December, 2011 BIEE-029 : POWER GENERATION SYSTEM Maximum Marks : 70 Time : 2 hours Note : Question number 1 is compulsory. Attempt any four questions from the remaining questions. All the questions carry equal marks. 1. (a) Which of the following plants will have the 2x7=14 highest capital cost ? (i)

Nuclear power plant

(ii)

Diesel power plant

(iii)

Thermal power plant

(iv)

None of these

(b) In which place induced draft fans are located in the cooling tower ? (i)

The top

(ii)

The bottom

(iii)

In the middle

(iv)

Can be any where in the cooling tower

BIEE-029

1

P.T.O

(c) For a thermal power plant, which is not the fixed cost ? (i)

Interest on capital

(ii)

Peak load plant

(iii)

Cost of fuel

(iv)

All of these

(d) The pH value of water used for boiler is (e) The cheapest plant in operation and maintenance is : (i)

Thermal power

(ii)

Hydropower

(iii)

Nuclear power

(iv)

Diesel power

(f) The overall thermal efficiency of a thermal power plant lies in the range : (i) 25% to 30% (ii) 35% to 40% (iii) 45% to 60% (iv) 65% to 80%

(g)

For meeting the changing load of the system ,the control rod adjusted is : (i)

safety rod

(ii)

shim rod

(iii)

regulating rod

(iv)

none of the above

2. (a) Briefly describe the main parts and working of steam power station. (b) Why pulverised fuel is preferred ?

BIEE-029

2

7

3.

(a) Write the differences between conventional and Non - Conventional source of energy. (b) What are the factors of selection of the site 7 for hydro - electric station ?

4.

(a) Describe briefly the Photo Voltaic cell.

7

(b) Describe the main parts and working of windmills.



7

5.

(a) Briefly describe the various methods for 7 obtaining energy from Biomass. (b) What are the difference between Geo - 7 thermal and Tidal energy ?

6.

(a) Describe the operating principle of fuel 7 cell. (b) Briefly describe the flow diagram and their 7 operation for power generation.

7.

Write short note on :

3.5x4=14

(a)

MHD

(b)

Full cell

(c)

Solar Cooker

(d)

Geo - thermal energy

BIEE-029

3

Power Generation System.pdf

(b) Full cell. (c) Solar Cooker. (d) Geo - thermal energy. 3.5x4=14. BIEE-029 3. Page 3 of 3. Main menu. Displaying Power Generation System.pdf. Page 1 of 3.

80KB Sizes 2 Downloads 170 Views

Recommend Documents

Power Generation System.pdf
(ii) liquid metal or gas. (iii) liquid metal. (g) Biogas consists of. (i) only methane ... Page 3 of 3. Main menu. Displaying Power Generation System.pdf. Page 1 of 3.

Power Generation System.pdf
(c) Electrostatic precipitator is installed. between and. BIEE-029 1 P.T.O. ... Page 3 of 4. Main menu. Displaying Power Generation System.pdf. Page 1 of 4.

[PDF] Download Power Generation Technologies ...
... Next Generation Data Center Architectures 2nd Edition Latest trending topics .... Technology solutions such as combined heat and power and distributed ...

EEE-III-ELECTRIC POWER GENERATION [10EE36]-NOTES.pdf ...
Page 3 of 88. EEE-III-ELECTRIC POWER GENERATION [10EE36]-NOTES.pdf. EEE-III-ELECTRIC POWER GENERATION [10EE36]-NOTES.pdf. Open. Extract.

Jamshoro Power Generation Project - Asian Development Bank
Feb 1, 2016 - The Jamshoro Power Company Limited (JPCL) (the “Employer”) invites sealed bids from eligible Bidders from the ADB member countries for ...

Telangana State Power Generation Corporation Limited (TSGENCO ...
Structure and properties of engineering materials, bonding in solids,imperfections in. crystals and metals ... and forced vibrations, effect of damping, resonance, vibration isolation,critical speeds. of shafts. 5.Design of ... piston, gyroscopes, ba

Jamshoro Power Generation Project - Asian Development Bank
Feb 1, 2016 - Generation Project and it intends to apply part of this loan to ... The Jamshoro Power Company Limited (JPCL) (the “Employer”) invites sealed ...

orissa power generation corporation limited - OPGC
Sep 23, 2011 - power generating company with state-of-art technology with a ... refer to the detailed job posting available at website for all information relating.