corporation-limited.pdf. Bangalore-Metro-Rail-Corporation-limited.pdf. Open.
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 2010 The Green ...
Jan 16, 2017 - construction and maintenance of launching. girders/tunnel during his tenure in Metro. OR. Diploma in Engineering or equivalent with. 26 years' ...
Whoops! There was a problem loading more pages. Retrying... Mumbai Metro Rail Corporation Recruitment [email protected]. Mumbai Metro Rail Corporation Recruitment [email protected]. Open. Extract. Open with. Sign In. Main menu. Displaying Mumba
party systems with minimum IT effort. ⢠Reduce tag deployment times. ⢠Quickly make ... proprietary performance data to third parties. The online marketing team depended entirely on available IT staff for all ... custom HTML tag, Rail Europe was