• All information shared with the Parish is in good faith with the sole purpose of full and open engagement • All projected information remains ‘open to change’ and should be considered as provisional where delivery has not yet been completed
Broadband Delivery UK (BDUK) Programme • £multi-million major engineering programme • March 2013 and June 2015 contracts awarded
• Programme aims: • Basic broadband for premises in programme area • As much fibre based broadband with the funds available
• When added to commercial broadband roll-out: • 93% fibre based broadband • 87% superfast broadband (National target 90%)
• Milestone of build to date April 2016: • • •
275 Structures live, serving over 51,000 premises Average speed uplift to date – 52Mbps 35% of sub 2Mbps now getting faster broadband
Condover parish meeting 898 Premises served by Dorrington, Bayston Hill and Cross Houses exchange areas
Build projections Build projections for structures serving Condover parish Exchange
Cabinet
Parish premises
Information
Bayston Hill
1
323
Live - check availability with your chosen ISP
Dorrington
1
55
Build expected complete by end of 2016
Dorrington
3
128
Due to go live by the end of June
Dorrington
4
258
Live - check availability with your chosen ISP
Dorrington
5
99
Live - check availability with your chosen ISP
Cross Houses
1
10
Live but parish premises too far to benefit
Dorrington
All In One
25
Condover Park
Please note that not all premises in an exchange area will get access to fibre based broadband and not all premises served by a fibre enabled cabinet will necessarily get a speed enhancement.
Summary Projected coverage in the parish (estimated) Premises in the parish
Access to fibre broadband
Planned in progress
Exploring solutions
898
650
198
50
Percentage
72%
22%
6%
Exploring solutions means that we’re looking at other ways to provide access to faster broadband for these premises. For example, solutions may come from: • Technological advances • Future procurement • Basic Broadband Subsidy Scheme
What Next Broadband- Phase 2b Summary Beyond Phase 2:
12k premises are projected to not have access to SFBB The above figure excludes 13k premises where suppliers have committed to build networks over next 3 years (includes BT, Virgin and SWS)
Shropshire Council has additional funds RINGFENCED to undertake a further procurement BDUK – Balance of £11.38m = £6.68m LEP Local Growth funds = £5.02m Total available = £11.7m + Savings and Take up Clawback Soft market engagement has been undertaken with a range of alternative providers. All have indicated an interest. European funds – to support further broadband coverage during 2015 – 2020. Projects being developed: ERDF – to support business connections - £2.2m – Launch later this year EAFRD – to address rural communities in final 5% areas - £1.3m – Launch 2017
Projected Timescales:
Open Market Review (OMR) – Summer 2016 Invitation to Tender (ITT) – Winter 2016 Deployment Summer 2017
© British Telecommunications plc
Page 7
Broadband Alternatives - Options Now FIBRE BROADBAND You can check current and planned availability of fibre broadband services in the Shropshire Council area at: http://connectingshropshire.co.uk/when-and-where/ If you discover that you cannot currently order a fibre service and your existing broadband speeds aren’t fast enough, the following alternative solutions offer an increase speeds until fibre broadband becomes available
4G MOBILE BROADBAND You may be able to get a 4G mobile broadband connection, which can provide download speeds averaging 15+mbps. You can check current availability of 4G mobile broadband services at the Ofcom mobile coverage checker: http://www.ofcom.org.uk/mobile-coverage.
WIRELESS BROADBAND Some parts of the Shropshire Council area are covered by wireless broadband service providers. You can check whether they cover your area by visiting the providers’ websites: Airband Community Internet Ltd - https://www.airband.co/ EPX Technical Services - http://www.epx.co.uk/connectivity/microwave ITS Technology Group (eXwavia) - https://itstechnologygroup.com/ Rural Tech Cloud - http://ruraltechcloud.co.uk/ Secure Web Services Ltd - http://www.securewebservices.co.uk/page/home/index.html Simply WISP - http://www.simplywisp.co.uk/ Userve Internet - https://www.userve.net/
© British Telecommunications plc
Page 8
Basic Broadband Subsidy Scheme Scheme Outline Commitment to provide a basic level of broadband to all premises. The Basic Broadband Subsidy Scheme provides support towards the cost of the installation of a broadband connection so that a basic broadband service can be purchased for a first year cost of no more than £400 (taking account of any up-front costs and the 12 month service charges). The scheme can also be used to access more expensive packages with higher speeds and/or greater monthly data allowances. Up to £350 subsidy. Before applying check alternatives: Commercial Satellite solutions (hire equipment) 4G Wireless
http://connectingshropshire.co.uk/basic-broadband-subsidy-scheme/
© British Telecommunications plc
Page 9
Thank You Ben Walker Connecting Shropshire Marketing & Engagement Manager Tel: 01743 253897
[email protected]