152 Strathgowan Avenue MAIN FLOOR Grand Entrance Hall

21’10 x 12’2”

Two storey Marble floor Antique Dutch chandelier Built-in bench with storage

Living Room

22’11” x 14’4”

Sunken floor Wood-burning fireplace Hardwood floors French doors walk out to patio and landscaped garden

Dining Room

16’9” x 14’5”

Formal room Hardwood floors Plate rail Overlooks garden and ravine

Kitchen

16’2” x 11’10”

Granite countertops Hardwood floors Stainless steel appliances Overlooks park and ravine French doors to Juliette balcony

Family Room

16’2” x 12’5”

Gas fireplace Hardwood floors Built-in shelves and cabinets Pot lights French doors to Juliette balcony

Powder Room

Prospective Buyers should satisfy themselves as to the accuracy of the information contained in this feature sheet. All measurements are approximate. The statements contained herein are based upon information furnished by principals and sources which we believe are reliable, but for which we assume no responsibility. Not intended to solicit parties under any agency contract.

152 Strathgowan Avenue SECOND FLOOR Master Bedroom

22’7” x 14’

Double door entrance 6 piece ensuite His and hers closets with closet organizers Hardwood floors Overlooks park and ravine French doors to Juliette balconies

Second Bedroom

13’1 x 11’6”

His and hers closets with closet organizer Hardwood floors Large windows overlook ravine and backyard Ceiling fan

Third Bedroom

12’3 x 11’10”

Closet with closet organizers Hardwood floors Large window overlooks backyard Ceiling fan

Fourth Bedroom/Study

12’1” x 11’11”

Closet with closet organizers Hardwood floors Built-in shelves and cabinets Large window overlooks back yard

Main 4 piece bathroom

Skylight

Skylights in hall Prospective Buyers should satisfy themselves as to the accuracy of the information contained in this feature sheet. All measurements are approximate. The statements contained herein are based upon information furnished by principals and sources which we believe are reliable, but for which we assume no responsibility. Not intended to solicit parties under any agency contract.

152 Strathgowan Avenue BASEMENT Family Room

16’3” x 12’7”

Wood laminate flooring 2 windows Track lighting Very high ceiling

Fifth Bedroom

10’5” x 10’3”

Wood laminate flooring Window Closet Pot lights

Laundry

8’4” x 6’7”

Ceramic flooring Double closets Built-in shelves

4 piece bathroom

Wine Cellar/storage

Utilities Room

Landing

Ceramic flooring Double Closets Built-in shelves

Access to garage

Prospective Buyers should satisfy themselves as to the accuracy of the information contained in this feature sheet. All measurements are approximate. The statements contained herein are based upon information furnished by principals and sources which we believe are reliable, but for which we assume no responsibility. Not intended to solicit parties under any agency contract.

152 Strathgowan Avenue PROPERTY DETAILS Lot:

50’ x 126’ feet LT 123 PL 511E TORONTO Extensive professional landscaping In-ground sprinkler system Stone patio and walkways

Taxes:

$13,188.29/2017

Heating/Cooling:

Forced air gas, central air conditioning

Parking:

Private double drive with parking for 4 cars and spacious double garage

Hot Water Tank (gas):

Rental

Inclusions:

Stainless steel Bosch gas stove Stainless steel range hood Stainless steel Kitchenaid refrigerator Stainless steel Kenmore Elite dishwasher Stainless steel Panasonic microwave Whirlpool front-loading washer Whirlpool front-loading dryer Kenmore stand up freezer Eureka central vacuum and related equipment All electrical fixtures including chandelier and ceiling fans LiftMaster garage door openers with remotes Culligan water softener Goodman forced air gas furnace Air conditioner Outdoor planters

Exclusions:

All window coverings on the second floor

Prospective Buyers should satisfy themselves as to the accuracy of the information contained in this feature sheet. All measurements are approximate. The statements contained herein are based upon information furnished by principals and sources which we believe are reliable, but for which we assume no responsibility. Not intended to solicit parties under any agency contract.

152 STRATHGOWAN FEATURE SHEET - May 2nd, 2017.pdf ...

Master Bedroom 22'7” x 14' Double door entrance. 6 piece ensuite ... Wine Cellar/storage ... 152 STRATHGOWAN FEATURE SHEET - May 2nd, 2017.pdf.

450KB Sizes 1 Downloads 148 Views

Recommend Documents

text feature recording sheet-2.pdf
chose this text feature for this. particular information? Page 1 of 1. text feature recording sheet-2.pdf. text feature recording sheet-2.pdf. Open. Extract. Open with.

Laszlo-Sroufe-Waddock AIP Feature Torn between Paradigms May ...
Laszlo-Sroufe-Waddock AIP Feature Torn between Paradigms May 2017.pdf. Laszlo-Sroufe-Waddock AIP Feature Torn between Paradigms May 2017.pdf.

Thursday MAY 2nd 2013 -
May 2, 2013 - U9 Details. Varsity Half Time U9 Bulldogs vs. Raiders Exhibition Game. -U9 Players and coaches assemble below the scoreboard 5 MIN before half time. -Suited up, Pads on Ready to Play. -The Game will be fast paced running clock, run and

FDK Info Sheet May 2017 without enrollment for website.pdf ...
FDK Info Sheet May 2017 without enrollment for website.pdf. FDK Info Sheet May 2017 without enrollment for website.pdf. Open. Extract. Open with. Sign In.

Teacher Tidbit Sheet May Memorial Day.pdf
Teacher Tidbit Sheet May Memorial Day.pdf. Teacher Tidbit Sheet May Memorial Day.pdf. Open. Extract. Open with. Sign In. Main menu.

Collier Diamond C Jubilee Sale Supplement Sheet - May 2, 2017 ...
Collier Diamond C Jubilee Sale Supplement Sheet - May 2, 2017 pdf.pdf. Collier Diamond C Jubilee Sale Supplement Sheet - May 2, 2017 pdf.pdf. Open.

May-2017 Balance Sheet as on 31s -
May 31, 2017 - Payable to Paint Contractor. 89392.00 Current Assets. 2532061.00. Other Contribution. 22604.00 Painting Collections receivbles. 31000.00. Water Deposit-Payable. 31500.00 Fixed Deposits. 2325000.00. Income and Exp A/c. (6004.00) Electri

psych sheet may madness 2016.pdf
9 Linden, Harry 13 NEXUS 5:37.34. 10 Corbett, James 14 TTS 5:39.25. 11 Varma, Samir 13 UWCPX 6:05.54. #3 Girls 11-12 400 SC Meter Freestyle. Name Age ...

152,s. 2015
Dec 4, 2015 - Consciousness Week (NHRCW) with the theme "Karapatang Pantao: Igalang ... under the universal declaration in order to create a sustainable.

Verreynne 152.pdf
Page 1 of 22. Growth - intentions, perceptions and reality: Evidence based directions for innovation researchers. Martie-Louise Verreynne. UQ Business School, University of Queensland. Brisbane, Australia. While measurement of innovation and growth i

pdf-0241\managefirst-customer-service-with-answer-sheet-2nd ...
... apps below to open or edit this item. pdf-0241\managefirst-customer-service-with-answer-shee ... ociation-solutions-national-restaurant-association.pdf.

152 - Raida Chakroun.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 152 - Raida ...

152 08 article.pmd
High Altitude and Tribal (HAT) area of Andhra. Pradesh (AP) during rabi. The dry seed is largely marketed internally in northern states of the country. Local cultivar 'Chitra' is largely grown by the tribal farmers of North Coastal A.P. and varying i

Vasavai CE B.E CSE 2nd Year May 2013 Data Communications.pdf ...
(b) Explain any two collision free LAN protocols. 17. Write short notes on: a) X.25. b) Error control in data link layer. c) Bluetooth architecture. ****. Page 1 of 1. Vasavai CE B.E CSE 2nd Year May 2013 Data Communications.pdf. Vasavai CE B.E CSE 2

Vasavai CE B.E ME 2nd Year May 2013 Thermodynamics.pdf ...
Vasavai CE B.E ME 2nd Year May 2013 Thermodynamics.pdf. Vasavai CE B.E ME 2nd Year May 2013 Thermodynamics.pdf. Open. Extract. Open with. Sign In.

man-152\jd-740-grapple.pdf
Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. man-152\jd-740-grapple.pdf. man-152\jd-740-grapple.pdf. Open.

Rs 152-2017.pdf
Sign in. Page. 1. /. 31. Loading… Page 1 of 31. Page 1 of 31. Page 2 of 31. Page 2 of 31. Page 3 of 31. Page 3 of 31. Rs 152-2017.pdf. Rs 152-2017.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Rs 152-2017.pdf. Page 1 of 31.

Vasavai CE B.E EE 2nd Year May 2013 Environmental Studies.pdf ...
Page 1 of 1. Code No. 2023. FACULTY OF ENGINEERING & INFORMATICS. B.E. 2/4 (EE/Inst./MP/IT) I – Semester (Suppl) Examination, May 2013. Subject : Environmental Studies. Time : 3 hours Max. Marks : 75. Note: Answer all questions from Part-A. Answer