PAGE 1

PROMENADE © 1990 TERI DUSENBURY SNOWFLAKE MEASURES APPROXIMATELY 4 INCHES MATERIALS: 2 SHUTTLES, 1 BALL OF 6-CORD SIZE 20 WIND ONE SHUTTLE LEAVING BALL THREAD ATTACHED. SNOWFLAKE IS TATTED IN TWO ROUNDS. ROUND ONE: Ring A: R 5 dk - 5 dk - 3 dk, mp, 3 dk - 5 dk - 5 dk. close ring *CHAIN ONE RDK/LHK: 5 knots - 5 knots Ring B: R 6 dk +(join to last p of ring A) 6 dk. close ring.

© 1990 TERI DUSENBURY

PAGE 2 Ring C: R 6 dk - 6 dk. close ring. CHAIN TWO RDK/LHK: 5 knots - 5 knots Ring A: R 5 dk +(join to last p of ring C) 5 dk +(join to fourth p of ring A) 3 dk, mp, 3 dk - 5 dk - 5 dk. close ring. *Repeat around in pattern ending with last chain. End off. Pull running thread through base of ring A and first chain knot. Tie a square knot on the wrong side of the lace. Rethread ends through completed knots on the wrong side of the lace. USING THE CONTINUOUS THREAD METHOD WIND TWO SHUTTLES. ROUND TWO: Ring A-S1: R 6 dk +(join to space made between rings B & C, round one) 6 dk. close ring. *Ring B-S1: R 6 dk - 6 dk. close ring. Ring C-S1: R 6 dk - 6 dk. close ring. CHAIN ONE RDK/LHK: 5 knots +(join to corresponding p of chain one, round one) 10 knots Ring D-S1: R 6 dk +(join to last p of ring C) 3 dk - 3dk. close ring. CHAIN TWO RDK/LHK: 5 knots Ring E-S1: R 3 dk +(join to last p of ring D) 3 dk, sp, 3 dk - 3 dk. close ring. Ring F-S1: R 3 dk +(join to last p of ring E) 3 dk, sp, 3 dk - 3 dk. close ring. Ring G-S1: R 3 dk +(join to last p of ring F) 5 dk, sp, 5 dk - 3 dk. close ring. Ring H-S1: R 3 dk +(join to last p of ring G) 3 dk, sp, 3 dk - 3 dk. close ring. Ring I-S1: R 3 dk +(join to last p of ring H) 3 dk, sp, 3 dk - 3 dk. close ring. CHAIN THREE RDK/LHK: 5 knots Ring J-S1: R 3 dk +(join to last p of ring I) 3 dk - 6 dk. close ring. CHAIN FOUR RDK/LHK: 10 knots +(join to corresponding p of chain two, round one) 5 knots Ring A-Turn work to face the wrong side of the lace. Directional Ring S2: R second hitch, 5 dk, first hitch, pull the ring thread up through space made between rings B & C, round one, guide shuttle through loop, pull ring thread to bring loop taut, 5 dk, first hitch, bring shuttle two through the ring to the front of the work. Turn work to face the front of the work. * Repeat in pattern ending with chain four. End off. Pull running thread through space between ring A & ring B. Tie a square knot on the wrong side of the lace. Rethread ends through completed knots on the wrong side of the lace. ABBREVIATIONS . (period) = close ring - (dash) = link picot + or j = join ctm = continuous thread method dk = double knot dr = directional ring dyk = Dora Young knot exlp = extra large picot lhk = lark's head knot lk = lock knot lkp = link picot lp = large picot mp = medium picot p = picot, 5p = fifth picot pthread = picot thread r = ring, R-A= ring A

© 1990 TERI DUSENBURY

PAGE 3 rdk = reverse double knot S1 = shuttle one S2 = shuttle two sep = separated sp = small picot sr = split ring

PROMENADE © 1990 TERI DUSENBURY SNOWFLAKE MEASURES APPROXIMATELY 4 INCHES

© 1990 TERI DUSENBURY

TATTING-SNOWFLAKES-PROMENADE-PATTERN-DUSENBURY ...

Page 1 of 3. PAGE 1. PROMENADE. © 1990 TERI DUSENBURY. SNOWFLAKE MEASURES APPROXIMATELY 4 INCHES. MATERIALS: 2 SHUTTLES, 1 BALL ...

196KB Sizes 1 Downloads 135 Views

Recommend Documents

No documents