FEASIBILITY STUDY FOR THE UPPER PERKIOMEN SCHOOL DISTRICT MONTCO / BERKS COUNTY, PA

BRESLIN RIDYARD FADERO ARCHITECTS

JANUARY 14, 2016

B

R

F

A

Table of Contents

Page INTRODUCTION

1-4

Regional Map

2

District Map

3

Educational Program

4

EXISTING FACILITIES

5-25

Marlborough Elementary School Hereford Elementary School

5-8 9-12

Education Center

13-15

Middle School

16-20

High School

21-25

ENROLLMENTS AND CAPACITIES

26-31

Elementary Facilities

26

Elementary Conceptual Cost Options A, B, and C Plans Options A, B, and C Middle School

27-28 A-1 to A-6 29

Middle School Conceptual Cost Options D and E Plans Options D and E High School

30-31 A-7 to A-12 32

Plan Option F

A-13

CAPITAL IMPROVEMENT PROGRAM

33-43

Marlborough Elementary School

34-35

Hereford Elementary School

36-37

Education Center

38

Middle School

39-40

High School

41-43

APPENDIX

44-48

PlanCon Forms

45-48

Breslin Ridyard Fadero Architects

Introduction

A.

PURPOSE OF THE STUDY The Commonwealth of Pennsylvania requests that School Districts complete a Study of Facilities owned by the School District on a periodical basis. The Study must provide an appraisal as to each facility’s ability to meet current and planned educational program needs. It must also describe the degree to which the facilities meet current construction standards, applicable codes, and provide estimated costs of repairs and upgrades. In addition, the Study must contain an analysis of construction or renovation options with cost estimates.

B.

AUTHOR’S CREDENTIALS This report has been prepared by Breslin Ridyard Fadero Architects. Over the past 50 years Breslin Ridyard Fadero has been the Architect for a wide range of educational projects encompassing more than four billion dollars in current construction value including eight major projects for the Upper Perkiomen School District. The following professional staff contributed to the completion of this report: Robert J. Breslin, A.I.A. Robin W. Breslin, A.I.A. Michael K. Ackerman, A.I.A.

Joseph L. Herman, A.I.A., LEED AP Andrew Bartos, A.I.A., LEED AP BD+C Diane M. Downing

Breslin Ridyard Fadero Architects wishes to acknowledge the contribution of Consolidated Engineers for their assistance in evaluating the heating, ventilating, airconditioning, plumbing, and electrical components of this study. In addition, we wish to thank Dr. Alexis McGloin, Superintendent of Schools, Sandra M. Kassel, Business Administrator, John W. Sheeran, Director of Facilities and Operations, and the various school principals for their guidance and input in the completion of this Study. C.

GRADE STRUCTURE AND ENROLLMENTS Marlborough Elementary Hereford Elementary School Upper Perkiomen Middle School Upper Perkiomen High School

D.

K-5 K-5 6-8 9-12 TOTAL

727 876 780 921 3,304

students students students students students

OVERVIEW OF SCHOOL DISTRICT The Upper Perkiomen School District serves a community of over 22,000 residents in six Upper Montgomery County municipalities and one Berks County municipality (Hereford Township). Situated in the scenic Upper Perkiomen Valley, the District lies approximately 15 miles south of Allentown and 30 miles north of Philadelphia. Regional and School District maps are located on the following pages.

Breslin Ridyard Fadero Architects -1-

Introduction

E.

REGIONAL MAP

Breslin Ridyard Fadero Architects -2-

Introduction

F.

DISTRICT MAP

Breslin Ridyard Fadero Architects -3-

Introduction

G.

EDUCATIONAL PROGRAM The District’s total enrollment during the 2015-2016 school year of 3,303 students represents an elementary program of grade K through 5 at Hereford and Marlborough, a 6 through 8 middle school program, and a 9 through 12 high school program. Instructional programs implement current technology such as Google Apps for Education, Learning Management Systems and 3D printing at all levels. Due to the District’s commitment of Open Education Resources, Upper Perkiomen School District was named as one of six #GoOpen Ambassador Districts in the United States and was recognized in Washington DC by the US Department of Education. A comprehensive district-wide technology upgrade of hardware and infrastructure is ongoing and will be completed in early spring. To further technology integration, the district will institute a one to one initiative at the middle and high school and a one to three initiative at the elementary level at the start of the second semester of the 2015-2016 school year, with the goal of students having access to a multi-platform experience. Upper Perkiomen participates jointly with the Pottsgrove and Spring-Ford School Districts in the Western Career and Technology Center which offers majors ranging from automotive technology to biomedical science. Eligible high school students may attend the technical school for a three year half-day program. High School students may also participate in numerous advance placement courses and a dual enrollment program through Montgomery County Community College. Special offerings are also available in related arts including a robust technology education program that incorporates the makerspace movement. District curriculum priorities include a focus on integrating core standards in to mathematics and English language arts. The District offers a comprehensive special education program which includes learning support, autistic and multiple disabilities support (MDS) classes at all grade levels, speech and language services, and classes for gifted students. Social skills curriculum is incorporated through guidance classes as well as through group lessons. Staff development programs include effective teaching strategies, balanced literacy approach and core standards implementation, and technology integration: 89% of the teaching staff have earned a master’s degree.

Breslin Ridyard Fadero Architects -4-

Existing Facilities Marlborough Elementary School

I.

LOCATION The Marlborough Elementary School is situated off of Route 29, on 1450 Gravel Pike, Green Lane, Pennsylvania. The size of the building is approximately 77,000 square feet.

II.

SITE The school is located on a 21 acre site which includes hard play areas and soft play areas. A bituminous paved access drive, parking and bus loading areas are located on the south and east side of the building. There are 135 designated parking places and 15 bus parking spaces.

III.

BUILDING This school was opened in 1991. The building presently functions as an elementary school, housing grades K through 5. The steel framed, brick veneered building occupies two levels. The first floor contains the Main Entrance, Administrative Offices, Multi-Purpose Room, Kitchen, Library, Music and Classrooms. The second floor contains Classrooms. The two levels are served by an elevator which does not conform to current accessibility requirements.

IV.

HEATING, VENTILATING, AND AIR CONDITIONING Heat for all areas is generated by two combination gas/oil fired, cast iron, hot water boilers. The piping system is dual temperature system (hot and chilled water in the same pipes), with a separate heating only piping serving heating only equipment. The boilers are provided with gas from an interruptible gas service. Oil backup is provided by an underground 12,000 gallon fuel oil tank. Cooling for most areas of the facility is provided by a chiller. The Administration Area is served by a split system HVAC system.

Breslin Ridyard Fadero Architects -5-

Existing Facilities Marlborough Elementary School

V.

PLUMBING SYSTEM The building is serviced by an on-site well system with an indoor storage tank and pump booster system. Sewage is treated by a District owned and operated treatment plant. The building does not have a sprinkler system. However, the kitchen range hood has a fire suppression system.

VI.

ELECTRICAL SYSTEM The main electric service is supplied by PECO Energy via an exterior, pad-mounted transformer located outside the Mechanical Room at the northeast portion of the site. The service is metered at the secondary voltage of 480/277 volts, three-phase, four wire, wye distribution. The current peak demand load consumed leaves approximately 447 kVA of available power for future use. A fully air-conditioned addition of approximately 37,000 square feet could be accommodated with this available power. Building lighting consists of mainly fluorescent sources. Classroom lighting is provided by parabolic fixtures with interior silver reflectors designed to improve fixture efficiency. The Gymnasium/Cafeteria contains metal halide source fixtures. The Office and Corridors contain 2’ x 2’ recessed parabolic fluorescent fixtures with silver reflectors. The Stage contains a small theatrical dimming system and in-wall sound reinforcement system. The Stage contains two electrics with borderlights, several fresnels, and scoops.

VII.

SEWAGE TREATMENT SYSTEM The School District owns and operates a sewage treatment plant which is located in the Montgomery County Park land adjacent to the Marlborough school site. The plant is permitted to treat 4,250 gallons per day and currently treats between 3,300 and 3,900 gallons per day.

Breslin Ridyard Fadero Architects -6-

Existing Facilities Marlborough Elementary School First Floor Plan

PLAYGROUND

LIBRARY

WR

A/V

SE

ART

MECHANICAL ELEC. ROOM RM

SE SGI

COMP. RM

M.P.

SE

ST. CR

CR

CR

CR

CR

K

STAGE MUSIC CR

W

K G

B

M

STOR. RM

WR

CR

CR

CR

CR

CR

K

K

CR

EQUIP. STOR. REC.

GUID. MULTI-PURPOSE ROOM

COMP. HUB

FAC. RM

KITCHEN

LOBBY ADMIN.

First Floor Plan North

0

40

80

120

Breslin Ridyard Fadero Architects -7-

NURSE

Existing Facilities Marlborough Elementary School Second Floor Plan

STAGE BELOW

MECH RM

CR

CR

CR

CR

CR

CR

CR

ST. G

B

SGI

CR

CR

CR

CR

CR

CR

CR

SE

SGI

ST.

MULTI-PURPOSE ROOM BELOW

SGI

Second Floor Plan North

0

40

80

120

Breslin Ridyard Fadero Architects -8-

MECH RM

Existing Facilities Hereford Elementary School

I.

LOCATION The Hereford Elementary School is located at 1043 Gravel Pike (Route 29) in Hereford Township, Pennsylvania.

II.

SITE The site is an irregular shaped parcel containing the elementary building, parking lots, playfields, and a hard surface play area. There are 24 designated bus spaces and 78 designated car spaces. A service drive is located along the north side of the building. The site contains a sewage treatment building, a treatment lagoon, and a spray irrigation field. The site has a significant amount of wetlands.

III.

BUILDING The building is a single story brick veneer building with a steel roof structure. The original building was constructed in 1957 in a circular layout. Classrooms and offices ring the perimeter. A circular wood laminated arch Large Group Instruction Area is in the center. A 1975 addition behind the original building utilizes a more traditional orthogonal geometry. The 1975 addition contains the Library, Gymnasium, Cafeteria, Kitchen, Art, Mechanical Rooms and General Classrooms. A second addition of approximately 27,400 square feet was completed in 2008. It contains classrooms and a cafeteria expansion accompanied with significant site improvements for bus loading and parking. The total building area is approximately 91,000 square feet.

IV.

PLUMBING The building is serviced by a 4 inch municipal water service located in a storage room adjacent to the Cafeteria. There is one booster pump located at the service entrance to provide additional water pressure to serve the entire building. The 2008 Addition has an approved fire suppression sprinkler system. The 1975 Addition and original building do not have a sprinkler system.

Breslin Ridyard Fadero Architects -9-

Existing Facilities Hereford Elementary School

V.

HEATING, VENTILATING, AND AIR CONDITIONING The HVAC system is a combination air and water based system. Rooftop variable air volume systems serve the 2008 Addition including the classrooms, small group instructional rooms, lobby, and corridors. The 2008 Cafeteria Addition is served by a rooftop energy recovery unit to heat, cool, and ventilate. The administration and nurse’s suite are served by indoor variable air volume air handling units. The existing floor mounted unit ventilators in the circular original building were replaced in 2008 with heating, ventilating, and air conditioning unit ventilators. Hot water for heating is supplied for the entire building from two boilers located in the existing mechanical room of the 1974 Addition. The boilers were installed as part of the 2008 expansion project. In the 2008 expansion, hot water pumps were replaced with two variable speed pumps which distribute heating water to all heating equipment in the building. Chilled water is generated by split-system two air cooled chillers. One of the chillers is located in a Mechanical Room, adjacent to the Library, and provides chilled water for the original building as well as the 1975 addition. The chiller was installed approximately 10 years ago and appears to be in good condition. The other chiller is located in a mechanical room that is west of the Cafeteria. This chiller was installed during the 2088 renovations and is in good operating condition. Redundant pumps are provided for each chiller to distribute chilled water to all terminal equipment including rooftop air handling units and unit ventilators. All areas of the building are air conditioned except mechanical spaces, storage rooms, and toilet rooms.

VI.

ELECTRICAL SYSTEM The main electrical service is supplied by MetEd. In 2008, a new main switchboard was installed and backfeeds the existing switchboard. 480/277 volt panels are provided for large loads and HVAC equipment, 277 volt for lighting, 208/120 volt for general power supplied via dry type transformers and distribution panels. While new panels were added in 2008, there are a large number of existing panels that remained. In 2008, a new 150 KW diesel standby emergency generator was installed in the existing building.

Breslin Ridyard Fadero Architects - 10 -

Existing Facilities Hereford Elementary School

Building lighting in classrooms and small group instruction rooms contain recessed fluorescent troffers with low-brightness lenses. Corridors contain recessed fluorescent troffers with parabolic louvers. The 2008 Cafeteria Addition contains pendant mounted direct/indirect fluorescent fixtures with electronic ballasts. The data system was installed throughout the bundling during the 2008 construction; however, the existing intercom system was relocated. The fire alarm system is a current code compliant system. The cafeteria addition received a new sound system, while the existing LGI sound and lighting systems remained during the 2008 construction. VII.

SEWAGE TREATMENT SYSTEM Sewage is treated by a District-owned and operated on-site sewage treatment plant. The plant is permitted to treat 4,590 gallons per day and treats approximately 3,274 gallons per day.

Breslin Ridyard Fadero Architects - 11 -

Existing Facilities

CR

CR

CR

.P .

RE

B

CR M E RMCH .

ST O

R.

CA

G

FE

KI

TE

TC

RI

A

HE

N

ST .

PLAY AREA

CR

CR

ST .

M

ST .

SOFT PLAY AREA

C.

ST .

CR

M

EC

CR

H.

CR

SE

Hereford Elementary School Floor Plan

MULTI-PURPOSE ROOM SGI

SGI CR

CR

FAC. RM

FAC. WOMEN

SE

LIBRARY

CR

FAC. MEN T.

ADMIN.

MECH.

SGI

CR

SGI

T

CR

CR

MUSIC CR COMP. RM

T

G

B C.

STAGE

ART

SE

CR

K

G

C.

GUID.

VESTIBULE

STOR.

CR

SGI

SE

CR

CR

CR

CR

SE

CR

K CR

CR

CR

CR

CR

Floor Plan North

0

40

80

K

K K

CR CR

SE

LGI

NURSE

B

120

Breslin Ridyard Fadero Architects - 12 -

Existing Facilities Education Center

I.

LOCATION The Education Center is located at 2229 East Buck Road in Upper Hanover Township, in close proximity to Pennsburg.

II.

SITE The Education Center is located on a 13.32 acre site. Access is off East Buck Road and there are approximately 130 designated parking spaces. The site contains a storm detention basin and a significant amount of wetlands.

III.

BUILDING The Education Center is an approximately 32,000 square foot single story pre-engineered building that was originally constructed as a commercial roller skating rink. A 17,000 square foot area on the front of the building was renovated for the School District Administration Offices and completed in 2007 for a total project cost of $5,179,674. The building has a steel structural system supporting a sloped metal roof. Most of the exterior walls are exposed concrete masonry. The front of the building has an insulated glass curtainwall that provides abundant natural light to the administrative offices.

IV.

HEATING, VENTILATING, AND AIR CONDITIONING SYSTEM Heating, ventilating, and air conditioning is provided by a packaged heat recovery unit with gas heat, electric cooling, and a heat wheel. The unit is a variable air volume (VAV) unit that feeds fan powered and shut-off VAV boxes with electric heating coils. Supplemental heat within the space is electric and consists of radiation and wall insert heaters. In June of 2012, a condensing unit with a capacity of approximately 15 tons was installed along with a cooling coil in the return ductwork to provide additional capacity. Related ductwork modifications, refrigerant piping, wiring, and controls were also provided.

Breslin Ridyard Fadero Architects - 13 -

Existing Facilities Education Center

V.

PLUMBING The building is serviced by a municipal water service and a municipal sewage service. The 17,000 square foot Administration Office section has a sprinkler system. There is no sprinkler system in the vacant 14,800 square foot rear section.

VI.

ELECTRICAL SYSTEM The main electrical service is supplied by a utility owned 300kVA padmounted transformer, feeding a 277/480V GE Spectra series distribution panel with 600A main breaker installed while the building was used as a skating rink. During the 2007 renovations, new breakers were installed in the existing distribution panel to feed new panelboards in the renovated area. All new lighting with T8 lamps, electrical devices and low voltage systems (fire alarm, sound system in the board room, etc.) were installed in the renovated area in 2007. The building currently does not have a permanently installed generation system, and provides emergency lighting via battery packs. The existing panelboards, lighting, low voltage systems and other electrical devices in the areas not renovated in 2007 were left in place and reconnected into the new systems installed in the renovated area.

Breslin Ridyard Fadero Architects - 14 -

Existing Facilities Education Center Floor Plan

ENTRANCE

OFF.

DATA

REC.

BUS. ADMIN.

OFF.

OFF. OFF.

OFF.

OFF. ST

OFF.

WR

STOR.

OFF. WR

LUNCH RM

OFF.

OFF.

UNOCCUPIED SPACE ST

OFF. MULTI PURPOSE ROOM

LOBBY

WAIT.

CONF. RM

OFF. CONF. RM

ST

ELECT./ TRASH

M

ST CONF.

WR

W

WAIT.

OFF. MECH RM.

ASSIST. SUPER.

SUPERINT. OFF.

ENTRANCE

Floor Plan North

0

40

80

Breslin Ridyard Fadero Architects - 15 -

120

ST

Existing Facilities Upper Perkiomen Middle School

I.

LOCATION The Upper Perkiomen Middle School is located at 201 West Fifth Street in East Greenville, Pennsylvania. The Middle School is approximately 140,000 square feet and houses grades 6 through 8.

II.

SITE The Middle School is located on a 15-1/2 acre site which includes athletic fields, designated parking spaces for 115 cars, and on-site bus loading for 33 school buses. Currently, buses enter the site on Fifth Street, load and unload at the rear of the building, and exit onto Sixth Street. Parent drop off and pick up is in the front of the building on Jefferson Street.

III.

BUILDING The school was opened in 1958 with a major addition completed in 1973. The 1958 building was renovated in 1988. The entire building was renovated in 2009 for a construction cost of $10.3 million. The building is constructed with steel framing and masonry walls with a brick veneer. Portions of the 1958 building have bearing walls with steel roof framing. The building occupies three levels on two floors. The lower floor contains the Gymnasiums, Cafeteria, Kitchen, Homemaking, General Classrooms, Science Classrooms and mechanical spaces. The upper level contains the Library, Auditorium, Band, Choral, Science, Administration Offices, and General Classrooms.

IV.

HEATING, VENTILATING, AND AIR CONDITIONING The HVAC system is a combination air and water based system with variable air volume units serving the renovated classroom areas and single zoned air handling units to condition the Gymnasium. There are two existing boilers installed in 1988 with an existing oil storage tank and oil piping system. New heating pumps were installed in the 2009 renovation to distribute hot water throughout the renovation.

Breslin Ridyard Fadero Architects - 16 -

Existing Facilities Upper Perkiomen Middle School

There are three chillers that generate chilled water to cool all areas of the building with the exception of the Administration area. Two of the chillers are water cooled, located in the boiler room, and utilize a cooling tower, located in an exterior courtyard, as a means of heat rejection. These two chillers generate chilled water for cooling the main classroom areas of the building and the Gymnasium. The other chiller is a split system chiller with an indoor unit, located in the boiler room, and an aircooled condensing unit located in the exterior courtyard. This chiller supplies chilled water for the remainder of the building. The Administration area is cooled by a self-contained rooftop air handling unit with DX cooling. The chillers, cooling tower, air-cooled condensing unit and rooftop air handling unit were installed during the 2009 renovations and are in very good condition. V.

PLUMBING The building is served by a municipal water service that is located in the lower level of the original building. There are no reported issues with the existing domestic water piping much of which was replaced during the 2009 renovations. The building is connected to a municipal sanitary system. Over the past few years portions of the original sanitary drain pipes had developed leaks. The Owner has replaced sections of the piping when required. There is a grease trap located in the Kitchen area to capture grease laden waste from the various fixtures in the Kitchen area. The grease trap was installed during the 2009 renovations and there are no reported operational issues with the trap. Domestic hot water is provided by electric domestic water heaters that have been installed within the past few years. There is a storm water system which collects and conveys rain water to the exterior of the building. There are no reported issues with the system. Plumbing fixtures are located throughout the building. Many of the fixtures in the gang toilet areas were replaced during the 2009 renovations. There are no reported operational issues with the plumbing fixtures. There is no sprinkler system in the building.

Breslin Ridyard Fadero Architects - 17 -

Existing Facilities Upper Perkiomen Middle School

VI.

ELECTRICAL SYSTEM The main electrical service is supplied by PPL owned transformers located within a utility vault, feeding a 277/480V Square D QED series switchbaord with 1600A main breaker installed during the 2009 renovations. The distribution panelboards are manufactured by Square D, most of them installed during the 2009 renovations. There are also a limited number of panelboards that were installed prior to this renovation. All of the general building lighting is either T8 or T5HO lamps, most of it installed during the 2009 renovations, and the site lighting is high pressure sodium, also primarily installed during the 2009 renovations. The building emergency system is comprised of a 125kW generator, manufactured by Kohler, which backs up the heating equipment, kitchen cooler and freezer, as well as the life safety systems, including the emergency lighting. The data, intercom and security systems were installed throughout the building during the 2009 renovations, and the fire alarm system was expanded as required at the same time. The closed circuit television system, manufactured by Panasonic, was installed since 2009 and continuously added to over the years. The cafeteria sound system was replaced in 2009. The gymnasium sound system and lighting is older but still functions with no reported issues. The auditorium sound system and lighting has problems and should be replaced.

Breslin Ridyard Fadero Architects - 18 -

Existing Facilities Upper Perkiomen Middle School Upper Floor Plan

CR

CR

CR

ST

SCIENCE CR

CR

ROOF

ST OFF

CR

CR

CR

CR

BAND

LGI CHORAL

SCIENCE CR

SE

ART

LGI

M.P.

ROOF MUSIC CR

OFF

SE

ST B

G

CR

ST.

LIBRARY S.E. LIB. SGI BOOK OFF. RM

COMP. LAB

STAGE

CR

ST

MECH.

TV STUDIO

COMP. LAB UPPER GYMNASIUM

CR

AUDITORIUM

G GUID GUID

CR M J.C.

LOBBY OFFICE

CONF. RM

B

ST.

VAULT WAITING

LUNCH RM

CR

W

FAC. RM

MAIL

S.G.

SE ADMIN.

PRINCIPAL

ASSIS. PRINC.

S.G.

SE NURSE

Upper Floor Plan 0

50

100

North

Breslin Ridyard Fadero Architects - 19 -

200

CR

CR

Existing Facilities Upper Perkiomen Middle School Lower Floor Plan

STOR.

AUXILIARY GYM

CR

CR

CR

CR

SE

CR

CR

CR

CR

HEALTH CR

ART

STOR.

STOR.

OFF.

SCI. LAB

FCS

TECH ED.

STORAGE ST ST

SE

SE

JAN. CL.

LGI

MECH.

STOR. DR DATA CLOSET

OFFICE STORAGE

ST

B

ELECTRICAL ROOM

G

TRANS FORMER

STOR.

CAFETERIA

TEAM ROOM

BOYS LOCKER ROOM

SCI. LAB

OFF.

ST

ST

ST

ST

KITCHEN FACULTY ROOM

FOOD COURT

EQUIPMENT GARAGE LOBBY

COPY RM

GYMNASIUM KITCHEN STORAGE

CR MECH.

G STORAGE

SCIENCE LAB

ST.

SCIENCE LAB

ST.

B

CORRIDOR

ST

ST

ST

MACH. RM

RESOURCE RM

ST.

SE

SE

SE

RESOURCE RM

SE

ST

Lower Floor Plan 0

50

100

LOBBY

OFF

ST.

200

North

Breslin Ridyard Fadero Architects - 20 -

GIRLS LOCKER ROOM

FITNESS LAB

Existing Facilities Upper Perkiomen High School

I.

LOCATION The Upper Perkiomen High School is situated off of Route 29 on 2 Walt Road in Pennsburg, Pennsylvania. The site includes the District Sports Complex. The size of the High School is approximately 225,000 square feet.

II.

SITE The High School is located on a 44 acre site which includes athletic fields, tennis courts, football stadium, and an all weather track. Access is off of Route 29. A bituminous paves access drive circumscribes the High School building and provides access to parking facilities for staff, students, buses, and public as well as delivery and receiving.

III.

BUILDING The facility was opened in 1968 with major additions and renovations completed in 1986, 1993, 2000, and 2010. The building presently functions as a secondary school housing grades 9 through 12. The steel framed brick veneer building occupies three floors on a sloping site. The lower floor contains the gymnasium, locker rooms, cafeteria, kitchen, and general classrooms. The middle floor contains the main entrance, auditorium, band, choral, audion, industrial arts, science labs, library, and administration offices. The third floor contains five classrooms that were part of the 2000 addition.

IV.

PLUMBING The building is served by a municipal water service. There are separate water services to the original building and to the two 2000 additions. The water service to the original building has been upgraded with a backflow preventer. The main domestic water heaters have been replaced in or around 2009 and appear to be in excellent condition. The school is connected to a municipal sanitary sewage system. The southern 2000 addition has a sprinkler system in storage areas.

Breslin Ridyard Fadero Architects - 21 -

Existing Facilities Upper Perkiomen High School

V.

HEATING, VENTILATING, AND AIR CONDITIONING Heat Generation and Distribution There are number of different systems that generate heat in the building. The majority of the original building is heated by a hot water boiler system consisting of (4) duel fuel water tube boilers which are housed in a separate building located near the Kitchen. The boilers were installed when this portion of the building was converted from a geothermal system to a four–pipe system. The boilers appear to be very good condition. Redundant heating pumps distribute heating water throughout the areas. The 1986 portion of the building is heated by a hydronic system through and electric boiler. The boiler appears to be in good condition. The 1993 addition is heated by roof mounted air-to air heat pumps. The units appear to be good condition and there are no reported operation issues. The areas of the building that were built in 2000 are heated by a geothermal heat pump system. We have been advised the geothermal system does not provide adequate heating. Air Conditioning Generation The original building and the 1986 addition are supplied with cooling generated by a water cooled chiller. Heat rejection from the chiller is accomplished by a cooling tower located on the exterior. This system was installed in or around 2005 and appears to be in very good condition. The original portions of the building appear to be cooled adequately but the 1986 Classroom addition does not have adequate cooling. The 1993 additions are cooled by packaged air-to-air heat pumps with no reported operational issues. The 2000 additions are cooled by two separate geothermal systems which does not cool adequately. Terminal Equipment The majority of areas in the original building are conditioned by airhandling units and with ducted systems. The age of the units is unknown but there are no reported operational issue with the units. The terminal units in the 1986 and 2000 additions are geothermal heat pumps. The geothermal units do not heat or cool properly. Roof mounted energy recovery units are connected to the geothermal system and provide ventilation air to this portion of the building. Breslin Ridyard Fadero Architects - 22 -

Existing Facilities Upper Perkiomen High School

There are a number of exhaust systems located throughout the building to exhaust toilet rooms and the Kitchen. There are no reported operational issues with these systems. In many portions of the original building and in the 1986 addition the Corridors function as a relief air plenum which is no longer code compliant. If renovations are planned for these areas the relief systems would need to be changed to meet current code requirements. The Swimming Pool area is provided with heat from the main boiler system. Ventilation for this area is provided by a large amount of outdoor air which is the method used to dehumidify the pool area. This method increases operating costs and does not provide adequate dehumidification during the warmer weather. The existing temperature control system in the majority of the building is comprised of pneumatic operators with a connection to electronic system and a central computer. There are no reported operational issue with the system. VI.

ELECTRICAL SYSTEM The main electric service is supplied by an exterior, pad-mounted transformer located to the northwest of the 1993 library addition. The service is metered at the secondary voltage of 480/277 volts, threephase, four wire, wye distribution. The electric rate for the building is designated GH1. This is a rate that offers a cost advantage for electrically heated buildings. The rate is no longer offered for new construction, but is “grandfathered” for existing facilities as long as no fossil fuel heating system is introduced into the building. The other separately metered PPL secondary services are present on site. One of the additional services supplies athletic field lighting and is located in the Maintenance Building to the west of the library addition, and another serves the Farmhouse at the northern corner of the site. The exterior lighting for the building consists of HID lighting, while the interior consists of mainly fluorescent sources. The fire alarm system is a current code compliant system. The remote sound systems, while minimal, have no reported issues. The data system has been installed throughout the years, and is sufficient to meet current needs; however, the backbone is minimal with limited overhead.

Breslin Ridyard Fadero Architects - 23 -

Existing Facilities

CR

CR

LOBBY

CR

CR

T.

CR

STAIR

STAIR

Upper Perkiomen High School Middle and Third Floor Plan

T. ELEVATOR

CR

T.

CR

CR

T. CR

TECH. ED

STAIR

CR

CR

STAIR

STAIR

Third Floor Plan

CR

COMP. LAB

COMP. LAB

LIBRARY

RAMP UP

CR

STAIR

CR

CR COMPUTER HUB

CR

CR

ST.

ART

ART

CHEM. LAB

CHEM. LAB PHY/ENV LAB

SG

T.

CHEM. LAB

CR

AUDION

BIO. LAB

BIO/ENV LAB

T. T.

STAGE

AUDITORIUM

LOBBY

T.

CR

GUID.

STAIR

NURSE

ADMIN.

STAIR

BAND

CHORAL

BUILDING ROOF AREA

CR

CR CR

CR

COMP. LAB

STOR.

CR

COURTYARD TECH. ED

STAIR

FAC.

COURTYARD

STAIR

ST.

CR

PHYSICS LAB

Middle Floor Plan North 0

50

100

Breslin Ridyard Fadero Architects - 24 -

200

Existing Facilities

CR

CR

CR

HYDRO

FUTURE SPACE

FACULTY

GYMNASIUM

CR KITCHEN

STOR

STUD. STORE

LOCKER RM

MECH

CRAWL SPACE

TEAM RM

STAIR

CAFETERIA CR

UNDEVELOPED

TEAM RM

BOILER MECH

MECH.

TRAINING RM. WEIGHT/ FITNESS RM.

LOCKER RM

TV STUDIO

STUDIO

MAINT. ELEV.

STAIR

P.E. STOR. STOR.

AUXILIARY GYMNASIUM

LOBBY

CR CR CR AUDION

PSYCHOLOGIST

COMP. LAB

NATATORIUM

CR

CR

LOCKER RM. UNEXCAVATED

COMP. LAB

CR

CR

STAIR

T SPECIAL ED.

SPECIAL ED.

T

SPECIAL ED.

Lower Floor Plan North 0

50

100

Breslin Ridyard Fadero Architects - 25 -

ATHLETIC DIRECTOR LOCKER RM.

SPECIAL ED.

STAIR

ELEC.

STOR

STAIR

STAIR

Upper Perkiomen High School Lower Floor Plan

200

Enrollment and Capacities

A.

ELEMENTARY FACILITIES (K-5) The Hereford Elementary School presently has 876 students. Marlborough Elementary School has 727 students. The total elementary enrollment is 1,603 students. There are currently five (5) half-day kindergarten classrooms, four (4) full-time kindergarten classrooms, twenty-four (24) grades 1 and 2 classrooms, and thirty (30) grades 3 to 5 classrooms. Using a maximum class size of fifteen (15) for fulltime kindergarten, twenty-two (22) for half-day kindergarten, twenty-three (23) for grades 1 and 2, and twenty-five (25) students in grades 3 to 5, the total functional classroom capacity of the Elementary Schools is 1,582. The Montgomery County Planning Commission projects that enrollment at Hereford will decline over the next five (5) years. However, they project that enrollment at Marlborough Elementary School will increase by about 50 students because of active housing activity and consistent birth activity. Furthermore, they state that this estimate may be conservative. This suggests that Marlborough Elementary School will need additional classrooms. Furthermore, in addition to classrooms, the elementary curriculum requires small group instructional rooms. An appraisal at Marlborough indicates a deficiency of space for this curriculum requirement. For example, two instructional spaces are in corridors, one in the music practice room and two in small former storage rooms. Also, the large group classroom has been taken over for an instructional room and a computer classroom that was displaced from its original location in the building. Therefore, in order to return the large group classroom to its originally intended use, space should be added for six small group instructional rooms, a dedicated computer classroom, and two grade level classrooms. This can be accomplished by constructing a modest addition to Marlborough. A new kindergarten cluster of classrooms could be constructed and the existing kindergartens in the two-story classroom wing could be converted to instructional classrooms, a dedicated computer classroom, and two additional grade level classrooms. Such an addition and reconfiguration of existing space will provide Marlborough with the ability to meet current/planned educational program needs. Expansion plans with estimated costs are included on the following pages. Options ‘A’ and ‘B’ are concepts to expand Marlborough. In lieu of expanding Marlborough, Option ‘C’ is a concept to develop a kindergarten center in the vacant space at the Education Center.

Breslin Ridyard Fadero Architects - 26 -

Elementary Conceptual Cost Options

I.

OPTION ‘A’ Site Development Building Addition (10,104 sq. ft.) Renovations Chiller Replacement Sub-Total

$ $ $ $ $

600,000 3,536,400 100,000 180,000 4,416,400

Sub-Total

$ $ $ $ $ $ $ $

380,000 125,000 50,000 20,000 15,000 150,000 100,000 840,000

TOTAL

$

5,256,400

Sub-Total

$ $ $ $ $

300,000 3,877,000 100,000 180,000 4,457,000

Sub-Total

$ $ $ $ $ $ $ $

380,000 125,000 50,000 20,000 15,000 150,000 100,000 840,000

TOTAL

$

5,297,000

Architectural Services Land Development Services Furniture and Equipment Site Survey Geotechnical Investigation Contingency Fund Municipal Approvals and Permits

II.

OPTION ‘B’ Site Development Building Addition (11,220 sq. ft.) Renovations Chiller Replacement Architectural Services Land Development Services Furniture and Equipment Site Survey Geotechnical Investigation Contingency Fund Municipal Approvals and Permits

Note: • •

Cost estimates do not include financing costs. Cost estimates assume that the Marlborough Sewage Treatment Plant has adequate capacity to support increased enrollment.

Breslin Ridyard Fadero Architects - 27 -

Elementary Conceptual Cost Options

III.

OPTION ‘C’ Site Development Building Renovation (14,800 sq. ft.) Building Addition (4,800 sq. ft.) Add Sprinkler System Food Service Equipment

Sub-Total

$ $ $ $ $ $

300,000 4,144,000 1,920,000 75,000 50,000 6,489,000

Sub-Total

$ $ $ $ $ $ $ $

584,000 125,000 140,000 15,000 9,000 250,000 100,000 1,223,000

TOTAL

$

7,712,000

Architectural Services Land Development Services Furniture and Equipment Site Survey Geotechnical Investigation Contingency Fund Municipal Approvals and Permits

Note: • IV.

V.

Cost estimate does not include financing costs.

SUMMARY OF ESTIMATED CONCEPT COSTS Option A

$

5,256,400.00

Option B

$

5,297,000.00

Option C

$

7,712,000.00

ANALYSIS Options A and B resolve the lack of Small Group Instruction space at Marlborough. Option C does not. For Option C, the building addition extends beyond the zoning ordinance setback line and would require a zoning variance. For Option C, the sight lines for buses exiting the site do not comply with State standards.

Breslin Ridyard Fadero Architects - 28 -

Enrollment and Capacities

B.

MIDDLE SCHOOL (6-8) The Middle School currently has 780 students in grades 6-8. There are ten core classrooms per grade or a total of 30, which includes four science labs. The curriculum includes team teaching. There are two teams of five teachers per grade or a total of six teams. Using PDE class size standards, the functional capacity of the Middle School is approximately 768 students. The Montgomery County Planning Commission projects that the Middle School enrollment will increase to 847 students by the 2020-21 school year and then gradually decrease to its present enrollment by 2025. Options in the next five years are to increase class size, lease portable classrooms, or build a modest addition to the building that would add classrooms. In addition to classroom space, there are other concerns that have been brought to our attention. Examples are that the 6th grade does not have a science lab, only a classroom; there is no media production area, the technology assistant does not have a place to work or lock up valuable equipment, guidance counselors do not have a space to hold groups or meet with parents; there is no elevator serving the two levels of the lower floor; and the auditorium does not have support facilities such as dressing rooms, props and costumes storage, etc. There is also a security concern at the main entrance to the school. Once a visitor is “buzzed” into the building, the visitor can roam free. The Middle School site is not large enough to accommodate a major addition to alleviate all space concerns. An auditorium alone of 800 seats would cost approximately $16 million. However, constructing a modest addition as depicted in Options D and E is feasible. This could provide additional classrooms, a guidance conference room, a secured space for the technology assistant, an elevator to serve three floor levels, and an improved security entrance into administration. Also, the auditorium could be renovated to provide improved acoustics and sight lines, new stage and house lighting and controls, a new sound system, and in general, improved visual appearance. On the lower level, the industrial arts area could be renovated to provide a technical education space with a “design” area and a separate “build” component. Options D and E plans and cost estimates are included on the following pages.

Breslin Ridyard Fadero Architects - 29 -

Middle School Conceptual Cost Options

I.

OPTION ‘D’ Site Development Building Addition (9,000 sq. ft.) Elevator/Stair Renovation Administration Renovation Renovate Technical Education Rooms

Sub-Total

$ $ $ $ $ $

100,000 3,980,000 160,000 400,000 400,000 5,040,000

Sub-Total

$ $ $ $ $ $ $

450,000 50,000 200,000 15,000 150,000 75,000 940,000

TOTAL

$

5,980,000

Sub-Total

$ $ $ $ $ $

100,000 3,950,000 160,000 250,000 400,000 4,860,000

Sub-Total

$ $ $ $ $ $ $

425,000 50,000 200,000 15,000 150,000 75,000 915,000

TOTAL

$

5,775,000

Architectural Services Land Development Services Furniture/Tech Ed Equipment Geotechnical Investigation Contingency Fund Municipal Approvals and Permits

II.

OPTION ‘E’ Site Development Building Addition (7,500 sq. ft.) Elevator/Stair Renovation Renovate Administration for Classrooms Renovate Technical Education Rooms Architectural Services Land Development Services Furniture/Tech Ed Equipment Geotechnical Investigation Contingency Fund Municipal Approvals and Permits

Note: •

Cost estimates do not include financing costs.

Breslin Ridyard Fadero Architects - 30 -

Middle School Conceptual Cost Options

III.

AUDITORIUM RENOVATION OPTION Demolition New Ceiling System New House and Theatrical Lighting System and Controls New Sound System HVAC Ductwork Modifications Fixed Seating New Carpet Aisles and VCT Flooring Under Seating Miscellaneous Renovations Sub-Total

$ $ $ $ $ $ $ $ $

50,000 200,000 350,000 110,000 75,000 100,000 50,000 100,000 1,035,000

Sub-Total

$ $ $

90,000 50,000 140,000

TOTAL

$

1,175,000

Architectural Services Contingency Fund

Note: •

Cost estimate does not include financing costs.

Breslin Ridyard Fadero Architects - 31 -

Enrollment and Capacities

C.

UPPER PERKIOMEN HIGH SCHOOL (9-12) The High School currently has 921 students. It contains 33 classrooms, eight science labs, six computer rooms, two art rooms, one band room, one choral room, two industrial arts rooms, a large divisible gymnasium, an auxiliary gymnasium, an auditorium and audion, cafeteria, and various administration, guidance, and support facilities. Using PDE class size standards and a utilization factor of 0.85, the functional capacity of the High School is 1159 students. The Montgomery County Planning Commission predicts that enrollment at the High School will increase by 135 students in the next 5 years due to recent smaller sized classes graduating and being replaced by the currently above average sized grades between 3rd and 7th grade. They predict that the second five years will also show some growth but to a much lesser degree. In summary, the High School enrollment may increase to 1056 students in five years, but will be less than the functional capacity of 1159. Assuming there will be no change in the curriculum, the High School does not require any additional space at this time to accommodate increased enrollment. However, there is a security concern at the entrance to the school. Once a visitor is “buzzed” into the building, the visitor can roam free. An option for improved security would be to demolish the vestibule at the lobby entrance adjacent to the auditorium and audion. A new security booth with an enlarged “holding” vestibule could be constructed with vestibule doors that are electronically operated by the security personnel. The glass enclosed security booth could be equipped with a CCTV monitoring system. The glass enclosing the booth and the inner vestibule doors could be Level 3 bullet resistant glass. Drawing A-13 on the following page depicts this option. The estimated construction cost, excluding architectural services and equipment and financing costs, is approximately $400,000. Incorporating bullet resistant level 3 glass would add approximately $200,000; i.e., a total of $600,000.

Breslin Ridyard Fadero Architects - 32 -

Capital Improvement Program

The line item chart on the following pages presents a capital improvement program to upgrade each facility to current standards including necessary repairs over a 10 year period of time. The line item total estimated costs for the following facilities is as follows: Marlborough Elementary: $ 6,097,388 Hereford Elementary:

$ 2,572,246

Education Center:

$

Middle School:

$ 7,015,366

High School:

$ 13,519,571

969,708

Line item ratings are provided on a scale of 1 through 5 as follows: 1. Excellent Condition: Does not need to be addressed in the next 10 years 2. Very Good Condition: Does not need to be addressed in the next 5 years 3. Good Condition: Satisfactory for now, but should be budgeted for within the next 5 years 4. Poor Condition: Should be addressed within the next 3 years for repair or replacement 5. Critical Condition: Should addressed immediately

Breslin Ridyard Fadero Architects - 33 -

be

MARLBOROUGH ELEMENTARY SCHOOL

UPPER PERKIOMEN SCHOOL DISTRICT CAPITAL IMPROVEMENT PLAN CATEGORY S = SITE B = BUILDING ADA = ACCESSIBILITY LS = LIFE SAFETY P = PLUMBING H = HVAC E = ELECTRICAL

Item #

School

1 2 3 4 5

Marlborough Marlborough Marlborough Marlborough Marlborough

6

Marlborough

7

Marlborough

8 9 10 11

Marlborough Marlborough Marlborough Marlborough

12A

Marlborough

12B 13 14 15 16

Marlborough Marlborough Marlborough Marlborough Marlborough

17

Marlborough

18

Marlborough

19

Marlborough

20 21 22 23 24

Marlborough Marlborough Marlborough Marlborough Marlborough

25

Marlborough

26 27 28

Marlborough Marlborough Marlborough

PRIORITY 1 = Excellent Condition - Does not need to be addressed in the next 10 years 2 = Very Good Condition - Does not need to be addressed in the next 5 years 3 = Good Condition - Satisfactory for now, but should be budgeted for within the next 5 years 4 = Poor Condition - Should be addressed within the next 3 years for repair or replacement 5 = Critical Condition - Should be addressed immediately

Item Re-caulk window sills, windows, doors and expansion joints Replace standing seam curved metal roofs above library and entrance Replace standing seam metal roofs above the classroom wing Repoint brick pavers at entrance Replace dock bumpers Asphalt: Remove existing roadway and parking areas including 2 inches of the existing 8 inches of stone. Install 3” base course and 1 1/2” wearing surface. Asphalt: Remove existing asphalt and 8” stone base. Install 6” stone base, 3” base course and 1 1/2” wearing surface. Replace all water fountains to be ADA compliant Remove efflorescence on exterior brick trellis walls Replace portion of concrete curb Renovate gang toilet rooms to be ADA accessible Replace all door hardware with ADA compliant classroom lock sets. Standardize cores to one master key system. Replace wood doors (in conjunction with 12A) Repaint hollow metal door frames Repaint hollow metal doors and frames Provide ADA signage Repaint drywall and CMU wall & ceiling surfaces Change height of fire extinguisher cabinet to meet ADA height standards. Remove classroom carpet and replace with VCT Remove and replace classroom sinks and cabinets. Height and cabinets do not meet current ADA standards Remove classroom hold-open devices from doors with fire ratings Elevator does not meet current ADA standards Stairs: Install center rail to meet current reach standards Repaint stair railings Interior ramp: provide handrails Interior ramp: replace flooring with slip resistant flooring and provide safety strips Replace library, music room and administration’s carpet Gym: Repaint HVAC ducts Vertical chair lift to provide accessibility to the stage

34

1991

Category B B B S B

2016 Estimated Cost Including Unit 2016 Unit Cost Priority 20% Indirect (sf, lf, etc.) Costs 77,000 $ 0.20 $ 18,480.00 3 2,750 $ 56.00 $ 184,800.00 5 14,269 $ 40.00 $ 684,912.00 3 1 $ 1,000.00 $ 1,200.00 3 3 $ 345.00 $ 1,242.00 4

S

140,409

$

7.50

$ 1,263,681.00

4

S

11,784

$

8.00

$

113,126.40

4

ADA B S ADA

9 1 75 4

$ $ $ $

2,000.00 2,500.00 50.00 15,000.00

$ $ $ $

21,600.00 3,000.00 4,500.00 72,000.00

1 4 3 1

ADA

173

$

400.00

$

83,040.00

4

B B B ADA B

141 141 32 173 77,000

$ $ $ $ $

600.00 180.00 210.00 100.00 1.50

$ $ $ $ $

101,520.00 30,456.00 8,064.00 20,760.00 138,600.00

4 1 1 1 2

ADA

14

$

2,500.00

$

42,000.00

1

B

25,420

$

6.00

$

183,024.00

4

ADA

192

$

210.00

$

48,384.00

1

B LS LS B ADA

58 1 46 1 1

$ $ $ $ $

10.00 250,000.00 150.00 15,000.00 5,000.00

$ $ $ $ $

696.00 300,000.00 8,280.00 18,000.00 6,000.00

1 1 1 3 1

ADA

325

$

7.00

$

2,730.00

5

B B ADA

5,438 1 1

$ $ $

9.50 25,000.00 30,000.00

$ $ $

61,993.20 30,000.00 36,000.00

4 1 1

Comment

One (1) hour rated doors Two (2) stops

MARLBOROUGH ELEMENTARY SCHOOL

29

Marlborough

E

1

$

75,000.00

$

90,000.00

2

E

17

$

7,500.00

$

153,000.00

2

E

5

$

15,000.00

$

90,000.00

2

Marlborough

Replace switchboard Replace existing panelboards that remained during the recent renovations Replace transformers meeting current Department of Energy (DOE) efficiency requirements Provide new intercom/clock system

30

Marlborough

31

Marlborough

32

E

72,800

$

1.25

$

109,200.00

4

33

Marlborough

Replace data backbone to accommodate 10Gps speeds

E

1

$

20,000.00

$

24,000.00

3

34

Marlborough

E

72,800

$

3.50

$

305,760.00

3

Includes backbone replacement.

35 36

Marlborough Marlborough

E E

40 72,800

$ $

3,250.00 6.50

$ $

156,000.00 567,840.00

4 1

Price will depend on extent of system and building needs.

37

Marlborough

S/E

25

$

1,500.00

$

45,000.00

2

Only includes head replacement.

38 39

Marlborough Marlborough

Provide new data cabling throughout School and add air conditioning for data closets. Provide Closed Circuit TV (CCTV) System for security surveillance Replace T8 lighting with LED to achieve better energy efficiency Replace exterior Pole lighting with LED to achieve better energy efficiency Replace Multipurpose stage theatrical lighting system Replace Multipurpose stage sound system

E E

1 1

$ $

175,000.00 60,000.00

$ $

210,000.00 72,000.00

3 3

40

Marlborough

Replace existing air-cooled chiller

H

1

$

144,000.00

$

172,800.00

3

Only needed if used for performances Only needed if used for performances If an addition is added to this building the chller replacement costs would be part of the addition costs.

41A 41B 41C 41D

Marlborough Marlborough Marlborough Marlborough

Install fire protection sprinkler system Provide fire pump (If needed) Install new ceiling grid and acoustic panels in corridors Install new corridor light fixtures

P P B E

77,000 1 12,128 12,128

$ $ $ $

4.00 40,000.00 3.00 6.50

$ $ $ $

369,600.00 48,000.00 43,660.80 94,598.40

1 1 1 1

42

Marlborough

Provide classroom audible visual light fixture settings

E

40

$

750.00

$

36,000.00

1

43 44

Marlborough Marlborough

2nd Floor Toilet Room drain issues Replace stair light fixtures and install at ADA height

P ADA/E

1 4

$ $

15,000.00 800.00

$ $

18,000.00 3,840.00

5 1

$ 6,097,387.80 CATEGORY S = SITE B = BUILDING ADA = ACCESSIBILITY LS = LIFE SAFETY P = PLUMBING H = HVAC E = ELECTRICAL

PRIORITY 1 = Excellent Condition - Does not need to be addressed in the next 10 years 2 = Very Good Condition - Does not need to be addressed in the next 5 years 3 = Good Condition - Satisfactory for now, but should be budgeted for within the next 5 years 4 = Poor Condition - Should be addressed within the next 3 years for repair or replacement 5 = Critical Condition - Should be addressed immediately

35

1991

Panelboards are still in good condition; however, parts will become difficult to find.

Current system only capable of all-page. Horizontal wirring appears to be satisfactory for current needs, although limited. Do not include if data system upgraded.

Requirement if sprinkler system is installed. Would be done if sprinkler system is installed. Provide additional light switch in each classroom to control lighting.

HEREFORD ELEMENTARY SCHOOL UPPER PERKIOMEN SCHOOL DISTRICT CAPITAL IMPROVEMENT PLAN CATEGORY S = SITE B = BUILDING ADA = ACCESSIBILITY LS = LIFE SAFETY P = PLUMBING H = HVAC E = ELECTRICAL

Item # 1 2A 2B 3 4 5 6 7 8A 8B 9 10 11 12 13 14 15 16 17 18 19 20 21

School

PRIORITY 1 = Excellent Condition - Does not need to be addressed in the next 10 years 2 = Very Good Condition - Does not need to be addressed in the next 5 years 3 = Good Condition - Satisfactory for now, but should be budgeted for within the next 5 years 4 = Poor Condition - Should be addressed within the next 3 years for repair or replacement 5 = Critical Condition - Should be addressed immediately

Item

Hereford: Area C Plant low shrubs in unused planter Remove existing sidewalk and install sidewalk for radiant heat system Hereford: Area C/B to melt snow and ice Hereford: Area C/B Add hydronic snow melt system at new sidewalk Hereford: Area A Repair canopy columns at entrance Hereford: Area A Replace round roof above LGI Powerwash brick and thru-wall flashing at (3) courtyard planters. Hereford: Area A/B Repoint as required. Hereford: Area A/B Replace deteriorating courtyard paving with patterned concrete Replace all door hardware with ADA compliant classroom lock sets. Hereford A/B Standardize cores to one master key system. Asbestos abatement of adhesive mastic behind chalkboards/tack Hereford boards Hereford: Area A/B Replace Chalk Boards/Tack Boards Hereford: Area A/B Repaint drywall and CMU wall & ceiling surfaces throughout Remove and replace the library’s acoustical light well fascia material Hereford: Area B with drywall. Install new acoustical panels on the fascia. Replace existing grid with grid with acoustical panels. Hereford: Area B Replace Computer Room ceiling tiles Replace classroom pyramid ceiling system with new grid and acoustical Hereford: Area B panels Replace existing switchboard that remained during the recent Hereford renovations Replace existing panel boards that remained during the recent Hereford renovations Hereford Provide new intercom/clock system Hereford Replace data backbone to accommodate 10Gps speeds Hereford Provide Closed Circuit TV (CCTV) System for security surveillance Hereford Replace T8 lighting with LED to achieve better energy efficiency Replace exterior Pole lighting with LED to achieve better energy Hereford efficiency Hereford Replace LGI stage theatrical lighting system Hereford Replace LGI stage sound system

36

Unit Category (sf, lf, etc.)

2016 Unit Cost

2016 Estimated Cost Including 20% Indirect Costs $ 4,896.00

Priority

Comment

S

680

$

6.00

4

S/E

1,000

$

12.00

$

14,400.00

3

P

1

$

21,000.00

$

25,200.00

3

B

10

$

2,500.00

$

30,000.00

3

B

2,000

$

22.00

$

52,800.00

4

B

180

$

20.00

$

4,320.00

4

S

2,072

$

15.00

$

37,296.00

2

ADA

97

$

400.00

$

46,560.00

3

B

52

$

537.00

$

33,508.80

1

B B

52 63,600

$ $

1,000.00 1.50

$ $

62,400.00 114,480.00

1 1

B

1

$

12,000.00

$

14,400.00

2

B

1,450

$

3.00

$

5,220.00

3

B

9,000

$

3.50

$

37,800.00

3

E

1

$

50,000.00

$

60,000.00

4

E

1

$

150,000.00

$

180,000.00

4

E E E E

92,000 1 40 92,000

$ $ $ $

1.25 20,000.00 3,250.00 6.50

$ $ $ $

138,000.00 24,000.00 156,000.00 717,600.00

3 3 4 1

Horizontal wiring appears to be satisfactory, although limited Price will depend on extent of system and building needs.

E

25

$

1,500.00

$

45,000.00

2

Only includes head replacement.

E E

1 1

$ $

175,000.00 60,000.00

$ $

210,000.00 72,000.00

3 3

Only needed if used for performances Only needed if used for performances

In lieu of a hydronic snow melt system, an electric system would cost $9,750.00 with an approximate life expectancy of ten (10) years. Deterioration below the sidewalk cannot be estimated at this time.

See abatement report.

HEREFORD ELEMENTARY SCHOOL

22

Hereford

23A

Hereford A/B

23B 23C 23D

Currently there is only one pump and if that pump fails the domestic water pressure will be inadequate. The purchase of an additional spare pump would limit the time needed to replace the existing pump The 2008 additions are sprinklered. The other areas are not sprinklered.

Purchase spare domestic water pressure pump

P

1

$

12,000.00

$

14,400.00

3

Install fire protection sprinkler system

P

63,600

$

4.00

$

305,280.00

1

Hereford Hereford

Provide fire pump (If needed) Install new ceiling grid and acoustic panels in corridors

P B

1 10,411

$ $

40,000.00 3.00

Requirement if sprinkler system is installed.

Install new corridor light fixtures

E

10,411

$

6.50

48,000.00 37,479.60 81,205.80

1 1

Hereford

$ $ $

1

Would be done if sprinkler system is installed.

$

2,572,246.20

CATEGORY S = SITE B = BUILDING ADA = ACCESSIBILITY LS = LIFE SAFETY P = PLUMBING H = HVAC E = ELECTRICAL

PRIORITY 1 = Excellent Condition - Does not need to be addressed in the next 10 years 2 = Very Good Condition - Does not need to be addressed in the next 5 years 3 = Good Condition - Satisfactory for now, but should be budgeted for within the next 5 years 4 = Poor Condition - Should be addressed within the next 3 years for repair or replacement 5 = Critical Condition - Should be addressed immediately

37

EDUCATION CENTER UPPER PERKIOMEN SCHOOL DISTRICT CAPITAL IMPROVEMENT PLAN CATEGORY S = SITE B = BUILDING ADA = ACCESSIBILITY LS = LIFE SAFETY P = PLUMBING H = HVAC E = ELECTRICAL

ITEM # 1 2 3 4 5 6 7 8 9 10 11 12A 12B 13 14

SCHOOL

PRIORITY 1 = Excellent Condition - Does not need to be addressed in the next 10 years 2 = Very Good Condition - Does not need to be addressed in the next 5 years 3 = Good Condition - Satisfactory for now, but should be budgeted for within the next 5 years 4 = Poor Condition - Should be addressed within the next 3 years for repair or replacement 5 = Critical Condition - Should be addressed immediately

ITEM

Ed Center: Area A Repair spalling at exterior concrete steps Ed Center: Area A Clean efflorescence showing on exterior CMU at stair. Ed Center: Area B Repair metal soffits coming off of their supporting structure. Remove and install new expandable caulking and weeps at exterior Ed Center: Area A site walls with limestone caps. Remove moss growing on north side pilasters. Repoint and repaint Ed Center: Area B pilasters. Ed Center Add a Trellis Sun-screen to south & west facing office windows Ed Center Replace older panelboards Ed Center Replace T8 lighting with LED to achieve better energy efficiency Replace exterior pole lighting with LED to provide more uniform Ed Center lighting. Ed Center Install a permanent generator and distribution system Ed Center Replace concrete sidewalks at selected locations Ed Center Add insulated return air ductwork Ed Center Remove and reinstall acoustical panels and new metal grid Ed Center Upgrade security camera system by adding 10 cameras Ed Center Replace existing Aaon Air-handling Unit

38

Unit Category (sf, lf, etc.)

2016 Estimated Cost Including 20% Indirect Costs 2,500.00 $ 3,000.00 1,000.00 $ 1,200.00 1,200.00 $ 1,440.00

2016 Unit Cost

Priority

B B B

1 1 1

$ $ $

B

108

$

120.00 $

15,552.00

4

B

9

$

1,600.00 $

17,280.00

4

B E E

153 1 32,000

$ $ $

160.00 $ 25,000.00 $ 6.50 $

29,376.00 30,000.00 249,600.00

4 2 1

E

1

$

60,000.00 $

72,000.00

3

B S H B E H

1 2,600 1 8,750 10 1

$ $ $ $ $ $

120,000.00 37,440.00 151,920.00 31,500.00 39,000.00 170,400.00 969,708.00

3 3 4 4 3 3

100,000.00 12.00 126,600.00 3.00 3,250.00 142,000.00

$ $ $ $ $ $ $

2 2 5

Comment

MIDDLE SCHOOL UPPER PERKIOMEN SCHOOL DISTRICT CAPITAL IMPROVEMENT PLAN CATEGORY S = SITE B = BUILDING ADA = ACCESSIBILITY LS = LIFE SAFETY P = PLUMBING H = HVAC E = ELECTRICAL

Item #

School

1

MS: AREA A

2

MS: AREA A

3

MS: AREA A

4 5 6 7 8 9 10 11 12 13

MS: AREA A MS: AREA A MS: AREA A MS: AREA A MS: AREA A MS: AREA A MIDDLE SCHOOL MS: AREA A MS: AREA A MIDDLE SCHOOL

14

MIDDLE SCHOOL

15

MIDDLE SCHOOL

16 17 18

MS: AREA A MS: AREA A MS: AREA A

19

MS: AREA A

20 21 22 23 24

MS: AREA A MS: AREA A MS: AREA A MS: AREA A MS: AREA A

25

MS: AREA B

26 27

MS: AREA B MS: AREA B

28

MS: AREA B

29

MS: AREA B

PRIORITY 1 = Excellent Condition - Does not need to be addressed in the next 10 years 2 = Very Good Condition - Does not need to be addressed in the next 5 years 3 = Good Condition - Satisfactory for now, but should be budgeted for within the next 5 years 4 = Poor Condition - Should be addressed within the next 3 years for repair or replacement 5 = Critical Condition - Should be addressed immediately

Item Provide secure visitor entrance to Administration Suite per concept in Scheme D Renovate Auditorium with new ceiling, fixed seating and miscellaneous renovations Repair, replace and repoint exterior brick as required. Replace precast concrete coping @ H/C ramp with limestone due to coping deterioration. Replace cracked precast concrete sills. Replace exterior concrete stair at entrance Clean exterior concrete walls at main entrance Replace wood loading dock with a concrete loading dock Replace shingles on loading dock canopy Canopy roof refurbishment at the stair near the boy’s locker room Repair metal gutter at the auditorium roof Entrance Doors: Replace weatherstripping Re-caulk window sills, doors and expansion joints Touch up paint of interior door frames Replace sagging and water stained ceiling tiles - various locations Replace student corridor lockers with wider lockers (double high - 15” wide x 15” deep x 72” tall) Install additional 120 student lockers (double high - 15” wide x 15” deep x 72” tall) Repaint drywall and CMU wall & ceiling surfaces Replace VCT in science classrooms Replace carpet in Library and Administration with carpet tile Build one (1) hour partitions for Art Room Storage (over 100 SF), doors and ceilings to replace existing Reconfigure access to wheelchair lift to improve clearances Art Room: Replace casework Office kitchenette: Replace casework 2nd floor toilet room: Add ADA mirror FCS: Replace ovens / cooktops units Remove Dark Room casework and plumbing. Patch and paint walls. New Floor finishes. Repaint science casework Replace science classroom acoustical ceiling panels Two (2) 6th Grade Science Classrooms: Install (30) LF of base cabinets with epoxy resin countertops in each classroom Replace floor finishes at H/C ramp. Floor finish to be slip resistant.

39

Unit Category (sf, lf, etc.)

2016 Unit Cost

2016 Estimated Cost Including 20% Indirect Costs

Priority

LS

1

$

400,000.00

$

480,000.00

5

B

1

$

675,000.00

$

810,000.00

4

S

1

$

90,000.00

$

108,000.00

4

S B B B B B B B B B

336 1 224 428 33 1 27 140,000 1 1

$ $ $ $ $ $ $ $ $ $

30.00 2,000.00 60.00 7.00 80.00 500.00 210.00 0.20 15,000.00 20,000.00

$ $ $ $ $ $ $ $ $ $

12,096.00 2,400.00 16,128.00 3,595.20 3,168.00 600.00 6,804.00 33,600.00 18,000.00 24,000.00

4 2 3 4 4 5 4 5 1 2

B

780

$

550.00

$

514,800.00

4

B

120

$

475.00

$

68,400.00

4

B B B

140,000 2,200 6,258

$ $ $

1.50 5.00 9.00

$ $ $

252,000.00 13,200.00 67,586.40

1 3 4

LS

500

$

25.00

$

15,000.00

5

ADA B B ADA B

1 44 3 1 3

$ $ $ $ $

15,000.00 300.00 200.00 500.00 1,000.00

$ $ $ $ $

18,000.00 15,840.00 720.00 600.00 3,600.00

2 1 1 2 2

B

106

$

110.00

$

13,992.00

1

B B

91 2,171

$ $

70.00 3.00

$ $

7,644.00 7,815.60

2 2

B

60

$

600.00

$

43,200.00

3

ADA

188

$

7.50

$

1,692.00

5

Comment

See MS Conceptual Cost Options

Reuse existing railings

MIDDLE SCHOOL

30A

MS: AREA A

30B

MS: AREA A

31A

MS: AREA A

31B MS: AREA A 32 MS: AREA B 33 MIDDLE SCHOOL 34 MS: AREA B 35 MS: AREA B 36 MS: AREA B

Asbestos abatement of vinyl asbestos floor tile and mastic at First Floor shop office Install VCT at First Floor shop office Asbestos abatement of vinyl asbestos floor tile and mastic at Second Floor classrooms, offices & auditorium Install VCT at Second Floor classrooms, offices & auditorium Repair corner bead of drywall bulkhead above corridor steps Replace all Drinking fountains to be ADA compliant Main Gym: Replace bleachers Main Gym: Repair floor depression Auxiliary Gym: Replace Doors Replace existing older Normal Emergency Hybrid Backup (NEHB) panelboards that are no longer supported Replace T8 lighting with LED to achieve better energy efficiency Replace exterior pole lighting with LED to achieve better energy efficiency Replace the theatrical lighting system in the auditorium Replace the sound system and A/V equipment and connections in the auditorium Replace sound system in Gymnasium Add an exhaust systems in two Science Classrooms Add security cameras Replace pneumatic controls on the HVAC equipment that was not replaced during the 2009 renovations, with electronic controls

B

400

$

4.00

$

1,920.00

1

B

400

$

3.50

$

1,680.00

1

B

11,400

$

4.00

$

54,720.00

1

B B ADA B B B

11,400 1 12 876 1 2

$ $ $ $ $ $

3.50 800.00 2,000.00 275.00 20,000.00 2,000.00

$ $ $ $ $ $

47,880.00 960.00 28,800.00 289,080.00 24,000.00 4,800.00

1 3 1 2 1 3

E

5

$

7,500.00

$

45,000.00

1

E

140,000

$

6.50

$

1,092,000.00

1

E

13

$

1,500.00

$

23,400.00

2

E

1

$

250,000.00

$

300,000.00

3

E

1

$

110,000.00

$

132,000.00

3

E H E

1 2 10

$ $ $

40,000.00 38,000.00 3,250.00

$ $ $

48,000.00 91,200.00 39,000.00

3 4

H

1

$

110,000.00

$

132,000.00

3

See abatement report.

See abatement report.

Bleacher parts are discontinued. ($222/seat new)

Panelboards are still in good condition; however, parts will become difficult to find.

37

MIDDLE SCHOOL

38

MIDDLE SCHOOL

39

MIDDLE SCHOOL

40

MIDDLE SCHOOL

41

MS: AREA A

42 43 44

MS: AREA A MIDDLE SCHOOL MIDDLE SCHOOL

45

MIDDLE SCHOOL

46

Replace existing mechanical equipment that was not replaced in the MIDDLE SCHOOL 2008 renovations

H

1

$

215,000.00

$

258,000.00

4

MIDDLE SCHOOL MIDDLE SCHOOL MIDDLE SCHOOL MIDDLE SCHOOL

P P B E

140,000 1 20,425 20,425

$ $ $ $

4.00 40,000.00 3.00 6.50

$ $ $ $

672,000.00 48,000.00 73,530.00 159,315.00

1 1 1 1

Requirement if sprinkler system is installed. Would be done if sprinkler system is installed.

P

100

$

7,200.00

$

864,000.00

1

See abatement report.

P

100

$

120.00

$

14,400.00

1

B

100

$

60.00

$

7,200.00

1

E

8

$

3,250.00

$ $

31,200.00 7,015,366.20

3

47A 47B 47C 47D

48A MIDDLE SCHOOL 48B MIDDLE SCHOOL 48C MIDDLE SCHOOL 49

MIDDLE SCHOOL

CATEGORY S = SITE B = BUILDING ADA = ACCESSIBILITY LS = LIFE SAFETY P = PLUMBING H = HVAC E = ELECTRICAL

Install fire protection sprinkler system Provide fire pump (If needed) Install new ceiling grid and acoustic panels in corridors Install new corridor light fixtures Asbestos abatement of pipe fitting insulation at crawlspace and pipe tunnel Install pipe fitting insulation at crawlspace and pipe tunnel Asbestos abatement of asbestos-containing debris from Crawlspace & Pipe Tunnel. Install additional Closed Circuit TV (CCTV) cameras

PRIORITY 1 = Excellent Condition - Does not need to be addressed in the next 10 years 2 = Very Good Condition - Does not need to be addressed in the next 5 years 3 = Good Condition - Satisfactory for now, but should be budgeted for within the next 5 years 4 = Poor Condition - Should be addressed within the next 3 years for repair or replacement 5 = Critical Condition - Should be addressed immediately

40

Only includes head replacement.

If this work proceeds the cost of replacing pneumatic controls on the HVAC equipment that was not replaced during the 2009 renovations, with electronic controls will be reduced to $75,000.00 including indirect costs.

See abatement report.

HIGH SCHOOL

UPPER PERKIOMEN SCHOOL DISTRICT CAPITAL IMPROVEMENT PLAN PRIORITY S

= SITE

1 = Excellent Condition - Does not need to be addressed in the next 10 years

B

= BUILDING

2 = Very Good Condition - Does not need to be addressed in the next 5 years

ADA = ACCESSIBILITY

3 = Good Condition - Satisfactory for now, but should be budgeted for within the next 5 years

LS

= LIFE SAFETY

4 = Poor Condition - Should be addressed within the next 3 years for repair or replacement

P

= PLUMBING

5 = Critical Condition - Should be addressed immediately

H

= HVAC

E

= ELECTRICAL

Item #

School

Item

1 2 3 4

HS: AREA A HS: AREA A HIGH SCHOOL HIGH SCHOOL

5

HIGH SCHOOL

6A

HIGH SCHOOL

6B

HIGH SCHOOL

7

HS: AREA A

8

HS: AREA A

9

HS: AREA A

10 11

HS: AREA A HIGH SCHOOL

12A

HS: AREA A

12B

HS: AREA A

13A

HS: AREA A

13B

HS: AREA A

14 15

HS: AREA A HIGH SCHOOL

16

HIGH SCHOOL

17 18

HIGH SCHOOL HS: A/B

19

HS: AREA A

20

HS: AREA A

21

HS: AREA A

22

HS: AREA A

Add a secure entrance into the building at the auditorium lobby Level 3 bullet resistant glass in new security entrance Concrete sidewalk replacement @ the front of the school Pave existing stone access road Asphalt: mill existing wearing course and place new 1 1/2” thick wearing course to existing binder course Replace windows containing asbestos glazing throughout the building, except at the Cafeteria, Library and the 400 Wing. Replace caulking around windows and at expansion joints Replace all brick at front entrance canopy and curved walls. Utilize 6” limestone coping at curve detail. Repair student drop-off canopy. Paint to match existing Roof repairs (Minor) - upper penthouse roof above classrooms and roof above and classrooms Roof replacement above auditorium Entrance Doors: Replace weatherstripping at all entrance doors Abate asbestos floor tile in stair towers, nurse suite, music suite and classrooms Install VCT in stair towers, nurse suite, music suite and classrooms. Abate asbestos floor tile in rooms 108, 109, 111, 112, 114, 201, 206, 210, 212, and main office vault Install VCT in rooms 108, 109, 111, 112, 114, 201, 206, 210, 212, and main office vault Replace carpet in Administration and Guidance spaces with carpet tile Touch paint hollow metal door frames Replace discolored and sagging acoustic panel ceiling tiles in classrooms. Repaint drywall and cmu wall & ceiling surfaces Replace non-ADA compliant door hardware with classroom lock sets. Replace vinyl wall covering in corridors and cafeteria with ceramic wall tile Remove vinyl wall covering in facility lounge. Paint. Replace stair fire doors and hardware with hold open devices to reduce maintenance and improve student traffic flow Paint stair guardrails

41

Category

Unit (sf, lf, etc.)

2016 Unit Cost

B B S S

1 1 16,000 16,255

$ 400,000.00 $ 200,000.00 $ 12.00 $ 6.00

2016 Estimated Cost Including Priority 20% Indirect Costs $ 480,000.00 5 $ 240,000.00 5 $ 230,400.00 5 $ 117,036.00 1

S

346,674

$

1.75

$

728,015.40

4

B

133,000

$

0.50

$

79,800.00

1

B

188,000

$

0.20

$

45,120.00

3

B

1,046

$

400.00

$

502,080.00

5

B

150

$

30.00

$

5,400.00

1

B

21,000

$

9.00

$

226,800.00

3

B B

10,300 21

$ $

18.00 400.00

$ $

222,480.00 10,080.00

4 5

B

24,650

$

4.00

$

118,320.00

1

24,650

$

3.50

$

103,530.00

1

7,180

$

4.00

$

34,464.00

1

7,180

$

3.50

$

30,156.00

1

B B

3,226 229

$ $

8.00 180.00

$ $

30,969.60 49,464.00

5 1

B

126,000

$

1.50

$

226,800.00

3

B ADA

188,000 200

$ $

1.50 400.00

$ $

338,400.00 96,000.00

1 4

B

6,138

$

10.00

$

73,656.00

3

B

600

$

5.50

$

3,960.00

3

B

14

$

10,000.00

$

168,000.00

2

B

150

$

150.00

$

27,000.00

2

B

Comment

See abatement report.

See abatement report.

HIGH SCHOOL

23

HS: AREA A

24

HIGH SCHOOL

25

HS: AREA A

26 27 28A 28B 28C 29 30 31 32 33 34 35 36 37 38

HS: AREA A HS: AREA A HS: A/B HS: AREA A HS: AREA A HS: AREA B HS: AREA B HS: AREA B HS: AREA C HIGH SCHOOL HIGH SCHOOL HIGH SCHOOL HIGH SCHOOL HIGH SCHOOL HIGH SCHOOL

39

HIGH SCHOOL

40 41

HIGH SCHOOL HS: AREA A

42A

HIGH SCHOOL

42B

HIGH SCHOOL

43B 43C 43D

HIGH SCHOOL HIGH SCHOOL HIGH SCHOOL

44

HIGH SCHOOL

45

HIGH SCHOOL

46

HIGH SCHOOL

47

HS: AREA C

48

HIGH SCHOOL

Replace wood handrails with 1.5” dia aluminum handrails Abate laboratory table top in 115, 200 Wing Science Classrooms. Install new laboratory table tops Auditorium: Replace theatrical lighting, including stage lighting, tormentors and front of house Auditorium: Electric height control system of light bars on stage Connect Auditorium house lights control into the Control Booth Replace carpet in the Library with carpet tile Renovate Library into Collaborative 21st Century learning spaces Replace library furniture Re-grout pool tile Replace broken glass block in Natatorium Add ceiling sound absorbing panels in Natatorium to control acoustics Replace VCT in all 400 series classrooms Replace switchboards w/ new homogeneous unit Replace panelboards installed during the 1993 addition and before Replace transformers to meet current DOE efficiency requirements Provide new intercom/clock system Replace data backbone to accommodate 10Gps speeds Replace T8 lighting with LED to achieve better energy efficiency

ADA

300

$

250.00

$

90,000.00

1

B

2,100

$

70.00

$

176,400.00

1

E

1

$ 325,000.00

$

390,000.00

3

E E B B B B B B R E E E E E E

1 1 5,733 5,733 250 1,500 1 1 16,000 1 1 1 225,000 1 225,000

$ 90,000.00 $ 19,000.00 $ 9.00 $ 40.00 $ 625.00 $ 5.00 $ 500.00 $ 30,000.00 $ 5.00 $ 150,000.00 $ 337,500.00 $ 100,000.00 $ 1.25 $ 60,000.00 $ 6.50

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $

108,000.00 22,800.00 61,916.40 275,184.00 187,500.00 9,000.00 600.00 36,000.00 96,000.00 180,000.00 405,000.00 120,000.00 337,500.00 72,000.00 1,755,000.00

3 3 5 5 5 4 5 1 3 4 4 3 3 3 1

E

22

$

7,500.00

$

198,000.00

2

Install new corridor light fixtures Replace stair lighting with LED fixtures Remove asbestos containing sprayed-on structural fireproofing above ceilings in 106, 107, 108, 110 and corridor between gymnasium and natatorium New Sprayed-on Structural Fireproofing above ceilings in 106, 107, 108, 110 and Corridor between Gymnasium and Natatorium Install fire protection sprinkler system Provide fire pump (If needed) Install new ceiling grid and acoustic panels in corridors Abate pipe fitting insulation above ceilings in rooms and hallways, and bathroom chases and wall chases Abate pipe fitting insulation in Maintenance Garage, Women's and Men's Restrooms Replace existing geothermal HVAC systems with variable air volume systems in classroom areas and single zone systems in larger areas. Rooftop air handling unit will be used and comprised of either chilled water or DX cooling.

E E

33,500 10

$ $

6.50 7,500.00

$ $

261,300.00 90,000.00

1 1

B

2,680

$

10.00

$

32,160.00

1

See abatement report. Does not include Ceiling Replacement cost.

B

2,680

$

2.50

$

8,040.00

1

See abatement report. Does not include Ceiling Replacement cost.

P P B

188,000 1 33,500

$ $ $

4.00 40,000.00 3.00

$ $ $

902,400.00 48,000.00 120,600.00

1 1 1

Requirement if sprinkler system is installed.

P

430

$

20.00

$

10,320.00

1

See abatement report.

P

30

$

20.00

$

720.00

1

See abatement report.

H

1

$ 1,950,000.00

$

2,340,000.00

3

Modify HVAC system to control excess moisture.

H

1

$

38,000.00

$

45,600.00

5

Replace existing air handling system currently serving the Stage area of the Auditorium to eliminate excessive noise.

H

1

$

85,000.00

$

102,000.00

3

Replace parking pole lighting with LED to achieve better energy efficiency and uniformity. Rewire back to the building.

42

See abatement report.

Every 3 years

Includes replacement of panels and feeders Current system only functions as all-page Horizontal wirring appears to be satisfactory, although limited. Includes new poles and heads at new locations. Lots appear to not meet current IESNA recommended light levels and uniformity recommendations. Would be done if sprinkler system is installed.

Moisture is an issue in the lower floor level. This item would be covered if the geothermal HVAC system is replaced as indicated above.

HIGH SCHOOL

49

HIGH SCHOOL

50 51

HS: AREA A HIGH SCHOOL

52

HS: AREA A

Add Dehumidification system in Pool Area by replacing the existing air handling unit. Lift station overhaul Replace existing pneumatic controls Replace ramp flooring with non-slip surface

PRIORITY S

= SITE

1 = Excellent Condition - Does not need to be addressed in the next 10 years

B

= BUILDING

2 = Very Good Condition - Does not need to be addressed in the next 5 years

ADA = ACCESSIBILITY

3 = Good Condition - Satisfactory for now, but should be budgeted for within the next 5 years

LS

= LIFE SAFETY

4 = Poor Condition - Should be addressed within the next 3 years for repair or replacement

P

= PLUMBING

5 = Critical Condition - Should be addressed immediately

H

= HVAC

E

= ELECTRICAL

43

H

1

$ 280,000.00

$

336,000.00

4

P H

1 1

$ 18,000.00 $ 410,000.00

1

$

21,600.00 492,000.00 840.00

4 3

B

$ $ $ $

13,519,571.40

700.00

4

Appendix

The Pennsylvania Department of Education (PDE) PlanCon forms A07 and A08 indicating functional capacity calculations are included on the following pages for each of the District’s schools: Marlborough Elementary School Hereford Elementary School Upper Perkiomen Middle School Upper Perkiomen High School

Breslin Ridyard Fadero Architects - 44 -

Appendix

ELEMENTARY BUILDING CAPACITY District/CTC:

Project Name:

Upper Perkiomen School District

Grades:

District-Wide Feasibility Study Marlborough Elementary

SCHOOL: PRESENT #1

#2

PLANNED

#3

#4

UNIT FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

HALF-TIME KINDRGRTN

44

2

FULL-TIME KINDRGRTN

15

2

REG CLSRM 660+ SQ FT (Grades 1-2)

23

REG CLSRM 660+ SQ FT (Grades 3-5)

25

NAME OF SPACE

K

PRESENT

#5

#6

NUMBER OF UNITS

TOTAL FTE CAP

- 12

Hereford Elementary

SCHOOL:

PLANNED

#3

#4

#5

NUMBER OF UNITS

TOTAL FTE CAP

#6

NUMBER OF UNITS

TOTAL FTE CAP

88

3

132

30

2

30

11

253

13

299

14

350

16

400

XXXXXX

721

XXXXXX

861

XXXXXX

SPECIAL ED CLASSROOMS OTHER: BUILDING TOTAL

XX

XXXXXX

SCHOOL:

SCHOOL:

PRESENT #1

NAME OF SPACE

PLANNED

PRESENT

PLANNED

#2

#3

#4

#5

#6

#3

#4

#5

#6

UNIT FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

HALF-TIME KINDRGRTN

50

FULL-TIME KINDRGRTN

25

REG CLSRM 660+ SQ FT (Grades 1-2)

23

REG CLSRM 660+ SQ FT (Grades 3-5)

25

SPECIAL ED CLASSROOMS OTHER: BUILDING TOTAL

XX

XXXXXX

XXXXXX

XXXXXX

SCHOOL: PRESENT #1

NAME OF SPACE

XXXXXX

SCHOOL: PLANNED

PRESENT

PLANNED

#2

#3

#4

#5

#6

#3

#4

#5

#6

UNIT FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

HALF-TIME KINDRGRTN

50

FULL-TIME KINDRGRTN

25

REG CLSRM 660+ SQ FT (Grades 1-2)

23

REG CLSRM 660+ SQ FT (Grades 3-5)

25

SPECIAL ED CLASSROOMS OTHER: BUILDING TOTAL

XX

XXXXXX

XXXXXX

XXXXXX

SCHOOL: PRESENT #1

#2 UNIT FTE CAP

NAME OF SPACE

HALF-TIME KINDRGRTN

50

FULL-TIME KINDRGRTN

25

REG CLSRM 660+ SQ FT (Grades 1-2)

23

REG CLSRM 660+ SQ FT (Grades 3-5)

25

XXXXXX

SCHOOL: PLANNED

#3

#4

NUMBER OF UNITS

TOTAL FTE CAP

PRESENT

#5

#6

NUMBER OF UNITS

TOTAL FTE CAP

PLANNED

#3

#4

NUMBER OF UNITS

TOTAL FTE CAP

#5

#6

NUMBER OF UNITS

TOTAL FTE CAP

SPECIAL ED CLASSROOMS OTHER: BUILDING TOTAL

XX

XXXXXX

XXXXXX

XXXXXX

XXXXXX

Only kindergarten and regular classrooms 660 square feet or greater should be reported. Although special education rooms and pre-school rooms may be eligible for capacity, these spaces should not be included in the room counts reported above. The following spaces do not receive reimbursable capacity and therefore should not be included in the capacities for an elementary school building: science labs, computer rooms, art rooms, music rooms, small and large group instruction rooms, and multi-purpose rooms.

REVISED JULY 1, 2010

FORM EXPIRES 6-30-12

Breslin Ridyard Fadero Architects - 45 -

PLANCON-A07

Appendix

MIDDLE/SECONDARY BUILDING CAPACITY District/CTC:

Project Name:

Upper Perkiomen School District

Grades:

District-Wide Feasibility Study

SCHOOL:

Middle School

K

-

12

SCHOOL:

PRESENT

PLANNED

PRESENT

PLANNED

#1

#2

#3

#4

#5

#6

#3

#4

#5

#6

NAME OF SPACE

UNIT FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

25 25 20 20 20 25 20 20 20 20 25 25 25 25 20 20 20 20 20 66 33 10

26

650

4

80

2

40

2

40

1

25

1

25

1

25

1

20

1

20

1.0

66

1

33

XXXXXX XXXXXX

1,024

REG CLSRM 660+ SQ FT SCIENCE CLSRM 660+ SQ FT SCIENCE LAB 660+ SQ FT PLANETARIUM W/CLSRM 660+ SQ FT ALTERNATIVE ED ROOM 660+ SQ FT BUSINESS CLSRM 660+ SQ FT BUSINESS LAB 660+ SQ FT COMPUTER LAB 660+ SQ FT TV INSTRUCTIONAL STUDIO 660+ SQ FT ART CLASSROOM 660+ SQ FT MUSIC CLASSROOM 660+ SQ FT BAND ROOM 660+ SQ FT ORCHESTRA ROOM 660+ SQ FT CHORAL ROOM 660+ SQ FT FAMILY/CONSMR SCIENCE 660+ SQ FT IA/SHOP 1800+ SQ FT TECH ED 1800+ SQ FT VO AG SHOP W/CLSRM 660+ SQ FT DRIVER'S ED 660+ SQ FT GYM 6500-7500 SQ FT AUX GYM 2500 SQ FT OTHER: Life Skills OTHER: BUILDING TOTAL MS/SEC UTILIZATION (BLDG TOTAL X .75)

XXX XXX

768

XXXXXX XXXXXX

XXXXX XXXXX

SCHOOL:

XXXXXX XXXXXX

SCHOOL:

PRESENT

PLANNED

PRESENT

PLANNED

#1

#2

#3

#4

#5

#6

#3

#4

#5

#6

NAME OF SPACE

UNIT FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

REG CLSRM 660+ SQ FT SCIENCE CLSRM 660+ SQ FT SCIENCE LAB 660+ SQ FT PLANETARIUM W/CLSRM 660+ SQ FT ALTERNATIVE ED ROOM 660+ SQ FT BUSINESS CLSRM 660+ SQ FT BUSINESS LAB 660+ SQ FT COMPUTER LAB 660+ SQ FT TV INSTRUCTIONAL STUDIO 660+ SQ FT ART CLASSROOM 660+ SQ FT MUSIC CLASSROOM 660+ SQ FT BAND ROOM 660+ SQ FT ORCHESTRA ROOM 660+ SQ FT CHORAL ROOM 660+ SQ FT FAMILY/CONSMR SCIENCE 660+ SQ FT IA/SHOP 1800+ SQ FT TECH ED 1800+ SQ FT VO AG SHOP W/CLSRM 660+ SQ FT DRIVER'S ED 660+ SQ FT GYM 6500-7500 SQ FT AUX GYM 2500 SQ FT OTHER:

25 25 20 20 20 25 20 20 20 20 25 25 25 25 20 20 20 20 20 66 33

OTHER: BUILDING TOTAL MS/SEC UTILIZATION (BLDG TOTAL X .9)

REVISED JULY 1, 2010

XXX XXX

XXXXXX XXXXXX

XXXXXX XXXXXX FORM EXPIRES 6-30-12

Breslin Ridyard Fadero Architects - 46 -

XXXXX XXXXX

XXXXXX XXXXXX PLANCON-A08

Appendix

MIDDLE/SECONDARY BUILDING CAPACITY District/CTC:

Project Name:

Upper Perkiomen School District

Grades:

District-Wide Feasibility Study

SCHOOL:

High School

K

-

12

SCHOOL:

PRESENT

PLANNED

PRESENT

PLANNED

#1

#2

#3

#4

#5

#6

#3

#4

#5

#6

NAME OF SPACE

UNIT FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

25 25 20 20 20 25 20 20 20 20 25 25 25 25 20 20 20 20 20 66 33 10

33

825

8

160

6

120

1

20

2

40

1

25

1

25

2

40

1.0

66

1 1

33 10

XXXXXX XXXXXX

1,364

REG CLSRM 660+ SQ FT SCIENCE CLSRM 660+ SQ FT SCIENCE LAB 660+ SQ FT PLANETARIUM W/CLSRM 660+ SQ FT ALTERNATIVE ED ROOM 660+ SQ FT BUSINESS CLSRM 660+ SQ FT BUSINESS LAB 660+ SQ FT COMPUTER LAB 660+ SQ FT TV INSTRUCTIONAL STUDIO 660+ SQ FT ART CLASSROOM 660+ SQ FT MUSIC CLASSROOM 660+ SQ FT BAND ROOM 660+ SQ FT ORCHESTRA ROOM 660+ SQ FT CHORAL ROOM 660+ SQ FT FAMILY/CONSMR SCIENCE 660+ SQ FT IA/SHOP 1800+ SQ FT TECH ED 1800+ SQ FT VO AG SHOP W/CLSRM 660+ SQ FT DRIVER'S ED 660+ SQ FT GYM 6500-7500 SQ FT AUX GYM 2500 SQ FT OTHER: Life Skills OTHER: BUILDING TOTAL MS/SEC UTILIZATION (BLDG TOTAL X .85)

XXX XXX

1,159

XXXXXX XXXXXX

XXXXX XXXXX

SCHOOL:

XXXXXX XXXXXX

SCHOOL:

PRESENT

PLANNED

PRESENT

PLANNED

#1

#2

#3

#4

#5

#6

#3

#4

#5

#6

NAME OF SPACE

UNIT FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

NUMBER OF UNITS

TOTAL FTE CAP

REG CLSRM 660+ SQ FT SCIENCE CLSRM 660+ SQ FT SCIENCE LAB 660+ SQ FT PLANETARIUM W/CLSRM 660+ SQ FT ALTERNATIVE ED ROOM 660+ SQ FT BUSINESS CLSRM 660+ SQ FT BUSINESS LAB 660+ SQ FT COMPUTER LAB 660+ SQ FT TV INSTRUCTIONAL STUDIO 660+ SQ FT ART CLASSROOM 660+ SQ FT MUSIC CLASSROOM 660+ SQ FT BAND ROOM 660+ SQ FT ORCHESTRA ROOM 660+ SQ FT CHORAL ROOM 660+ SQ FT FAMILY/CONSMR SCIENCE 660+ SQ FT IA/SHOP 1800+ SQ FT TECH ED 1800+ SQ FT VO AG SHOP W/CLSRM 660+ SQ FT DRIVER'S ED 660+ SQ FT GYM 6500-7500 SQ FT AUX GYM 2500 SQ FT OTHER:

25 25 20 20 20 25 20 20 20 20 25 25 25 25 20 20 20 20 20 66 33

OTHER: BUILDING TOTAL MS/SEC UTILIZATION (BLDG TOTAL X .9)

REVISED JULY 1, 2010

XXX XXX

XXXXXX XXXXXX

XXXXXX XXXXXX FORM EXPIRES 6-30-12

Breslin Ridyard Fadero Architects - 47 -

XXXXX XXXXX

XXXXXX XXXXXX PLANCON-A08

Appendix

SUMMARY OF OWNED BUILDINGS AND LAND Grades:

Project Name:

District-Wide Feasibility Study

K

Subtotal High School

Subtotal Administrative Center

#7

BUILDING FTE

CONVERSION / DISPOSITION AND PLANNED COMPLETION DATE BASED ON OPTION CHOSEN

#9

#10

1957, 1975, 1990, 2008 1989

27

K-5

861 Maintain

27

K-5

861

21

K-5

721 Maintain

21

K-5

721

XXXXXXXXX

XXX

XXXX

XXX

XXXX

1954, 1958, 1973, 1988, 2008

16

6-8

16

6-8

XXXXXXXXX

XXX

XXXX

XXX

XXXX

768

1966, 1986, 1993, 2000

56

9-12

1,228 Maintain

56

9-12

1,159

XXXXXXXXX

XXX

XXXX

1,228

XXX

XXXX

1,159

1994

13.32

XXXX XXXX

3,509

Upper Hanover Site

1,582

XXXXXXXXXXXXXXXXXXXXXX

801 Maintain

801

XXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXX Maintain

44

Subtotal TOTAL

#8

PDE PROJECTED GRADE LEVEL ENROLLMENT 10 YEARS INTO THE FUTURE

#6

GRADE LEVELS

Subtotal Middle School

#5

SITE SIZE (ACRES)

Marlborough Elementary School

XXXXXXXXX XXXXXXXXX

XXX XXX

-

12

PLANNED

#4

GRADE LEVELS

NAME OF BUILDING OR SITE (INCLUDING DAO AND VACANT LAND) OWNED BY SCHOOL DISTRICT/CTC

Hereford Elementary School

#3

SITE SIZE (ACRES)

#2

CONSTRUCTION AND/OR RENOVATION DATES (BID OPENING DATES)

PRESENT #1

PLANNED BUILDING FTE

Upper Perkiomen School District

1,582 768

13.32 44

XXXX XXXX

3,611

XXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXX

XXX XXX

XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX 1,570 XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX 774 XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX 1,101 XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX 3,445

#11

FTE MINUS ENROLLMENT (#9 - #10)

District/CTC:

XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX 12 XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX -6 XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX 58 XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXX 64

ACTIONS TO BE TAKEN IN THE FUTURE IF PROJECTIONS COME TRUE AND THE SCHOOL DISTRICT EXPERIENCES EXCESS OR INSUFFICIENT CAPACITY (FTE MINUS PROJECTED ENROLLMENT (Col. 11) > + or - 300)

CHECK IF APPLICABLE: EXPAND PROGRAMS OR COURSE OFFERINGS PROVIDE SPACE FOR USE BY COMMUNITY GROUPS OR SERVICE AGENCIES OFFER FULL-TIME KINDERGARTEN OR PRE-SCHOOL REDUCE CLASS SIZE CLOSE SCHOOL(S) OTHER (DESCRIBE):

REVISED JULY 1, 2010

FORM EXPIRES 6-30-12

Breslin Ridyard Fadero Architects - 48 -

PLANCON-A09

619 FEASIBILITY STUDY.pdf

Retrying... 619 FEASIBILITY STUDY.pdf. 619 FEASIBILITY STUDY.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying 619 FEASIBILITY STUDY.pdf.

7MB Sizes 2 Downloads 292 Views

Recommend Documents

EMBA 619 -
Jul 7, 2010 - the physical performance of the work requires a detailed study and careful ... estimates: estimates of elements of the work breakdown structure.

Minecraft Generator Account 2017 619
Minecraft 1.5.2 Hacked Client - WiZARDHAX.com .... 1.7.4 Live Free Game Generator Codes on Android phone, Free Game Generator Codes Minecraft.

Call to Reserve | (619) 236-0616 SAVINGS STATUS -42 ...
Call to Reserve | (619) 236-0616. BRAND. DESCRIPTION. MODEL #. IN/OUT OF BOX. SERIAL #. WAS $. NOW $. SAVINGS. STATUS. FRIGIDAIRE.

artigos-prontos-08-03-619-626.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

SPH 619 Biostatistics II Sentil W2016.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. SPH 619 ...

Pokemon Go Cheat Sheet 619 ^% Pokemon Go Cheat Codes Ios
Free Pokemon Go hacks and cheats online for Android and iOS devices, which ... 6 Code Generator Pokemon Go Cheats For Ios 10 Live Free Game Generator.

Verrazano Pedestrian/Bicycle Access: Planning / Design Feasibility
Pedestrian/Bigde Aaess: Pamming/Design Faasibility. Rudolph W. Giuliani, Mayor. City ºf New Yºrk. Joseph B. Rose, Director. Department ºf City Planning.

Feasibility Study_Options_Botsford_Final-1.pdf
The feasibility study of the market considers the drive time potential within 5, 8 and 12 minutes, and breaks the market in. these drive times into key segments ...

Political Realism, Feasibility Wedges, and ...
4 Compare Broome: “Efficiency without sacrifice has the further, serious ... (I consider the effect of changing these assumptions about savings rates etc. ..... enrich sophisticated investment banks and thus accomplishes no good, but succeeds in.

coffee shop feasibility study pdf
coffee shop feasibility study pdf. coffee shop feasibility study pdf. Open. Extract. Open with. Sign In. Main menu. Displaying coffee shop feasibility study pdf.

Barrambie Pre-feasibility Study Results - Neometals
Aug 25, 2015 - Operating and Capital costs are both valid as at July 2015 with an indicative ... Media. Richard Glass / Michael Weir. Citadel MAGNUS. T: +61 8 6160 4900 .... identifying the contacts during the second drilling campaign in 2007 (hole .

Characterizing the Opportunity and Feasibility of Reconfigurable ...
best memory hierarchy configuration for each application, ..... Includes dynamic power only, no accounting ..... and Software (ISPASS), White Plains, NY, 2010.

Characterizing the Opportunity and Feasibility of Reconfigurable ...
tablet, laptop, and server environments. As Moore's law continues to deliver ... the memory wall [10], multi-level caches have been a key element of computer architecture for decades with research studies spanning organization [11], write and ...

Christian Morrisson - The Political Feasibility of Adjustment.pdf ...
of short-term measures — budget cuts and tight monetary policy — and through. devaluation. Adjustment was limited to a stabilization programme, the sole. criterion being the reduction of the external deficit as rapidly as possible. It was. soon r

Feasibility Conditions for Interference Alignment
Dec 1, 2009 - Bezout's and Bernshtein's Theorems (Overview) - 1. ▻ Both provide # of solutions → Prove solvability indirectly .... Page 101 ...

Oxford Circle Redevelopment Feasibility Study.pdf
Oxford Circle Redevelopment Feasibility Study.pdf. Oxford Circle Redevelopment Feasibility Study.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying ...

Verrazano Pedestrian/Bicycle Access: Planning / Design Feasibility
Page 1. Page 2. |6||37.3/10. Pedestrian/Bigde Aaess: Pamming/Design Faasibility. Rudolph W. Giuliani, Mayor. City ºf New Yºrk. Joseph B. Rose, Director.

2016_June_15_Final Response to Felicita Creek Feasibility ...
Page 2 of 4. Mr. Nassiri - 2 - June 15, 2016. Additional Investigations Needed to Determine Contaminant Pathways. The Report failed to include sufficient information regarding the contaminant pathways from. the Site to Felicita Creek. A basic princip

The Feasibility of Streamlining Aid.pdf
This extends the analysis. of Dynarski and Scott-Clayton (2006) which was. limited to dependent students. Page 3 of 13. The Feasibility of Streamlining Aid.pdf.

project feasibility study sample pdf
Page 1 of 1. File: Project feasibility study sample pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. project feasibility study sample pdf. project feasibility study sample pdf. Open. Extract. Open with. Sign In

Feasibility of a privacy preserving collaborative ...
App Engine – a performance case study. Anirban Basu Jaideep Vaidya Theo Dimitrakos ... filtering) requires computing power. Cloud is a solution for building a recommendation system, but there is a problem. . . ...privacy ...... High replication but