Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

Building Condition Assessment Report Asset Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Report Date

C4b - Boys Industrial School - Cottage 3 Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 1922. 11,424 Sq.Ft. RV_Assisted - Senior Living with Brick Veneer on Block / Bearing Wall, Valleyview and Cottages 1, 2 & 3 2 August 2013

1

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

Executive Summary

Cottage 3 was completed in 1922 and formed a portion of the “Boy’s Industrial Training School.” This cottage was designed in Tudor Revival style with two-storeys on brick foundations with interlocking clay tile load bearing walls. It was converted to the “Essondale Home for the Aged” in 1936. Including the basement, Cottage 3 totals 1,061 m2. Cottage 3 is currently vacant and unsafe for occupancy. A 1991 seismic engineering evaluation reported that “Cottage 3 is structurally deficient by several orders of magnitude and would be an extremely hazardous building in an earthquake.”

This report assumes a continuation of the current use (or previous use if building is vacant) and does not include costs associated with a change of use of the building.

Summary Results of Assessment: Replacement Costs $1,839,000.00

C4b - Boys Industrial School - Cottage 3 Renewal Costs $1,449,000.00

FCI 79%

Definitions: • Replacement Cost: The combined costs (construction only - soft costs are not included) to replace all the components in the building without demolition and rebuilding. This number is arrived at from RS Means and other sources then verified (validated) by the persons doing the building assessments. • Renewal Cost: The combined costs (construction only - soft costs are not included) of all the identified renewal needs. • Facility Condition Index (FCI): a ratio of renewal costs divided by replacement costs • FCI Level Definitions: o Good: 0%-5% o Fair: 6%-10% o Poor: 11%-30% o Critical: greater than 30%

2

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

A10 Foundations Component

1

Last Major Action Year Replacement Value What & Where

1922. $300,000 Concrete and brick foundations with brick interior partition and load bearing walls.

Commentary (Condition ...)

Seismic upgrade required (consultant assessment required to confirm scope and more accurate cost)

Action

1.

Action Type Action Cost Action Year

Replacement $300,000 2014.

Brief Description

Existing foundations to be replaced with reinforced concrete.

Overall Condition

Poor

Overall Condition

Fair

Commentary

A20 Basement Construction Component

1

Last Major Action Year Replacement Value What & Where

1922. $100,000 Concrete and brick walls with concrete slab and wood floor joists above. Interlocking clay tile load bearing walls. Assumed Painted drywall wall finishes, some "T" bar ceilings, glued down acoustic tiles and painted lath & plaster. Floors mostly VCT tiles.

Commentary (Condition ...)

Water ingress through concrete and brick wall in basement. Possible perimeter drainage failure (consultant assessment recommended). Similar to cottage #1.

Action

1.

Action Type Action Cost Action Year Brief Description Commentary

Repair $8,911 2072.

3

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

B10 Superstructure Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $64,000 Brick foundation, Interlocking clay tile load bearing walls in basement. assumed wood construction main and upper floor with wood construction roof rafters.

Commentary (Condition ...)

Structurally deficient, Unsafe for Occupancy (seismic upgrade required). Similar to cottage#1.

Action

1.

Action Type Action Cost Action Year Brief Description Commentary

Repair $6,397 2072.

Fair

B2010 Exterior Walls Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $250,000 Terra cotta bricks for the first 4 to 5 feet above grade and the remainder rock-dash stucco with wood trim.

Commentary (Condition ...)

Some water ingress damage.

Action

1.

Action Type Action Cost Action Year Brief Description

Repair $75,000 2014. Repair exterior stucco and trim (east wall water damage)

Commentary

A more detailed envelope assessment required to confirm further scope and cost of work.

4

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

B2020 Exterior Windows Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $80,000 Original single glazed windows. Combination steel framed and aluminum framed. Some fixed and some awning. 104 windows in total.

Commentary (Condition ...)

Some basement windows are broken.

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $80,000 2014. Replace all exterior windows.

Commentary

Basement windows original (steel frames and fixed)

Poor

B2030 Exterior Doors Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $11,000 Exterior doors are solid wood with raised face panels c/w wood frames. Some with half light.

Commentary (Condition ...)

Original doors and frames.

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $11,000 2014. Replace all existing exterior doors. 10 doors in total.

Commentary

5

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

B30 Roofing Component

1

Last Major Action Year Replacement Value What & Where

1922. $90,000 Interlocking asphalt shingles on a hip roof.

Commentary (Condition ...)

Interlocking asphalt shingles on a hip roof.

Action

1.

Action Type Action Cost Action Year

Replacement $90,000 2014.

Brief Description

Replace existing asphalt shingle roof.

Overall Condition

Poor

Overall Condition

Poor

Commentary

C1010 Partitions Component

1

Last Major Action Year Replacement Value

1922. $100,000

What & Where

Assumed non load bearing wood framed painted lath and plaster in basement, main and upper floor. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year

Repair $15,000 2014.

Brief Description

Repair lath and plaster and repaint partitioning walls. Replace all metal washroom partitions.

Commentary

6

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

C1020 Interior Doors Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $16,000 Assumed original interior doors, combination solid slab and raised face panel. fire separation doors having side glass. Approximately 35 doors in total. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year

Replacement $16,000 2014.

Brief Description

Replace all existing interior doors with new (approx. 35 doors in total).

Poor

Commentary

C1030 Fittings Overall Condition

Component

1

Last Major Action Year Replacement Value

1922. $100,000

What & Where

Assumed common areas counters, cabinets and vanities. (No building access do to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $100,000 2014. Replace all existing counters and cabinets.

Commentary

7

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

C20 Stairs Overall Condition

Component

1

Last Major Action Year Replacement Value

1922. $25,000

What & Where

Exterior exit stairs are concrete when exiting basement and steel construction for exiting main and upper floor. Interior stairs are wood frame from basement to upper floor.

Poor

Commentary (Condition ...) Action

1.

Action Type Action Cost Action Year

Replacement $25,000 2014.

Brief Description

Metal exit stairs from first and second floor to be replaced. Concrete stairs to be repaired. Interior stairs to have new finish on risers and runs, including nosing and non-slip strips on runs.

Commentary

Large amount of rust on metal exit stairs and landings. Unsafe.

C3010 Wall Finishes Overall Condition

Component

1

Last Major Action Year Replacement Value

1922. $35,000

What & Where

Assumed combination painted lath and plaster and painted drywall. (90% painted lath and plaster) (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year

Replacement $35,000 2014.

Brief Description

All wall finishes to be repaired and repainted (basement, main and upper floor).

Commentary

8

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

C3020 Floor Finishes Overall Condition

Component

1

Last Major Action Year Replacement Value

1922. $35,000

What & Where

Assumed combination VCT, carpeting and sheet vinyl. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $35,000 2014. Replace all flooring in basement, main floor and upper floor.

Commentary

Possible sub floor replacement where applicable due to water ingress damage and mould issues.

Poor

C3030 Ceiling Finishes Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $30,000 Assumed combination T-bar with lay in acoustic tiles, painted lath and plaster and glued down acoustic tiles. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $30,000 2014. Replace all existing ceiling finishes.

Commentary

Repair existing lath and plaster ceilings.

9

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D2010 Plumbing Fixtures Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $40,000 Assumed common area bathrooms are a combination of ceramic and ceramic coated fixtures. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $40,000 2014. All existing plumbing fixtures to be replaced with new.

Commentary

Assumed existing fixtures are all original. More efficient fixtures to be installed.

Poor

D2020 Domestic Water Distribution Overall Condition

Component

1

Last Major Action Year Replacement Value

1922. $20,000

What & Where

Assumed domestic copper water supply lines with PRV valve in basement area. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $20,000 2018. Re-Pipe

Commentary

10

Fair

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D2030 Sanitary Waste Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $13,000 Assumed cast iron sanitary lines. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year

Replacement $13,000 2033.

Fair

Brief Description Commentary

D2040 Rain Water Drainage Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $11,000 Assumed cast iron sanitary lines. (No building access due to severe mould issues)

Commentary (Condition ...) Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $11,000 2014. As part of the roof replacement replace gutters and rainwater leaders.

Commentary

11

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D2095 Domestic Water Heaters Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $15,000 Assumed 175 litres electric hot water tank located in basement. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $15,000 2014. Replace existing assumed electric Hot Water Tank.

Commentary

Building had been shut down for over 15 years.

Poor

D3012 Gas Supply System Overall Condition

C Component t

1

Last Major Action Year Replacement Value What & Where

1922. $7,000 Natural gas metering valve to side of building and to assumed boiler. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1. Building has been vacant for more than 15 years.

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $7,000 2014. Replace natural gas line and associated valves from exterior connection to inside boiler connection

Commentary

12

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D3024 Boiler Room Piping And Specialties Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $10,000 Assumed hot water cast iron heating pipes, booster pump. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1. Before boiler start-up all pipes need to be inspected and repaired as required.

Action

1.

Action Type Action Cost Action Year Brief Description

Repair $5,000 2014. Since the heating boiler has not been operable for more than 15 years then it may be necessary to repair or replace some of the inline components as required.

Fair

Commentary

D3026 Heating Generating Auxiliary Equipment Overall Condition

Component

1

Last Major Action Year Replacement Value

1922. $20,000

What & Where

Assuming there is a Boiler hot water retention tank located in basement and miscellaneous pumps. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Repair $20,000 2014. Repairs to boiler hot water retention tank, associated pipes and valves and any miscellaneous pumps as required upon start up of boiler.

Commentary

13

Fair

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D3027 Heating Generating Equipment & Piping Insulation Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $10,000 Assumed Low pressure steam natural gas fired boiler located in basement. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $10,000 2014. Replace existing boiler

Commentary

Boiler has not been operable for over 20 years

Critical

D3041 Air Distribution Systems Overall Condition

Component p

1

Last Major Action Year Replacement Value What & Where

1922. $10,000 Assumed Air conditioning and air distribution system located on upper floor. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $10,000 2014. Replace air conditioning and distribution system.

Commentary

Building has been shut down for more than 15 years.

14

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D3043 Hydronic Distribution Systems Overall Condition

Component

1

Last Major Action Year Replacement Value

1922. $20,000

What & Where

Assumed Low pressure steam and hot water insulated lines exposed in basement area feeding fin tube heaters. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $20,000 2018.

Fair

Commentary

D3045 Exhaust Ventilation Systems Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $8 000 $8,000 Assumed boiler exhaust with booster fan and commercial kitchen exhaust hood fan in basement. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $8,000 2014. Replace air conditioning and distribution system.

Commentary

Boiler has been shut down for over 15 years.

15

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D3055 Fin Tube Radiation Overall Condition

Component

1

Last Major Action Year Replacement Value

1922. $30,000

What & Where

Assumed low pressure steam fin tube heaters located in basement, main and upper floor. (No building access due to server mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year

Replacement $30,000 2018.

Fair

Brief Description Commentary

D3060 Controls And Instrumentation O Overall ll C Condition di i

Component

1

Last Major Action Year Replacement Value What & Where

1922. $30,000 Assumed low pressure steam fin tube heaters located in basement, main and upper floor. (No building access due to server mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $30,000 2014. Replace thermostats, instrumentation and controls.

Commentary

Building has been shut down for over 15 years.

16

P Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D5010 Electrical Service And Distribution Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $230,000 Assumed electrical service (located in basement) and distribution. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description Commentary

Replacement $230,000 2018.

Fair

D5021 Branch Wiring Overall Condition

Component

1

Last Major j Action Year Replacement Value What & Where

1922. $140,000 Assumed copper wiring switches and power outlets no ground wire. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description Commentary

Repair $15,000 2018.

17

Fair

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D5022 Lighting Equipment Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $35,000 Assumed Combination of incandescent and fluorescent lighting. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $35,000 2014. Recommend all lighting to be replaced with more energy fixtures and bulbs.

Poor

Commentary

D5032 Intercommunications And Paging Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $20,000 Assumed existing inter communication and paging system available (outdated). (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year

Replacement $20,000 2014.

Brief Description

Outdated equipment.

Commentary

18

Poor

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D5033 Telephone Systems Overall Condition

Component

1

Last Major Action Year Replacement Value

1922. $25,000

What & Where

Phone system condition unknown. Maintenance an replacement by supplier. (No building access due to sever mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost

Replacement $25,000

Action Year

2022.

Good

Brief Description Commentary

D5037 Fire Alarm System Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $20,000 Assumed fire alarm system by Fire Pro last inspection date May 2009. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year

Replacement $20,000 2022.

Brief Description Commentary

19

Fair

Building Condition Assessment Report

C4b - Boys Industrial School - Cottage 3

D5038 Security Systems Overall Condition

Component

1

Last Major Action Year Replacement Value What & Where

1922. $50,000 Assumed main doors alarmed with motion detectors. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year Brief Description

Replacement $50,000 2022.

Fair

Commentary

D5091 Exit & Emergency g y Light g Systems y Overall Condition

Component

1

Last Major Action Year

1922.

Replacement Value

$3,000

What & Where

Assumed Illuminated exit signage at fire exit points. No emergency lights. (No building access due to severe mould issues)

Commentary (Condition ...)

Similar to cottage #1

Action

1.

Action Type Action Cost Action Year

Replacement $3,000 2022.

Brief Description

Replace exit signage with new and install emergency lighting as required.

Commentary

20

Poor

Riverview_C4b - Boys Industrial School ... - Renewing Riverview

Renewal Costs. FCI ... Renewal Cost: The combined costs (construction only - soft costs are not included) of all the identified ..... more energy fixtures and bulbs.

146KB Sizes 0 Downloads 137 Views

Recommend Documents

Riverview_C4a - Boys Industrial School ... - Renewing Riverview
Renewal Costs. FCI ... Renewal Cost: The combined costs (construction only - soft costs are not included) of all the identified ..... more energy fixtures and bulbs.

Renewing ICT.pdf
Transition period from old to new team: February to April. New team in place: May 2017. Page 3 of 3. Renewing ICT.pdf. Renewing ICT.pdf. Open. Extract.

Renewing Library Resources
Automatic Renewals. Library materials automatically renew from the original loan date until they reach a maximum final ... A courtesy email is sent before the ...

Renewing Our Commitment to Learning -
May 14, 2016 - Tools & Assessment for Programs and Tutors. Keynote Speaker. We are pleased to welcome Michelle Hodara, PhD, as our morning Keynote presenter. Michelle's experience writing and presenting about assessment and placement, in addition to

High School Boys Basketball-revised 10_18_16.pdf
Page 1 of 1. Liberty High School. P.O. Box 464. Mountain View, MO 65548. Phone (417) 934-2020. Fax (417) 934-5410. Junior Varsity/Varsity Boys Basketball.

Genesee Christian School - WINTER 17-18 Special Varsity Boys BB ...
Genesee Christian School - WINTER 17-18. Special. Varsity Boys BB. JV Boys BB. JH 8th Boys BB. JH 7th Boys BB. Varsity Girls BB. JH Girls BB. M. 11/6. Tryouts 3:30-5:30. HS Gym. Tu. 11/7. 3:30-5:30 HS Gym. W. 11/8. Th. 11/9. 3:30-5:30 HS Gym. F. 11/1

PDF Download Resonant Leadership: Renewing ...
Yourself and Connecting with Others Through. Mindfulness, Hope and CompassionCompassion. (Harvard Business School Press) PDF New E-Book. By #A#.

pdf-1829\the-indian-industrial-school-carlisle-pennsylvania-its ...
... apps below to open or edit this item. pdf-1829\the-indian-industrial-school-carlisle-pennsylv ... and-the-difficulties-surmounted-cumberland-county-h.pdf.

(>
laptop, including Microsoft's cost-free Reader application, or perhaps a ... Users can purchase an book on diskette or CD, however the most widely used.

Renewing Licenses for the Nation's Nuclear Power Plants - APS Physics
University of California, Berkeley ... Physical Society Panel on Public Affairs study on renewing licenses for operation of U.S. ..... River nuclear plant in Florida,.

Junior Instructor -Mechanic Industrial Electronics - Industrial Training ...
(o 6A @) o.4A. lt. A wd biad ... @1l hs .n op.n voriase : (c) r.5v ... Displaying Junior Instructor -Mechanic Industrial Electronics - Industrial Training.pdf. Page 1 of ...

1. Bad Boys, Bad Boys! - Mia Watts.pdf
Bad Boys, Bad Boys! - Mia Watts.pdf. 1. Bad Boys, Bad Boys! - Mia Watts.pdf. Open. Extract. Open with. Sign In. Main menu.

Boys Shorts.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Boys Shorts.pdf. Boys Shorts.pdf. Open. Extract. Open with. Sign In.

U12 Boys
Oct 1, 2017 - G/A. 3 max per game Points. Byram Raptors. 3. 0. 3. 0. 1. -7. 0. 7. 1. NWRAA Cyclones. 3. 1. 1. 1. 4. 0. 1. 3. 14. Pearl Real Madrid. 3. 3. 0. 0. 9. 9. 0. 6. 27. NWRAA Golden Dragons. 3. 1. 1. 1. 3. -2. 2. 3. 14. Group B. Games Played.

Young Gay Boys Videos
Young Gay Boys Videos - https://www.boysc.com/rss.xml