UNIVERSITY OF CALIFORNIA, BERKELEY, CAPITAL PROJECTS, CONTRACT ADMINISTRATION
Final
Underhill Garage Maintenance and Repairs
Contract Time: 90
Project No.: 19397A Project Manager(s): Caroline Tsang Bid Opening Date & Time: 2:02 pm April 26, 2018
License Type: "A" Pre-Bid Estimate: $900,000
A
B
Yes
Yes
Rainbow Waterproofing & Restoration Company
Ashron Construction and Restoration, Inc.
600 Treat Avenue
641 Reed Street
San Francisco, CA 94121
Santa Clara, CA 95050
415-641-1578
408-956-0909
Corporation
Corporation
148753
816425
DESCRIPTION Contractor's Special Statement of Experience received?
Name Address City State Zip Telephone Type of Bidder License Number Department of Industrial Relations Number (DIR) 10% Bid Bond Issued By
LUMP SUM BASE BID
1000001056
1000005812
The Ohio Casualty Insurance Company
Philadelphia Indemnity Insurance Company
$425,317
$675,780
$190
$250
$7
$24
$20
$30
$75
$140
$430,200
$198,100
$44,800
$72,000
$46,000
$39,797
UNIT PRICES Unit Price 1: Contractor to provide cost per square foot for Work Item #3.1 Floor Repair – Partial Depth/Shallow on R-000 (per square foot). Unit Price #2: Contractor to provide cost per linear foot for Work Item #11.1 Rout and Seal Cracks in Existing Slabs on R-000 (per linear foot). Unit Price #3: Contractor to provide cost per linear foot for Work Item #11.3 Vertical Joint Sealant on R-000 (per linear foot). Unit Price #4: Contractor to provide cost per linear foot for Work Item #11.5 Epoxy Injection on R-000 (per linear foot). ALTERNATES Alternate No. 1: Contractor shall provide price for stair tread replacement for all four (4) towers at all floors as referenced in detail 41.1 on sheet R-501. Alternate No. 2: Contractor shall provide price for installing penetrating concrete sealer on Level P-3 slab as referenced on R-000 and Specification section 071900. Alternate No. 3: Contractor shall provide price for stair tread replacement at Stair Tower #2 between Level P1 and P2 as referenced in detail 41.1 on sheet R-501 (18 treads). SUBTOTAL: ALTERNATES
$521,000
$309,897
TOTAL: Base Bid
$946,317
$985,677
DAILY RATE FOR COMPENSABLE DELAYS $ per day $1,500 $750 DAILY RATE X MULTIPLIER OF 10 $15,000 $7,500 CALCULATED BASIS FOR AWARD - (LUMP SUM BASE BID PLUS ALTERNATE 2 (COMPENSABLE DELAYS X MULTIPLIER) $485,117.00
$755,280.00
* This sheet is for informational purposes only; bids have not been individually evaluated for UC requirements. Preliminary: cc via e-mail: S. Holloway, C. Tsang, T. Cerney, J Chavez, M. Mendoza, N. Mata, CA Project File
SUBCONTRACTORS Mechanical Welding Debris Removal
Prepared By: CA Analyst
H.V. Heathorn Co. ACW Steel Valdivia Trucking
Page 1 of 1
5/4/2018