Anaheim Elementary School District Board Meeting April 27, 2016 Proposed: Budget Stabilization Plan Phase II

Presenters David A. Rivera Assistant Superintendent, Administrative Services

Christeen Betz Director of Fiscal Services

2

Board Approved Second Interim Report: Multi-Year Budget Projections:

3

Budget Stabilization Plan Phases I & II • Phase I Plan was approved by the Governing Board at the March 9 Meeting • Approved Phase I Plan consisted of a $36.2 million in augmentations to address potential $19.95 million revenue short-fall • To meet future fiscal obligations, the District is recommending the Board adopt Budget Stabilization Plan Phase II which is approximately $10 million. • The Business Department will continue presenting viable budget plans for Board consideration that will strengthen the fiscal position of the District. – .

4

Recommendation 6: Revenue Enhancement Background •

Implement Saturday School Program



Education Code authorizes Districts to recapture student absences on Saturday/Sunday



Recaptured funding is $71/student



Revenues Estimates (# of sessions): 2015-16 72 (24 sites x 3) 2016-17 144 (24 sites x 6) 2017-18 144 (24 sites x 6)

Fiscal Impact •

Because of declining student enrollment, funding is delayed until the following year



Net impact to District Reserves from recapturing attendance for 100 students per school (per session) – -

-

2016-17 $443K (sessions held in 2015-16) 2017-18 $885K (sessions held in 2016-17) 2018-19 $885K (sessions held in 2017-18)

Impact to Reserves An Additional $2.2 million over three years

On April 23, more than 4,100 students attended Saturday School

5

Recommendation 7: Expenditure Reduction Background •



Total on-going expenditure for Saturday School is budgeted at $930K (LCAP Report) Funds are uncommitted at this time

Fiscal Impact •

Updated the District Budget to include Recommendation 6 Projections



Reduce current budget projections as shown in the LCAP Report



Impact to Reserves –

An Additional $1.9 million over four years

6

Recommendation 8: Energy Savings Cost Reduction Background •



Fiscal Impact

In 2015-16 the District began a comprehensive energy savings program.



The District will utilize $4.3 million from the California Clean Energy Jobs Act to improve energy efficiency throughout the District.



2015-16 estimated savings from decrease in electrical bill –

2016-17 to 2018-19 –



Annual savings is $100 thousand

Annual Savings will increase to $200 thousand per year

Impact to Reserves –

An Additional $700 thousand over four years

For December through March, the District realized over $140 thousand in savings for electricity costs 7

Recommendation 9: Increase in Trio Plan Savings Background •





Based on recommendation from insurance broker, the District offered for Plan Year 2016 a new network referred to as TRIO. Business staff is increasing the savings estimates from the offering of the Trio Plan. At second interim, the savings estimate was $281K. The current projection has been increased by an additional $168K.

Fiscal Impact •

2015-16 total estimated savings from the Trio Plan $448K



Future savings have been budgeted for the same amount.



Impact to Reserves for increased Trio Savings over four years $670K –

Since Second Interim Report

8

Recommendation 10: Early Incentive Retirement Program Background •



At the April 13th Meeting, the Board approved an agreement with the Teachers Bargaining Unit which included an Early Retirement Incentive Program Offering.

Fiscal Impact •

Projected additional annual savings equal $1.4 million per year effective 2016-17.



A total of $4.3 million in savings over four years.

28 Certificated Unit Members signed up for the offering.

9

Recommendation 11: Optimize Restricted Resources Medi-Cal Background •



Medi-Cal provides reimbursement for health assessment and treatment for eligible children and family members within the school environment. The District contracts with qualified medical practitioners to render certain health services.

Fiscal Impact •

Increase revenues by $100K in current budget year



Transfer unrestricted expenses into Program totaling $100K



Increase in general fund balance of $100 thousand

10

2015-16

2016-17

2017-18

2018-19

Totals

$442,944

$885,888

$885,888

$2,214,720

$442,944

$885,888

$885,888

$2,214,720

$677,064

$424,128

$424,128

$424,128

$1,949,448

Recommendation 8: Energy Savings Cost Reduction

$100,000

$200,000

$200,000

$200,000

$700,000

Recommendation 9: Increase Trio Plan Savings

$167,610

$167,610

$167,610

$167,610

$670,440

$1,434,263

$1,434,263

$1,434,263

$4,302,789

$944,674

$2,226,001

$2,226,001

$2,226,001

$7,622,677

$100,000

-

-

-

$100,000

$100,000

-

-

-

$100,000

$3,111,889

$3,111,889

$9,937,397

Revenue Enhancement Recommendation 6: Saturday School Revenue Subtotal Expenditure Reductions Recommendation 7: Update Saturday School Exp.

Recommendation 10: Early Incentive Retirement Plan Subtotal Shift Program Costs Recommendation 11: Optimize Medi-Cal Funding Subtotal Budget Stabilization Phase ll

Total

$1,044,674

$2,668,945

Budget Stabilization Phase l

Total

$2,229,001

$13,037,566 $11,500,455

$9,493,714

$36,260,736

Grand Total

$3,273,675

$15,706,511 $14,612,344 $12,605,603

$46,198,133

$6,650,000

$6,650,000

$19,950,000

$9,056,511 $7,962,344 $5,955,603

$26,248,133

Target

13

Variance

$3,273,675

$6,650,000

Other Considerations (Value of Having Adequate Reserves) • Change in State Funding

• Negotiated Salary Increases – Annual impact $6.53 million



Additional Enrollment Decline

• Increases in operating costs above current projections – – – –

Health Insurance Premiums Workers’ Compensation Rates Change in Minimum Wage Affordable Care Act

12

Next Steps……… • Questions and Comments from the Board • Reach Consensus on Budget Stabilization Plan

• Incorporate Board Decision(s) in District’s Budget Projections

13

PP 7A Budget Stabilization Plan Phase 2_(2) 4-27-16.pdf ...

PP 7A Budget Stabilization Plan Phase 2_(2) 4-27-16.pdf. PP 7A Budget Stabilization Plan Phase 2_(2) 4-27-16.pdf. Open. Extract. Open with. Sign In.

344KB Sizes 0 Downloads 174 Views

Recommend Documents

PP 7A HR Development 4-13-16.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. PP 7A HR Development 4-13-16.pdf. PP 7A HR Development 4-13-16.pdf. Open. Extract. Open with. Sign In. Main

Regards Sociologiques, n°22, 2001, pp. 5-22
Regards Sociologiques, n°22, 2001, pp. 5-22. Page 2. Page 3. Page 4. Page 5. Page 6. Page 7. Page 8. Page 9. Page 10. Page 11. Page 12. Page 13. Page 14 ...

Regards Sociologiques, n°22, 2001, pp. 5-22
Regards Sociologiques, n°22, 2001, pp. 5-22. Page 2. Page 3. Page 4. Page 5. Page 6. Page 7. Page 8. Page 9. Page 10. Page 11. Page 12. Page 13. Page 14 ...

Output Stabilization of Strongly Minimum-Phase Systems
Keywords: output-input stability, minimum-phase systems, relative degree, stabilization, .... c ;. (ii) limt→∞ h(x(t)) = 0 ∀(x(0),xc(0)) ∈ Rn × Rnc . 2. DEFINITIONS.

2-21-18 Board Approved Budget Stabilization Plan.pdf
Sign in. Page. 1. /. 2. Loading… Page 1 of 2. Page 1 of 2. Page 2 of 2. Page 2 of 2. 2-21-18 Board Approved Budget Stabilization Plan.pdf. 2-21-18 Board Approved Budget Stabilization Plan.pdf. Open. Extract. Open with. Sign In. Main menu. Displayin

2015 ATM-ARTICLE 22-TRANSFER TO CAPITAL STABILIZATION-CV ...
2015 ATM-ARTICLE 22-TRANSFER TO CAPITAL STABILIZATION-CV.pdf. 2015 ATM-ARTICLE 22-TRANSFER TO CAPITAL STABILIZATION-CV.pdf. Open.

Small business plan budget-sample.pdf
Small business plan budget-sample.pdf. Small business plan budget-sample.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Small business plan ...Missing:

Small business plan budget-sample.pdf
Small business plan budget-sample.pdf. Small business plan budget-sample.pdf. Open. Extract. Open with. Sign In. Main menu.

PP 7A_8-22-16 Long Range Technology Plans.pdf
Increase number of sites with a dedicated. DLC. DLCs will work with Technology Assistants,. Technology Support Technicians,. Information Systems Specialists, and. Network Administrators to advise on. future technology purchases. 2017-2018. Page 4 of

22.- MARTÍNEZ (MaríaReginaNaturae), pp. 294-304.pdf ...
IRONOyULFRHVLQVLJQLÀFDQWH. La procesión es el acto culminante en ambas. romerías. El lugar de culto se transporta tempo- ralmente a otros espacios ...

22.- PELÁEZ (Curso11,2005), pp. 399-414.pdf
strong influence in the village, revealed by historical documentation, toponymy and customs. KEYWORDS: Don Alonso de Aguilar, P. Torres, Priego de Córdoba.

PP-Action-Plan---Summer-2015.pdf
Consider marketing options. Utilise volunteer leaders. CPC. Wards. Autumn 2015 Edition. 4.2 Develop plan for all. weather games area. in Dorrington.

Overall - 7A prova.pdf
(c) Cyber Altura Crucero Version ORC 13.0 EFZCEGBT Data : 05/03/2017 19:01:45. Page 2 of 2. Overall - 7A prova.pdf. Overall - 7A prova.pdf. Open. Extract.

Board -Budget Workshop - March 22, 2017.pdf
The Object Code Budget showed that salaries and benefits equal 78% of the. increase. Preliminary Estimated Tax assessments were reviewed. The amounts are higher. than in the past. The District does not have control over how the numbers. come out. It

INGLES-7A-SONIA.pdf
Internet Slang;. Kinds of Music;. Musical Instruments;. Holidays;. Action Verbs. Após cada duas unidades trabalhada o livro traz. uma revisão dos conteúdos.

ANNUAL GAD PLAN AND BUDGET FY 2014 DOH WORK AND ...
ANNUAL GAD PLAN AND BUDGET FY 2014 DOH WORK AND FINANCIAL PLANNING FORM 2B .pdf. ANNUAL GAD PLAN AND BUDGET FY 2014 DOH ...

IPG GAD PLAN and BUDGET 2015.pdf
nutritious food. To decrease cases of. malnourished childred. Supplementary. Feeding Program. 200,000.00 2015 PENRO. 250,000.00. 3. Page 3 of 4 ...

Stabilization Wedges
Aug 14, 2008 - ... August 14, 2008 ):. The following resources related to this article are available online at ... sion, space-based solar electricity, and artificial photosynthesis (2). ... panied by 2% growth in primary energy con- sumption and 3% 

Plan in North Carolina: Phase I Research Methods and Data
At the time of the data request, two companies provided the payroll software database ... of K12 Enterprise's “SunPac” program and Education Management System's “ISIS” program .... Online access to accounts and financial literacy programs.

Downtown Master Plan Phase I - City of Langley
Nov 16, 2007 - A free local bus shuttle provides local residents a convenient connection to their home or business. The rich mix of restaurants and supporting office uses make ... indicates demand for low profile compact mixed use development, while

ANNUAL GAD PLAN AND BUDGET FY 2014 DOH WORK AND ...
ANNUAL GAD PLAN AND BUDGET FY 2014 DOH WORK AND FINANCIAL PLANNING FORM 2B .pdf. ANNUAL GAD PLAN AND BUDGET FY 2014 DOH ...

Downtown Master Plan Phase I - City of Langley
Nov 16, 2007 - Highway area and expansion of the Transit Exchange. The most significant and exciting part of this Master Plan are the eight special design districts that embrace the future potential of the Downtown. (see Concept Plan next page). A se

Gonzales LEA Plan 7-22-15 FINAL DRAFT.pdf
for those for which a waiver has been obtained. A copy of all waivers will remain on file. I certify that. actual ink signatures for this LEA Plan/Plan Addendum/Action Plan are on file, including signatures of. any required external providers, i.e.,