Public Works Funds

22.

Public Works Funds Table of Contents Public Works Funds - Expenditure Summary Solid Waste Management Steam Plant Stormwater Management Wastewater Management

The Public Works Funds include those city departments that charge a fee to users of their services.; typically residents of the city. Many of these departments were once in the General Fund, but were put into a different fund group because of a state or federal mandate pertaining to increased costs involving an environmental issue. In order to obtain clearer accounting of the fees charged for the services, the city moved these departments to seperate funds outside of the General Fund.

City Manager's Office - Budget Division

City of Hampton

Public Works Funds Expenditure Summary Mission The Public Works Funds contain major public works departments that are outside the general fund.

Departmental Breakdown 2016 Actual

Departments

2017 Actual

2018 Budget

2018 Adjusted

2019 Increase/ Budget (Decrease)

11,031,854 11,789,968 15,980,634 15,980,634 16,016,099 6,912,398 7,201,350 7,957,775 7,957,775 8,088,150 7,561,133 8,139,092 11,134,807 11,134,807 10,869,090 7,390,320 8,084,403 10,592,589 10,592,589 10,595,065 32,895,705 35,214,813 45,665,805 45,665,805 45,568,404

Solid Waste Management Steam Plant Stormwater Management Wastewater Management Grand Total

35,465 130,375 (265,717) 2,476 (97,401)

Percentage of Team's FY 2019 Budget

Wastewater Management 23.3% Solid Waste Management 35.1%

Stormwater Management 23.9% Steam Plant 17.7%

City Manager's Office - Budget Division

City of Hampton

Public Works Funds Expenditure Summary Council Priorities Breakdown The entire business team's budget is spent across the following council strategic priorities, in the following amounts: 2016 Actual

Council Priorities

2017 Actual

2018 Budget

2018 Adjusted

2019 Increase/ Budget (Decrease)

Economic Growth Placemaking Living with Water Educated & Engaged Citizenry

0 0 2,228,619 2,431,999 13,009,875 14,110,121 0 0

0 0 0 3,483,548 3,483,548 3,488,353 19,566,888 19,566,888 19,270,708 0 0 0

0 4,805 (296,180) 0

Safe & Clean Community Good Government Family Resilience & Economic Empowerment Grand Total

4,564,514 4,957,945 13,092,698 13,714,749 0 0

7,105,079 7,105,079 7,114,077 15,510,291 15,510,291 15,695,267 0 0 0

8,998 184,976 0

32,895,705

45,665,805

(97,401)

35,214,813

45,665,805

45,568,404

Percentage of Team's FY 2019 Budget

Safe & Clean Community 15.6%

Placemaking 7.7% Good Government 34.4%

Living with Water 42.3%

City Manager's Office - Budget Division

City of Hampton

Solid Waste Management

Mission Solid Waste Management provides weekly collection of residential refuse, yard waste, and bulk trash and provides for recyclable material collection and solid waste disposal. Revenues for this service are derived from commercial tipping fees and residential user fees.

Expenditure Summary and History Personnel

Operating

Capital Outlay

Thousands ($)

20,000 15,000 10,000 5,000

2016 Actual

2017 Actual

2018 Budget

2018 Adjusted

2019 Budget

2019 Increase / Budget (Decrease)

2016 Actual

2017 Actual

2018 Budget

2018 Adjusted

Personnel Services Operating Expenses Capital Outlay

2,230,900 7,576,539 1,224,415

2,385,220 8,227,999 1,176,749

2,507,837 10,284,524 3,188,273

2,507,837 10,284,524 3,188,273

2,557,994 10,462,151 2,995,954

50,157 177,627 (192,319)

Grand Total

11,031,854

11,789,968

15,980,634

15,980,634

16,016,099

35,465

Permanent Full-Time (PFT) Staffing History

PFT Positions

2016 Actual

2017 Actual

62.5

62.0

2018 Budget 62.0

2018 Adjusted 62.0

2019 Increase / Budget (Decrease) 62.0

0.0

Budget Note The FY19 Budget numbers include funding for the 2% general wage increase (GWI). The increase in operating expenses is the result of the costs of a rate study for vehicle replacements, landfill disposal rate setting and higher fixed costs. The decrease in capital outlay is a result of a Lease Purchase Financing finalized on March 23, 2018 for 10 new Refuse Vehicles to stabilize, replace aging vehicles and an increase in Debt Service Principal for repayment of Lease Purchase beginning July 1, 2018. The expected lead time for delivery of the new trucks could be 6 to 8 months from the manufacturer. As a result, Solid Waste Management will continue to utilize the existing fleet of vehicles through much of FY19. Lower repair and maintenance costs are expected as new vehicles come online.

City Manager's Office - Budget Division

City of Hampton

Solid Waste Management

2019 PFT Positions Position

# of PFT

Position

# of PFT

OFFICE SPECIALIST

1

EQUIP OPER III - SOLID WASTE

6

OFFICE SPECIALIST-SENIOR

1

EQUIP OPER II - SOLID WASTE

35

SW COLLECTIONS SUPERVISOR

2

FINANCIAL ANALYST

1

CUSTOMER SERVICE SUPERVISOR CUSTOMER SER/ENFORCEMENT TECH EQUIP OPER I - SOLID WASTE

1 3 3

SOLID WASTE SUPERINTENDENT ADMIN SERVICES MANAGER SOLID WASTE COLLECT TEAM LDR

1 1 7

Grand Total:

62

Performance Indicators Indicator

Type

2016 Actual

2017 Actual

2018 Estimate

2019 Target

Citizen's Satisfaction Rating

Outcome

95%

94%

98%

98%

Customer Service Levels (Completed pickups as a % of total residential units)

Outcome

99%

98%

99%

99%

% of citizens who recycle

Outcome

92%

95%

95%

98%

Recycling collected (thousands of tons)

Outcome

6,000

6306

6500

6500

Output

10

11

13

12

Yard Waste Collected (thousands of tons)

City Manager's Office - Budget Division

City of Hampton

Solid Waste Management

Services Breakdown and Descriptions Yard Waste/Bulk Trash - $5,386K

Yard Waste Processing Opr $957K

Total Funding: $16,016,099

Fixed Cost $2,063K

Garbage Collection $6,276K Recycling Collection - $1,334K

Garbage Collection

$6,275,955

Provides weekly residential and business refuse collection services to all customers in an effort to maintain health standards and improve the basic quality of life for our citizens and our community. Also provides dumpster services for City schools, townhouses and other City facilities that require a contractual dumpster collection service.

Recycling Collection

$1,333,638

To provide bi-weekly residential and business recycling collection services to all customers and to encourage at least 92% in citizen's recycling participation. Included is the contribution to Hampton Clean City Commission in the amount of $60,166.

Yard Waste Processing Operations

$957,454

To provide Residential and Commercial drop off Location for Yard debris generated with-in the city of hampton (limbs, leaves and grass) Recycling Dumptster Drop off location and transfer of material to processing center contractor Virginia Pensinsula Public Service Authority.

Yard Waste/Bulk Trash

$5,386,365

To provide weekly residential and business bulk trash and yard waste collection services to all customers in an effort to maintain health standards and improve the basic quality of life for our citizens and our community.

Fixed Cost

$2,062,687

This service accounts for various fixed costs for the department, including auto/fleet, IT, and risk management costs.

City Manager's Office - Budget Division

City of Hampton

Solid Waste Management

Revenues Summary 2016 Actual Approp From Retained Earn Gain on Sale of P,P&E Landfill Usage Fees Miscellaneous Revenue Mobile Toter Sales Sale of Property Tipping Fees-Residue User Fees Grand Total

0 (49,075) 542,790 32,080 24,230 7,888 677,068 12,360,185 13,595,166

City Manager's Office - Budget Division

2017 Actual 0 (6,552) 603,858 43,375 20,952 8,365 609,215 11,823,183 13,102,396

2018 Budget

2018 Adjusted

2019 Budget

Increase / (Decrease)

1,500,000

1,500,000

2,195,108

695,108

0 720,000 0 25,000 0 680,000 13,055,634 15,980,634

0 720,000 0 25,000 0 680,000 13,055,634 15,980,634

0 745,791 33,000 20,000 17,000 0 13,005,200 16,016,099

0 25,791 33,000 (5,000) 17,000 (680,000) (50,434) 35,465

City of Hampton

Steam Plant

Mission The Steam Plant is a facility which burns City and Federal government refuse to generate steam that is sold to NASA to meet their energy needs. The residue ash from the burning process is disposed of at the landfill. Revenues for the operation of the Steam Plant come from the sale of steam, tipping fees for private trash haulers and the Solid Waste Enterprise Fund. The Steam Plant operates in accordance with all Federal and State environmental laws and standards.

Expenditure Summary and History Personnel

Operating

Capital Outlay

10,000

Thousands ($)

8,000 6,000 4,000 2,000

2016 Actual

2017 Actual

2018 Budget

2018 Adjusted

2019 Budget

2019 Increase / Budget (Decrease)

2016 Actual

2017 Actual

2018 Budget

2018 Adjusted

Personnel Services Operating Expenses Capital Outlay

1,851,666 4,547,718 513,014

1,790,339 4,882,169 528,842

2,193,516 4,924,259 840,000

2,193,516 4,924,259 840,000

2,237,386 4,923,105 927,659

Grand Total

6,912,398

7,201,350

7,957,775

7,957,775

8,088,150

43,870 (1,154) 87,659 130,375

Permanent Full-Time (PFT) Staffing History

PFT Positions

2016 Actual

2017 Actual

41.0

41.0

2018 Budget 41.0

2018 Adjusted 41.0

2019 Increase / Budget (Decrease) 41.0

0.0

Budget Note The FY19 Budget numbers include funding for the 2% general wage increase (GWI). The increase in capital outlay is related to the timing and scheduling of an equipment purchase.

City Manager's Office - Budget Division

City of Hampton

Steam Plant

2019 PFT Positions Position

# of PFT

Position

# of PFT

PLANT ENGINEER

1

ADMINISTRATIVE ASSISTANT-SR

1

OFFICE SPECIALIST-SENIOR

1

STEAM PLANT OPERATIONS MGR

1

PLANT OPERATOR

9

PLANT OPERATING ENGINEER

4

PLANT AUX OPERATOR

9

PLANT MAINTENANCE MANAGER

1

PLANT MECHANIC TEAM LEADER

1

STEAM PLANT MANAGER

1

PLANT MECHANIC I

3

PLANT MECHANIC II

5

WEIGH MASTER

1

PLANT OPERATOR - SENIOR

3

Grand Total:

41

Performance Indicators Indicator

Type

2016 Actual

2017 Actual

2018 Estimate

2019 Target

Capacity Utility Rate (Percent)

Output

88

83

92

92

Demand Utility Rate (Percent)

Output

20

86

89

90

Municipal Solid Waste Diverted from Landfill (in Tons)

Output

36,937

37,084

37,000

37,000

Refuse Processed (in tons)

Output

75,408

70,316

81,500

81,500

Steam Exported (in million pounds)

Output

73

278

313

315

Steam Generated (in million pounds)

Output

499

449

495

495

City Manager's Office - Budget Division

City of Hampton

Steam Plant

Services Breakdown and Descriptions Total Funding: $8,088,150

Debt Service $549K Fixed Cost - $645K

Garbage Disposal/Steam $6,894K

Garbage Disposal/ Steam Supply

$6,893,639

To provide safe economical and environmentally sound refuse disposal while providing high pressure steam to NASA Langley Research Center. To comply with all Virginia and Federal environmental regulations and permits. To minimize the City's and NASA costs by generating direct disposal revenues.

Debt Service

$549,483

Debt service requirement to repay principal and interest on the 2002 and 2005 Bond Issuances. The 2002 Bond Series proceeds were used to make required capital improvements to the Steam Plant such as the garbage disposal. The 2005 Bond Series proceeds were used to construct the air pollution control facility.

Fixed Cost

$645,028

This service accounts for various fixed costs for the department, including auto/fleet, IT, and risk management costs.

City Manager's Office - Budget Division

City of Hampton

Steam Plant

Revenues Summary 2016 Actual

2018 Budget

2018 Adjusted

2019 Budget

Increase / (Decrease)

2,600 4,285 59,170

2,425 0 73,068

0 0 150,000

0 0 150,000

0 0 150,000

0 0 0

1,232,746 5,349,999 1,069,126 10,263 7,728,189

1,017,077 5,350,000 1,133,410 26,038 7,602,018

1,325,000 5,416,875 1,065,900 0 7,957,775

1,325,000 5,416,875 1,065,900 0 7,957,775

1,352,520 5,498,412 1,087,218 0 8,088,150

27,520 81,537 21,318 0 130,375

Miscellaneous Revenue Sale of Property Steam Plant Recycling Rev Steam Plant Usage Fees Steam Sales Tipping Fees-City Interest Income Grand Total

2017 Actual

City Manager's Office - Budget Division

City of Hampton

Stormwater Management

Mission Stormwater Management is intended to enhance the quality of life in the community as it is impacted by storm drainage systems and the quality of surface waters. Hampton has been granted a municipal separate storm sewer system permit by the Virginia Department of Environmental Quality (DEQ). This permit outlines Hampton’s commitment to processes and activities that will facilitate compliance with stormwater quality standards established by mandate in order to protect citizens, property and natural resources.

Expenditure Summary and History Personnel

Operating

Capital Outlay

12,000

Thousands ($)

10,000 8,000 6,000 4,000 2,000 2016 Actual

2017 Actual

2018 Budget

2018 Adjusted

2019 Budget

2019 Increase / Budget (Decrease)

2016 Actual

2017 Actual

2018 Budget

2018 Adjusted

Personnel Services Operating Expenses Capital Outlay

2,568,768 4,984,217 8,148

2,846,928 5,014,707 277,457

3,007,085 3,314,592 4,813,130

3,007,085 3,314,592 4,813,130

3,067,227 3,467,231 4,334,632

60,142 152,639 (478,498)

Grand Total

7,561,133

8,139,092

11,134,807

11,134,807

10,869,090

(265,717)

Permanent Full-Time (PFT) Staffing History

PFT Positions

2016 Actual

2017 Actual

71.0

71.0

2018 Budget 71.5

2018 Adjusted 71.5

2019 Increase / Budget (Decrease) 71.5

0.0

Budget Note The FY19 Budget numbers include funding for the 2% general wage increase (GWI). The increase in operating expenses is attributed to increase maintenance associated with new Best Management Practices (BMPs). The decrease in capital outlay is due to fewer projects in anticipation of the Hampton Roads Sanitation District (HRSD) SWIFT Project.

City Manager's Office - Budget Division

City of Hampton

Stormwater Management

2019 PFT Positions Position DEPUTY CITY ATTORNEY

# of PFT

Position

0.5

# of PFT

DRAINAGE MAINTENANCE TECH

8

PARALEGAL

1

STORMWATER TEAM LEADER

2

ACCOUNTANT

1

CONSTRUCTION INSPECTOR

2

FISCAL SUPPORT SPECIALIST

1

MASTER TECHNICIAN - PWSTD

1

OFFICE SPECIALIST-SENIOR

1

CONSTRUCTION INSPECTOR

1

WATER RESOURCES ENGINEER

1

EQUIP OPER IV

3

CIVIL ENGINEERING TECHNICIAN

2

EQUIP OPER V

3

GRANT WRITER

1

EQUIP OPER II

6

PERMIT COORDINATOR

1

PEST CONTROL TECHNICIAN

2

CIVIL ENGINEER-SENIOR

4

EQUIP OPER III

7

CONSTRUCTION INSPECTION MGR

1

GIS SPECIALIST

1

CONSTRUCTION INSPECTOR

2

BIOLOGIST

1

EQUIP OPER IV

4

GIS SPECIALIST

2

EQUIP OPER III

1

TEAM LEADER-FIELD SERVICE

2

ADMIN SERVICES MANAGER

1

EQUIP OPER V

1

INFRA CONST PROJECT TEAM LDR

1

ENV/SUST MGR-SR PROJ COOR

1

OFFICE SPECIALIST

1

SIT PLAN/SUBDIV AGE II

1

CONSTRUCTION INSPECTOR

2

LAND DEVELOPMENT/ENV INSPECTOR

1

Grand Total:

71.5

Performance Indicators Indicator

Type

2016 Actual

2017 Actual

2018 Estimate

2019 Target

Mechanized Ditching (in linear feet)

Output

113,580

831,696

875,000

875,000

# of Best Management Practice (BMP) Inspections

Output

196

21

30

30

# of Erosion and Sediment (E & S) Inspections

Output

2,230

3,914

2,500

3,000

Street Sweeping/Debris Removal (in Tons)

Output

2,806

2,591

2,500

2,500

# of Stormwater Projects completed

Output

0

2

3

7

City Manager's Office - Budget Division

City of Hampton

Stormwater Management

Services Breakdown and Descriptions Plans Review & Permit Issued 200K

Stormwater System Maint. - $2,270K

Stormwater Plan Review - $67K

Administration $343K

Non-departmental $536K

Capital Improvements $4,312K

Heavy Equipment $683K Engineering - $902K

Total Funding: $10,869,090

Citywide Street Sweeping - $1,557K

Administration

$342,832

Provide customer service, legal counsel and accounting support.

Capital Improvements

$4,312,000

Allocated funds for stormwater-related capital projects which are managed in the Capital Projects Fund and the Indirect Cost Allocation designated for the general fund.

Citywide Street Sweeping

$1,556,836

Sweeping services provided to clean up after landscape maintenance such as mowing and edging.

Engineering

$901,776

Design, construct and manage capital projects that will improve stormwater drainage, including piping open ditches, outfall improvements and drainage basin construction.

Heavy Equipment

$683,177

Provide heavy equipment and manpower for neighborhood stormwater projects which include cleaning and regrading of outfall ditches on a regular basis while meeting the demand for new improvement projects.

Non-departmental

$536,204

Provide funding for items that cannot be easily assigned to any specific department within the Fund. Examples include Hampton Roads Planning Commission payments and various other stormwater projects or studies. Also included is a transfer to the Clean City Commission in the amount of $52,281.

Plans Review & Permit Issued

$200,039

Provide erosion and sediment control inspection services and planning support related to environmental issues for the Hampton Wetlands Board, Chesapeake Bay and commercial development.

Stormwater Plan Review

$66,570

Plan and coordinate all environmental and stormwater related planning issues.

Stormwater System Maintenance

$2,269,656

Increase the frequency of storm drain cleaning and maintenance of the drainage system in the city.

City Manager's Office - Budget Division

City of Hampton

Stormwater Management

Revenues Summary 2016 Actual

2018 Adjusted

2019 Budget

Increase / (Decrease)

0

2,520,252

2,520,252

2,254,535

3,240

0

0

0

0

0

8,758,697

8,863,927

8,614,555

8,614,555

8,614,555

0

2,500

1,535

0

0

0

0

8,764,437

8,865,462

11,134,807

11,134,807

10,869,090

CGP Fees-Stormwater

Land Disturbance/ Stormwater Penalties Grand Total

2018 Budget

0

Approp From Fund Balance

Fees-Storm Water Mgmt

2017 Actual

City Manager's Office - Budget Division

(265,717)

(265,717)

City of Hampton

Wastewater Management

Mission Wastewater Management maintains, repairs, and operates the sanitary sewer system and continues in its effort to extend the system to newly developing areas as well as non-sewered properties in the city. Sewage from businesses and residential properties are collected and delivered to the Hampton Roads Sanitation District for treatment. Revenue for this Fund comes from sewer user fees and new tap fees that are collected for connections to the system.

Expenditure Summary and History Personnel

Operating

Capital Outlay

12,000

Thousands ($)

10,000 8,000 6,000 4,000 2,000 2016 Actual

2017 Actual

2018 Budget

2018 Adjusted

2019 Budget

2019 Increase / Budget (Decrease)

2016 Actual

2017 Actual

2018 Budget

2018 Adjusted

Personnel Services Operating Expenses Capital Outlay

2,082,862 3,911,723 1,395,735

2,310,560 4,435,707 1,338,136

3,119,867 6,407,086 1,065,636

3,119,867 6,407,086 1,065,636

3,015,335 6,256,866 1,322,864

Grand Total

7,390,320

8,084,403

10,592,589

10,592,589

10,595,065

(104,532) (150,220) 257,228 2,476

Permanent Full-Time (PFT) Staffing History

PFT Positions

2016 Actual

2017 Actual

68.5

69.0

2018 Budget 69.0

2018 Adjusted 69.0

2019 Increase / Budget (Decrease) 69.0

0.0

Budget Note The FY19 Budget numbers include funding for the 2% general wage increase (GWI). The decrease in Personnel services is attributed to the loss of three long term employees, one being a HERS retiree. The decrease in Operating expenses results from reductions to compensate for the decline in revenues due to the decline in daily water consumption and water conservation efforts. The updated calculations consider actual gallons per day averaged over the last several years. The increase in Capital outlay is related to the replacement of pump station 032, consent order rehabilitation projects and the office additions to the operations building.

City Manager's Office - Budget Division

City of Hampton

Wastewater Management

2019 PFT Positions Position

# of PFT

WASTEWATER TECHNICIAN TRAINEE

9

Position

# of PFT

PUMP STATION MECHANIC

4

OFFICE SPECIALIST-SENIOR

2

EQUIP OPER II

4

WASTEWATER COLLEC TEAM LEADER

3

EQUIP OPER III

1

FOG CONTROL COORDINATOR

1

FINANCIAL ANALYST

1

WASTEWATER TEAM LEADER

3

PUMP STATION TECHNICIAN

5

OPERATIONS MANAGER

1

GIS SPECIALIST

1

WW INFRASTRUCTURE INSPECTOR

1

WASTEWATER SUPERINTENDENT

1

SYSTEM PERFORMANCE MANAGER

1

TECHNOLOGY SUPPORT SPECIALIST

2

EQUIP OPER IV

4

WW INSPECTION AND REPAIR TECH

6

CIVIL ENGINEER-SENIOR

1

ADMIN SERVICES MANAGER

1

EQUIP OPER V

3

UTILITY LOCATOR TECHNICIAN

1

CHIEF PUMP MECHANIC

4

WASTEWATER LINE TECHNICIAN

8

INFRA CONST PROJECT TEAM LDR

1

Grand Total:

69

Performance Indicators Indicator

Type

2016 Actual

2017 Actual

2018 Estimate

2019 Target

% of All Calls responded to within 3 Hours

Efficiency

100%

100%

100%

100%

# of Stoppage Calls

Outcome

3,903

3,960

4,000

4,000

# of Overflows

Output

13

18

15

15

Feet of Sewer Line - Root Cleaned (LF)

Output

30,000

30,000

30,000

30,000

Feet of Sewer Line Cleaned (LF)

Output

224,076

224,076

400,000

400,000

Feet of Sewer System Televised (Inspections) (LF)

Output

118,440

106,486

250,000

250,000

# of Grease Trap Inspections

Output

283

226

225

225

# of Completed Service Connection Requests

Output

46

16

35

35

# of Pump Station Rehab.

Output

2

2

5

5

# of Sewer Connection Requests

Output

51

42

35

35

# of Rehab of Pipes and Manholes (LF, VF)

Output

6,995

7,250

7,500

7,500

City Manager's Office - Budget Division

City of Hampton

Wastewater Management

Services Breakdown and Descriptions TV Testing of Sewer Sys - $3,051K

Total Funding: $10,595,065

Fixed Cost $1,043K Leadership & Management $1,318K

Sewer Revolving Fund - $300K Maint/Repair Sewer Lines - $1,887K

Sewer Pump Stations - $1,391K Respond to Sewer Call - $367K

Management/Suppo rt/GIS - $1,238K

Leadership & Management

$1,317,774

Provide for the efficient and dependable wastewater collection and conveyance services to citizens with a commitment of outstanding customer service. Plan, direct and administer all functions and activities of the division. Implement policies and procedures that ensure the safety of employees and the citizens of Hampton.

Maintain / Repair Sewer Lines

$1,886,829

Maintain and repair over 482 miles of sewer line and 10,000+ manholes throughout the city's aging infrastructure in order to eliminate overflows.

Management/Support/GIS

$1,237,988

Provide administrative, managerial and general business support for procurement, budgeting and financial tracking to ensure an environment of fiscal responsibility and adherence to city policies. Provide technical services in the form of logistical support, database management, mapping and design, surveying and engineering to ensure a safe and productive operation while maintaining a database that captures current infrastructure assets to meet governmental reporting requirements. Develop and implement new business practices.

Respond to Sewer Call

$367,464

Provide sewer stoppage and emergency response service 24-hours a day, 365-days a year. Service calls include sewer stoppages and overflows, structure failures and other related service calls within the Department of Public Works.

Sewer Pump Stations

$1,391,051

Monitor, service, maintain, repair and rehabilitate 108 pump stations within the city. These stations consist of pumps, valves, piping, buildings, grounds, electrical panels/controls, alarm systems and telemetry equipment. Consent Order: ensure that each station can handle capacity requirements without overflow during normal operating and wet-weather/emergency events.

Sewer Revolving Fund

$300,000

Provide sanitary sewer service to non-sewered properties throughout the city. The sewer extension program eliminates septic systems in order to reduce negative environmental impact, establishes sewer service to properties for future development and enhances property values.

TV Testing of Sewer System

$3,050,682

Provide an overall view of the wastewater infrastructure through the use of computer-controlled, data-capturing cameras. The data collected is used to evaluate the sewer system in order to prioritize rehabilitation and repairs for manholes, main lines, laterals and sewer pumping station wet wells.

Fixed Cost

$1,043,277

This service accounts for various fixed costs for the department, including auto/fleet, IT, and risk management costs.

City Manager's Office - Budget Division

City of Hampton

Wastewater Management

Revenues Summary 2016 Actual

2017 Actual

2018 Budget

2018 Adjusted

2019 Budget

Increase / (Decrease)

0

0

1,400,000

1,400,000

1,250,000

(150,000)

Fees-Sewer Connection Fees-Sewer Usage Fees-Sewer Usage Surcharg Gain on Sale of P,P&E Sale of Property

236,265 5,817,229 2,682,902

95,754 5,522,416 2,534,546

300,000 6,150,015 2,742,574

300,000 6,150,015 2,742,574

300,000 6,314,233 2,730,832

0 164,218 (11,742)

0 41,444

0 0

0 0

0 0

0 0

Grand Total

8,785,400

8,194,160

10,592,589

10,592,589

10,595,065

2,476

Approp From Fund Balance

(1,929) 50,933

City Manager's Office - Budget Division

City of Hampton

Public Works Funds - Hampton.gov

35.1%. Steam Plant. 17.7%. Stormwater. Management. 23.9%. Wastewater. Management. 23.3%. City Manager's Office - Budget Division. City of Hampton ...

518KB Sizes 0 Downloads 293 Views

Recommend Documents

Public Works Funds
Roads Planning Commission payments and various other stormwater projects or studies. Also included is a transfer to the Clean. City Commission in the amount of $52,281. Plans Review & Permit Issued. $200,039. Provide erosion and sediment control insp

PUBLIC WORKS COMMITTEE AGENDA
Apr 4, 2018 - Call to order and acknowledgement that the press and public were duly notified of the meeting in accordance with the Freedom of Information ...

Yukon Public Schools 403(b) Funds
Call our National Service Center at 1-800-888-2461. Advisor Program. Fund List. 9001 K. 32-90011-10 2013/10/30 (1/2). In completing your application or investment request, please clearly write the fund code and fund name listed below in the appropria

Public Works Department - Environment Clearance
authorities to prevent downdrift erosion and to maintain channel free from siltation. Later, discontinuing of sand bypassing due to various technical reasons, lead to erosion on ... Protection Measures through Pilot project", with financial support f

FAYETTEVILLE PUBLIC WORKS COMMISSION ... - FAYPWC.COM
and submitted electronically through our website. Please go to ... Who can I contact for assistance, if I have problems completing the Vendor Application?

Public works - Town of Arlington
During the year the Division maintains Town trees, including ... Thompson Elementary students plant a tree on Arbor Day with the help of Arlington Public Works ...

PUBLIC INFORMATION OFFICE Public Works and Transportation to ...
Aug 1, 2016 - Media Inquiries: Tony Jones, Public Information Officer ... Imagine helping a child to read, an adult succeed at his/her job, a senior maintain ...

Veterans Workplace Preference - Public Works Contracts
Signature. Date. E-mail address. Phone Number. Subscribed to and sworn before me. My commission expires: this ____ day of. , 20 . X. Notary Public Signature.

Town of Canmore Public Works Department
As part of the treatment process, biosolids are dewatered to 10-33% solids using a belt filter press. ..... of route analysis and milder winter weather conditions. .... A hazard tree is a tree that is in poor health and poses a risk to public safety,

Department of Public Works and Highways (DPWH)
1000(1) Soil Poisoning. 115.00 liters. 1,070.73. 123.133.95 loomm CHB Non load Bearing (Ind. 1046 (2) a1. 88.00 sq.m. 871.36. 76,679.68. Reinforcing Steel). 150mm CHB Non load Bearing (Incl. 1046 (2) a2. 400.00 sq.m. 1.260.79. 504,316.00. Reinforcing

WHATCOM COUNTY PUBLIC WORKS DEPARTMENT Jon Hutchings ...
Apr 5, 2018 - The Whatcom County Public Works Department will close Hovander Road beginning at the 5300 block running to the junction with West Smith ...

Public Works - City of Long Beach
Class II & III bikeway facility over an 8.4 mile along Pacific Ave., San Antonio Dr., Del Amo Blvd. and Harding ..... Call Center Operations, Work Order. System & ...

Town of Canmore Public Works Department
fleet including the Fire Service units. In-house ..... 4 vault washroom facilities (Quarry Lake, Mountain Shadows, Eagle Terrace, Cougar Creek). • Gates and ...

Public Works 2016-2019.pdf
SECTION 4 HELPERS 21. SECTION 5 LICENSES AND FEES 22. SECTION 6 SAFETY COMMITTEE 22. SECTION 7 ALCOHOL AND DRUG TESTING POLICY ...

VO RS Public Works HW.crtr - Pennysaver
Applications are available on our website, or by email or fax. Dayle A. Barra, Vllage Clerk www.villageofrichfieldsprings-ny.com [email protected].

FNMA Presentation on Public Funds and REO.pdf
FNMA Presentation on Public Funds and REO.pdf. FNMA Presentation on Public Funds and REO.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying ...

(Projects Over $25000) PUBLIC WORKS NOTICE INVITING BIDS 1. The
Aug 4, 2016 - This is a public works project subject to compliance monitoring and enforcement by the .... furnish all tools, equipment, services, apparatus, facilities, ...... service is specified by brand or trade name, the specified name shall be .

public works committee agenda - City of Isle of Palms
Apr 4, 2018 - meeting in accordance with the Freedom of Information Act. 2. Election of Chair and Vice Chair. 3. Approval of Previous Meeting's Minutes.

TOWN OF HAMILTON DEPARTMENT OF PUBLIC WORKS Summer ...
Apr 10, 2018 - The Town of Hamilton, MA is seeking applicants for 2018 seasonal employment positions with the Department of Public Works. Primary ...

town of grand valley seasonal summer employment - public works ...
Public Works Summer Labourer – Duties include lawn maintenance, painting, gardening/watering, municipal housekeeping and assisting with cemetery ...

Public Works Strategic Business Plan - FY17.pdf
SECTION 1: EXECUTIVE SUMMARY. Purpose of the Strategic Business Plan. The purpose of the Public Works Strategic Business Plan is to provide a roadmap ...

New Durham Department of Public Works 10 ... - New Durham NH
American 11DRA RH wing 10' front cable post rear hydraulic. • Force America Patrol Commander Ultra spreader and plow controls. • Rear Wing Slide Option ...

October 2011 International Major Projects Report - Public Works ...
Oct 1, 2011 - U.S. top DB builders, advisors,. 4. ... 10. Developers ranked by investments. 11. The U.S. roadbuilding maze. 15. ... company web sites, and other sources to update and ... Shift risks and reduce claims that under design-bid-.