www.thietbidientudonghoa.com.vn Data sheet

Three-phase monitoring relays CM-PVS CM-PVS.31 and CM-PVS.41

The three-phase monitoring relays CM-PVS.x1 monitor the phase parameters phase sequence, phase failure as well as over- and undervoltage.

2CDC 251 001 V0012

All devices are available with two different terminal versions. You can choose between the proven screw connection technology (double-chamber cage connection terminals) and the completely tool-free Easy Connect Technology (push-in terminals). Characteristics –– Monitoring of three-phase mains for phase sequence (can be switched off), phase failure, over- and undervoltage –– Suitable for railway applications –– TRMS measuring principle –– Threshold values for over- and undervoltage are adjustable as absolute values –– Tripping delay Tv can be adjusted or switched off by means of a logarithmic scale (0 s; 0.1-30 s) –– ON-delayed or OFF-delayed tripping delay selectable –– Powered by the measuring circuit –– Precise adjustment by front-face operating controls –– Screw connection technology or Easy Connect Technology available –– Housing material for highest fire protection classification UL 94 V-0 –– Tool-free mounting on DIN rail as well as demounting –– 2 c/o (SPDT) contacts –– 22.5 mm (0.89 in) width –– 3 LEDs for the indication of operational states Order data Three-phase monitoring relays Type

Rated control supply voltage = measuring voltage

Connection technology

Order code

CM-PVS.31P

3 x 160-300 V AC

Push-in terminals

1SVR740794R1300

Screw terminals

1SVR730794R1300

Push-in terminals

1SVR740794R3300

Screw terminals

1SVR730794R3300

CM-PVS.31S CM-PVS.41P

3 x 300-500 V AC

CM-PVS.41S

Accessories Type

Description

Order code

ADP.01

Adapter for screw mounting

1SVR430029R0100

MAR.01

Marker label for devices without DIP switches

1SVR366017R0100

COV.11

Sealable transparent cover

1SVR730005R0100

www.thietbidientudonghoa.com.vn

www.thietbidientudonghoa.com.vn Connection technology

Type designation CM-xxS.yyP

Type designation CM-xxS.yyS

2CDC 253 025 F0011

Approved screw connection technology with double-chamber cage connection terminals

2CDC 253 026 F0011

Maintenance free Easy Connect Technology with push-in terminals

Push-in terminals –– Tool-free connection of rigid and flexible wires with wire end ferrule –– Easy connection of flexible wires without wire end ferrule by opening the terminals –– No retightening necessary –– One operation lever for opening both connection terminals –– For triggering the lever and disconnecting of wires you can use the same tool (Screwdriver according to DIN ISO 2380-1 Form A 0.8 x 4 mm (0.0315 x 0.157 in), DIN ISO 8764-1 PZ1 ø 4.5 mm (0.177 in)) –– Constant spring force on terminal point independent of the applied wire type, wire size or ambient conditions (e. g. vibrations or temperature changes) –– Opening for testing the electrical contacting –– Gas-tight

Double-chamber cage connection terminals –– Terminal spaces for different wire sizes –– One screw for opening and closing of both cages –– Pozidrive screws for pan- or crosshead screwdrivers according to DIN ISO 2380-1 Form A 0.8 x 4 mm (0.0315 x 0.157 in), DIN ISO 8764-1 PZ1 ø 4.5 mm (0.177 in)

Both the Easy Connect Technology with push-in terminals and screw connection technology with double-chamber cage connection terminals have the same connection geometry as well as terminal position.

www.thietbidientudonghoa.com.vn

2 - Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 | Data sheet

www.thietbidientudonghoa.com.vn Functions Operating controls 1 Adjustment of the threshold value >U for overvoltage 2 Adjustment of the threshold value
F2: red LED – Fault message

2 4 Adjustment of the tripping delay Tv 2CDC 251 001 V0012

5 Function selection (see rotary switch „Function“) 3 6 Marker label 4 5 6

Application The three-phase monitoring relays CM-PVS.x1 are designed for use in three-phase mains for monitoring the phase parameters phase sequence, phase failure as well as over- and undervoltage. The CM-PVS.x1 provide an adjustable tripping delay and work according to the closed-circuit principle.

Operating mode The CM-PVS.x1 have 2 c/o (SPDT) contacts and are available for 3-wire AC systems. The units are adjusted with frontface operating controls. The selection of ON-delay with phase sequence monitoring A , OFF-delay with phase sequence monitoring B , ON-delay without phase sequence monitoring A l , OFF-delay without phase sequence monitoring B l is made with a rotary switch. Potentiometers, with direct reading scale, allow the adjustment of the threshold values for overvoltage (>U), undervoltage (
Adjustment potentiometer Threshold values By means of three separate potentiometers with direct reading scales, the threshold values for over- and undervoltage as well as for phase unbalance can be adjusted within the measuring range. Measuring range for overvoltage

Measuring range for undervoltage

CM-PVS.31

3 x 220-300 V AC

3 x 160-230 V AC

CM-PVS.41

3 x 420-500 V AC

3 x 300-380 V AC

Tripping delay Tv The tripping delay Tv can be adjusted within a range of 0.1 to 30 s by means of a potentiometer with logarithmic scale. By turning to the left stop, the tripping delay can be switched off.

www.thietbidientudonghoa.com.vn Data sheet | Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 - 3

www.thietbidientudonghoa.com.vn Rotary switch Type of tripping delay and phase sequence monitoring The type of tripping delay and phase sequence monitoring can be selected via the rotary switch „Function“. ON-delay with phase sequence monitoring The output relays de-energize as soon as a phase sequence error occurs. The output relays re-energize automatically as soon as the phase sequence is correct again. OFF-delay with phase sequence monitoring The output relays de-energize as soon as a phase sequence error occurs. The output relays re-energize automatically as soon as the phase sequence is correct again. ON-delay without phase sequence monitoring Phase sequence errors will not cause a tripping of the relay. OFF-delay without phase sequence monitoring Phase sequence errors will not cause a tripping of the relay.

Indication of operational states LEDs, status information and fault messages Operational state Control supply voltage applied,

F1: LED red

F2: LED red

V

-

-

W

-

-

Phase failure

-

V

Phase sequence

-

Overvoltage

-

V

-

Undervoltage

-

-

V

W

W

W

output relay energized Tripping delay Tv active

Adjustment error 1)

R/T: LED yellow

1)

W

W alternating

Overlapping of the threshold values: The threshold value for overvoltage is set to a smaller value than the threshold value for undervoltage.

www.thietbidientudonghoa.com.vn

4 - Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 | Data sheet

www.thietbidientudonghoa.com.vn Function descriptions / diagrams Configuration of the devices is made by means of operating controls accessible on the front of the unit and signalling is made by means of front-face LEDs. Phase sequence and phase failure monitoring Applying control supply voltage begins the fixed start-up delay Ts. When Ts is complete and all phases are present with correct voltage, the output relays energize and the yellow LED R/T is on. Phase sequence monitoring: The output relays de-energize as soon as a phase sequence error occurs. The fault is displayed by alternated flashing of the LEDs F1 and F2. The output relays re-energize automatically as soon as the phase sequence is correct again. Phase failure monitoring:

Measured value

L1, L2, L3

L1, L3, L2

L1, L2, L3

Ts

L3

15-18 15-16 25-28 25-26 F1: red LED F2: red LED R/T: yellow LED Ts

L1, L2

= start-up delay fixed 200 ms

L1, L2, L3

L1 L2, L3

L1, L2, L3

2CDC 252 094 F0207

L1, L2, L3

2CDC 252 094 F0207

The output relays de-energize instantaneously if a phase failure occurs. The fault is indicated by lightning of LED F1 and flashing of LED F2. The output relays re-energize automatically as soon as the voltage returns to the tolerance range.

www.thietbidientudonghoa.com.vn Data sheet | Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 - 5

www.thietbidientudonghoa.com.vn Over- and undervoltage monitoring Applying control supply voltage begins the fixed start-up delay Ts. When Ts is complete and all phases are present with correct voltage and with correct phase sequence, the output relays energize and the yellow LED R/T is on. Type of tripping delay = ON-delay A If the voltage to be monitored exceeds or falls below the set threshold value, the output relays de-energize after the set tripping delay Tv is complete. The LED R/T flashes during timing and turns off as soon as the output relays de-energize. The output relays re-energize automatically as soon as the voltage returns to the tolerance range, taking into account a fixed hysteresis of 5 %. The LED R/T is on. 2CDC 252 090 F0207

L1, L2, L3 >U >U-5% Measured value
Tv


Tv

15-18 15-16 25-28 25-26

2CDC 252 090 F0207

F1: red LED F2: red LED R/T: yellow LED Ts = start-up delay fixed 200 ms Tv = adjustable tripping delay

Type of tripping delay = OFF-delay B If the voltage to be monitored exceeds or falls below the set threshold value, the output relays de-energize instantaneously and the LED R/T turns off.

L1, L2, L3 >U >U-5% Measured value
Tv



2CDC 252 091 F0207

As soon as the voltage returns to the tolerance range, taking into account a fixed hysteresis of 5 %, the output relays reenergize automatically after the set tripping delay Tv is complete. The LED R/T flashes during timing and turns steady when timing is complete.

15-18 15-16 25-28 25-26

F2: red LED R/T: yellow LED Ts = start-up delay fixed 200 ms Tv = adjustable tripping delay

www.thietbidientudonghoa.com.vn

6 - Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 | Data sheet

2CDC 252 091 F0207

F1: red LED

www.thietbidientudonghoa.com.vn Electrical connection

L2

L1 L2 L3

26 16

15

L3 25

16 18

26 28

25 15

28 18

L1, L2, L3

Control supply voltage = measuring voltage

15-16/18 25-26/28

Output contacts - closed-circuit principle

2CDC 252 037 F0008

L1

Connection diagram CM-PVS.x1

Technical data Data at Ta = 25 °C and rated values, unless otherwise indicated Input circuit Type

CM-PVS.31

Supply circuit = measuring circuit

CM-PVS.41 L1, L2, L3,

Rated control supply voltage Us = measuring voltage

3 x 160-300 V AC

Rated control supply voltage Us tolerance

-15...+10 %

3 x 300-500 V AC

Rated frequency

50/60 Hz

Frequency range

45-65 Hz

Typical current / power consumption

25 mA / 10 VA

25 mA / 18 VA

(230 V AC)

(400 V AC)

Measuring circuit Monitoring functions

L1, L2, L3 Phase failure Phase sequence

J can be switched off

Over-/undervoltage Measuring range Thresholds

the threshold value

J

J

Overvoltage

3 x 220-300 V AC

3 x 420-500 V AC

Undervoltage

3 x 160-230 V AC

3 x 300-380 V AC

Overvoltage

adjustable within the measuring range

Undervoltage

adjustable within the measuring range

Tolerance of the adjusted threshold value Hysteresis related to

J can be switched off

6 % of full-scale value Over-/undervoltage

fixed 5 %

Rated frequency of the measuring signal

50/60 Hz

Frequency range of the measuring signal

45-65 Hz

Maximum measuring cycle time

100 ms

Accuracy within the rated control supply voltage tolerance

DU  0.5 %

Accuracy within the temperature range

DU  0.06 % / °C

Measuring method

True RMS

Timing circuit Start-up delay Ts

fixed 200 ms

Tripping delay Tv

ON- or OFF-delay 0 s; 0.1-30 s adjustable

Repeat accuracy (constant parameters)

< w0.2 %

Accuracy within the rated control supply voltage tolerance

Dt  0.5 %

Accuracy within the temperature range

Dt  0.06 % / °C

www.thietbidientudonghoa.com.vn Data sheet | Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 - 7

www.thietbidientudonghoa.com.vn User interface Indication of operational states Relay status / timing

R/T

yellow LED

Fault message

F1

red LED

Fault message

F2

red LED

Details see table ‚LEDs, status information and fault messages‘ on page 5 and ‚Function descriptions / diagrams‘ on page 6.

Output circuits Kind of output

15-16/18

relay, 1st c/o (SPDT) contact

25-26/28

relay, 2nd c/o (SPDT) contact 1 x 2 (SPDT) contacts

Operating principle

closed-circuit principle

Contact material

AgNi alloy, Cd free

Rated operational voltage Ue

250 V

Minimum switching voltage / Minimum switching current

24 V / 10 mA

Maximum switching voltage / Maximum switching current

see load limit curves

Rated operational current Ie

AC-12 (resistive) at 230 V

4A

AC-15 (inductive) at 230 V

3A

DC-12 (resistive) at 24 V

4A

DC-13 (inductive) at 24 V

2A

AC rating (UL 508)

Utilization category (Control Circuit Rating Code) max. rated operational voltage max. continuous thermal current at B 300 max. making/breaking apparent power at B 300

Mechanical lifetime

1)

B 300 300 V AC 5A 3600/360 VA 30 x 106 switching cycles

Electrical lifetime

AC-12, 230 V, 4 A

0.1 x 106 switching cycles

Maximum fuse rating to achieve

n/c contact

6 A fast-acting

short-circuit protection

n/o contact

10 A fast-acting

General data MTBF

on request

Duty time

100 %

Dimensions

see ‘Dimensional drawings’

Weight

Screw connection technology

Easy Connect Technology (push-in)

CM-PVS.31

0.141 kg (0.311 lb)

0.132 kg (0.291 lb)

CM-PVS.41

0.139 kg (0.306 lb)

0.131 kg (0.289 lb)

CM-PVS.31

0.166 kg (0.366 lb)

0.157 kg (0.346 lb)

CM-PVS.41

0.164 kg (0.362 lb)

0.156 kg (0.343 lb)

net weight

gross weight Mounting

DIN rail (IEC/EN 60715), snap-on mounting without any tool

Mounting position

any CM-PVS.31

Minimum distance to other units

horizontal

> 220 V Material of housing Degree of protection

1)

UL 94 V-0 housing

IP50

terminals

IP20

Closed-circuit principle: Output relay(s) de-energize(s) if measured value exceeds or falls below the adjusted threshold value.

www.thietbidientudonghoa.com.vn

8 - Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 | Data sheet

CM-PVS.41

10 mm (0.39 in) in case of continuous voltage of ... > 400 V

www.thietbidientudonghoa.com.vn Electrical connection

Connnecting capacity

Screw connection technology

Easy Connect Technology (push-in)

fine‑strand with(out)

1 x 0.5-2.5 mm²

2 x 0.5-1.5 mm²

wire end ferrule

(1 x 18-14 AWG)

(2 x 18-16 AWG)

2 x 0.5-1.5 mm² (2 x 18-16 AWG) rigid

1 x 0.5-4 mm²

2 x 0.5-1.5 mm²

(1 x 20-12 AWG)

(2 x 20-16 AWG)

2 x 0.5-2.5 mm² (2 x 20-14 AWG) Stripping length

8 mm (0.32 in)

Tightening torque

0.6 - 0.8 Nm

-

(7.08 lb.in)

Environmental data Ambient temperature ranges

operation

-25...+60 °C

storage

-40...+85 °C

Damp heat, cyclic (IEC/EN 60068-2-30)

6 x 24 cycle, 55 °C, 95 % RH

Climatic class

3K3

Vibration, sinusoidal

Class 2

Shock

Class 2

Isolation data Type Rated insulation voltage Ui Rated impulse withstand voltage Uimp Basic insulation

input circuit / output circuit

600 V

output circuit 1 / output circuit 2

300 V

input circuit / output circuit

6 kV, 1.2/50 µs

output circuit 1 / output circuit 2

4 kV, 1.2/50 µs

input circuit / output circuit

Protective separation

input circuit /

(IEC/EN 61140, EN 50178)

output circuit

600 V -

Pollution degree

3

Overvoltage category

III

Standards / Directives Standards

IEC/EN 60947-5-1, IEC/EN 60255-27, EN 50178

Low Voltage Directive

2014/35/EU

EMC directive

2014/30/EU

RoHS directive

2011/65/EU

www.thietbidientudonghoa.com.vn Data sheet | Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 - 9

www.thietbidientudonghoa.com.vn Railway application standards EN 50155, IEC 60571

temperature class

“Railway applications – Electronic equipment

supply voltage category

used on rolling stock” IEC/EN 61373

T3 S1, S2, C1*), C2*) Category 1, Class B

“Railway applications – Rolling stock equipment – Shock and vibration tests” EN 45545-2 Railway applications – Fire protection on railway vehicles – part 2:

HL3

Requirements for fire behavior of materials and components

ISO 4589-2

LOI 32.3 %

NF X-70-100-1

C.I.T. (T12) 0.45

EN ISO 5659-2

Ds max (T10.03) 104

NF F 16-101: Rolling stock. Fire behaviour. Materials choosing

I2 / F2

NF F 16-102: Railway rolling stock. Fire behaviour. Materials choosing, application for electric equipment DIN 5510-2 Preventive fire protection in railway vehicles. Part 2: Fire behaviour and fire

fullfilled

side effects of materials and parts *) only applicable for devices with DC supply

Electromagnetic compatibility Type Interference immunity to

IEC/EN 61000-6-2

electrostatic discharge

IEC/EN 61000-4-2

Level 3 (6 kV / 8 kV)

radiated, radio-frequency,

IEC/EN 61000-4-3

Level 3 (10 V/m)

electrical fast transient / burst

IEC/EN 61000-4-4

Level 3 (2 kV / 2 kHz)

surge

IEC/EN 61000-4-5

Level 4 (2 kV L-L)

conducted disturbances, induced by

IEC/EN 61000-4-6

Level 3 (10 V)

electromagnetic field

radio-frequency fields harmonics and interharmonics

IEC/EN 61000-4-13

Interference emission

Class 3 IEC/EN 61000-6-3

high-frequency radiated

IEC/CISPR 22,

Class B

EN 55022 high-frequency conducted

IEC/CISPR 22,

Class B

EN 55022

www.thietbidientudonghoa.com.vn

10 - Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 | Data sheet

www.thietbidientudonghoa.com.vn Technical diagrams Load limit curves V 300

V 300

V 200

resistive load

20

20

10 0.1

0.2

0.5

1

2 I

4

6

10 A

2CDC 252 194 F0205

100 80 60 50 40 30

AC load (resistive)

10 0.1

0.5

1

2 I

4

6

10 A

DC load (resistive)

Switching cycles

1.0 0.9 0.8 F

0.2

2CDC 252 193 F0205

resistive load

100 80 60 50 40 30

0.7

250 V resistive load

0.5 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 cos ϕ

2CDC 252 192 F0205

0.6

Derating factor F for inductive AC load

Switching current [A]

2CDC 252 148 F0206

V 200

Contact lifetime

Dimensions in mm and inches 113.4 4.47” 22.5 0.89”

103.7 4.08”

2CDC 252 009 F0011

85.6 3.37”

105.9 4.17”

www.thietbidientudonghoa.com.vn Data sheet | Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 - 11

www.thietbidientudonghoa.com.vn Accessories in mm and inches

8 0.32” 4.8 0.19”

68 2.68”

11.5 0.453”

ADP.01 ‑ Adapter for screw mounting

MAR.01 ‑ Marker label for devices without DIP switches

front to back 110.5 4.31”

COV.11 ‑ Sealable transparent cover

Further documentation Document title

Document type

Document number

Electronic relays and controls

Catalog

2CDC 110 004 C02xx

CM-PAS, CM-PFS, CM-PSS, CM-PVS

Instruction manual

1SVC 730 510 M0000

You can find the documentation on the internet at www.abb.com/lowvoltage -> Automation, control and protection -> Electronic relays and controls -> Measuring and monitoring relays.

CAD system files You can find the CAD files for CAD systems at http://abb-control-products.partcommunity.com -> Low Voltage Products & Systems -> Control Products -> Electronic Relays and Controls.

www.thietbidientudonghoa.com.vn

12 - Three-phase monitoring relays CM-PVS.31 / CM-PVS.41 | Data sheet

2CDC 252 010 F0011

20 .787”

8 .315”

3A11

2CDC 252 186 F0005

60 2.362” 70 2.756”

2CDC 252 008 F0010

62.5 2.461” 10 0.394” 20 0.787”

6.5 0.256”

22.5 0.89”

www.thietbidientudonghoa.com.vn

Contact us

Document number 2CDC 112 211 D0201 (03.2017)

ABB STOTZ-KONTAKT GmbH P. O. Box 10 16 80 69006 Heidelberg, Germany Phone: +49 (0) 6221 7 01-0 Fax: +49 (0) 6221 7 01-13 25 E-mail: [email protected] You can find the address of your local sales organisation on the ABB home page http://www.abb.com/contacts -> Low Voltage Products and Systems

Note: We reserve the right to make technical changes or modify the contents of this document without prior notice. With regard to purchase orders, the agreed particulars shall prevail. ABB AG does not accept any responsibility whatsoever for potential errors or possible lack of information in this document. We reserve all rights in this document and in the subject matter and illustrations contained therein. Any reproduction, disclosure to third parties or utilization of its contents – in whole or in parts – is forbidden without prior written consent of ABB AG. Copyright© 2017 ABB All rights reserved

www.thietbidientudonghoa.com.vn

Three-phase monitoring relays CM-PVS.pdf

www.thietbidientudonghoa.com.vn. Page 1 of 13 ... Page 2 of 13 ... Page 3 of 13. Three-phase monitoring relays CM-PVS.pdf. Three-phase monitoring relays ...

2MB Sizes 1 Downloads 185 Views

Recommend Documents

bv relays results.pdf
9 Henry, Katie 9 BV NORTHWEST 13:40.67. 10 Flanigan, Kait 12 BV NORTHWEST ... THOMAS AQUINAS A 53.08 5. 5 BLUE VALLEY SOUTHWEST A 53.27 4.

2018 Mustang Relays meet program.pdf
Sign in. Page. 1. /. 3. Loading… Page 1 of 3. Downers Grove South H.S. Hy-Tek's MEET MANAGER 12:33 PM 3/3/2018 Page 1. 2018 Mustang Relays - 2/27/2017. North Central College. Meet Program - Running Evensts. Event 1 Girls 4x800 Meter Relay (32). Lan

2014 dunlap relays meet results.pdf
1 Gilbert, Maryjeanne PND 5:12.00. 2 Miller, Haley TREM 5:15.10. 3 Jockisch, Abby DUNL 5:22.30. 4 Supan, Shannan UNIV J5:36.40. 5 Shroyer, Jordan GALE ...

2018 Mustang Relays Information Sheet.pdf
Mar 5, 2018 - LOCATION:​ North Central College Recreation Center, 440 S. Brainard St., Naperville, IL. BUS PARKING: ​ You may drop athletes off next to the Rec Center and then all vehicles will be directed to park by. security officers. Mini-buse

2010 Warrior Relays 2010.pdf
Page 1 of 13. Seaholm Boys Swimming & Diving. Menu. Home. Announcements. Code of Honor. Coaches. Team Requirements. Things to Know. Tips from Tom. Swim Practice Schedule. Meet Schedule. Just For Divers. Championship Meet Info. Meet Results 2011 to 20

Big Red Relays Team Scores.pdf
Page 1 of 1. file:///C|/Users/e125249/Downloads/Scores.htm[2/26/2017 11:35:38 AM]. Licensed to Aztec High School HY-TEK's Meet Manager 2/25/2017.

2016 Club Relays Results.pdf
10 8.80 Ausloos, Emily Wisconsin. 11 8.85 Riemer, Jordyn Wisconsin. 12 8.86 Ostiguy, Ansley Loyola. 12 8.86 Thomas, Katelyn Wisconsin. 14 8.92 Bell-Bey, ...

Wayzata Relays meet program.pdf
3 Briana Gilbert 11 White Bear L 14-01.00 ______. 4 Makenna Loveless 9 ... 2 Maxwell Hoyt 11 Maple Grove 30-05.50 ______ ... 14 Margaret Anderson 9 Mounds View 8-06.00 ______. 15 Julia .... Wayzata Relays meet program.pdf. Wayzata ...

Big Red Relays Team Scores.pdf
Licensed to Aztec High School HY-TEK's Meet Manager 2/25/2017. Big Red Relays - 2/25/2017. Belton. Team Rankings ... 10 Brownwood BRWD 13. 11 China Spring CHSP 10. 12 Waco WACO 6. Page 1 of 1. Big Red Relays Team Scores.pdf. Big Red Relays Team Score

Anomalous keys in Tor relays - arXiv
Apr 17, 2017 - and go over the last decade, the Tor network is one of the largest ... sumably in an attempt to attack onion services as we discuss in Section 5.4.

Don Shelton Relays- Hays Rebels
Canyon Lake. 42. 6th. San Marcos. 35. 7th. Akins. 31. 8th ... Canyon Lake. 52.69. 4th. Becker, Brock. Canyon ... Kelton Powell. 3rd. Taylen Moore. Luling. 44.52.

Delay Diversity Methods for Parallel OFDM Relays - Semantic Scholar
of wireless OFDM networks in a cost-efficient manner. ... full diversity benefits, which limits the number of relays, Nr. To achieve maximum delay diversity, the ...

SERVER MONITORING SYSTEM
Department of Computer Science and Information Technology ... SYSTEM” in partial fulfillment of the requirements for the degree of ... the period of last three and half years. .... CHAPTER 2: REQUIREMENT AND FEASIBILITY ANALYSIS .

Delay Diversity Methods for Parallel OFDM Relays - Semantic Scholar
(1) Dept. of Signal Processing and Acoustics, Helsinki University of Technology. P.O. Box 3000 ... of wireless OFDM networks in a cost-efficient manner. ... full diversity benefits, which limits the number of relays, Nr. To achieve maximum delay.

Considering using PIN diodes rather than relays for ... -
... which could be used as psuedo PIN diodes as part of keeping the cost down. ... have a trr (reverse recovery time) as good or better than many purpose made ... low reverse bias capacitance and sufficient voltage and current handling can be ...

Lead_DC_Env_Exposure_Detection-Monitoring-Investigation-of ...
... of the apps below to open or edit this item. Lead_DC_Env_Exposure_Detection-Monitoring-Investig ... l-and-Chronic-Diseases-regulations(6CCR1009-7).pdf.

Intel AR-33 From Relays To MPUs.pdf
... defects are not randomly distributed.) The cost for twice the function then would be 20 times as. great (twice the processing cost since twice the area of. silicon ...

Networking by Parallel Relays - Diversity, Lifetime and ...
Stage 1 (flooding): The source broadcasts a route request (RREQ) packet to its neighbors. The RREQ contains the source ID, the destination ID, a lifetime counter and other control information. Each node that receives such a RREQ packet checks whether

NZ Nationals 2010 Relays (Naseby) - Results
70 30:26 18 BCA. 4 57:01 15. Alistair Cory-Wright 66 21:38 5 AAC. 2 1:18:39. 10 142 CM Counties Manukau CM2. 1:18:42. Jourdan Harvey. 90 26:26 12 BBC .... Phil Wood. 71 28:37 18 ACC. 1 28:37 18. Erin Batchelor. 93 40:34 55 BAA. 4 1:09:11 38. Dave Bro

Open Vehicle Monitoring System - GitHub
Aug 14, 2013 - 10. CONFIGURE THE GPRS DATA CONNECTION (NEEDED FOR ...... Using the OVMS smartphone App (Android or Apple iOS), set Feature ...

Weather Monitoring Model
obtained from Internet in the form raw data which specific format data. Specific format data refers to ..... Rogers, R.R. 1983. A short course in Cloud Physics.

monitoring-technology-design.pdf
Page 3 of 4. Page 3 of 4. monitoring-technology-design.pdf. monitoring-technology-design.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying ...