News Release Vectren Corporation One Vectren Square Evansville, IN 47708

May 2, 2016 FOR IMMEDIATE RELEASE Media contact: Natalie Hedde, 812-491-5105 or [email protected]

Gas pipeline upgrades underway in Hagerstown Hagerstown, Ind. — Contract crews working for Vectren Energy Delivery (Vectren) have begun replacing gas mains and service lines in Hagerstown as part of the company’s pipeline replacement program, which is a multiyear program to replace about 1,200 miles of bare steel and cast iron pipeline infrastructure throughout Indiana. In Hagerstown, more than $960,000 will go toward retiring more than 1.3 miles of gas main and more than 130 service lines in 2016. Since 2008, more than one mile has been retired within the city. Vectren intends to retire a total of six miles in Hagerstown over the next several years. “To ensure the continued reliability of our natural gas pipeline systems and service, Vectren has undertaken a program to replace essentially all of our bare steel and cast iron pipeline infrastructure in addition to other improvements to our natural gas delivery system,” said Mike Roeder, Vectren Energy Delivery of Indiana-North president. “These infrastructure enhancements are vital to meeting federal requirements and ensuring the continued safety of our system for decades to come.” Streets affected during the project include: N. Maple Street, W. High Street, W. Harrison Street, W. North Market Street, N. Pearl Street, W. College Street, W. Main Street (SR 38) and N. and S. Washington Street. Visit the Active Projects tab on www.vectren.com/pipelinereplacement to view an interactive map displaying all streets in Hagerstown where construction will take place in 2016. In most cases, a polyethylene (plastic) system is being installed to replace the current bare steel and cast iron gas pipeline system. First, the gas main, which is a gas pipeline that ranges in size from 2” to 8” and is often underneath the street or sidewalk, will be replaced within the right-of-way, and then the service lines running directly to homes and businesses will be replaced. Upon completion of the project, affected yards, sidewalks and streets will be restored. “Construction for these pipeline projects may take several weeks to complete, and times may vary based on the size of the project, weather, ground surface/soil and other situations that may arise,” said Roeder. “Please be assured that Vectren and its contractors will make every effort to complete each project as quickly as possible and minimize impact to customers and the community.” Prior to service replacement, a Vectren representative will contact customers to provide an overview of the required work. Vectren reminds Hagerstown residents to please keep the following in mind: 

Please exercise caution when driving through the construction zones.



We urge residents and their children to keep a safe distance away from any work zones.

Hagerstown is one of nearly 75 cities in Indiana undergoing this type of pipeline replacement. Since 2008, nearly 340 miles of gas mains have been replaced in the Vectren North territory, which has led to a reduction in leak calls and natural gas emissions from the distribution system. For more information about Vectren’s gas infrastructure modernization program, visit Vectren.com/modernization. About Vectren Vectren Corporation (NYSE: VVC) is an energy holding company headquartered in Evansville, Ind. Vectren's energy delivery subsidiaries provide gas and/or electricity to more than 1 million customers in adjoining service territories that cover nearly two-thirds of Indiana and about 20 percent of Ohio, primarily in the west-central area. Vectren’s nonutility subsidiaries and affiliates currently offer energy-related products and services to customers throughout the U.S. These include infrastructure services and energy services. To learn more about Vectren, visit www.vectren.com. - end -

News Release

May 2, 2016 - Street, N. Pearl Street, W. College Street, W. Main Street (SR 38) and N. and ... and minimize impact to customers and the community.” ... territories that cover nearly two-thirds of Indiana and about 20 percent of Ohio, primarily ...

22KB Sizes 4 Downloads 505 Views

Recommend Documents

News Release
Oct 24, 2016 - ... (AMR) devices throughout its southeast and central Indiana service ... “The addition of AMR technology to Vectren's system has a number of benefits for ... the efficiencies of the utility's natural gas infrastructure and enhance 

News Release
May 2, 2016 - and service lines in Greenfield as part of the company's pipeline replacement program, which is a multi-year program to replace about 1,200 ...

News Release
Feb 8, 2016 - mains and service lines in Vincennes as part of the company's ... Vectren's energy delivery subsidiaries provide gas and/or electricity to more ...

News Release
Feb 16, 2016 - and service lines in Elwood as part of the company's pipeline replacement program, which is a multi-year program to replace about 1,300 miles ...

NEWS RELEASE
NEWS RELEASE. UNITED STATES AIR ... The local re-initiation of the program is in compliance with the Air Force Anthrax Vaccine. Implementation Plan ...

News Release
Feb 16, 2016 - and service lines in Elwood as part of the company's pipeline ... of our natural gas pipeline systems and service, Vectren has undertaken a.

News Release
Oct 24, 2016 - ... (AMR) devices throughout its southeast and central Indiana service ... the U.S. These include infrastructure services and energy services. To.

News Release
Feb 8, 2016 - Washington, Ind. — Contract crews working for Vectren Energy Delivery (Vectren) have begun replacing gas mains and service lines in Washington as part of the company's pipeline replacement program, which is a multi- year program to re

News Release
Mar 30, 2016 - “Each year, we consistently invest in our gas infrastructure to ensure we maintain ... These include infrastructure services and energy services.

News Release
News. Release. Vectren Corporation. One Vectren Square. Evansville, IN 47708. FOR IMMEDIATE RELEASE. Jan. 20, 2016. Media contact: Natalie Hedde, 812-491-491-5105 or [email protected]. Vectren reminds customers about safe snow and ice removal around

News Release
May 2, 2016 - and service lines in Marion as part of the company's pipeline replacement program, which is a multi-year program to replace about 1,200 miles ...

News Release
Feb 16, 2016 - mains and service lines in Huntington as part of the company's pipeline replacement program, which is a multi- year program to replace about ...

News Release
Jun 29, 2016 - Ind. Vectren's energy delivery subsidiaries provide gas and/or electricity to more than 1 million customers in adjoining service territories that ...

News Release
May 2, 2016 - and service lines in Marion as part of the company's pipeline ... of our natural gas pipeline systems and service, Vectren has undertaken a.

News Release
May 2, 2016 - mains and service lines in Hagerstown as part of the company's ... miles of bare steel and cast iron pipeline infrastructure throughout Indiana.

News Release
Jul 1, 2014 - continue to grow the overall business,” said Carl Chapman, Vectren's ... respectively, once the sale of Vectren Fuels is closed, the company will ...

News Release
Jun 29, 2016 - Indianapolis, Ind. - In response to continued low, stable natural gas prices, Vectren Energy. Delivery of Indiana – North (Vectren) gas customers ...

News Release
Jun 1, 2016 - ... in the market price of natural gas and using normalized weather data, ... including rebates on high-efficiency heating and air conditioning ...

News Release
Jan 22, 2015 - Signs and educational panels will be placed in the area to advise and educate users about the closure. Violators are subject to penalty by fine.

News Release
May 2, 2016 - and service lines in Greenfield as part of the company's pipeline ... miles of bare steel and cast iron pipeline infrastructure throughout Indiana.

News Release
Mar 30, 2016 - platform for partners to showcase their efforts to reduce methane emissions, ... The EPA identified best measurement practices from which a company ... to more than 1 million customers in adjoining service territories that.

News Release
Feb 1, 2016 - driving routes, rather than walking the routes, which will increase reads per day and eliminate issues such as weather, meter reader turnover, animals and ... equipment such as computers, radios, satellite television, home security syst

News Release
Feb 16, 2016 - Vectren reminds Hartford City residents to please keep the following in mind: • Please exercise caution when driving through the construction ...

News Release
Mar 29, 2016 - Contact: Natalie Hedde, (812) 491-5105 or [email protected]. Vectren Energy Delivery of Indiana – South union employees ratify new ...