Watkins  Moderniza/on  

 

School  Improvement  Team  Mee/ng   1/13/2016    

District of Columbia Public Schools

|

1200 First Street, NE

|

Washington, DC

20002

|

T

202.442.5885

|

F

202.442.5026

|

dcps.dc.gov

Agenda   §  §  §  §  § 

Project  Update   Swing  Space  Transporta/on   Swing  Space  AEercare   Space  Pre-­‐Occupancy  Improvements   Swing  Space  Program  Layout  –  Review  Session  

District of Columbia Public Schools | January 1, 2010

2

Project  Update   §  Builder  Selec/on:    RFP  review  panel  has  made  a  recommenda/on  and  a   builder  is  expected  to  be  on-­‐board  in  the  coming  weeks.   §  January  2016   §  Focus  on  swing  space  program  layout  

§  February  2016     §  Builder  reviewing  the  project  and  preparing  pricing  es/mates.   §  Regroup  on  site  layout  and  gardens  

§  March  2016   §  Regroup  on  design  and  program  layout  

§  Spring  2016   §  Color  discussions,  flooring  types,  etc  

District of Columbia Public Schools | January 1, 2010

3

Transporta/on   §  DCPS  will  provide  transporta/on  to/from  the  Eliot-­‐Hine.   §  We  would  like  to  form  a  subgroup  with  the  school  leadership,  SIT,  PTA,   parents  to  help  us  answer  ques/ons  like:   §  §  §  § 

#  of  Students  Requiring  Transporta/on   Pick-­‐Up/Drop  Off  Times   Pick-­‐Up/Drop  Off  Loca/ons   Others  

§  DCPS  will  con/nue  to  work  with  WMATA  &  DDOT  on  the  C40  route,  but  we   are  commi`ed  to  supplemen/ng  the  transporta/on.   §  The  informa/on  above  will  help  DCPS  prepare  a  RFP  for  a  transporta/on   company.  The  informa/on  above  is  needed  by:  Mid-­‐February  

District of Columbia Public Schools | January 1, 2010

4

AEercare   §  School-­‐led  aEerschool  enrichment  programs  will  be  determined  by  the   school,  but  there  are  no  reasons  why  they  cannot  operate  as  they  have  in   the  Watkins  building.     §  OST  Programs  will  con/nue  to  operate  at  Eliot-­‐Hine  for  Watkins  students.   §  Springboard  will  con/nue  to  operate  at  Eliot-­‐Hine  for  Watkins  students.   §  DPR:  There  are  ongoing  discussions  with  DPR  about  their  program   placement.   §  This  group  will  work  with  the  school  (Vanessa  Drumm)  and  DCPS  to   determine  where  in  the  building  these  programs  will  be  located.  

District of Columbia Public Schools | January 1, 2010

5

Pre-­‐Occupancy  Improvements   §  Many  of  the  pre-­‐occupancy  improvements  will  be  determined  aEer  the  final   layout  (wall  addi/on/demo,  etc),  but  we  would  like  the  SIT  to  help  us  think   through  other  pre-­‐occupancy  improvements,  like:     §  §  §  §   

Pain/ng   Ligh/ng   Other  cosme/c  upgrades   IT  Infrastructure  (determined  by  OCTO)  

§  This  will  be  part  of  the  SIT  discussions.  

District of Columbia Public Schools | January 1, 2010

6

Move  Logis/cs   §  DCPS  &  DGS  will  be  working  to  set  up  move  coordina/on  mee/ngs  with   Watkins  staff  in  February.   §  The  selected  contractor  will  be  responsible  for  the  move  from  Watkins  to   Eliot-­‐Hine.       §  The  contractor  will  provide  boxes  and  supplies   §  The  move  mee/ngs  will  focus  on  packing  procedures,  packing  best  prac/ces,   labeling,  scheduling,  etc.   §  DCPS  moves  all  student  records/files  and  technology.   §  The  school  may  ask  for  parent  volunteers  to  help  pack.    To  be  coordinated  by   the  school.    

District of Columbia Public Schools | January 1, 2010

7

Program  Layout  at  Eliot-­‐Hine   §  DCPS  &  DGS  are  presen/ng  a  VERY  PRELIMINARY  DRAFT  layout.   §  This  process  has  to  go  through  review  by  leaderships  at  both  schools.   Exercise  for  Tonight   §  Break  into  3  groups  and  include  a  parent,  teacher,  staff  member   §  Answer  the  following  ques/ons  as  a  group:   §  What  elements  do  you  like  about  this  layout?   §  What  are  your  biggest  concerns?   §  Are  there  elements  missing?  

§  We  would  like  to  con/nue  this  discussion  with  the  SIT.    Layout  needs  to  be   finalized  by  early  March     District of Columbia Public Schools | January 1, 2010

8

Next  Mee/ng     §  February   §  §  §  § 

Updates  on  subgroup  topics   Con/nued  discussion  on  program  layout  in  swing  space.   Site  design  and  garden  discussion   Builder  Introduc/on    

9

Watkins Moderniza5on

Jan 13, 2016 - Swing Space Program Layout – Review Session. District of ... The move mee5ngs will focus on packing procedures, packing best prac5ces,.

94KB Sizes 0 Downloads 87 Views

Recommend Documents

watkins-socc16-poster.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

Epub Rude Cakes Rowboat Watkins for Ipad
... Book Award – New Illustrator HonorWho knew that cakes were so rude?! ... Populer books Rude Cakes, Read [FREE],Rude Cakes download and read pdf ...

Commentary on Nolen-Hoeksema and Watkins (2011)
ioral account have failed spectacularly. ... In addition, we show that even a simple network structure naturally accounts ..... Software: Practice & Experience, 21,.