MAGNETOM System
MR Update Instructions
MR025/09/P
Split nut with left hand thread for gradient coax cable Performance Update
Kriegel MR025/09 Siemens
Urgent?
H Yes
Time period
within 3 months
Intranet download available?
Q Yes
Q No H No
Remote update handling feasible? Q Yes without CSE Q Yes with CSE H No (Category 2) (Category 1/3) Materials for logistic update required?
H Yes
Q No
Materials free of charge?
H Yes
Q No Q No, but credit at return
Return of parts?
Q Yes
Estimated completion time
3 hour(s)
Customer application training?
Q Yes
H No Number of CSE’s: 1 H No
Criteria for system to be affected Criteria
Value
System material number
10276755
System software version Component material number
10048321
see table on next pages
Chg. Ref. No.:
530803
Name:
Kriegel
Dept.:
CS PS MR
Print No.: Replaces:
M6-040.896.07.01.02 n.a.
© Siemens
2009
The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All rights, including rights created by patent grant or registration of a utility model or design, are reserved.
English Doc. Gen. Date: 06.09 CS PS MR n.a.
2
Revision / Disclaimer
1Revision / Disclaimer
Document revision level The document corresponds to the version/revision level effective at the time of system delivery. Revisions to hardcopy documentation are not automatically distributed. Please contact your local Siemens office to order current revision levels. Disclaimer The installation and service of equipment described herein is to be performed by qualified personnel who are employed by Siemens or one of its affiliates or who are otherwise authorized by Siemens or one of its affiliates to provide such services. Assemblers and other persons who are not employed by or otherwise directly affiliated with or authorized by Siemens or one of its affiliates are directed to contact one of the local offices of Siemens or one of its affiliates before attempting installation or service procedures.
MAGNETOM
M6-040.896.07.01.02 06.09
Page 2 of 16 CS PS MR
Siemens
Table of Contents
3
0Table of Contents
1 _______ Preparation_____________________________________________________ 4 General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Systems/products affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Reason for the update . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Explanation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Special tools / documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 4 4 4 4 4
Material Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Contents of the Update Kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ordering information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Return of Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 5 5 5
2 _______ Update_________________________________________________________ 6 Work steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Final Mechanical Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Final Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Customer Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Final Work Steps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Changes to Previous Version . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
3 _______ Completion Protocol ____________________________________________ 16
Siemens
M6-040.896.07.01.02 06.09
Page 3 of 16 CS PS MR
MAGNETOM
4
Preparation 1-
General Information
0
Systems/products affected
0
1Preparation
MAGNETOM Verio p/n 10276755 Serial no. 40101 - 40290 w/o 40133, 40138, validation system
Reason for the update
0
This Update Instruction provides instructions to prevent potential damage to the gradients when applying non-product sequences with special frequency attributes.
Explanation
0
By securing the coax cable using a "Split nut with left-hand thread", possible shaking loose of the gradient coax cables will be avoided.
Prerequisites
0
Please read through these update instructions carefully prior to planning any work activities
Special tools / documents • • • • • • • • •
MAGNETOM
0
Non-magnetic torque wrench ranging from 5 - 20 Nms (p/n 8395829) Non-magnetic torque wrench ranging from 20 - 50 Nms (p/n 8395803) Non-magnetic torque wrench ranging from 90 - 200 Nms (p/n 8395845) Non-magnetic 40 mm spanner socket (10399537) Non-magnetic socket assortment (8396116) Non-magnetic standard tool kit (p/n 7757706) Ground rod 4659348 Ceramic knife 5137596 Loctite_270 (or equivalent), to be procured locally
M6-040.896.07.01.02 06.09
Page 4 of 16 CS PS MR
Siemens
Preparation
5
Material Information
1.1
Contents of the Update Kit
0
Update kit 10358257 contains the following parts: Pos.
Quantity
Material No.
Name
1
3
10358622
Split nut with left-hand thread
2
1
M6-040.896.07
Update manual MR025/09/P
Fig. 1:
Split nut with left-hand thread
Ordering information
0
The following update kit must be ordered from CSML (SAP Distribution Channel, plant 2050/6050): Update kit 10358257 (Material No.)
NOTE
In addition to the update kit, some of the service tools from the preceding page must also be ordered.
Return of Parts
0
No returns.
Siemens
M6-040.896.07.01.02 06.09
Page 5 of 16 CS PS MR
MAGNETOM
6
Update 2-
Work steps
2Update
0
1. Leave MR system on and Numaris running 2. Run 5 times spike test and store results 3. Remove covers in numerical order as indicated in (1-7/Fig. 2 / p. 6)as well as (8/Fig. 4 / p. 7)
MAGNETOM
Fig. 2:
Covers
Pos. 1
Service panel, bottom
Pos. 2
Service panel, top
Pos. 3
Rear funnel
Pos. 4
Above the funnel
Pos. 5
Chimney
Pos. 6
Top right
Pos. 7
Lid
M6-040.896.07.01.02 06.09
Page 6 of 16 CS PS MR
Siemens
Update
7 4. Store the covers out of your way and line them up in the order in which you removed them
Fig. 3:
covers removed and lined up
5. Also remove the two covers indicated below: (8/Fig. 4 / p. 7)
Fig. 4:
Siemens
hazardious voltage
Pos. 8
protecting covers
Pos. 9
gradient cable terminals
M6-040.896.07.01.02 06.09
Page 7 of 16 CS PS MR
MAGNETOM
8
Update 6. Enter QA - Expert mode - Spike check 7. Run spike check 5 times without covers and store results - if outside spec. remedy problem 8. End Numaris and invoke system shut down. 9. De-energize system at alarmbox or switch to “Stand-by” 10. Switch-off 80 amps breaker F1 inside GPA cabinet Discharging hazardous voltage 1. Connect one end of the ground rod to the frame structure of the magnet and with the tip of the ground rod touch the non-insulated gradient leads to discharge any residual electrical current (Fig. 5 / p. 8)
MAGNETOM
Fig. 5:
Discharging
Pos. 1
Ground rod
Pos. 2
Gradient leads
M6-040.896.07.01.02 06.09
Page 8 of 16 CS PS MR
Siemens
Update
9 Coax cables 1. Remove sufficient shrink tubing with the ceramic knife (Fig. 6 / p. 9)
Fig. 6:
Black insulation removed on coax cable
2. Hold the coax cable with one hand and with the non-magnetic torque wrench and the 40 mm spanner socket tighten the coax cables to 90 Nm (1, 2/Fig. 7 / p. 9).
Fig. 7:
Siemens
Using the torque wrench
Pos. 1
Torque wrench
Pos. 2
Coax cable
M6-040.896.07.01.02 06.09
Page 9 of 16 CS PS MR
MAGNETOM
10
Update 3. There should now be no gap visable between the mating contactors at the window of the securing nut (1/Fig. 8 / p. 10).
Fig. 8:
Gradient coax cable and coil mated
Pos. 1
Window indicating quality of connection
NOTE
The above visible verification is only possible on the latest coil designs.
Installing the “split nut” 1. Attach the larger section of the split nut first, followed by the mating part
Fig. 9:
MAGNETOM
Engaging the lower section of the split nut
M6-040.896.07.01.02 06.09
Page 10 of 16 CS PS MR
Siemens
Update
11 2. Apply loctite to allen screws
Fig. 10: Split nut
3. Withe a torque wrench tighten the split nut to the coax cable at 8 Nm.
Fig. 11: Split nut fastened
4. Both halves of the split nut should be flush and there should be no gap at the joints.(arrow/Fig. 12 / p. 11)
Fig. 12: Split nut properly fastened Pos. 1
Siemens
Gap
M6-040.896.07.01.02 06.09
Page 11 of 16 CS PS MR
MAGNETOM
12
Update NOTE
If after tightening of the split nut a gap remains, remove the split nut. Attach it again, displaced by 1/8th of a revolution. Repeat this procedure until the optimal position of the split nut is achieved. By applying a torque of 8 Nm tighten it
5. Apply loctite to secure the allen screws 6. When the first of the three axes is complete, apply the same procedure to the next axis.
MAGNETOM
M6-040.896.07.01.02 06.09
Page 12 of 16 CS PS MR
Siemens
Update
13 Work sequence on interface panel 1. Tighten all 19 mm hex nuts (twelve in total) with the torque wrench applying a torque of 35Nm, see items 1 & 2 in (1, 2/Fig. 13 / p. 13)
Fig. 13: Coax cable attached Pos. 1
19 mm hex nut external contactor
Pos. 2
19 mm hex nut internal contactor
2. Check the work you've just completed. All connections, especially the external gradient cables, jumper cables and coax cables must be securely tightened on all three axes. 3. Energize the system, set breaker F1 inside the GPA to on and invoke SESO
Siemens
M6-040.896.07.01.02 06.09
Page 13 of 16 CS PS MR
MAGNETOM
14
Update 4. Enter QA - Expert mode - Spike check 5. Run spike check five times as proof of the successful UI implementation and compare with spike checks taken previously. There should not be any deviation.
Final Mechanical Work
0
• Install the covers in reverse order, with reference to (Fig. 2 / p. 6)and (8/Fig. 4 / p. 7)
Final Check
0
1. Run spike check again making sure the reinstalled covers do not cause spikes 2. Pack your tools away. Leave the Rf room the way you found it.
Customer Information
0
Politely inform your customer of the update you've just performed
Final Work Steps
0
1. Fill out, and if necessary, make a copy of the attached "Completion Protocol" and file it in the corresponding folder. 2. The update must be reported by authorized personnel, either via an intranet application or by automated data transfer (only in countries connected via update handling interface). 3. Take five minutes of your time and answer below questions: Prior to this UI was the torque of the coax connection at the gradient coil within spec. (90 Nm) ? X answer yes or no Y answer yes or no Z answer yes or no Prior to this UI was the torque at the lower section of the gradient cable interface panel within spec (35 Nm)? X answer yes or no Y answer yes or no Z answer yes or no Prior to this UI was the torque at the upper section of the gradient cable interface panel within spec (35 Nm)? X answer yes or no Y answer yes or no Z answer yes or no Meant are all gradient cable joints at the gradient coil and gradient cable interface panel (Fig 7 and Fig 13). Please note MR system serial no. and customer here: Use this URL to forward your answers: https://intranet.med.siemens.com/cs/ps/UI-Survey_01.asp
MAGNETOM
M6-040.896.07.01.02 06.09
Page 14 of 16 CS PS MR
Siemens
Update
15
Changes to Previous Version
0
n/a.
Siemens
M6-040.896.07.01.02 06.09
Page 15 of 16 CS PS MR
MAGNETOM
16 3Completion Protocol
Completion Protocol 3-
(Not required for "Remote updates without a service technician")
The update with the number MR025/09/P has been completed. System Material No.:
...................................
System Serial No.:
...................................
Customer:
...................................
Customer No.:
...................................
Name (CSE):
Site:
...................................
...................................
Telephone:
...................................
Country:
...................................
Location:
...................................
Date:
...................................
Signature:
...................................
Remark:
.....................................................................................................
.....................................................................................................
NOTE
MAGNETOM
Please make a copy of the Completion Protocol, fill it out and file it in the corresponding binder.
M6-040.896.07.01.02 06.09
Page 16 of 16 CS PS MR
Siemens