BE7-R4: SOFTWARE TESTING AND QUALITY MANAGEMENT NOTE: 1. There are TWO PARTS in this Module/Paper. PART ONE contains FOUR questions and PART TWO contains FIVE questions. 2.
PART ONE is to be answered in the TEAR-OFF ANSWER SHEET only, attached to the question paper, as per the instructions contained therein. PART ONE is NOT to be answered in the answer book.
3.
Maximum time allotted for PART ONE is ONE HOUR. Answer book for PART TWO will be supplied at the table when the answer sheet for PART ONE is returned. However, candidates, who complete PART ONE earlier than one hour, can collect the answer book for PART TWO immediately after handing over the answer sheet for PART ONE. TOTAL TIME: 3 HOURS TOTAL MARKS: 100 (PART ONE – 40; PART TWO – 60) PART ONE (Answer all the questions) 1.
Each question below gives a multiple choice of answers. Choose the most appropriate one and enter in the “tear-off” answer sheet attached to the question paper, following instructions therein. (1x10)
1.1 A) B) C) D)
The approach/document used to make sure all the requirements are covered when writing test cases Test matrix Check list Test bed Traceability matrix
1.2 A) B) C) D)
Executing the same test case by giving the number of inputs on same build called as Regression Testing Retesting Ad hoc Testing Sanity Testing
1.3 A) B) C) D)
To check whether we have developed the product according to the customer requirements are not. It is a Dynamic process Validation Verification Quality Assurance Quality Control
1.4 A) B) C) D)
It is a set of levels that defines a testing maturity hierarchy TIM (Testing Improving Model) TMM (Testing Maturity Model) TQM (Total Quality Management) None of the above
1.5
A Non-Functional Software testing done to check if the user interface is easy to use and understand Usability Testing Security Testing Unit testing Black Box Testing
A) B) C) D)
BE7-R4
Page 1 of 5
January, 2013
1.6 A) B) C) D)
Verification is Process based Product based Both A) and B) None of the above
1.7 A) B) C) D)
White box testing is not called as ________ Glass box testing Closed box testing Open box testing Clear box testing
1.8 A) B) C) D)
Requirements Specification, Planning, Test case Design, Execution, Bug Reporting & Maintenance This Life Cycle comes Under SDLC STLC SQLC BLC
1.9 A) B) C) D)
Management and Measurement, It will come under CMM Level 1 CMM Level 3 CMM Level 4 CMM Level 2
1.10
________ means under what test environment(Hardware, software set up) the application will run smooth Checkpoint Test Bed Code Walk through Checklist
A) B) C) D)
BE7-R4
Page 2 of 5
January, 2013
2.
Each statement below is either TRUE or FALSE. Choose the most appropriate one and ENTER in the “tear-off” sheet attached to the question paper, following instructions therein. (1x10)
2.1
Splitting project into tasks and estimate time and resources required to complete each task called as Project Scheduling.
2.2
Path Tested = Number of Path Tested / Total Number of Paths.
2.3
Project Risk affects The Schedule or Resources.
2.4
Earlier a defect is found the cheaper it is to fix it.
2.5
Graph-based testing methods can only be used for object-oriented systems.
2.6
Boundary value analysis can only be used to do white-box testing.
2.7
Test case design "in the small" for OO software is driven by the algorithmic detail of the individual operations.
2.8
Encapsulation of attributes and operations inside objects makes it easy to obtain object state information during testing.
2.9
Random order tests are conducted to exercise different class instance life histories.
2.10
Multiple class testing is too complex to be tested using random test cases.
3.
Match words and phrases in column X with the closest related meaning/ word(s)/phrase(s) in column Y. Enter your selection in the “tear-off” answer sheet attached to the question paper, following instructions therein. (1x10) X
Y
3.1
Boundary value analysis
A.
Developers' site
3.2
non-functional software testing
B.
Big Bang Testing
3.3
Alpha testing
C.
CMM Level 3
3.4
Integration
D.
Black Box testing
3.5
Management and Measurement
E.
CMM Level 2
3.6
AdHoc testing is a part of
F.
True
3.7
Phase Definition
G.
User's site
3.8
Type of Integration Testing
H.
Performance Testing
3.9
Open box testing
I.
Exploratory Testing
3.10
Beta Testing
J.
Closed box testing
K.
CMM Level 1
L.
White box testing
M.
CMM Level 4
BE7-R4
Page 3 of 5
January, 2013
4.
Each statement below has a blank space to fit one of the word(s) or phrase(s) in the list below. Enter your choice in the “tear-off” answer sheet attached to the question paper, following instructions therein. (1x10) A.
True
B.
Two
C.
Major Project Report
D.
Process metric
E.
Four
F.
black-box testing
G.
Product metric
H.
White-box testing
I.
Module Testing
J.
Unreachable Code
K.
Testing
L.
Indirect Project Status Report
M.
False
4.1
Status
________ the reporting process is very important because software tools are being upgraded, and manual supporting activities sometimes break down.
4.2
________ reports provide information related to a specific project component.
4.3
________ measure the characteristics of the documentation and code.
4.4
________ categories of data will be collected during testing.
4.5
________ categories of testing techniques can be used in acceptance testing.
4.6
The testing technique that requires devising test cases to demonstrate that each program function is operational is called ________.
4.7
The testing technique that requires devising test cases to exercise the internal logic of a software module is called ________.
4.8
________ occupies unnecessary memory.
4.9
During ________, we concentrate on testing algorithms and their data.
4.10
________ is a risk-oriented activity in which resources should be expended to minimize the major risks.
BE7-R4
Page 4 of 5
January, 2013
PART TWO (Answer any FOUR questions) 5. a) b) c) 6. a) b) c)
Differentiate top down approach and bottom up approach? Describe bottom up approaches in Regression testing? What is the purpose of software testing? Explain the general guidelines for performing a software testing? Define SDLC? Explain Waterfall model in detail? (5+5+5) Explain WHITE BOX TESTING? What are the types of White box testing? Compare Integration testing and Regression testing give example. Define BLACK BOX TESTING? What are the types and explain any one of them? (5+5+5)
7. a) b) c) 8. a) b) c) 9. a) b) c)
What is SPICE? How SPICE standard is useful in software Industry? Compare software verification and software validation. When are verification and validation performed during the software life cycle? Bring out the difference between ISO 9000 and SEI CMM quality model. (5+5+5) How can Software Quality Assurance (SQA) processes be implemented without reducing productivity? Explain the key process areas associated with the five levels of Capability Maturity Model (CMM). List and explain the various Software Quality Assurance activities? (5+5+5) What do you understand by the term Software Quality? List important attributes of Quality, which all software product should have. Explain each of them. Explain in detail about IDE? Define the following term. i) Risk-based testing ii) Beta testing iii) RAD iv) V-Model v) Test coverage (5+5+5)
Sign in. Loading⦠Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect ...
Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. NIELIT BE7-R4 Software Testing & Quality Management SP-1.pdf. NIELIT BE7-R4 Software Tes
Download Automated Software Testing: Introduction, Management, ... software releases--without compromising quality--the ... is designed to lead you through ...
So even though the customer needs, the market conditions, the schedule, the ..... The state of tester certification as of this writing (November 2008) should be ...
Sign in. Loading⦠Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect ...
through actual executions, i.e., with real data and under real (or simulated) ... In this paper, we focus on the technology maturation of testing techniques, including ..... Another interesting research in 1997 used formal architectural description f
Does construction of ... Software Development differs from Object Oriented Software Development? (4+6+8). 7. ... NIELIT C10-R4 Software Systems SP-1.pdf.
Draw a Sequence diagram and Activity diagram for. the following ... sequence. Page 1 of 2 ... Displaying NIELIT C10-R4 Software Systems SP-2.pdf. Page 1 of 2.
1. Software Testing Techniques. Technology Maturation and Research Strategies. Lu Luo ... research area within computer science is likely to become even more important in the future. This retrospective on a fifty-year of software testing technique re
an important role in all SDLC stages. Testing ... paper nothing is for execution therefore Manual Testing is done at this stage. ... testing b) Black box testing [2,4,7].
Non-incremental ( Big-Bang integration ) . â« unit test each module ... to determine whether the program can handle the required volumes of data, requests, etc. â« .... System Testing tools and Unit Testing Frameworks are good examples. â« Tool
Integration Testing. Subsystem. System Testing. Tested Software. Acceptance. Testing ... Non-incremental ( Big-Bang integration ) . â« unit test each ... to determine whether the program can handle the required volumes of data, requests, etc. â«
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. quality software ...
a) Define Design Pattern. Differentiate between Pattern, Framework and Architecture. b) For the Social Networking site of your choice, prepare the following ...
Jun 18, 2001 - One way to improve software quality on the functional level is to have good tests in place. This paper does not cover everything ... these patterns in order to allow for new perspectives on how to test software. The first pattern Separ
Page 1 of 2. Page 2 of 2. Page 2 of 2. Main menu. Displaying VNSGU M.Sc. (ICT) 2014 Sem II P-1609 Software Testing & Quality Assurance.pdf. Page 1 of 2.
Jan 20, 2018 - The candidate should affix his/her recent coloured passport size photograph on the. Application Form generated online with unique reference ...