June, 2012 BNA-024 : SHIP OPERATIONS Maximum Marks : 70
Time : 2 Hours Note :
(i) Question No 1 and 2 are Compulsory. (ii) Attempt any five of the remaining seven questions. (iii) Use of non programmable calculator and M.V. Hindship table is allowed.
1.
A vessel of 6500t, KM 7.2m KG 6.8m is floating 10 upright. A weight of 100T is shifted 2.3 m to port and 3.9m upwards. Calculate the resulting list.
2.
M.V. Hindship arrives at a port in R.D. 1.012 with drafts F 6.15 m, A 7.22m. Her sailing draft in water of RD 1.025 was F 5.33m A 5.98m. Calculate the weight of cargo discharged at that port if 85 tonnes of fuel and fresh water were consumed in the port.
3.
Draw midship cross-section of a container ship 10 with longitudinal framing.
BNA-024
1
10
P.T.O.
4.
With the help of diagram define the following : 5x2=10 (a) FLARE (b) CAMBER (c) MOULDED DEPTH (d) FREE BOARD (e) AFT PERPENDICULAR'
5.
Describe with suitable sketch the structural arrangements in Fore part of the ship to with stand panting and pounding stresses.
6.
List the entries required for machinery space 10 operations in the Oil Record Book.
7.
(a) State the conditions under which the glass bottles can be disposed off Into the sea. 2x5=10 (b) State the purpose of international Convention on Antifouling Paints.
8.
Describe how a fire drill is conducted with 10 mockfire in Galley.
9.
Write short notes on the following : (a) Centrifugal Pump (b) Bow thruster (c) Evaporator
Calculate the weight of cargo discharged at that. port if 85 tonnes ... Draw midship cross-section of a container ship 10 ... Displaying Ship Operations.pdf. Page 1 ...
Draw the sketch of a typical forecastle deck with. mooring and anchoring arrangements, showing. leads of moorings. Label at least ten items. 10. 6. (a) State the criteria under which oily water. from slop tank of an oil tanker may be. discharged into
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Slave Ship study ...
estimate. Powering. Structure. General. arrangements. Freeboard. and subdivision. Hydrostatics. Lines. Proportions. Vessel. objectives. Cost. estimate. Stability. Figure 1.1 Design spiral. 4 Ship Construction. Whoops! There was a problem loading this
Page 1 of 1. Page 1 of 1. ship or sheep pdf. ship or sheep pdf. Open. Extract. Open with. Sign In. Main menu. Displaying ship or sheep pdf. Page 1 of 1.
There was a problem loading more pages. Retrying... general ship knowledge pdf. general ship knowledge pdf. Open. Extract. Open with. Sign In. Main menu.
The diaphragm. is a large dome-shaped muscle which separates the chest from the abdominal cavity. When. the diaphragm muscle contracts, its dome becomes ...
for free sailing in calm weather, and. followed up by the relative heavy/light. running conditions which apply when. the ship is sailing and subject to different.
considerations, but also those likely to develop within the life of the ship. ... final arrangements and systems agreed with the owner and satisfies the building.
ships, including bulk carriers, the first cost of the ship is the major factor for the owner. and the ship may be designed for ease of production. Resale value is also ...
(An e book reader could be a software software for use over a laptop, including ... Customers should buy an e book on diskette or CD, even so the hottest way of ...
Page 1 of 10. Bermuda. Compiled by the Department of Marine and Ports Services. Information subject to change without notice. Dated: January 17th, 2011. www.marops.bm. 2011 CRUISE SHIP SCHEDULE. Page 1 of 10 ...