RESERVOIR APPLICATION SUPPLEMENTAL SHEET (Use with Form S.W. 3) for Temporary Filing No. _________________
THE_______________________________________________ RESERVOIR DETAILS OF DAM FREEBOARD ABOVE SPILLWAY ______
TOP WIDTH ←
TOP OF DAM ELEV. = ↑
_______ SLOPE
DM
↓
↑
←
HIGH WATER LINE ELEV. =
TOTAL HEIGHT
_______ INCH OUTLET PIPE
↕
D1
→
_______ SLOPE
↓
CROSS-SECTION OF DAM—No Scale
CAPACITY Area at High Water Line (HWL): (a) ________ acres Area at elevation of Outlet (invert): (b) ________ acres (DM) Maximum water Depth (less freeboard): (c) ________ feet (D1) Water Depth below Outlet: (d) ________feet TOTAL CAPACITY = (a) x (c) ÷ 3 = ________ acre-feet INACTIVE CAPACITY = (b) x (d)) ÷ 3 = ________ acre-feet ACTIVE CAPACITY = TOTAL CAPACITY - INACTIVE CAPACITY = ______ acre-feet BODY OF RESERVOIR Length: __________feet Width: ________ feet Average Depth: _________ feet NOTES: Measure length as straight line distance (at HWL) from dam to most remote point. Measure width at HWL along dam. Average Depth = TOTAL CAPACITY ÷ Area at HWL. SHOW PLAN VIEW IN THE SPACE PROVIDED AND IDENTIFY SCALE:
PROFILE OF DAMSITE (Looking Upstream)
SCALE: VERTICAL - 1” = _____________
HORIZONTAL - 1” _____________
DECLARATION I declare that I have examined this application/map and to the best of my knowledge and belief it is true, correct and complete.
_______________________________________________________________ Printed Name and Signature of Applicant or Agent
Permit No. __________________________Res.
__________________________________ Date
Page No. _________________ (Leave Blank)
¤VALVE
SHOW CROSS-SECTION AND HYDRAULIC PROPERTIES OF THE SPILLWAY IN THE SPACE PROVIDED BELOW:
SHOW PLAN VIEW IN THE SPACE PROVIDED AND IDENTIFY SCALE: PROFILE OF DAMSITE (Looking Upstream). SCALE: VERTICAL - 1â = ______. HORIZONTAL - 1â ______. DECLARATION. I declare that I have examined this application/map and to the best of my knowledge and belief it is true, correct and complete.
Gta 5 max.No brashow.658450196189.Walking dead comic pdf.Fukushima:ANuclear Story.Fun radio dance 2014.Iamevel. 2014.The LAPDis nowbigger, with nearly 10,000 officers,and claims to be moresensitivethan it is beforetheriots. ... ColonelMoodus, who use
Frydman and Erik Loualiche for sharing their data, and Tyler Muir and Omair ..... or other form of venture financing, depending on how the purchase of physical.
7 An instance document must not have more than one fact having the same .... A Validation Tool has been provided on the MCA XBRL portal for validating the ...
Our system is not integrated at this time, so pre-existing cases are not currently recognized within the e- Filing system. You may still electronically file on these ...
Feb 1, 2008 - At any time (initialization, learning and generalization phases), the complete cartography of the network activity can be observed on a spike ...
work, carried out with a program system called. MOHERES ... The program then places the bodies within the .... channels was 6 rn, with a standard deviation.
Mar 11, 2004 - tion increases as a fractional poWer of source strength,. betWeen MN5 .... In an alternative embodiment, the inverted resistivity depth images ...
Whoops! There was a problem loading more pages. Retrying... 4-10 No Show Drop Policy.pdf. 4-10 No Show Drop Policy.pdf. Open. Extract. Open with. Sign In.
Mar 11, 2004 - do not exceed 0.1 degree and the total amplitude variations of the source currents .... described in M. Zhdanov and G. Keller, (1994, op. cit.) or.
There was a problem previewing this document. Retrying. ... Watch There's No Business Like Show Business (1954) Full Movie Online.pdf. Watch There's No ...
Sign in. Page. 1. /. 1. Loading⦠Page 1 of 1. File: Reservoir modeling pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1.
Filing Declaratory Judgment Actions in Trademark Case: When Is a Cloud Over Your. 'Empire' Large ... qualified as an actual controversy under the Declara-.