Post-Production schedule

Monday

Tuesday

week 1 (February)

1st

2nd

2nd Semester start. (Major Project and Post-Production) Beginning planning Schedule

week 2 (February)

8th

Presenting animatic and redrawn mother design in Major Project and PostProduction lecture. :D -Begin animating rough scene (sequence 32: Ghoul attacks Werewolf) :D -Feedback: -Allow the film to have more breathing room -change reaction to characters that feel generic -give the mother her moment to shine -change the age of boy to add contiunity and purpose to his role in the plot -Change the vulnerability to truly feel like a horror themed film. :D -Revisit storyboard (start) :D

week 3 (February)

15th *Continue storyboard (7-30) :D *start scene 8 :D *continue scene 15-16 (rough sketch) :D *update blog from today's feedback :D *update employability blog with entry notes of previous session and research and rough up of action plan :D *blog post of rough sketch vids on vimeo, updated character designs and updated storyboards.:D

week 4 (February)

22nd

-1st employability lecture. -revisit mother anatomy design. -Start to be objective with animatic. 9th

-Continue with redesigning storyboard based on yesterday's notes -sort out ending when it comes the mother getting her moment to shine so it has something finish from. -2nd employablity lecture. :D -start scene 7: sequence 35-36 (werewolf hears howl) :D *start 1st scene (basic scene of camera panning of moon shot down to building):D

16th

*finish updated storyboard (detail) :D *finish mother character and breakdown sheet :D *employabiliy lecture with speaker Lisa Law :D 23rd

Week 5 (Feb-March)

Week 6 (march)

Week 7 (March)

*present to lecturers and peers of previous week's work flow :D *afternoon off :D

*start updating animatic :D *begin keyframing sequence 1-4 :D

29th

1st

*present to lecturers and peers of previous week's work flow (x) **Continue Keyframing (sequence 11-15 continue)

Unwell

7th

8th

*present two weeks worth of work to lecturers and peers *using garage band to create sounds :D keyframing sequences 32-35 :D

*finisn keyframing :D

14th

15th

show keyframing so far to lecturers with music *sound booth 12:15-16:15pm

Easter holiday (march)

easter holiday (march-april)

week 8 (April)

*trip to silent signal event in birmingham university

21st

22nd

animating sequence 20-21

animating sequence 13-14, 3

28th

29th

continue animating seqeunces 17-18

continue animating sequences 33, 35

4th

5th

week 9 (April)

week 10 (April)

target to get half of the animation's lineart *continue sequences 5 and 36 *continue action plan

update blog posts :D *continue portfolio research *continue animating

11th

12th

show animation so far to lecturers :D *deadline for synopsis :D *animating sequence 22, continue 34 :D

*relitavely most of the lineart animation done :D *animate sequences 22, 35 :D

18th

19th

*finish animation inbetweens :D *start clean up (sequence 13) :D

week 11 (April)

week 12th (may)

*continue promotion poster :D *continue skills audit, business plan and summarize research :D *edit music into finished inbetweens and publish on vimeo :D *begin showreel edit :D

25th

26th

*deadline for the prey poster (TARGET) :D *continue clean up and editing (sequences 4,5, 8, 22, 26 and 27) *continue presentation of industry role *showreel editing

*mock presentation *continue clean up and editing *

2nd

3rd

*presenation of industry role *continue aniamtion clean up of final scenes *continue notes on evaluation and reflection most of clean up finished

week 13 (may handin)

9th

10th

Wednesday

Thursday

Friday

Saturday

3rd

4th

5th

6th

*basic pratice on female anatomy *finish testing out more potnetial shapes for *research industry roles for mother character employability module.

10th

11th

1pm-9pm part-time Work

12th

*continue storyboard. *continue finishing designs for improved boy :D and mother concepts. :D *only do scenes based on feedback such as changed designs of characters, reactions, actions, the vulnerability of the character and giving the mothe her moment to change into werewolf herself. :D *redesign the boy character by aging *continue rough sequences :D him down to 13 :D Day off *begin sequence 15-16 :D 17th

13th

*1pm-9pm work shift

18th

19th

20th

*update blog post for week 2 :D *finish ghoul character sheet :D *start sequence 7-8 :D *continue sequence 17-18 :D

*have morning off *finish boy character sheet :D

*start sequence 23-27 (boy is attacked but turns into werewolf) *start linart for sequence 32 to see where the final look should go *update blog for week 3 :D

*1pm-9pm work shift *continue rough line scenes

24th

25th

26th

27th

*continue keyframing (sequence 5-7) *South Booth 12:15- 16:00pm

*Continue keyframing (sequence 810)

*Continue keyframing (Sequence 11-15) *help set up lighting and blue screen for andrew

1pm-9pm part-time Work 5th

2nd

3rd

4th

*Continue Keyframing (sequence 16-20)

*Continue keyframing (sequence 2128) *look at blog and record what needs updating *update wall schedule

*Continue keyframing (Sequence 29-35) *update blog fropm recorded notes from previous workflow *start an action plan and note strength and weaknesses 1pm-9pm part-time Work

9th

10th

11th

*Continue lineart and animation inbetween *improve the mother characteristics *south booth 12;15-16:00pm *write a rough action plan for *plan major project reflection and evaluation employability module :D

*animating *look for old CV* :D *sound booth 12:15-16:15pm *start editing the music to the sound

16th

18th

trip to dudley zoo

17th begin aniamting backgrounds for each scene *continue drawing studies of animals from zoo trip and from the photos

12th

1pm-9pm part-time Work *animating 19th

1pm-9pm part-time Work 23rd

24th

25th

26th

animating sequence 9 continue sequence 20

continue animating sequence 15

animating sequence 15-18

continue animating seqeunce 17-18 1pm-9pm part-time Work

30th

31st

1st continue animating seqeunce 28

animating sequence 6-8

animating sequence 4, continue 6-8

2nd continue animating 33, 35 1pm-9pm part-time Work

6th

7th

8th

9th

*continue portfolio research *animating sequence 5, 36

animating sequence 10-12, 22

animating sequence 23-25, 29, 34

13th

14th

15th blog for final film week 9: *feedback and festival talk and links :D *music and sound effects :D *press kit so far no contact details before its done :D *drawing of zoo animals ;D *paul ward talk :D

1pm-9pm part-time Work *Prey synopsis *action plan building 16th

blog for porfoilio *lizz hobbs talk *porfolio drawings *sound booth 12:15-16:15pm sound effects :D continue life drawings of animals for portfolio :D

*start writing up the press kit :D *update blog :D *continue portfolio buildingpersonal action plan, CV and research :D

*continue portfolio (success points, ideal situation.... *Scan portfolio drawings :D *CV building :D *finishing structure of portfolio :D

20th

21st

22nd

clean up and colour to animation ;D

*Finish promotional poster :D *continue Evaulation and reflection :D *continue clean up and colour :D clean up and colour to animation ;D *edit better version of the first scene :D *Update Blog from final film posts :D

27th

28th

Animation and clean up :D 4th

1pm-9pm part-time Work 23rd 1pm-9pm part-time Work *continue Evaulation and reflection (night after work) *continue clean up and colouring (morning before shift) 30th

Animation and clean up :D

29th *Sound booth 10:00am- 14:00pm :D *clean up poster :D *finish showreel by the end of the day (PRIORITY) :D *Setup presentation *finish bio and send to cherai :D *email with details of film to degree show :D *clean up and edit animation

5th

6th

7th

1pm-9pm part-time Work

Finish all clean up *finish evaulation and start reflection * 11th

*continue editing the music, sound and aniamtion effects together *tweak the animation (title at the beginning, bite shot, blur some background for more character focus and add moon reverse back into clouds after howl and before reverse back into human form :D *finish CV, Creative Cv and Business cards (print out and photographed for portfolio *sound booth 13:45pm- 16:30pm *finish press kit and reflection *continue portfolio (partularly the *sound booth 10:00am- 14:00pm industry role based on the *finish editing and start rendering presentation research. * 13th

1pm-9pm part-time Work 14th

Sunday 7th

1pm-9pm part-time Work

14th

*1pm-9pm work shift

21st

*1pm-9pm work shift *begin adding background and detail to roughed out scenes 28th

Floating day *Continue keyframing 6th

1pm-9pm part-time Work *continue writing action plan 13th

1pm-9pm part-time Work 20th

1pm-9pm part-time Work 27th animating sequence 19 holiday 3rd animating sequence 30-32 holiday 10th

portfolio building 1pm-9pm part-time Work 17th

1pm-9pm part-time Work 24th 1pm-9pm part-time Work *continue clean up and colouring (morning before shift) *continue career research presentation 1st

1pm-9pm part-time Work 8th

1pm-9pm part-time Work 15th

production plan (second semester).pdf

keyframing sequences 32-35 :D *finisn keyframing :D. Week 7 (March) 14th 15th. show keyframing so far to lecturers with music. *sound booth 12:15-16:15pm.

157KB Sizes 0 Downloads 166 Views

Recommend Documents

PLAN OF PRODUCTION AND SITE SELECTION FOR ...
12,75 cm/sec (the best case with cleaned or not fouled net). .... intervals of 3 degrees (Figure10). Figure 3. .... Chua TE. Tech, E: Introduction and history of.

film production company business plan pdf
film production company business plan pdf. film production company business plan pdf. Open. Extract. Open with. Sign In. Main menu. Displaying film production ...