LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2A: AMAO 1 -Annual Progress Learning English

An increasing percentage of English learners will make annual progress in learning English. By June, 2014 the percentage of English learners making annual progress learning English will meet or exceed 59% as measured by CELDT.

STRATEGY

Filing Cabinet Count

0

Resources and state requirements for this goal Available

3

Provide Daily ELD Instruction for all ELs

Filing Cabinet Count

ACTION STEP

0

ELs have access to ELD Curriculum and Instruction

All English learners have access to state board approved and district adopted ELD curriculum, materials and instruction aligned to the new ELD Standards and Common Core State Standards. Status

In Progress 12/26/2011

Start-End Dates

08/22/2011 - 06/30/2016

Tags

T3Y4

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

20 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2A: AMAO 1 -Annual Progress Learning English STRATEGY

Provide Daily ELD Instruction for all ELs

ACTION STEP TASKS

ELs have access to ELD Curriculum and Instruction 1 of 4 Complete

EL Placement by Language Level

Completed

All ELs will be placed into an ELD block or class according to their language proficiency as measured by the CELDT. Placement will be monitored quarterly. ELD Daily Instructional Minutes

Anne Green (LEA)

In Progress

All daily ELD instruction will follow the VUSD Instructional Time and Materials Guidelines: Kindergarten- no less than 30 minutes;grades 1-12 - 45. ELSSA Completion

VUSD will create an advisory committee tasked with revising Master Plan for English Learners to align to Common Core State Standards, the new ELD Standards and transitions to SBAC and new CELDT assessments. ACTION STEP

Due 6/30/2016 Anne Green (LEA)

In Progress

All schools that did not make the AMAO #1 will be required to complete the ELSSA (AMAO #1 section) and develop a monitoring plan to ensure that ELD achievement improves over time. EL Program- EL Master Plan

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA)

Schools to Establish an ELD Resource Teacher

The District will work with sites to identify a team of ELD Resource Teachers to assist with program implementation, staff development and program monitoring. Status

In Progress 12/26/2011

Start-End Dates

08/08/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

21 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2A: AMAO 1 -Annual Progress Learning English STRATEGY

Provide Daily ELD Instruction for all ELs

ACTION STEP TASKS

Schools to Establish an ELD Resource Teacher 1 of 6 Complete

Support EL Placement

Completed

Create team of EL Resource Teachers to support EL placement and movement. Provide ELD Professional Development and Coaching

Anne Green (LEA) In Progress

The ELD Resource Teacher provides initial and on-going professional development and coaching to all certificated staff in the delivery of effective ELD instruction through PLCs and Instructional Rounds processes. Direct Support to EL Newcomers and LTELs

In Progress

In Progress

ELD Resource Teachers will meet monthly online, in networks and face to face to discuss the progress of EL program, analyze EL achievement data, engage in professional reading/development and review state and federal program requirements for ELs.

Generated by CAIS | January 21, 2014 11:15 AM

Due 6/30/2014 Anne Green (LEA)

In Progress

The ELD Advisory Committee will revise job descriptions of ELD Resource Teachers to shift the focus to innovative and effective instructional practice and professional development. Monthly Collaboration Meetings

Due 6/30/2014 Anne Green (LEA)

The ELD Resource Teacher will work with the Learning Center staff, Adult Education, and Content Support Resource Teachers to provide parent involvement/education activities to promote active parent participation in the educational process. ELD Resource Teacher Job Description

Due 6/30/2014 Anne Green (LEA)

The elementary and secondary ELD Resource Teachers work with site staff to provide direct instructional support to EL newcomers and LTELs during the instructional day. Parent Involvement and Education

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA)

22 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2A: AMAO 1 -Annual Progress Learning English STRATEGY

Provide Daily ELD Instruction for all ELs

ACTION STEP

Encuentros Leadership Course for Latino Males

Provide an Encuentros Leadership course to Latino males in grades 6-12 (with emphasis on English learners and reclassified English learners) to develop positive verbal and written language skills using culturally relevant topics and materials. This course is designed to improve the graduation rate for Latino males. Status

In Progress 01/21/2014

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

3 of 5 Complete

Implement Encuentros Curriculum

Completed

All Encuentros classes will utilize the Encuentros curriculum designed and currently under revision by Dr. Zee Cline. Encuentros Culminating Project

Encuentros PLCs

In Progress

In Progress

The District will organize and support attendance at fall Encuentros STEM conference at Mira Costa College.

Due 6/30/2014 Anne Green (LEA)

Completed

The District will work with the Encuentros Board to develop a series of father/son evenings to support Latino male leadership. Encuentros STEM Conference

Due 6/30/2014 Anne Green (LEA)

Encuentros teachers and leadership will collaborate in monthly PLC meetings to discuss and develop curriculum, review data and plan family and community events. Platicas Evenings

Due 6/30/2014 Anne Green (LEA)

All participating Encuentros students will complete a culminating project focusing on leadership skills using music, art, and/or technology as a medium.

ACTION STEP

0

Due 6/30/2014 Anne Green (LEA)

Completed

Due 10/5/2013 Anne Green (LEA)

Refine and Align ELD Common FormativeAssessments

Generated by CAIS | January 21, 2014 11:15 AM

23 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2A: AMAO 1 -Annual Progress Learning English STRATEGY

Provide Daily ELD Instruction for all ELs

ACTION STEP

Refine and Align ELD Common FormativeAssessments

All schools will administer ELD Common Assessments to English learners based on their language levels. All Common Assessments are designed using the district adopted ELD instructional program. Status

In Progress 12/28/2011

Start-End Dates

07/01/2013 - 06/30/2014

Tags

T3Y4

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

0 of 2 Complete

Assessment Revision

In Progress

Due 6/30/2014

Assessment revision teams will be formed to revise ELD formative, common assessments to bring them into alignment with the new ELD standards and CCSS. Team will then engage in a cycle of analysis and revision of assessments. Utilize Data From ELD Common Assessments

Anne Green (LEA)

In Progress

Due 6/30/2014

Under the leadership of the ELD Resource Teachers, all sites will analyze the ELD Common Assessment data to identify interventions, adjust instruction, and move English learners among the ELD Blocks or levels based on language level. ACTION STEP

0

Anne Green (LEA)

Provide Extended Learning Time for ELD

VUSD will provide extended learning time (before/after school) for identified English learners who are having difficulty growing a level on the CELDT to continue to develop English language competencies. Status

In Progress 01/05/2012

Start-End Dates

10/07/2011 - 06/30/2014

Tags

T3Y4, DELAC

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

24 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2A: AMAO 1 -Annual Progress Learning English STRATEGY

Provide Daily ELD Instruction for all ELs

ACTION STEP TASKS

Provide Extended Learning Time for ELD 1 of 2 Complete

Jump Start ELD Academy

Completed

VUSD will provide jump start ELD academies (5 days, 3 hour sessions) prior to the beginning of the school year by grade span (1-2, 3-5, 6-8, 9-12) and language level for English learners who have not grown a level of the CELDT. LTEL CAHSEE Prep Bootcamp

Anne Green (LEA)

In Progress

The District will work with High School sites to provide CAHSEE prep Bootcamp in the spring prior to CAHSEE testing. ACTION STEP

Due 9/30/2013

Due 1/31/2014 Anne Green (LEA)

Learning Resource Specialist Position

Under the supervision of the Curriculum and Instruction Department, a Learning Resource Specialist will facilitate the implementation of the Master Plan for English Learner Instructional Programs with specific focus on EL program governance in ELAC and DELAC, EL program placement, CELDT assessment, and reclassification. Status

In Progress 01/08/2012

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

1

EL Data and Accountability Specialist

Under the supervision of the Curriculum and Instruction Department, the EL Data and Accountability Specialist provides support in the implementation of the Master Plan for English Learner Instructional Programs with specific focus on the state and federal data analysis and accountability rules and regulations for English learner programs. Status

In Progress 01/08/2012

Start-End Dates

07/15/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

1

25 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2B: AMAO 2 - English Proficiency

An increasing percentage of English learners will attain English language proficiency annually in order to move toward the VUSD Board goal of having all English learners reclassify within 5 years. By March 2014, the percentage of English learners in language instruction educational programs fewer than 5 years attaining English language proficiency as measured by the CELDT will meet or exceed 22.8% (AMAO 2). By March 2014, the percentage of English learners in language instruction educational programs 5 or more years attaining English language proficiency as measured by the CELDT will meet or exceed 49% (AMAO 2).

STRATEGY

Filing Cabinet Count

1

Resources and state requirements for this goal Available

3

Accountability

Hold schools accountable for English learners making annual progress in learning English (AMAO 1). Filing Cabinet Count

ACTION STEP

0

Data Review

On a quarterly basis, with Curriculum and Instruction team, site administration and site EL Resource Teacher will review the following data relative to EL students: CELDT scores; reclassification rates; common assessment data; SBAC assessment data (CST for 2013-14); grades; attendance; discipline. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

26 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2B: AMAO 2 - English Proficiency STRATEGY

Accountability

ACTION STEP TASKS

Data Review 2 of 5 Complete

Creat Shared Digital Data Files

Completed

Curriculum and Instruction team will establish shared digital data files populated with reclassification data, CELDT data, LAS data and formative assessment data. These files will be used for ongoing conversation regarding progress of ELs. Quarter 1 Review

Anne Green (LEA)

Completed

Fall review of past year's data to be completed in fall site visit with administration and EL Resource Teacher. Quarter 2 Review

In Progress

Not Begun

Due 4/18/2014 Anne Green (LEA)

Not Begun

End of year data to be used to create goals for next school year. ACTION STEP

Due 1/31/2014 Anne Green (LEA)

Spring data review to be completed by site Resource Teachers and used as foundation for spring site visit. Quarter 4 Review

Due 10/31/2013 Anne Green (LEA)

Mid year data review to be led by site resource teacher and submitted to digital data file for review by District Director. Quarter 3 Review

Due 12/1/2013

Due 5/1/2014 Anne Green (LEA)

Establish Goals Based on Data

Based on EL student data, each site will write SMART goals for EL program in September, review goals quarterly to inform instructional decisions and review final data in the spring to determine the following year's goals. District will provide a digital data file for each site. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

27 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2B: AMAO 2 - English Proficiency STRATEGY

Accountability

ACTION STEP TASKS

Establish Goals Based on Data 1 of 2 Complete

Fall Site Visits

Completed

ELD Director will complete a visit to every site to discuss a placement audit, reclassification data, intervention plans and site SMART goal for EL students. Spring Site Visits

Anne Green (LEA)

In Progress

ELD Director will complete a spring site visit to review placement, progress on site SMART Goal and all data regarding ELs. ACTION STEP

Due 11/1/2013

Due 6/30/2014 Anne Green (LEA)

Monitor Student Progress

School sites will utilize the ELSSA tool and all available student data to monitor progress of EL students over time. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

0

0 of 2 Complete

ELSSA Orientation

In Progress

District ELD Director will train and support site ELD resource teachers and administrators in use of ELSSA tool, which will become part of the spring site visit/review. Review Student Progress Data Twice yearly, ELD Director and Resource Teachers will review data on all ELD students - progress reports, report cards, attendance, grades and standardized and formative assessments in order to create SMART Goals for future improvement.

Generated by CAIS | January 21, 2014 11:15 AM

Due 6/30/2014 Anne Green (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA)

28 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2B: AMAO 2 - English Proficiency STRATEGY

English Learner Assessment

Administer the State's English learner assessments. Filing Cabinet Count

ACTION STEP

0

CELDT Administration (Newly Enrolled Students)

All sites will administer the annual CELDT assessment to any newly enrolled students whose primary language is not English within 30 calendar days of their enrollment. Status

Completed 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

1 of 1 Complete

CELDT Administration

Completed

Due 11/1/2013

Fall CELDT Administration ACTION STEP

0

Anne Green (LEA)

CELDT Administration (ELs not Reclassified)

All sites will administer the CELDT annually to all English learners who have not reclassified to measure their progress in English proficiency. Status

Completed 11/05/2013

Start-End Dates

07/01/2013 - 11/01/2013

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

CELDT Administration (Additional Support)

Students who do not make sufficient progress on the CELDT will be provided additional preparation prior to the fall assessment via Jump Start, tutorials or CELDT Bootcamp. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Site Team Meetings

All sites will begin the process of holding site team meetings with parents of EL students to review CELDT data/reclassification criteria and create an individual action plan for each student. Status

In Progress 11/05/2013

Start-End Dates

08/30/2013 - 06/30/2014

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

29 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2B: AMAO 2 - English Proficiency STRATEGY

English Learner Assessment

ACTION STEP TASKS

Site Team Meetings 0 of 2 Complete

Site Team Meeting Template

In Progress

Due 6/30/2014

ELD Resource Teacher team will create site team meeting template and protocol. Site Team Meetings

Anne Green (LEA) In Progress

Due 6/30/2014

Led by Resource Teacher, each site will hold site team meetings in the spring to review student data and create next steps plan for student and family. STRATEGY

Anne Green (LEA)

English Learner Language Placement Program

Place students appropriately based on the results of the State's English learner assessment. Filing Cabinet Count

ACTION STEP

0

Student Placement and Support

EL Support/Resource Teachers will review every English learner's assessment data (from multiple measures: CELDT, STAR reading, CST/SBAC assessments) in order to appropriately place students in English Language Development classes, intervention classes and/or support programs (tutorials, 21st Century, Encuentros, Hermanitas, etc.). Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

0 of 2 Complete

Data Review

In Progress

ELD Resource Teacher will complete fall review of data on each EL student in order to effect correct placement. Monitoring of Placement Each grading period, ELD Resource Teacher will review student progress and placement. ACTION STEP

0

Due 6/30/2014 Anne Green (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA)

Site Team Meetings

Generated by CAIS | January 21, 2014 11:15 AM

30 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2B: AMAO 2 - English Proficiency STRATEGY

English Learner Language Placement Program

ACTION STEP

Site Team Meetings

During annual site team meeting, EL Resource Teachers will review placement with every student and his/her parents. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Ensure Correct Student Placement

Curriculum and Instruction team will perform an audit in September and in January to ensure correct placement of every English learner. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

0

2 of 4 Complete

Fall Placement Audit

Completed

Data Specialist will run initial fall placement audit for every EL in District and report to Director. Fall Site Visit

Anne Green (LEA)

Completed

ELD Director will meet with every site to review and refine student placement. Collaboration with Special Education Department

C and I team will audit student placement in the new year to ensure that correct placement is ongoing.

Generated by CAIS | January 21, 2014 11:15 AM

Due 10/31/2013 Anne Green (LEA)

In Progress

District ELD Director will meet monthly with Special Education Department to create a plan for refining placement of all Special Education/ELD students. January Placement Audit

Due 10/31/2013

Due 6/30/2014 Anne Green (LEA)

In Progress

Due 1/31/2014 Anne Green (LEA)

31 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2B: AMAO 2 - English Proficiency STRATEGY

English Learner Language Instruction

Deliver high quality English Language instruction based on scientifically-based research. Filing Cabinet Count

ACTION STEP

0

Daily ELD Instruction

Every English learner K-12 will receive daily ELD instruction based on language proficiency levels. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Curriculum and Instructional Materials

Every English learner will have access to State Board approved and District adopted ELD curriculum and instructional materials. Status

Completed 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

High Quality Instruction

Every English learner will have access to high quality English Language Development instruction. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

STRATEGY

Filing Cabinet Count

0

English Learner Program Monitoring

Monitor student progress regularly and adjust instructional program accordingly. Filing Cabinet Count

ACTION STEP

0

Monitor Student Progress

English Language Development Teachers, with the support of EL Resource/Support Teachers, will monitor student progress regularly with district common assessments and grades, and provide the appropriate scaffolds and interventions in response. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

32 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2B: AMAO 2 - English Proficiency STRATEGY

English Learner Program Monitoring

ACTION STEP

Data Review

The Curriculum and Instruction team will review quarterly data for English learners on district common assessments in ELD, ELA and Mathematics and work with each site to adjust the instructional program accordingly. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

STRATEGY

Filing Cabinet Count

0

English Learner Reclassification

Reclassify English learners using multiple measures. Filing Cabinet Count

ACTION STEP

0

Establish Goals

The Curriculum and Instruction team will meet with each site in September to establish SMART goals for reclassification of English learners. Status

Completed 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Reclassification Presentations

ELD Resource/Support teachers will schedule reclassification presentations to be provided for families twice a year. Status

Completed 12/30/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Site Team Meetings

Each site will calendar in site team meetings in September to discuss and create reclassification SMART Goals for every student/family and long term college and career plans. A follow-up "site team" meeting will take place in the spring. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

33 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2B: AMAO 2 - English Proficiency STRATEGY

English Learner Reclassification

ACTION STEP

Reclassification Interventions

The Curriculum and Instruction team will create a series of district-wide reclassification interventions (Jump Start, CELDT Bootcamp, CAHSEE preparation) and communicate with students and parents about the available support. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Interventions and Supports

Each site will create a menu of interventions and supports for students who have not reclassified, and monitor student attendance and progress at these interventions. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Monitor Progress of Reclassified Students

The Curriculum and Instruction team will schedule a series of monthly meetings for recently reclassified students and their parents to create plans for post-reclassification monitoring. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Advisory Committee

The Curriculum and Instruction team will convene an advisory committee to review district reclassification criteria, particularly grades, and make recommendations regarding any revisions to the Master Plan. Status

In Progress 11/05/2013

Start-End Dates

07/01/2013 - 06/30/2014

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

34 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup

An increasing percentage of English learners will attain proficiency in Reading/Language Arts and mathematics annually. By May 2014, the percentage of English learners attaining proficiency in reading/language arts and mathematics will increase as measured by the following: 2012 CST, CMA, CAPA and/or CAHSEE,reclassification data, SBAC field tests and district ELD common formative assessments.

STRATEGY

Filing Cabinet Count

0

Resources and state requirements for this goal Available

3

VUSD Instructional Focus on Reading Comprehension

Filing Cabinet Count

ACTION STEP

0

Focus on Reading Comprehension Strategies for ELs

All teachers will continue to focus on improving reading comprehension for English learners in all content areas by utilizing strategies and instruction which aligns with the Common Core State Standards for ELA and Literacy. Status

In Progress 11/05/2013

Start-End Dates

08/22/2011 - 07/31/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

35 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

VUSD Instructional Focus on Reading Comprehension

ACTION STEP TASKS

Focus on Reading Comprehension Strategies for ELs 0 of 3 Complete

Reading Assessments: AR

In Progress

K-8 sites will use the Accelerated Reader program to create a culture of reading and to assess reading improvement on a regular basis. 9-12 sites will use AR for English learners only. Data from AR will be include in regular data conversations. Reading Strategies and Skills Resources

Anne Green (LEA)

In Progress

All VUSD teachers will become aware of and utilize the VUSD resources and guides that highlight reading comprehension strategies and skills. Professional Development on Literacy Standards

Due 6/30/2014 Anne Green (LEA)

In Progress

Professional development on the CCSS Literacy Standards will be provided to all teachers, k-12 through Buy Back Day presentations, literacy round tables and professional reading/collaboration through My Big Campus. ACTION STEP

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA)

Professional Commitments

All Principals will promote the following professional commitments for all staff: a. All students can achieve at high levels, and it is our responsibility that they do. Equitable and respectful treatment of all student groups at all times. b. All student achievement data is transparent for the purpose of examining current instructional practice and making improvement as needed (school, grade, classroom, and student level). c. Instructional practice is shared and improved openly. d. All staff will conduct themselves in a professional, respectful manner working as a cohesive team. Status

In Progress 12/28/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Independent Reading Program

Generated by CAIS | January 21, 2014 11:15 AM

36 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

VUSD Instructional Focus on Reading Comprehension

ACTION STEP

Independent Reading Program

Implement district wide Independent Reading Program to promote increased levels of student independent reading in addition to core instruction. This program includes a pre and post reading diagnostic assessment to monitor independent reading achievement growth. Status

Completed 12/30/2013

Start-End Dates

08/22/2011 - 06/08/2012

Tags

PI_Yr3, T3Y4, Exp. TASKS

Filing Cabinet Count

4

3 of 3 Complete

Develop Independent Reading Program Brief

Completed

Due 8/12/2011

Completed

Due 6/8/2012

VUSD will develop and communicate the purpose and rationale for the Independent Reading Program in the form of an executive brief. Identify and Train Site Leads for Indep. Reading VUSD will identify and train site teacher leaders in the implementation of the independent reading program. Each site leader will provide specific training to site staff three times a year. Independent Reading Program Monitoring

Anne Green (LEA)

Completed

Due 6/8/2012

VUSD will monitor the implementation of the Independent Reading Program using monthly reports of student usage and achievement on Accelerated Reader assessments. STRATEGY

Implement ELA/Math Instructional Program

Filing Cabinet Count

ACTION STEP

0

Instructional Time and Materials Guidelines

Generated by CAIS | January 21, 2014 11:15 AM

37 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Implement ELA/Math Instructional Program

ACTION STEP

Instructional Time and Materials Guidelines

All teachers of English language arts and Mathematics K-5 will follow the VUSD Daily Instructional Time and Materials Guidelines for Elementary. Status

In Progress 12/22/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Shari Fernandez, Anne Green, Cathy Williams

TASKS

Filing Cabinet Count

0

2 of 3 Complete

Grade Level Instructional Schedule

Completed

Due 9/15/2011

In Progress

Due 6/30/2014

All elementary schools will develop grade level instructional schedules that comply with district template. The instructional schedules will include ELA, Math, ELD, and other content areas. Instructional Schedule Monitoring All principals will observe classroom instruction in all classrooms a minimum of 10 hours per week to monitor the implementation of the instructional schedules. Placement Guide for English Learners

Anne Green (LEA) , Jeanie Luckey (LEA) , Larry White (LEA) , Shari Fernandez (LEA)

Completed

Due 6/30/2014

All elementary schools will place English learners into SEI/Mainstream ELA and Math classrooms according to the VUSD Elementary Placement Guide. ACTION STEP

Anne Green (LEA)

Master Schedule to Protect ELA/Math Instruction

All secondary schools will develop a master schedule for English learners that follows district and state criteria for ELA and Math instructional time and is protected from interruption. Status

In Progress 12/22/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green, Larry White, Cathy Williams

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

38 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Implement ELA/Math Instructional Program

ACTION STEP TASKS

Master Schedule to Protect ELA/Math Instruction 0 of 3 Complete

Placement Guides for English Learners

In Progress

All secondary schools will place English learners into SEI/Mainstream ELA and math classrooms according to the VUSD Middle/High School Placement Guides. Guide will be revised to include more specific math placement criteria. Master Schedule Monitoring

Anne Green (LEA)

In Progress

All principals will observe classroom instruction in all classrooms a minimum of 10 hours per week to monitor the implementation of the master schedule for ELA and mathematics using district identified monitoring tools. Student Placement in Master Schedule

Due 6/30/2014 Anne Green (LEA) , Shari Fernandez (LEA)

In Progress

All secondary schools will create the Master Schedule that adheres to the VUSD Placement Guides and appropriately place students into these classes. ACTION STEP

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA) , Cathy Williams (LEA) , Larry White (LEA)

Monitoring Teaching and Learning

Principals to implement a system for daily classroom visitations to monitor the quality of teaching and learning and provide timely feedback in the use of instruction materials, instructional design (DI2, SIOP, CCSS), and strategies to support student learning. Status

In Progress 12/23/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Shari Fernandez, Anne Green, Jeanie Luckey, Larry White, Cathy Williams

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

39 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Implement ELA/Math Instructional Program

ACTION STEP TASKS

Monitoring Teaching and Learning 2 of 2 Complete

Quarterly Reports of Student Achievement

Completed

Due 6/30/2014

All schools will develop digital quarterly report folder that contains district identified evidence of student achievement and instructional program implementation. Instructional Rounds

Anne Green (LEA) , Cathy Williams (LEA) , Jeanie Luckey (LEA) , Larry White (LEA) , Shari Fernandez (LEA) Completed

Due 6/30/2014

All sites will create a team to be trained in and implement Instructional Rounds practice, with the support of the San Diego County Office of Education. ACTION STEP

Implement a Balanced Math Program K-12

Principals, coaches, and teachers will promote the implementation of a K-12 balanced mathematics instructional program with specific attention given to supporting student mastery of the prerequisite skills needed to ensure success in Algebra 1 and Algebra 2 through the four domains of language (reading, writing, listening, speaking). Status

In Progress 12/23/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Shari Fernandez, Anne Green, Jeanie Luckey, Larry White, Cathy Williams

ACTION STEP

Filing Cabinet Count

0

Corrective Actions Implemented at PI Schools

All Program Improvement schools in years 3-5 will implement the School Board approved Corrective Action Assignments as designed. Status

In Progress 12/26/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, CA_Comp.

Persons Responsible

Shari Fernandez, Larry White

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

40 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Implement ELA/Math Instructional Program

ACTION STEP TASKS

Corrective Actions Implemented at PI Schools 1 of 2 Complete

DSLT Monitoring Process

Completed

Due 6/30/2014

Establish a District School Liaison Team (DSLT) at each PI school to monitor the implementation of the Corrective Action Assignment. Corrective Action Progress Reports

Shari Fernandez (LEA)

In Progress

Due 6/30/2014

Provide Corrective Action progress reports to the school board to highlight the status of each PI school's implementation status. STRATEGY

Shari Fernandez (LEA)

VUSD Response to Instruction and Intervention

Filing Cabinet Count

ACTION STEP

0

Implement Three Tiers of Intervention (RtI)

All schools will implement the three tiers of the Response to Instruction and Intervention at all grade levels school wide. Status

In Progress 12/23/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Shari Fernandez, Anne Green, Jeanie Luckey, Larry White, Cathy Williams

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

41 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

VUSD Response to Instruction and Intervention

ACTION STEP TASKS

Implement Three Tiers of Intervention (RtI) 3 of 5 Complete

Tier 1- Focus on Best First Teaching

In Progress

Administrators, Content Support Resource Teachers and ELD Resource Teachers will support teachers in refining their practice and implementing strategies to provide best, first teaching aligned to Common Core for all learners (including ELs and Sp. Ed.). Tier 2- Elementary Strategic Intervention

Anne Green (LEA) , Shari Fernandez (LEA)

Completed

Elementary schools will establish a before/after school strategic intervention program that targets students below proficiency in ELA and math. Tier 2- Secondary Strategic Intervention Support

Completed

All schools will implement intensive intervention support classes in math for students two or more years below grade level in grade 4-8 and high school using district placement criteria. Math 180 will be used for secondary students. ACTION STEP

Due 6/30/2014 Anne Green (LEA)

Completed

All schools will implement intensive intervention support classes in ELA for students two or more years below grade level in grade 4-8 and high school using district placement criteria. Tier 3- Intensive Intervention Support in math

Due 6/30/2014 Shari Fernandez (LEA)

All secondary schools will develop strategic intervention support classes in the master schedule for students below proficiency in ELA and math. Tier 3- Intensive Intervention Support in ELA

Due 6/30/2014

Due 6/30/2014 Shari Fernandez (LEA)

In Progress

Due 6/30/2014 Shari Fernandez (LEA)

Implement Tier 3 Core Replacement Program for ELA

Generated by CAIS | January 21, 2014 11:15 AM

42 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

VUSD Response to Instruction and Intervention

ACTION STEP

Implement Tier 3 Core Replacement Program for ELA

All schools will implement a Tier 3 Intensive Intervention core replacement instructional program for students two or more years below grade level in grades 4-8 and high school who meet the district placement criteria. Status

In Progress 12/23/2011

Start-End Dates

08/05/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Shari Fernandez, Anne Green

TASKS

Filing Cabinet Count

0

4 of 5 Complete

Grades 4-5 Purchase Tier 3 Program

Completed

Due 7/1/2011

Completed

Due 8/8/2011

Completed

Due 8/8/2011

In Progress

Due 6/8/2014

District will purchase a Tier 3 intensive intervention program for grades 4-5 for all elementary schools that is state board approved and district adopted. The program will have an ELD component embedded in the learning sequence. Grades 6-8 Purchase Tier 3 Program District will purchase a Tier 3 intensive intervention program for grades 6-8 that is state board approved and district adopted for all middle schools. The program will have an ELD component embedded in the learning sequence. Student Placement/Exit Criteria District to develop student placement and exit criteria for participation in the intensive intervention programs in 4-5, 68 and high schools. Initial and On-Going Professional Development Provide identified intensive intervention teachers in grades 4-8 and high school with initial and on-going professional development in the use of the adopted instructional program as designed. Develop Distribution Tracking Tool

Anne Green (LEA) , Shari Fernandez (LEA)

Completed

Due 8/8/2011

District office will develop an instructional materials distribution tracking tool to ensure that all schools have adequate intensive intervention materials.

Generated by CAIS | January 21, 2014 11:15 AM

43 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

VUSD Response to Instruction and Intervention

ACTION STEP

Implement Math Support Classes for grades 6-12

All secondary schools (6-8 and high school) will implement math support classes for students below proficiency in mathematics. The purpose of these support classes is to ensure success in Algebra 1 and Algebra 2. Status

In Progress 12/23/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green, Cathy Williams

TASKS

Filing Cabinet Count

0

0 of 3 Complete

Math Support Class Placement and Exit Criteria

In Progress

Due 8/20/2012

In Progress

Due 6/8/2012

Not Begun

Due 8/20/2012

District staff will work with math coaches and teachers to develop criteria for placement and exit from various math support classes: general math, algebra readiness, algebra support, etc. Algebra Readiness Course Development District staff will work with math coaches and teachers to develop and implement an Algebra Readiness course that prepares students for success in Algebra 1. The course will include specific curriculum, a pacing guide, and common assessments. Algebra Support Class District staff will work with math coaches and teachers to develop and implement an Algebra 1 support course that provides additional support to students who are enrolled in Algebra 1 and are below proficiency. ACTION STEP

Plan for Student Instruction and Intervention

Generated by CAIS | January 21, 2014 11:15 AM

44 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

VUSD Response to Instruction and Intervention

ACTION STEP

Plan for Student Instruction and Intervention

Provide additional time PLC for teachers to design instruction, plan interventions, and monitor progress for all students below grade level in English-language arts, mathematics, and ELD using the ancillary instructional materials from the core instructional program, digital resources, and core replacement materials (strategic and Intensive Intervention). Status

In Progress 04/30/2013

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Shari Fernandez, Anne Green, Jeanie Luckey, Larry White, Cathy Williams

STRATEGY

Filing Cabinet Count

0

Sheltered Instruction Components Utilized

Filing Cabinet Count

ACTION STEP

0

Learning Objectives Use In Daily Instruction

All ELA and Math classroom teachers will use Learning Objectives (Content and Language Objectives) during daily instruction to scaffold lessons for English learners. Status

In Progress 12/22/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green

TASKS

0

0 of 1 Complete

Learning Objective will Follow District Guide All Content and Language Objectives will follow the district guidelines. Content Objectives will include academic language and Language Objectives will include a form and function. ACTION STEP

Filing Cabinet Count

In Progress

Due 6/30/2014 Anne Green (LEA) , Shari Fernandez (LEA)

Lesson Design/Delivery to Include Sheltered Inst.

Generated by CAIS | January 21, 2014 11:15 AM

45 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Sheltered Instruction Components Utilized

ACTION STEP

Lesson Design/Delivery to Include Sheltered Inst.

All ELA and math teachers will incorporate the following sheltered instruction features into their daily lesson design and delivery: activities which use informational text; Content Objectives; Language Objectives (Form and Function); Key academic vocabulary; Links made to background knowledge; Careful use of speech and techniques to make content clear to English learners;Scaffolding techniques used consistently (e.g. sentence/response frames); Higher order thinking questioning used with sufficient wait time for ELs and Sp. Ed.; Student interaction activities that promote use of academic register and language; Student grouping techniques that promote active student engagement and use of language; Careful pacing of lesson to ensure comprehensibility; Formative assessments and checking for understanding data used to continually inform and modify instruction; Review of learning objectives. This will be monitored through daily principal lesson observations. Status

In Progress 12/23/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Shari Fernandez, Anne Green, Jeanie Luckey, Larry White

TASKS

Filing Cabinet Count

0

0 of 3 Complete

Use of Sheltered Instruction Resources

In Progress

All teachers will utilize the district adopted professional resources to design and delivery sheltered instruction: SIOP Teachers Guide; SIOP 99 Ideas for Lesson Design; District adopted ELA and math ancillary resources for English learners. Student use of Complete Sentences

Anne Green (LEA)

In Progress

All teachers will revise their student interactive routines to include the expectations that all students respond to teacher and peers with complete sentences. English learners are provided sentence frames as needed to participate. Student use of all Domains of Language All teachers will structure their classroom student engagement routines to ensure that English learners actively engage in all domains of language during the instructional week (reading, writing, speaking, listening). Generated by CAIS | January 21, 2014 11:15 AM

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA)

46 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Sheltered Instruction Components Utilized

ACTION STEP

Student Engagement and Academic Register

All teachers will incorporate the consistent use of student engagement routines and the academic register into daily lessons to promote a more rigorous use of language. Teachers will model the use of the academic register and establish an expectation that all students (especially English learners) use the academic register during lesson activities. Status

In Progress 12/23/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

T3Y4

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

1 of 3 Complete

Training and Use of Academic Lang. Resources

Completed

All teachers will receive training and utilize academic language resources that highlight the effective use of student engagement routines and the academic register. Response Frames To Support Academic Register

Classroom Observation Tools

Due 6/30/2014 Anne Green (LEA)

In Progress

All teachers will receive training on how to use response frames to provide a scaffold for English learners to use the academic register and language. Teachers use corrective feedback on the use of the forms and functions of language.

Due 6/30/2014 Anne Green (LEA) , Shari Fernandez (LEA)

In Progress

All principals, APs, and IR networks will utilize VUSD Instructional Rounds to provide feedback and support to classroom teachers related to student engagement and rigor. STRATEGY

0

Due 6/30/2014 Anne Green (LEA) , Shari Fernandez (LEA)

Differentiation of Instructional Support

Filing Cabinet Count

ACTION STEP

0

Identification of English Learner Inst. Needs

Generated by CAIS | January 21, 2014 11:15 AM

47 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Differentiation of Instructional Support

ACTION STEP

Identification of English Learner Inst. Needs

All ELA and math teachers will work with the administration and ELD Resource Teachers to identify the needs of English learners (with emphasis on long term ELs) Status

In Progress 12/23/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

0 of 1 Complete

Student Achievement Data Analysis

In Progress

Administrators will work with ELD Resource Teachers to develop multi-data profiles of English learners to identify areas for differentiation and intervention. ACTION STEP

0

Due 6/30/2014 Anne Green (LEA)

Differentiate Support to English Learners ELA/Math

All teachers will differentiate support for English learners (with emphasis on Long Term English Learners) during core ELA and math lessons using academic language and academic vocabulary strategies, Direct Interactive Instruction, student engagement techniques, response frames, teacher modeling, etc. in alignment with Common Core and ELA Standards. Status

In Progress 12/28/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

0

1 of 1 Complete

Complete Learning Walk Process

Completed

Due 6/8/2012

All schools will complete the VUSD Learning Walk process three times a year to monitor the use of differentiation techniques in the classroom. STRATEGY

Collaboration, Data Analysis, and Planning

Filing Cabinet Count

ACTION STEP

0

K-5 Monthly Grade Collaboration For PI Schools

Generated by CAIS | January 21, 2014 11:15 AM

48 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Collaboration, Data Analysis, and Planning

ACTION STEP

K-5 Monthly Grade Collaboration For PI Schools

All teachers in PI schools (Preschool-Grade 5) will be released for 7.5 hours per month as a grade level team to analyze data, examine instruction, monitor student progress, plan instruction and develop an action plan to change practice and collect evidence of student learning. This monthly process will be facilitated by the principal with support from the Content Support Resource Teachers and EL support teacher. Sp. Ed. teachers shall take an active role in all collaboration. Status

In Progress 12/22/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, CA_Comp.

Persons Responsible

Shari Fernandez

TASKS

Filing Cabinet Count

1 of 3 Complete

PLC Action Plan

Completed

All PI schools will completed a PLC Action Plan for each grade level monthly collaboration. The Action Plan will include short term SMART goals and cognitive planning notes for targeted improvement. Data Analysis

Pre/Post Reading Assessment

Due 6/30/2014 Shari Fernandez (LEA)

In Progress

All teachers will analyze multiple forms of student achievement data (including VUSD Common Assessments), during grade-level/course-level collaboration meetings (PLC) to inform instructional design and delivery and to identify students for interventions.

Due 6/30/2014 Anne Green (LEA) , Shari Fernandez (LEA)

In Progress

All students will take a pre/post reading assessment at the beginning and end of the school year using the STAR Early Literacy or STAR Reading diagnostic assessments for the purpose of monitoring reading comprehension. ACTION STEP

0

Due 6/30/2014 Anne Green (LEA) , Shari Fernandez (LEA)

K-5 Collaboration for Non-PI schools

Generated by CAIS | January 21, 2014 11:15 AM

49 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Collaboration, Data Analysis, and Planning

ACTION STEP

K-5 Collaboration for Non-PI schools

All non-PI schools will plan grade level collaboration before or after school a minimum of one time per month. Sp. Ed. teachers shall take an active role in all collaboration. Status

In Progress 12/23/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Shari Fernandez

TASKS

Filing Cabinet Count

1 of 3 Complete

Modified PLC Action Plan

Completed

All non-PI schools will complete a modified PLC Action Plan monthly. The Action Plan will include short term SMART goals and cognitive planning notes for targeted improvement. PD will be completed for all sites on effective use of the PLC process. Data Analysis

Pre/Post Reading Assessment All students will take a pre/post reading assessment 3 times during the year using the STAR Early Literacy or STAR Reading assessments for the purpose of monitoring reading comprehension. This data will be used during PLC inquiry.

Due 6/30/2014 Shari Fernandez (LEA)

In Progress

All teachers will analyze data during the PLC time (Prepare, Inquire, Act) using Common Assessments and other measures to monitor student achievement for the purpose of guiding instructional design and delivery to increase student achievement.

ACTION STEP

0

Due 6/30/2014 Anne Green (LEA) , Shari Fernandez (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA) , Shari Fernandez (LEA)

Late-Start or After School Collaboration 6-12

Generated by CAIS | January 21, 2014 11:15 AM

50 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Collaboration, Data Analysis, and Planning

ACTION STEP

Late-Start or After School Collaboration 6-12

All secondary schools will complete weekly late-start or after school collaboration by content area focused on analyzing student achievement data (including VUSD Common Assessments) and cognitive planning for improved lesson design and delivery. English learner achievement will be monitored during this activity. Sp. Ed. teachers shall take an active role in all collaborations. Status

In Progress 12/30/2013

Start-End Dates

08/08/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green, Larry White

TASKS

Filing Cabinet Count

0

1 of 3 Complete

PLC Action Plan Development

Completed

Due 6/30/2014

In Progress

Due 6/30/2014

All secondary sites will be trained in effective use of PLCs and use them to analyze student achievement data, establish SMART goals and support Common Core aligned instructional strategies. Data Analysis All teachers will participate in a data analysis cycle (Prepare, Inquire, Act) including site-based Common Assessments to monitor student achievement to guide instructional design and delivery to increase student achievement. Pre/Post Reading Assessment

Anne Green (LEA) , Larry White (LEA)

In Progress

Due 6/30/2014

All students in grades 6-8 will take a reading assessment 3 times during the school year using the STAR Reading diagnostic assessments for the purpose of monitoring reading comprehension. ACTION STEP

Anne Green (LEA)

Implement VUSD Common Assessments

The District will work with teacher leaders and administrators to pilot new site-based common assessments using the Illuminate tool as a first step towards creating district-based common assessments aligned to CCSS. Status

In Progress 12/28/2011

Start-End Dates

07/18/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Shari Fernandez, Anne Green, Jeanie Luckey, Larry White, Cathy Williams

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

51 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Collaboration, Data Analysis, and Planning

ACTION STEP TASKS

Implement VUSD Common Assessments 0 of 5 Complete

VUSD Common Assessments Participation

In Progress

Using Illumnate, all schools will create and pilot new site-based common assessments in ELA, ELD, math, and other content areas - aligned to Common Core State Standards. VUSD Math Common Assessments for grades 6-12

Anne Green (LEA) , Shari Fernandez (LEA)

In Progress

The District Math Director will lead cohorts of math teachers who will pilot new Common Core aligned Common Assessments in math. VUSD ELA Common Assessments for Middle School

In Progress

A team of ELD Resource Teachers will pilot a series of new ELD common assessments aligned to the new ELD Standards and Common Core. ACTION STEP

Due 6/30/2014 Anne Green (LEA)

In Progress

The secondary ELA cohort members will pilot new site-based Common Core aligned ELA Common Assessments using the Illuminate tool. VUSD ELD Common Assessments for Secondary

Due 6/30/2014 Cathy Williams (LEA)

The secondary ELA cohort members will pilot new site-based ELA Common Assessments using the Illuminate tool. VUSD ELA Common Assessments for High School

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA)

Analyze Multiple Forms of Student Achievement Data

All teachers will analyze multiple forms of student achievement data (including site-based Common Assessments) during grade-level/course-level collaboration meetings (PLC) to inform instructional design and delivery, and to identify students for strategic and intensive intervention. Status

In Progress 04/30/2013

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Shari Fernandez, Anne Green, Jeanie Luckey, Larry White, Cathy Williams

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

52 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Collaboration, Data Analysis, and Planning

ACTION STEP TASKS

Analyze Multiple Forms of Student Achievement Data 0 of 1 Complete

Use District Databases to Analyze Achievement

In Progress

All teachers will utilize the district databases, particularly Aeries.net, Illuminate , STAR, and VPORT, and District-created digital data files to analyze the multiple forms of student achievement data as integral part of PLC process. STRATEGY

Due 6/30/2014 Anne Green (LEA) , Shari Fernandez (LEA)

Transitional Kindergarten Program

Filing Cabinet Count

ACTION STEP

0

Transitional Kindergarten Program Development

A transitional kindergarten program will be developed in collaboration with teachers, early childcare providers, and parents in accordance with the state regulations. Status

In Progress 12/30/2013

Start-End Dates

08/22/2011 - 06/30/2014

Persons Responsible

Shari Fernandez

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

53 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Transitional Kindergarten Program

ACTION STEP TASKS

Transitional Kindergarten Program Development 0 of 4 Complete

Transitional Kindergaren Placement Criteria

In Progress

Transitional Kindergarten Placement Criteria to be established and communicated to all parents of incoming kindergarteners. Parent Informational Meetings

Shari Fernandez (LEA)

In Progress

VSUD to provide parent informational meetings to communicate the structure of the new transitional kindergarten program. Transitional Kindergarten Instructional Materials

In Progress

Due 6/30/2014 Shari Fernandez (LEA)

In Progress

VUSD will work with teachers and early childhood providers to develop a transitional kindergarten pacing guide and assessments to align to the curriculum. STRATEGY

Due 6/30/2014 Shari Fernandez (LEA)

VUSD will work with teacher representatives to identify the instructional materials and curriculum to be used for the transitional kindergarten program. Pacing Guide and Assessment Schedule

Due 6/30/2014

Due 6/30/2014 Shari Fernandez (LEA)

Increase Access to High Quality Preschool Programs

Filing Cabinet Count

ACTION STEP

0

On-Site Preschool Programs for VUSD

VUSD will continue to refine and enhance, as funding is available, the preschool partnership with Educational Enrichment Services (EES) on 10 campuses across the school district. Status

In Progress 12/26/2011

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Shari Fernandez

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

54 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2C: AMAO 3 - AYP for EL Subgroup STRATEGY

Increase Access to High Quality Preschool Programs

ACTION STEP TASKS

On-Site Preschool Programs for VUSD 0 of 2 Complete

Kindergarten Transition Program

In Progress

VUSD to work with EES to develop and implement a kindergarten transition process that includes preschool/kindergarten collaboration, parent transition, and student orientation. Bi-Yearly Preschool Articulation Meeting VUSD to host a preschool articulation meeting with VUSD principals and EES staff to discuss the current status of the program and make necessary adjustments to ensure high quality.

Generated by CAIS | January 21, 2014 11:15 AM

Due 6/30/2014 Shari Fernandez (LEA)

In Progress

Due 6/30/2014 Shari Fernandez (LEA)

55 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2D: High Quality Professional Development

The LEA will provide high quality professional development to teachers, administrators, and other school or community-based personnel to improve the education of English learners. • By June 2014 95% of LEA teachers will receive professional development on research-based strategies to improve English learner attainment of English language proficiency and/or achievement in Reading/Language arts and/or Mathematics, as determined by the LEA needs assessment. • By June 2014 100% of LEA administrators will receive professional development on the new ELD Standards and research-based strategies to improve English learner attainment of English language proficiency and/or achievement in reading/language arts and/or mathematics, as determined by the LEA needs assessment. • By June 2014 75% of teachers of English Language Development will receive training on the new ELD Standards.

STRATEGY

Filing Cabinet Count

0

Resources and state requirements for this goal Available

1

Provide a Comprehensive PD Plan

With the support of the Curriculum and Instruction Department, all sites will engage in a comprehensive and strategic PD plan integrating Common Core, Next Generation Science and ELD Standards awareness, PLC work and Instructional Rounds. Filing Cabinet Count

ACTION STEP

1

ELA, ELD and Math Core Professional Development

VUSD teachers will participate in district sponsored English language arts, ELD and math professional development (CCSS Cohort, E3D, READ 180, Math 180, and ELD and California Common Core State Standards). Status

In Progress 04/30/2013

Start-End Dates

08/01/2013 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Krista Berntsen, Shari Fernandez, Anne Green, Jeanie Luckey, Julie Prater, Larry White, Cathy Williams

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

56 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2D: High Quality Professional Development STRATEGY

Provide a Comprehensive PD Plan

ACTION STEP TASKS

ELA, ELD and Math Core Professional Development 3 of 5 Complete

Elementary ELD PD for Avenues

Completed

All ELD Support Teachers will attend PD in the use of the district adopted ELD curriculum for elementary called Avenues by National Geographic. Elementary Math Cohorts

Anne Green (LEA)

In Progress

Elementary Math Cohorts will collaborate on a regular basis for teachers in grades K-5. The cohort work will focus on developing teacher content knowledge and practice related to conceptual development. ELD Cohort Summer Institute

Completed

In Progress

Due 6/30/2014 Anne Green (LEA) , Julie Prater (LEA) , Shari Fernandez (LEA)

Completed

All ELD Resource Teachers will complete a 2 day training on the new ELD standards. This will be followed by additional sessions for additional teachers and administrators at our Buy Back Day professional development. ACTION STEP

Due 6/30/2014 Anne Green (LEA)

120 teachers K-12 will engage in year 2 of ELA Cohort work in order to implement the new CCSS ELA and ELD Standards. ELA Standards Awareness Workshops

Due 6/30/2014 Cathy Williams (LEA)

VUSD will provide optional ELD Cohort Summer Institute for teachers in grades K-12 who are responsible for teaching the ELD program. The Cohort institute will be held for 3 days in the summer . (Follow up will occur thereafter once every other month.) ELA Cohort

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA)

On-Going Site Professional Development

Generated by CAIS | January 21, 2014 11:15 AM

57 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2D: High Quality Professional Development STRATEGY

Provide a Comprehensive PD Plan

ACTION STEP

On-Going Site Professional Development

Provide on-going site professional development and teacher collaboration during regular PLCs, informed by evidence gathered from Instructional Rounds, classroom observations, and common assessment data, resulting in improved lesson design, delivery, and student achievement. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Tags

PI_Yr3, T3Y4, Exp.

Persons Responsible

Shari Fernandez, Anne Green, Jeanie Luckey, Julie Prater, Larry White, Cathy Williams

TASKS

Filing Cabinet Count

0

3 of 3 Complete

Summer Institute for PI Schools

Completed

Due 8/22/2011

Completed

Due 6/30/2014

Completed

Due 6/30/2014

All schools in Level 3-5 of program improvement will provide 2 days of professional development, collaboration and cognitive planning for all certificated staff. PLC Training Every school site will send a team of administrators and teachers to a 3 day summer session on PLCs. Instructional Rounds Every school site will send a team to Instructional Rounds trainings and will join a network of Instructional Rounds which will meet 3 times yearly. ACTION STEP

Academic Language and Literacy Course PD

All new teachers teaching Academic Language and Literacy, the ELD support class (using English 3D) in grades 6-10, will participate in initial and follow-up professional development in the use of the district adopted instructional program as designed. Status

Completed 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

58 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2D: High Quality Professional Development STRATEGY

Provide a Comprehensive PD Plan

ACTION STEP TASKS

Academic Language and Literacy Course PD 1 of 3 Complete

Initial PD for ALL Course

Completed

Due 8/12/2011

In Progress

Due 6/8/2012

In Progress

Due 8/20/2012

High school and middle school teachers identified to teach the ALL course to attend initial training in the district adopted instructional program for the LTEL course called English 3D by Scholastic On-Going PD for ALL Course Teachers All teachers who are teaching the ALL course shall attend on-going PD in order to ensure that the English 3D program is implemented as designed. PD for Core Academic Teachers PD will be provided for academic core teachers in the use of the routines, strategies, and instructional model of the ALL course. ACTION STEP

Anne Green (LEA)

Monthly Administrator Professional Development

All principals K-12 will attend monthly professional development designed to improve instructional content knowledge, develop current research knowledge, and foster improved leadership skills and collaboration. Each meeting will include a presentation related to ELs and the new ELD Standards. Status

In Progress 12/28/2011

Start-End Dates

08/01/2013 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green, Jeanie Luckey, Larry White

TASKS

Filing Cabinet Count

0

0 of 1 Complete

enVision Math Administrator Training

In Progress

Due 6/15/2012

VUSD to provide all elementary principals with 40 hours of enVision math training in supporting teachers in the implementation of the program as desinged. ACTION STEP

Common Core State Standards PD

Generated by CAIS | January 21, 2014 11:15 AM

59 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2D: High Quality Professional Development STRATEGY

Provide a Comprehensive PD Plan

ACTION STEP

Common Core State Standards PD

All VUSD teachers from every subject area will receive introductory training in the CCSS for Literacy during the August Buy Back Day. Status

Completed 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Persons Responsible

Shari Fernandez, Anne Green, Larry White

ACTION STEP

Filing Cabinet Count

0

Math 180 Professional Development

All teachers instructing in the newly adopted Math 180 intervention class will engage in an ongoing series of trainings. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Persons Responsible

Cathy Williams

ACTION STEP

Filing Cabinet Count

0

System 44 Next Generation Training

All middle school teachers instructing in the Read 180 program will attend 8 seminars aimed at aligning Read 180 and System 44 to the CCSS. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Persons Responsible

Anne Green

STRATEGY

Filing Cabinet Count

0

Content Support Resource Teachers

VUSd will create and train a cadre of 14 Content Support Resource Teachers who will support sites in the implementation of the Common Core State Standards in ELA and Math, the Next Generation Science Standards and the new ELD Standards. Filing Cabinet Count

ACTION STEP

0

Common Core Workshops

Generated by CAIS | January 21, 2014 11:15 AM

60 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2D: High Quality Professional Development STRATEGY

Content Support Resource Teachers

ACTION STEP

Common Core Workshops

Content Support Resource Teachers (CSRTs) will deliver professional development and sitebased coaching on Common Core State Standards, Next Generation Science Standards and ELD Standards to every school site. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Persons Responsible

Shari Fernandez, Anne Green, Jeanie Luckey, Julie Prater, Larry White, Cathy Williams

ACTION STEP

Filing Cabinet Count

0

A-G Presentations

CSRT Team will deliver A-G/My College Pathway presentations to all elementary and middle school students in support of our Board goal of increased A-G completion rates. Status

In Progress 12/31/2013

Start-End Dates

02/03/2014 - 06/30/2014

Persons Responsible

Anne Green, Julie Prater

STRATEGY

Filing Cabinet Count

0

ELD Resource Teachers

During PLC time, ELD Resource Teachers will provide professional development to staff at their sites on ELD Standards, Academic Language and Literacy, Redesignation Criteria, CELDT testing, A-G, and other literacy topics as requested by the site. Filing Cabinet Count

ACTION STEP

0

Create a PD Plan

With the collaboration of the administration and the assistance of the Learning Center, each ELD Resource Teacher will create a SMART Goal for professional development based on the needs of the ELs at the site. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

61 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2E: Parent and Community Participation

The LEA will promote the involvement of parents and community members in the education of English learners. • By June, 2014 the LEA will improve and increase parent outreach strategies so that 95% of parents are active participants in the education of their children. [Required per Elementary and Secondary Education Act, sections 3116(a) & (b) and 3115(c)(2)]

STRATEGY

Filing Cabinet Count

0

Resources and state requirements for this goal Available

1

Establish and Support Governance Committees

VUSD will establish and maintain DELAC and site ELAC committees. Filing Cabinet Count

ACTION STEP

0

District English Learner Advisory Committee

VUSD will establish and support the District English Learner Advisory Committee (DELAC) to fulfill their legal obligations to review, monitor,and advise on all matters related to the English learner instructional program. Status

Completed 04/04/2013

Start-End Dates

08/01/2013 - 06/30/2014

Tags

T3Y4

Persons Responsible

Gilberto Barrios, Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

1

62 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2E: Parent and Community Participation STRATEGY

Establish and Support Governance Committees

ACTION STEP TASKS

District English Learner Advisory Committee 2 of 6 Complete

DELAC Representative Annual Training

Completed

VUSD will provide annual governance training to all DELAC representatives in October 2013 prior to the first DELAC meeting. DELAC Executive Board Elections

Anne Green (LEA) , Gilberto Barrios (LEA)

Completed

VUSD will provide support to previous year's DELAC Executive Board in the completion of the annual DELAC Executive Board elections. DELAC Meeting Communication

In Progress

In Progress

VUSD will work to encourage DELAC representation in the following events: Annual DELAC Meet and Greet; Latino Migrant Conference; NABE; Migrant Education events. ACTION STEP

Due 6/30/2014 Anne Green (LEA) , Gilberto Barrios (LEA)

In Progress

VUSD will support the DELAC in completing the annual EL program evaluation and needs assessment. DELAC Representation at Community Events

Due 6/30/2014 Anne Green (LEA) , Gilberto Barrios (LEA)

VUSD will provide guidance and support to DELAC Executive Board members in the preparation of the agenda and resources during a monthly planning meeting prior to each DELAC meeting. Annual Program Evaluation and Needs Assessment

Due 11/29/2013 Anne Green (LEA) , Gilberto Barrios (LEA)

VUSD will provide logistical support to the DELAC representatives in the monthly DELAC meetings communications\reminders\agendas\min utes. DELAC Executive Board Planning Meetings

Due 10/31/2014

Due 6/30/2014 Anne Green (LEA) , Gilberto Barrios (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA) , Gilberto Barrios (LEA)

School English Learner Advisory Committee

Generated by CAIS | January 21, 2014 11:15 AM

63 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2E: Parent and Community Participation STRATEGY

Establish and Support Governance Committees

ACTION STEP

School English Learner Advisory Committee

All schools will establish and support the English Learner Advisory Committee (ELAC) to fulfill their legal obligations to review, monitor,and advise on all matters related to the English learner instructional program. Status

Completed 04/04/2013

Start-End Dates

08/22/2011 - 06/30/2014

Tags

T3Y4, DELAC, Parent

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

64 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2E: Parent and Community Participation STRATEGY

Establish and Support Governance Committees

ACTION STEP TASKS

School English Learner Advisory Committee 0 of 6 Complete

ELAC Governance Training

In Progress

Due 10/21/2011

In Progress

Due 9/30/2011

In Progress

Due 6/8/2012

In Progress

Due 6/8/2012

The ELD Support Teacher will provide annual governance training to all ELAC representatives in September/October 2011 prior to the first ELAC meeting. ELAC Election of Representatives The ELD Support Teacher will work with the ELAC representatives to plan and implement ELAC elections in accordance with the ELAC By-Laws. ELAC Meeting Communications The ELD Support Teacher will provide logistical support to the ELAC representatives in the monthly ELAC meetings\communications\reminders\age ndas\minutes. ELAC Program Eval. and Needs Assessment The ELD Support Teacher will support the ELAC in completing the annual EL program evaluation and needs assessment. Provide Spanish Translation of SPSA Template

Anne Green (LEA)

In Progress

Due 10/5/2012

In Progress

Due 8/20/2012

VUSD will translate in to Spanish an abbreviated version of the SPSA for schools in an effort to ensure that parents of English learners can provide an informed feedback during development and understand the action items upon completion. ELD Support Teacher PD District will ensure all ELD Support Teachers are provided with appropriate training in ELAC requirements and governance.

Generated by CAIS | January 21, 2014 11:15 AM

Anne Green (LEA)

65 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2E: Parent and Community Participation STRATEGY

Parent Education and Involvement Opportunities

VUSD will work to increase opportunities for parent education and involvement. Filing Cabinet Count

ACTION STEP

0

Expand Parent Education at the Learning Center

VUSD will expand the services provided at the VUSD Learning Center to include increased parent support and education opportunities offered for parents of English learners in preschool through high school. Status

In Progress 01/08/2012

Start-End Dates

08/15/2011 - 06/30/2014

Tags

T3Y4

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

4

3 of 8 Complete

Parent Education Calendar of Events

In Progress

The Learning Center will post a calendar of District and site education events on the District website, School Loop, outside the Learning Center, and on Peachjar. Parents will be surveyed as to their requests for such events. District Translation/Interpretation Position

Anne Green (LEA) , Gilberto Barrios (LEA)

Completed

VUSD will maintain a district level Translator/Interpreter position who will ensure that all major communications/events at the district and school level are translated/interpreted into Spanish. Event Translation/Interpretation

VUSD will expand the Community Liaison position Job Description to serve as the district lead in the development and communication of a coherent parent education and involvement system. Generated by CAIS | January 21, 2014 11:15 AM

Due 6/30/2014 Anne Green (LEA)

In Progress

All parent education events will either be conducted in Spanish or provide Spanish interpretation. Learning Center page on website and education events will also provide materials translated into Spanish. Expand Community Liaison Position

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA)

66 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2E: Parent and Community Participation STRATEGY

Parent Education and Involvement Opportunities

ACTION STEP

Expand Parent Education at the Learning Center

Staff Secretary Position

Completed

The Learning Center will maintain a Staff Secretary I position to provide secretarial support in the implementation of the English learner program and parent involvement. Office Assistant

Anne Green (LEA)

Completed

Learning Center Office Assistant position will be established to provide support and assistance in the implementation of the EL Program and parent involvement. Collaboration with Adult Education

In Progress

Due 6/30/2014 Anne Green (LEA) , Gilberto Barrios (LEA)

In Progress

Community Liaison will work to establish a monthly newsletter in Spanish and English for parents to inform them about college, scholarship opportunities, technology, homework support and community resources. ACTION STEP

Due 6/30/2014 Anne Green (LEA) , Gilberto Barrios (LEA)

The Learning Center will establish a collaborative model with Adult Education in order to facilitate and support parent enrollment in Adult Education programs. Parent Newsletter

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA)

Establish Communication, Education, Involvement

Schools will establish regular communication, education, and involvement for parents focusing on student achievement in ELD, ELA and Math, emphasizing what is expected of students at each grade level and how to support their student’s continued improvement. Status

In Progress 01/08/2012

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4, CA_Comp., Parent

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

67 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2E: Parent and Community Participation STRATEGY

Parent Education and Involvement Opportunities

ACTION STEP TASKS

Establish Communication, Education, Involvement 0 of 2 Complete

Parent Education Calendar of Events

In Progress

Due 8/22/2011

In Progress

Due 6/8/2012

The ELD Support Teacher at each of the schools will work with the principal, APs, counselors, and teachers to plan and provide parent involvement and/or education calendar of events to promote active parent participation in the educational process. Event Translation/Interpretation All parent education events at the school will be conducted in Spanish or provide Spanish interpretation as needed. Parent education events will also provide materials translated into Spanish as needed.

Generated by CAIS | January 21, 2014 11:15 AM

68 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2F: Parental Notification

The LEA will provide required communications to parents in a timely manner. • By September 15, 2013 the LEA will provide 100% of parents of ELs with the following information regarding their children, in a language parents can understand: o identification as EL; o program placement options; o program placement notification; o English language proficiency level, as determined by CELDT results and any local English Proficiency assessments used; o academic achievement level; o redesignation information; and o at the high school level, graduation requirements and annual notification of their students’ progress toward meeting those requirements. [Required per Elementary and Secondary Education Act, sections 3116(a) & (b) and 3302(a) through (c)]

STRATEGY

Filing Cabinet Count

0

Resources and state requirements for this goal Available

1

Provide Timely Communication and Information

Filing Cabinet Count

ACTION STEP

0

Annual English Learner Program Placement

All schools in VUSD will provide an annual program placement parent information workshop. The workshop will provide specific information about student current status on the CELDT and CST (if applicable), ELD program structure, and the opportunity for parents to make an informed decision about student placement. Status

Completed 01/08/2012

Start-End Dates

08/01/2013 - 09/30/2013

Tags

PI_Yr3, T3Y4

Persons Responsible

Gilberto Barrios, Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

69 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2F: Parental Notification STRATEGY

Provide Timely Communication and Information

ACTION STEP TASKS

Annual English Learner Program Placement 4 of 4 Complete

Program Placement Procedure- EL Master Plan

Completed

VUSD will post the EL Program Placement procedure in the Master Plan for English Learner Instructional Programs. This is currently undergoing revision in oder to align to new ELD standards and state testing requirements. Program Placement Notification

Anne Green (LEA)

Completed

All parents of English learners will receive a notification (in writing) of the program placement workshop at their school. Program Placement Forms

Completed

Due 9/30/2013 Anne Green (LEA)

Completed

VUSD has established a program placement monitoring system to ensure that all English learners have been placed appropriately and that parents were involved in the process. ACTION STEP

Due 9/30/2013 Anne Green (LEA)

VUSD will provide all schools with custom Program Placement forms that include specific information about the student's academic achievement in CELDT, CST, and previous placement. Program Placement Monitoring

Due 6/30/2014

Due 9/30/2013 Anne Green (LEA)

Reclassification Process

VUSD reclassifies English learners during the school year based on the district adopted reclassification criteria. Status

Completed 01/08/2012

Start-End Dates

08/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Gilberto Barrios, Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

70 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2F: Parental Notification STRATEGY

Provide Timely Communication and Information

ACTION STEP TASKS

Reclassification Process 1 of 5 Complete

Reclassification Procedure Training

Completed

Due 9/30/2013

The VUSD Learning Center trains all ELD Support Teachers and principals in the reclassification procedure and communication procedure. Reclassification Notification Worksheets

Anne Green (LEA) , Gilberto Barrios (LEA)

In Progress

Due 6/30/2014

VUSD develops and distributes custom reclassification worksheets for all English learners who have met the reclassification criteria. Reclassification Parent Notification

Anne Green (LEA)

In Progress

Due 6/30/2014

School ELD Support Teachers provide reclassification parent notification and seek feedback prior to completing the reclassification of an English learner. Reclassification Student/Parent Ceremony

Anne Green (LEA) , Gilberto Barrios (LEA)

In Progress

Due 6/30/2014

All schools hold reclassification ceremonies during the school year to recognize the accomplishment of English learners. Reclassified Student Follow-up

Anne Green (LEA)

In Progress

Due 6/30/2014

All schools will monitor and provide follow-up parent information meetings for reclassified ELs who are not performing at grade level in ELA and/or math. ACTION STEP

Anne Green (LEA)

English Learner Achievement Notification

VUSD provides parents of English learners with annual notifications of student achievement on state assessments, instructional program expectations, A-G requirements and graduation requirements. Status

Completed 01/08/2012

Start-End Dates

08/01/2013 - 06/30/2014

Tags

PI_Yr3, T3Y4, Parent

Persons Responsible

Gilberto Barrios, Anne Green

TASKS

Filing Cabinet Count

0

1 of 6 Complete

Generated by CAIS | January 21, 2014 11:15 AM

71 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2F: Parental Notification STRATEGY

Provide Timely Communication and Information

ACTION STEP

English Learner Achievement Notification

Secondary School Course Selection

In Progress

All secondary schools provide parent information packets (in English and Spanish) and meetings about course selections, expectations, A-G requirements and graduation requirements--enabling parents to make informed decisions about course selection. Back to School Information Nights

Anne Green (LEA)

Completed

All schools provide Back to School Information Nights during the first two weeks of school to provide detailed information about the instructional program, course requirements, and parent involvement events for English learners. Parent Conferences K-8

In Progress

In Progress

In support of the guaranteed admissions MOU with CSUSM, VUSD will hold an annual College/Career planning meeting with every ELD student/family to strategize for reclassification, A-G completion, course selection and college preparation. Generated by CAIS | January 21, 2014 11:15 AM

Due 6/30/2014 Anne Green (LEA)

In Progress

All high schools provide initial and followup course counseling services for English learners to ensure they are on track towards graduation and college entrance. My Pathway to College Career Planning

Due 6/30/2014 Shari Fernandez (LEA)

All high schools provide parent conferences with parents of English learners as requested based on current achievement. Counseling Services for English learners

Due 9/30/2013 Anne Green (LEA)

All elementary and middle schools provide parent conferences for all parents of English learners to discuss student achievement, intervention, and identify additional support based on student need. Parent Conferences 9-12

Due 6/30/2014

Due 6/30/2014 Anne Green (LEA)

In Progress

Due 6/30/2014 Anne Green (LEA)

72 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2F: Parental Notification STRATEGY

Provide Timely Communication and Information

ACTION STEP

NCLB Title III Program Status Notification

All parents of English learners will receive the annual NCLB Title III Program Improvement status notifications at the beginning of the school year. Status

Completed 01/08/2012

Start-End Dates

08/01/2013 - 09/16/2013

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Spanish Translation and Interpretation Services

VUSD provides timely translation and interpretation services to parents of English learners in all areas of the school programs (curriculum and instruction, student services, and special education). Status

In Progress 01/08/2012

Start-End Dates

07/22/2011 - 06/30/2014

Tags

PI_Yr3, T3Y4

Persons Responsible

Anne Green

TASKS

Filing Cabinet Count

0

2 of 2 Complete

District Translator/Interpreter

Completed

VUSD will maintain a district level Translator/Interpreter position who will ensure that all major communications/events at the district and school level are translated/interpreted into Spanish. Student Services Translator/Interpreter Student Services department will provide translation/interpretation services to ensure that parents of English learners have access to student services.

Generated by CAIS | January 21, 2014 11:15 AM

Due 6/30/2014 Anne Green (LEA)

Completed

Due 6/30/2014 Anne Green (LEA)

73 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2G: Services for Immigrant Students

The LEA will provide high quality Instruction and Support Services to all immigrant students. • By June 2014 enhanced instructional opportunities will be provided to 90% of immigrant students and their families. [See Elementary and Secondary Education Act, sections 3116(a) & (b) and 3115(e)]

STRATEGY

Filing Cabinet Count

0

Resources and state requirements for this goal Available

1

Provide a comprehensive instructional program

VUSD will provide a comprehensive instructional program for all immigrant students. Filing Cabinet Count

ACTION STEP

0

Placement

All immigrant students will be enrolled and placed in appropriate programs, depending upon their language acquisition levels, as measured by an initial CELDT assessment. Status

Completed 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Monitoring Teaching and Learning

ELD Resource Teachers will regularly monitor the progress of all immigrant students. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Tags

T3Y4

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

District Adopted Curriculum

All immigrant students in English Language Development programs will receive instruction aligned to the District adopted curriculum and aligned with new ELD Standards. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Tags

T3Y4

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

74 of 99

LEA PLAN

Vista Unified - 37684520000000 GOAL

Goal 2G: Services for Immigrant Students STRATEGY

Provide a comprehensive instructional program

ACTION STEP

District Adopted Curriculum

ACTION STEP

Migrant Education

Where applicable, immigrant students will receive the support of the Migrant Education program according to the VUSD/ Migrant Ed MOU. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Persons Responsible

Anne Green

STRATEGY

Filing Cabinet Count

0

Provide Support to Families

VUSD will provide support to immigrant families through the Learning Center, Student Support Services Department and Migrant Ed services. Filing Cabinet Count

ACTION STEP

0

Learning Center

The Learning Center will provide ongoing support to families. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Tags

Parent

Persons Responsible

Gilberto Barrios, Anne Green

ACTION STEP

Filing Cabinet Count

0

Student Support Services

Student Support Services will continue to provide support to immigrant families. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Persons Responsible

Anne Green

ACTION STEP

Filing Cabinet Count

0

Migrant Education

VUSD will meet bi-monthly with Migrant Education to monitor support of all immigrant students. Status

In Progress 12/31/2013

Start-End Dates

08/01/2013 - 06/30/2014

Persons Responsible

Anne Green

Generated by CAIS | January 21, 2014 11:15 AM

Filing Cabinet Count

0

75 of 99

Enclosure 4  ​       Page 1 of 2  ​ California Department of Education 

Elementary and Secondary Education Act  Local Educational Agency Plan Goal 2  Budget Update Sample Template   Name of LEA: ___Vista Unified School District_____________________________________________ Fiscal Year: __2015­2016____  Total Title III Allocation: LEP $568,000

           Immigrant: $___VUSD not Eligible 2014­2015________ 

LEP Administrative & Indirect Costs (2%): $_____11, 300_______

Immigrant Administrative & Indirect Costs: $ VUSD not Eligible14­15 

For each applicable Title III goal indicated below, indicate the key actions that will be implemented to meet each goal, the related Title III   Budget item, and the estimated cost for each item.     Associated  Title III Goal  Specific Title III Supplemental Key Actions  Estimated Costs  Unit (Purchase) Detail  (Activities) to Meet Goal  for each Activity    Listed   Supplemental Curriculum­ Academic Vocabulary  for additional ELD time. 

$300 per class set  elementary, middle and high  school 

Extended Day Interventions and Support for EL  students 

$350 per week for 30 weeks  $52,500  (2 hours per day afterschool)  @ 5 sites 

Goal 2C: AMAO 3 ­Adequate  Yearly Progress (AYP) in  English/Language Arts 

English Language Development Resource  Teacher Coaches (Salaries and certificated  benefits) 

$93,000 for 5 full released  teacher coaches. 

$465,000 

Goal 2C: AMAO 3 – AYP in  Mathematics 

English Language Development Resource  Teacher Coaches­ focused on developing 

Cost accounted for in Goal  2C: AMAO 3 

 

Goal 2A: AMAO 1­ Annual  progress Learning English  Goal 2B: AMAO 2 ­ English  Proficiency 

$38,000 

  disciplinary literacy in designated/integrated ELD.  (Salaries and certificated benefits)  Goal 2D: High Quality  Professional Development 

English Language Development Resource  Cost accounted for in Goal  Teacher Coaches­ focused on developing  2C: AMAO 3  disciplinary literacy in designated/integrated ELD.  (Salaries and certificated benefits) 

 

Goal 2E: Parent and  Community Participation 

Parent Nights – Focused on at home literacy  practices, reclassification criteria and resources  available to EL parents.  Presented by English  Language Development Resource Teacher  Coaches. 

Cost accounted for in Goal  2C: AMAO 3 

 

Goal 2F: Parental Notification 

 

 

 

Goal 2G: Services for  Immigrant Students  

N/A 

 

 

Extended Day Interventions and Support for EL  students 

Cost accounted for in Goal  2B: AMAO 2 

 

 

568,000 

(For LEAs receiving Title III,  Immigrant funds)  Goal 5A: Increase Graduation  Rates    Total Title III Budget Estimate  (Include Administration and  Indirect Costs) for LEP and  Immigrant Programs 

LEP $ 568,000  IMM $_none____ 

Program Notes​ :Activities must be of supplemental nature. Align activities with associated estimated costs.  I. II. April 2015 

LEAs must expend Title III funds on activities that are required, allowable, allocable, necessary and reasonable.  Title III funds should supplement the level of Federal, State, and local funds, including LCFF fund 

VUSD Title III Budget Update 2015-2016.pdf

There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. VUSD Title III ...

605KB Sizes 2 Downloads 275 Views

Recommend Documents

Title III Program ESL Services.pdf
Program/Services. Ingleside I.S.D. participates in a cooperative with other school districts. through the Education Service Center, Region 2. The ESC 2 provides.

Title Page-GR-III - Amazon AWS
Mar 31, 2011 - understand exchange rate risk, which can be defined as the variability in returns on securities caused by currency ...... The meaning of the words “to be pursued by the company on incorporation” is pertinent. ...... Direct interact

Title Page-GR-III - Amazon AWS
Mar 31, 2011 - hoped, you might not make as much money on your investment as you expected. Of course, if you invest in Index Funds, you forego management risk, because these funds do not employ managers. ...... Discuss the tax implications of the fol

ESL Title III Flunecy Hiring Plan.pdf
ESL Title III Flunecy Hiring Plan.pdf. ESL Title III Flunecy Hiring Plan.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying ESL Title III Flunecy Hiring ...

AVUSD Title III Plan 2015-16.pdf
Whoops! There was a problem loading more pages. AVUSD Title ... 2015-16.pdf. AVUSD Title I ... n 2015-16.pdf. Open. Extract. Open with. Sign In. Main menu.

May F-III-A Budget: Actual.pdf
Page 1 of 1. STATE OF ALABAMA. DEPARTMENT OF EDUCATION. LEA Financial System. Combined Statement of Revenues, Expenditures, and Changes in Fund Balances. All Governmental Fund Types and Expendable Trust Funds. Budget and Actual. Exhibit F-III-A. For

State and Federal Budget Update Website.pdf
Whoops! There was a problem loading more pages. Retrying... State and Federal Budget Update Website.pdf. State and Federal Budget Update Website.pdf.

SR - 2018 Budget Update 1-10-2018.pdf
$348k for two dump trucks ($174 each). $ 40k for a Hot Box. $ 40k for the purchase of a pickup truck. $ 59k for 2018 road maintenance expenditures. $487 ...

Budget Update form Template 8-11-15.pdf
Substitute costs for teachers to. understand and implement EL. instruction. Release time for teachers to. understand, plan, and implement. EL instruction. Intervention funds will be. allocated to support students. after school in acquiring English. p

VUSD Digital Citizenship Nights.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. VUSD Digital ...

VUSD Student Trans Permission Request.pdf
Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. VUSD Student Trans Permission Request.pd

Title title title
2 GHz Intel Core Duo as a test system. Baseline Experiment. It was important to establish a baseline before continuing with either model validation or the phage therapy experiment. In order to accomplish this we tuned the parameters outlined in Table

Samsung GALAXY S III Software update guide - Jellybean V4.1.2 In ...
Select OK. Step 9. Phone will reboot and software installation will occur. Step 10 ... Check to ensure that under the “Android version” heading it is listed as 4.1.2.

III" "III "III "III III" MI" III III" |ll
Jun 28, 2002 - received, and any other external data to perform an action or to move to ...... DVD-RAM, hard disk drive, magnetic tape or any other magnetic ...

III" "III "III "III III" MI" III III" |ll
Jun 28, 2002 - tomer service information to cell phone users may prompt a user With the question “What happened to ..... case, the speech application may de?ne a global variable, such as “GENDER,” that holds a value such as .... (VOIP) connecti

title title
Perhaps as a result of the greater social acceptance of homosexuals, more and more individuals have ..... This is but the first mention of what becomes a very ..... Biblical Ethics and Homosexuality: Listening to Scripture (ed. Robert L. Brawley;.

l III III" l||||| II" III" "III "III "III
Feb 18, 2005 - data (EDID) by a requesting one of the data ports is. (73) Asslgnee: ... device and if a memory read operation had been in progress. When the ..... processor arranged to process computer program product and associated data ...

l III III" l||||| II" III" "III "III "III
Feb 18, 2005 - ee app 10a Ion e or Comp e e Seam 15 Dry ..... panel ?at panel controller design, the tWo EDID ROM ... The cost of having tWo EDID ROM.

title
description

TITLE
Figure 1: Main energy flows during the plant production in agro-ecosystems. R- represents .... Environmental Policy, Environmental. Engineering ... Emergy evaluation of three cropping systems in the southwestern. Australia. Ecological.

title
descripsi

title
discripsi

title
description

title
Description