2015 Facilities Assessment Project Overview

Yuma High School

Yuma High School

Replace rooftop energy recovery ventilation units (lifecycle replacement) Upsize chilled water pumps at Central Plant

Install gas-fired boiler and re-pipe to provide heat to Snider, Old Main and Admin. buildings

HVAC Upgrades

Yuma High School

Add BacNET controls at Snider, Old Main and Research

Replace evaporative coolers and exhaust fans (lifecycle replacement)

Add Energy Recovery Ventilation at Palace Gym

HVAC Upgrades

Yuma High School Replace door handles and associated hardware (lifecycle)

Replace door locks and closers

Replace “Total Doors” (obsolete)

Door/Hardware replacement

Yuma High School

Replace missing/damaged door closers

Replace mis-matched and missing door handles, hinges and other hardware

Door/Hardware replacement

Yuma High School

Repair cracks, holes and blisters on foam roofs

Roof Repairs

Yuma High School

Replace obsolete rubber floor tile at Palace Gym

Repair/replace damaged ceramic tile

Replace carpeting (lifecycle replacement)

Flooring Repairs

Yuma High School

Replace obsolete rubber floor tile at Palace Gym Repair plumbing behind walls

Repair damaged walls/ceilings

Restroom Renovations

Repair/replace restroom doors and hardware

Yuma High School

Replace damaged/missing fixtures Upgrade fixtures Repair/replace flooring

Restroom Renovations

Yuma High School

Replace portable bleachers (safety)

Re-build pressbox catwalk (safety)

Replace Palace Gym sound system (lifecycle)

Athletic facilities renovations

Yuma High School

Re-surface running track at Carver Park (lifecycle)

Update signage

Athletic facilities renovations

Yuma High School

Repair damaged cabinets

Add storage racks

Repair/replace plumbing components

Training room renovations

Yuma High School

Paint upper level of Old Gym

Repair plaster/paint west end Research Bldg. Repair damaged plaster

Exterior Building Repairs

Yuma High School

Replace canal pump/controls (lifecycle)

Replace campus irrigation pump/controls (lifecycle)

Irrigation System

Yuma High School

Culinary Arts lab remodel

Sp. Ed. room/restroom remodel

Culinary Arts classroom remodel

Sp. Ed./CTE classrooms/labs remodel

Yuma High School

Elevator addition

Elevator addition

Old Main accessibility

Kofa High School

Kofa High School

Package unit replacement (lifecycle)

Cooling tower upgrades

Relocate booster pump location from Upper 200’s to west side of campus (efficient operations)

HVAC Upgrades

Kofa High School

Replace existing Tin Gym with new auxiliary gym: • • • • • • •

37 years old (1978 constr.) Structural issues Electrical issues HVAC issues Flooring issues Equity issue Site of proposed tennis courts

Auxiliary (“Tin Gym”) Gym replacement

Kofa High School

Replace two sets of classroom buildings (12 classrooms total): • • • • • •

56 years old (1959 constr.) Electrical issues HVAC issues Flooring issues Inadequate for Culinary Arts Site of proposed Bldg. 4

Upper 200’s/300’s classroom building replacement

Kofa High School

Demo building/relocate welding facilities to 900’s/Agriculture bldg: • • • • • • •

56 years old (1959 constr.) Poor lighting/ventilation Inadequate space for welding Structural issues Electrical issues Inefficient layout/unusable space IAQ issues

900’s/Welding building replacement

Kofa High School

Remodel/Expand C-2 classroom building (3 classrooms, restroom): • • • • •

56 years old (1959 constr.) Poor lighting/ventilation Carpet needs replacing Inefficient layout/unusable space IAQ issues

C-2 classroom building remodel

Kofa High School

Remodel Kitchen/Cafeteria building (including restroom): • • • • • •

56 years old (1959 constr.) Upgrade kitchen layout Replace flooring Upgrade utilities Poorly lit restroom Add double doors/windows at entry

Kitchen/Cafeteria remodel

Kofa High School Remodel Welding/ROTC building to accommodate new welding lab/classroom: • • • •

West half of building – Welding East half of building – ROTC 1 classroom each program Add roll-up door at south side for welding • Exhaust/Ventilation improvements • Electrical upgrades • Relocate exist. welding equipment

Welding/ROTC building remodel

Kofa High School

Demo 500’s classroom building (5 classrooms): • • • • •

37 years old (1978 constr.) 5 AC units need replacing Windowless Carpet needs replacing IAQ issues

500’s classroom building demolition

Kofa High School

“Pink Elephant” classroom building (4 classrooms/restrooms)

600’s Building (5 classrooms) (site of new Auxiliary Gym)

920’s portable classroom building (2 classrooms)

Classroom building demolition

Kofa High School

Replace wooden ramps (Safety)

Widen lower aisle-way (ADA/Safety)

Remodel pressbox (Safety)

Add handrail at center aisles (Safety)

Athletic facilities renovations (Grandstand/Pressbox)

Kofa High School

Remodel concessions building with new lighting/electrical, plumbing and doors/locks.

Remodel men’s restroom to include ADA accessible stall

Replace existing women’s toilet partitions with new (incl. ADA accesible)

Athletic facilities renovations (Restrooms/Concessions)

Kofa High School

Upgrade scoreboard (obsolete parts) Re-surface running track (lifecycle)

Improve stadium access from parking lot

Athletic facilities renovations (Scoreboard/Track)

Kofa High School

Replace stage rigging (lifecycle replacement)

Replace orchestra pit net & curtain (safety)

Complete sound system upgrade (2011)

Auditorium Improvements

Cibola High School

Cibola High School

Replace two portable classroom buildings (12 classrooms): • • • • • •

24 years old 12 AC units need replacing Subfloor is rotting Metal roofs leak Carpet needs replacing IAQ issues

720’s portable classroom replacement

Cibola High School

Replace obsolete Automated Logic HVAC control system

Replace 300 gallon water heater/burner unit at 700’s building (lifecycle)

HVAC Upgrades

Cibola High School

Replace rooftop energy recovery ventilation units (lifecycle replacement)

Replace roof-top Air Handler Units with new including ERV’s (lifecycle/efficient operations)

HVAC Upgrades

Cibola High School

Replace panic bars

Replace door handles/locks

Replace doors where needed (lifecycle replacement)

Exterior Door/Door Hardware replacement

Cibola High School

Add hardware where missing

Repair or replace doors as needed (safety)

Replace doors that are not repairable

Interior Door/Door Hardware replacement

Cibola High School

Replace stage rigging (lifecycle replacement)

Replace orchestra pit net & curtain (safety)

Replace broken seating

Auditorium Improvements

Cibola High School

Upgrade sound board

Upgrade lighting controls

Upgrade dimming equipment

Auditorium Improvements

Cibola High School

Replace primary irrigation pump (lifecycle)

Repair lining at irrigation pond

Upgrade irrigation pump controls

Irrigation System/Pond Improvements

Cibola High School

Replace baseball scoreboard electrical transformer

Upgrade Gold Gym lighting controls

Repair tennis court cracks

Athletic facilities renovations

Cibola High School

Upgrade press box

Replace scoreboard

Replace portable bleachers (safety) Upgrade stadium lighting (efficient operations)

Athletic facilities renovations

Cibola High School

Calcification at Auditorium/Bldg. A

Repair brick columns at 600’s/ Technology bldg.

Structural Repairs

Cibola High School

Replace broken fixtures Replace/support counters

Replace sinks (lifecycle replacement)

Restroom Renovations

Cibola High School

Replace broken equipment Replace broken fixtures

Replace toilet partitions

Restroom Renovations

Cibola High School

Replace worn carpeting (lifecycle replacement)

Replace VCT tile

Flooring Repairs

Cibola High School

Relocate/expand Sp. Ed. facilities

Relocate/expand sensory room Relocate Culinary Arts classroom/lab

Sp. Ed./CTE classrooms/labs remodel

San Luis High School

San Luis High School

Cooling tower upgrades

Chiller upgrades

Chilled water pump replacement (lifecycle replacement)

HVAC Upgrades

San Luis High School

Replace fan coil units (lifecycle replacement)

Replace ERV’s (lifecycle replacement)

Replace roof-top units (lifecycle replacement)

HVAC Upgrades

San Luis High School

Replace obsolete Automated Logic HVAC control system

Add Alerton BacNET controls

HVAC Upgrades

San Luis High School

Replace thin-wall copper piping

Install campus-wide RO water treatment system to prevent corrosion/build-up in water lines

Water Treatment System

San Luis High School

Re-paint exterior metal (original to 2002)

Exterior Paint

San Luis High School

Re-paint exterior metal (original to 2002)

Exterior Paint

San Luis High School

Building foundation settling/ cracks at walls

Structural Repairs

San Luis High School

Repair cracks, holes and blisters on foam roofs

Roof Repairs

San Luis High School

Drain pond/install liner

Irrigation System Improvements

San Luis High School

Repair/Replace irrigation timers

Irrigation pump/controls upgrades

Irrigation System Improvements

San Luis High School

Re-surface tennis courts

Athletic Facilities

San Luis High School

Replace original dirt track with all-weather rubberized track (equity)

Athletic Facilities

San Luis High School

Replace baseball field scoreboard

Construct roof at JV baseball field dug-outs

Athletic Facilities

San Luis High School

Treat/replace planking on grandstand bleachers

Press box upgrades

Athletic Facilities

San Luis High School

Space for (4) additional 2-room modular classroom buildings

Existing modular classrooms (3) 2-room bldgs (add 1 additional at this location)

Classroom space

Gila Ridge High School

Gila Ridge High School

Replace tower media

Re-pipe header from towers to condenser water pumps

HVAC – Central Plant Upgrades

Gila Ridge High School

Insulate duct work (efficient operations)

Replace mini-splits (obsolete units)

Add filter racks at air handler units

HVAC Upgrades

Gila Ridge High School

Install air curtains over snack bar windows

Repair boiler controls

HVAC Upgrades

Gila Ridge High School

Add additional exhaust fan for room exhaust

Upsize exhaust fans for welding fume hoods.

Welding Lab Exhaust System

Gila Ridge High School

Import clean soil. Top dress, level, re-seed practice fields (2), and baseball/softball outfields

Athletic Field Upgrades

Gila Ridge High School

Install permanent lighting at practice field

Build restroom building for west fields with crow’s nest

Athletic Field Upgrades

Gila Ridge High School

Repair/replace house light fixtures

Improve lighting at stairs (safety)

Repair/replace stage lighting equipment

Auditorium Lighting

Gila Ridge High School

Additional handrail at exterior stairway (safety)

Scene shop upgrades: • Expand electrical service • Improve materials storage • Add wash-out sink at tool crib area

Storage upgrades

Auditorium Improvements

Gila Ridge High School

Strengthen supports underneath counters in classroom/lab areas.

Classroom countertops

Gila Ridge High School

Seal around exterior windows

Add rain drip over windows

Add water stop at store front windows

Exterior weatherproofing

Gila Ridge High School

Pave solar parking lot north of gym

Parking lot paving

District-Wide

District-Wide

Upgrade/standardize access control system at all campuses

Access Control

District-Wide

Upgrade fire alarm panels. Replace obsolete and/or failed components. All campuses.

Upgrade intercom systems. Replace obsolete and/or failed components. All campuses.

Intercom/Fire Alarm Systems

District-Wide

Upgrade security guard stations at campus entrances

Provide secure visitor check-in areas at Admin building entrances. All campuses.

Campus Security

Bond Projects Site Photos.pdf

There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Bond Projects ...

27MB Sizes 1 Downloads 150 Views

Recommend Documents

Bond Projects Site Photos.pdf
Page 3 of 79. Yuma High School. HVAC Upgrades. Replace rooftop energy. recovery ventilation units. (lifecycle replacement). Upsize chilled water. pumps at Central Plant. Install gas-fired boiler and re-pipe. to provide heat to Snider, Old Main. and A

2016 2015 STATE PROJECTS 1 1 ... - Site Selection Magazine
SITE SELECTION. MARCH 2017. 69. 68. MARCH 2017. SITE SELECTION. 2016 2015 STATE ... 3. REGION TOTAL. 233. Source: Conway Projects Database.

2016 2015 STATE PROJECTS 1 1 ... - Site Selection Magazine
7 Mississippi. 46. REGION TOTAL 1,492. 2016 2015 STATE. PROJECTS. 1. 1 Arizona. 73. 2. T3 Colorado. 52. 3. 2 Nevada. 42. 4. T3 Utah. 26. 5. 5 New Mexico.

2016 2015 STATE PROJECTS 1 1 ... - Site Selection Magazine
2 Nevada. 42. 4. T3 Utah. 26. 5. 5 New Mexico. 18. 6. 6 Idaho. 11. 7. 8 Wyoming. 8. 8. 7 Montana. 3. REGION TOTAL. 233. Source: Conway Projects Database.

Indemnity Bond
I undertake to surrender the original Policy as and when received or recovered. Signed on the ………… day of ………………………......., 20.......... Signature : .

MATLAB Projects - IEEE Projects
... Human Action Recognition with Multimodal Feature Selection and Fusion. ... Medical Image Segmentation by Combining Graph Cuts and Oriented Active.

MATLAB Projects - IEEE Projects
(IEEE 2013). 2. Tracking Human with Multi-channel Interacting Multiple Models (IEEE 2013). ... MATLAB based INTELLIGIENT TRANSPORTATION. 1. CoSLAM: ...

binding site
3: College of Computing, Georgia Institute of Technology, USA .... Systems Bioinformatics CSB2007, 13-17 August 2007, University of California, San Diego.

Bond Premium
As a consequence of this view, we are able to discern the mechanism that ...... a 360 basis points rise in the two-year yield and a 160 basis point rise in the ...

ICE high bond no bond docs.pdf
U . .'. lmmigntion and Cu:tom ·Enforcement. LIS. Department or llomt?land Security. AILA InfoNet Doc. No. 14080799. (Posted 8/7/14). Page 1 of 13 ...

Bond Enthalpy.pdf
Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Bond Enthalpy.pdf. Bond Enthalpy.pdf. Open. Extract. Open with.

Bond Premium
Cycles capture the risk premium and the business cycle variation ... Group at the University of Chicago, University of Lugano, Bank of Canada, University of.

Julian Bond Condolence.pdf
Loading… Page 1. Whoops! There was a problem loading more pages. Julian Bond Condolence.pdf. Julian Bond Condolence.pdf. Open. Extract. Open with.

Bail bond Form.pdf
Dated, this ___________day of _________20. Signature. Signatures of Surety__________. Attesting Witness____________. Page 1 of 1. Bail bond Form.pdf.

Site Selection.PDF
... ft2, respectively. Find the. probability of visiting the gift shop by the. customers. Which mall would be preferred and. why ? 10. MFR-019 1 P.T.O.. Page 1 of 2 ...

DATASHEET SEARCH SITE | WWW.ALLDATASHEET.COM
processing does not necessarily include testing of all parameters. ..... Supply current. (two amplifiers). VCC = MAX, VO = 0.5 V,. No load. Full range. 1 ...... TI warrants performance of its hardware products to the specifications applicable at the 

site axon.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. site axon.pdf.

Site Inspections.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Site Inspections.

The Mortgage Revenue Bond - ncsha
What are Mortgage Revenue Bonds? The Mortgage Revenue Bond (MRB) and tax-exempt multifamily housing bond programs (collectively,. Housing Bonds) ...

Family bond MuseArticle.pdf
The target of this study is to discover the examples of family ties. depicted ... Makuri: And catch my death of cramp? ... what‟s preventing you from going? ... his wife „a fraud‟. .... Family bond MuseArticle.pdf. Family bond MuseArticle.pdf.

railway bond exemption.pdf
ow will pop ou. WORK director. CK MIN/MAX. u should see. eenshot abov. a”: ut. ry. X are. ve. Page 2 of 2. Main menu. Displaying railway bond exemption.pdf.

Julian Bond Condolence.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Main menu.

Complex site response: Does one-dimensional site ...
4th IASPEI / IAEE International Symposium: Effects of Surface Geology on Seismic Motion. August 23–26, 2011 · University of California Santa Barbara. Complex Site Response: Does One-Dimensional Site Response Work? Laurie G. Baise. Eric M. Thompson

Referring Site -
Oct 2, 2011 - Oct 3. Oct 13. Oct 23. Nov 2. Nov 12. Nov 22. Dec 2. Dec 12. Dec 22. Jan 1. Jan 11. Jan 21. Visits. This referring site sent 2,794 visits via 1 ...