www.apteachers.in PROCEEDINGS OF THE STATE PROJECT DIRECTOR RA.flV VIDYA MISSION (SSA), A.P, HYDERABAD Present: Smt V.Usha Rani, LA.S. Rc.No.S63/RVM (SSA)/SIEMAT/B14/2013

Date. 11.2013

SUB: A.P RVM(SSA), Hyderabad- SIEMAT Strengthening ofMRGS-Developing of Model School where MRGs are positioned- Reg. Ref: 1. Rc.No.563/RVM (SSA)/SIEMAT/B14/2013, dt22.10.2013 2. Rc.No.563/RVM (SSA)/SIEMAT/B14/2013, dt09.1 0.20 13 3. Rc.No.563/RVM (SSA)/SIEMAT/B1412013, dt08.10.2013 ***

All the DEOs,Project Officers of RVM (SSA),Principals of DIETs are hereby informed that RVM wish to develop 3 Model Schools in the MandaI where MRGs are working in the State. There is a plan to develop these Model Schools by providing inputs like orientation and training of MRGs, development of Teacher Learning Material through Workshops and other necessary support. In this regard as cited in ref 3rd all the MEOs in the State are instructed to visit all the 3 MRG Schools from 17thto 19 October in their respective Mandals.Further the POs are requested to deploy all the Sectoral officers of District Project Office's on the above three days to visit all the MRG Schools in different Revenue Divisions and send the consolidated reports received from MEOs and Sectoral Officers to State Project office by 28.10.2013.

In vide ref 2ndthe Guidelines and Road Map for developmentof Model Schools has sent to all Project Officers in the State to communicate the same to all MandaI Education officers and to MRG Schools. But after the review through audio conference conducted on 4.11.2013 and through the visits of SIEMAT faculty to various districts it came to know that the Guidelines and the Road Map and other instructions communicated by SIEMAT cell and Pedagogy cell have not yet reached the field level. In this regard all the Project Officers are instructed to implement the concept of Model Schools in the identified schools rigorously. Further they may be instructed to deploy all Sectoral officers working in the District Project Offices and MEOs to visit the Model Schools for effective Monitoring and send the status report to SPO by 10.11.2013. Those Districts who have not completed or not yet initiated are requested to undertake

such visits to Model School immediately. The revised Road Map on Model Schools for District Project Offices and revised Guide Lines for Model Schools and Job Chart for MRGs is annexed to this Progs. All the POs are requested to communicate the revised Guide Lines

www.apteachers.in

www.apteachers.in

on Model Schools and Job Chart for MRGs to all MRG Schools in their respective District and ensuretheir destinationPoints. All the Project Officers informed to conduct the review meeting with MEOs exclusively on Model Schools (MRG) after the completion of first cycle visits as specified in the Road Map .Further the POs/AMOs may be instructed to review the progress of Quality Monitoring Tools (QMT) at each level in their respective District and submit the consolidated DMFs with in the time schedule. Based on the out comes of the Quality Monitoring report at each level, review meeting may be conducted at each level as per the schedule and take remedial measures to improve the quality at each level. Further they may be asked to communicate the minutes of the meeting and Action Taken Report (ATR) to the next higher level. SINO

Level

Dates for Review Meeting

I

School

18 to 20 November, 2013

2

School Complex

22 and 23 November, 2013

3

MandaI

26 to 28 November, 2013

4

District

28 to 30 November, 2013

The DEOs/POs/ AMOs may be instructed to strictly adhere the schedule and may be asked to send the compliance report to SPO by December 5th2013.

Encls 1. Revised Guide Lines on Model Schools 2. Revised Road Map for Model School 3. Job Chart ofMRGs To all Project Officers of RVM (SSA) in the State

www.apteachers.in

~~mcrOjeY15r~ 'j1\\)Y't? .b

.,

Rc.563 Strengthening of MRGs Developing Model Schools Where ...

officers and to MRG Schools. But after the review through audio conference conducted on. 4.11.2013 and through the visits of SIEMAT faculty to various districts ...

178KB Sizes 0 Downloads 194 Views

Recommend Documents

Infrastructure Development for Strengthening the Capacity of ...
With the rapid development of computer and network technology, scholarly communication has been generally digitalised. While ... Subdivision on Science, Council for Science and Technology, July 2012) .... quantity of published articles in the consequ

DEVELOPING A COMMUNITY SUPPORT MODEL FOR TOURISM.pdf
DEVELOPING A COMMUNITY SUPPORT MODEL FOR TOURISM.pdf. DEVELOPING A COMMUNITY SUPPORT MODEL FOR TOURISM.pdf. Open. Extract.

MRGS December 2017 newsletter.pdf
including the Pasifika, Tongan, Samoan, Niue, Maori and MEAR groups to name some of them. Then. there is all the numerous sporting and cultural and music and dance events which are held at the school. Mt Roskill has engagement with the community at t

model schools - list of schools for the academic year ... -
Page 1. Page 2. Page 3. Page 4. Page 5. Page 6. Page 7. Page 8. Page 9.

Infrastructure Development for Strengthening the Capacity of ...
Currently, institutional repositories have been serving at about 250 national, public, and private universities. In addition to the ... JAIRO Cloud, which launched.

Where does model-driven engineering help ... - Springer Link
Oct 26, 2011 - pean research project with the objective of developing tech- niques and tools for ... scenarios of complex software systems' development. The.

Developing Model Papers for Formative and Summative ... - parvathi.prtu
Oct 3, 2012 - Present: Mrs. V. Usha Rani, IAS.,. Proc. Rc. No. ... Formative and Summative Test Items as per CCE – Preparation of. Question Papers at district ...

Page 1 Model Schools SI Name of Location of the e Name of the ...
9441787704. 9440414198. Nagireddy pet Nagireddy pet. 9492628196. 9951924938. Sulthanabad. Sulthanabad. 9493263604. 9573488546. 9441131711. 9490182058. Ibrahimpatnam Ibrahimpatnam. Karimnagar. Lingapur. Ramagundam. 9908709372. 9573488546. Kummaripally

A Public Service Broadcasting Model for Developing ... - OhioLINK ETD
Apr 9, 1999 - act as propaganda machines for the upcoming election campaign. They paid a ..... social activists, and media reform advocates for decades, but it could not be put in place ...... Cambodia Halving Poverty by 2015?: Poverty.

Circular 25-2017 Strengthening the concept of Victim Liaison Off.pdf ...
need to be acknowledged and accommodated. The victims deserve to be treated. with respect by the investigatory and prosecuting services and to help them in ...

pdf-2351\mitam-a-modified-ict-adoption-model-for-developing ...
... loading more pages. Retrying... pdf-2351\mitam-a-modified-ict-adoption-model-for-dev ... ing-in-a-developing-country-by-mohamed-elsaadani.pdf.

A Public Service Broadcasting Model for Developing ... - OhioLINK ETD
Apr 9, 1999 - Drew McDaniel, who has been my continuous mentor and chair of the ...... Geographically, Cambodia is located on a land area of 181,035 sq kilometers ...... broadcasting system that served the best interests of the public and was ..... I

A Public Service Broadcasting Model for Developing ... - OhioLINK ETD
Apr 9, 1999 - education, information, and entertainment – are the principles formulated by the first ...... There is a revolutionary new communications technology that undermines the ...... Brunei 155, Vietnam 166, Laos 169 and Burma 171.

Guidelines to Develop Model Schools at Elementary Level.pdf ...
Creating Child Rights culture in the School . The MRG have to Effectively use TLM available in the School . MRG and students have to prepare low cost teaching ...