DIVISION OF WATER RESOURCES FEE SCHEDULE (Non-Refundable and Subject to Statutory Change)

Effective 7/1/06 Well Permit Application Filing Fees all Areas of the State: Application for a new well permit, including a permit for the use of an existing well Change in use/aquifer, alternate point of diversion or change in point of diversion Correction of Well Location GWS-42: Exempt wells permitted after May 8, 1972 Non-exempt wells permitted after May 17, 1965 Late recording Late recording and replacement applications submitted simultaneously Monitoring and observation wells (permanent) Replacement of one year non-exempt permits (-F & -R Permits) Replacement of permitted exempt domestic, stock water and household (two-year permits) Geothermal and GeoExchange well permit: refer to fee table in Rule 6 of Geothermal Rules Extension of Permit Expiration Date: Exempt (two-year permits) Sections 37-92-602 and 37-90-105, one year at a time Non-exempt outside Designated Basins, Sections 37-90-137(2), and inside Denver Basin, 37-90-137(4), one additional year only High capacity permits inside Designated Basins, one year only

$100.00 $100.00 $60.00 $100.00 $100.00 $100.00 $100.00 $100.00 $60.00

No fee $60.00 $60.00

Change of Well Ownership or Address (to be submitted by the new well owner)

No fee

Late Filing of Evidence of Well Construction and/or Pump Installation, for Sections 37-90-137(2) and 37-90-137(4) type wells

$30.00

High Capacity Well Permits Inside Designated Ground Water Basins, Section 37-90-107: Late evidence of timely well construction Late statement of beneficial use Objection to application to use of ground water Determination of Water Rights (Denver Basin), fee per aquifer

$30.00 $30.00 $10.00 $60.00

Substitute Supply Plans/Replacement Plans: General, Section 37-92-308 - New/Renewal Gravel Pit, Section 37-90-137(11) - New/Renewal Within Designated Basins, Section 37-90-107.5 Miscellaneous Water Administration Fees Administer Temporary Instream flows, Section 37-83-105(2)(b)(I) Interruptible Water Supply Agreements, Sections 37-92-309(5), 37-80-111.5 Rotational Crop Management, New Plan (1st Year), Section 37-92-305(17)(a)&(b) Rotational Crop Management, Renewal Prior to Decree, Section 37-92-305(17)(a)&(b) Rotational Crop Management, Annual Fee After Decree, Section 37-92-305(17)(a)&(b) Well Tester Class Registration Fee - First Time/Renewal Every Two Years Ground Water Well and Pump Contractor Licensing, Section 37-91-107: Application fee-required upon filing application: Colorado resident/Non-resident Reapplication fee-after 45 days from examination failure: Colorado resident/Non-resident Initial license fee upon passing examinations: Colorado resident/Non-resident License renewal resident and non-resident per license type License reinstatement Drilling and pump rig registration per rig Listings of licensed contractors (each sort) Livestock Water Tank or Erosion Control Dam Application

$300/$300 $1,593/$257 $100.00 $100.00 $2,439.00 $1,734.00 $617.00 $300.00 $250/$100

$20/$50 $20/$50 $50/$400 $50.00 $100.00 $10.00 $8.00* $15.00

Copy of Document Per Single Copy Fax copy of record, payable in advance (per page): Local/Long Distance

$ 0.50 $1.00/$1.50*

Rules and Regulations

$3.00-$5.00*

* Prices are subject to change without notice

Division of Water Resources Fee Schedule.pdf

Exempt wells permitted after May 8, 1972 $60.00 ... Reapplication fee-after 45 days from examination failure: ... Division of Water Resources Fee Schedule.pdf.

23KB Sizes 0 Downloads 141 Views

Recommend Documents

Division of Water Resources Fee Schedule.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Division of ...

pdf-1829\water-rights-and-principles-of-water-resources-management ...
... apps below to open or edit this item. pdf-1829\water-rights-and-principles-of-water-resource ... nagement-water-project-series-by-chhatrapati-singh.pdf.

Water Resources Planning.pdf
Note : Answer any seven questions. Give sketches / ... (c) What is the difference between a lake and a 3. swamp ? 2. ... recharge and discharge area of a basin.

Water Resources Engineering.pdf
(c) Differentiate between hyetograph and hydrograph. 4. Q-7 (a) For a drainage basin of 600km2. , isohyets drawn for a storm gave the. following data: Isohyets ...

Human Resources Development Division Head ...
PUNJAB NATIONAL BANK INVITES ONLINE APPLICATIONS. FROM INDIAN CITIZENS ..... required to have a scanned (digital) image of his photograph and signature as per the specifications .... Maker Towers,F-wing,7th Floor. Cuffe Parade,.

Predator Management in Utah - Utah Division of Wildlife Resources
Jan 24, 2012 - wildlife officials may choose to implement predator-management plans. The DWR recently updated its policy on predator management to place ...

2012 Utah Black Bear Guidebook - Utah Division of Wildlife Resources
9 Basic requirements. 9 Adults must .... guidebook—such as Utah Code § 23-20-3 ..... email. You can also learn your drawing results by visiting wildlife.utah.govor by calling 1-800-221-. 0659 .... wildlife.utah.gov/licenses/agent.html. Before you.

Water Resources Update - South Florida Water Management District
Feb 4, 2016 - Meetings website (11/5/15 Meeting Date). 2. Questions about nitrogen to and from Lake. Okeechobee and in Estuary watersheds resulted in ...

2012 Utah Black Bear Guidebook - Utah Division of Wildlife Resources
wildlife.utah.gov/guidebooksto view digital versions of ... apply for or obtain a 2012 black bear hunting permit ...... The signature of the owner or person in charge.

WATER RESOURCES MANAGEMENT IN TANZANIA-final draft_31 ...
WATER RESOURCES MANAGEMENT IN TANZANIA-final draft_31 july 2012.pdf. WATER RESOURCES MANAGEMENT IN TANZANIA-final draft_31 july 2012.

CE6703-Water Resources and Irrigation Engineering.pdf ...
Discuss the different methods to measure consumptive use. BT-6. Page 3 of 10. CE6703-Water Resources and Irrigation Engineering.pdf. CE6703-Water ...

Statistics - California State Water Resources Control Board
Cleanup and Site Investigation Program oversees the remediation of spills, leaking storage tanks and vapor intrusion from contaminated soils. ❖ Surface Water Ambient Monitoring Program samples water quality to provide continuous data on the status