,"-_.= I NFIR |

---

National Federation ofIndian Bailwagpen

f{$b

3,CHELMSFoRD RoAD, NEWDELHT1100s5

$fl

Affiliated to : lndian NationalTrade Union Gongress(INTUC) lntemational TransportWorkers' FederationflTD Dated:0510112015

No. IVA.{FIR/HLC/FINANCIALHEALTFVIR The Secretary(E), RailwayBoard, New Delhi

kind affention: Shri Viiav Kumar, EDME(INFRA).

DearSir. Sub:

Refi

Task Force to give suggestions to improve productivity in Railway . Operations, manufacturing and other departments on Indian Railways reg. Railway Board's letter No. 20!4IINFRAITF/IPRO dated 2411212014and

3Ur2t20r4.

We convey our suggestionsvide Annexure to this letter to enable the Task Force to give seriousconsideration. Yours faithfullv. ,

DA/Asabove

A,fr. 9J I

.

l

(Dr. M. Ragbavaiat) t GeneralSecretary

Copyforwardedto the ExecutiveDirector/IR,RailwayBoard,New Delhi for informationand necessary action. Copyto the GeneralSecretaries of Affiliated UnionsofNFIR. MediaCentreA{FIR. Copyto File No. IVA{FIR/SW20I4IHLRRC. Copyto FileNo. IVI{FIR/FDYIR. Telegram fttiZ,,l8F',n}Z6,Fax:011-237440ft,Rfy.22*2, : RAILMAZDOR Ph.:011-23[3305,OSOaZ299, [email protected], Website: nrrmr.nfirindia.com ^. E-mail: [email protected]; OUALITYOFLIFE EARLYDETECIIONOF HIV'AIDS - PROLONGS

 

“Annexure” 1.

Railway Operations

1.1

Special priority should be given for ensuring “throughput” so as to avoid detention to

trains, thereby path on Railway tracks will be available for running additional services and at the same time rolling stock could be utilized to optimum level and equally expenditure on fuel can be brought down considerably. 1.2

Almost all passenger carrying trains are presently kept at signals due to non-

availability of platforms. Additional platforms should be constructed or new terminals be opened for prompt reception and despatch of trains. Presently due to detention at signals, image of Railways is adversely affected and equally man hours and engine hours are wasted. These are required to be addressed. 1.3

Unnecessary movement of empty wagons be avoided and at the same time empties be

supplied promptly for meeting the demands. At present on some Zones, empty wagons are run for hundreds of kilometres for the purpose of loading. A thorough review is needed. 1.4

The existing wagon capacity should be utilised for loading at least up to the extant of

80% against present “loaded to total of 65%”. 1.5

The Zonal Railways which have potential to increase the freight loading, should be

provided the required assistance. 1.6

A thorough study needs to be done with regard to Zonal Railways where Operating

Ratio is poor and steps taken for improving the efficiency levels. 2.

Stores

2.1

Supply of raw materials/spare parts should be ensured in order to prevent

cannibalization. 2.2

Quality material, spare parts should procured for quality performance of assets instead

of resorting to lowest tender system. 2.3

Procurement of machinery and assets may be resorted to only when the same are

really required for the system. 3.

Civil Engineering Works

3.1

Priority should be given for doubling and laying of third and fourth lines wherever the

Tracks are over saturated. There is no need to have “Bullet Train” as such a project would cost heavily to the Nation and the Railways. 3.2

The funds allotted for construction of new lines may be frozen and study be

conducted to assess whether such lines are really required at this juncture. 1   

 

4.

Human Resources Development

4.1

The employees belonging to safety categories (Running etc.,) are to be utilized for the

duties of the post they are expected to perform, instead of posting them for performing other miscellaneous duties. 4.2

For maintenance of new services/assets, new posts should be created without delay

and without insisting on matching surrender. Whenever new services are introduced, the required number of posts should be created simultaneously for manning these services. 4.3

Staff belonging to Safety and Operational categories should be imparted periodical

training/refresher courses for upgrading their skills in the areas of working. 4.4

Adequate resting and Running Room facilities should be ensured for availing

adequate rest by the staff so that they could take up duties without wastage of man hours. Outstation detention be minimised so that staff can reach back their Head Quarters, avail rest and get ready for working. 4.5

Disciplined, work oriented and dedicated staff & supervisors should be motivated in

the form of incentive for achieving good results. 4.6

Management-staff relations should be ensured through frequent interactions/meetings,

sharing each others concern/view points with the aim of building oneness at all levels for achieving extraordinary results. 4.7

Working of RRBs should be reviewed for ensuring that panels are made available for

promptly filling vacancies in Running and Safety categories. A mechanism should be evolved for ensuring that these vacancies are filled up atleast within seven days of their occurrence. 4.8

Pursuant to the inputs given by the NFIR to the Railway Board regarding scrapping of

New Pension Scheme in Railways, a d.o. letter on 29th March 2014 was sent by the former Railway Minister to the Union Finance Minister seeking exemption of railway employees from the purview of New Pension Scheme and to cover them under Liberalized Pension Scheme. This needs to be pursued further for securing approval. The decision on this would encourage new entrants to work for the system with greater commitment. 4.9

The existing system of obtaining Railway Board’s approval relating to certain staff

issues needs to be reviewed for delegating powers to the GMs/DRMs. 5.

Medical

5.1

Powers for recognition of Referral Hospitals for referring the cases for specialised

medical treatment may be delegated to the GMs of Zones/PUs. 2   

 

5.2

Contracterization of cleanliness activities in trains and station premises has failed as

complaints from rail passengers continue.

Earlier CMEs/CMDs were managing these

activities with the support of departmental staff. Thorough review of the existing policy is required to be done on priority. Reports also reveal that there are instances of Contractors giving work to sub-contractors and workers deserting the work resulting departmental staff thrusted this additional burden. These are required to be addressed. 5.3

Dual control of Health Inspectors between Medical and Commercial Departments

has been a failure. There is strong justification to create new Department/structure with the nomenclature Public Health Department from the existing strength with proper hierarchy at divisional, Zonal and Railway Board’s levels to oversee and ensure cleanliness and also to fulfil the obligations of Food Safety Act, since adopted by the Railway Ministry. 6.

Catering in Railways Travelling public have been bitterly complaining against the Railways on supply of

sub-standard food items by the contractors. The Departmental Catering should be strengthened and the catering staff (formerly in Railways) presently working under IRCTC should be posted back to the Railways. 7.

Bed rolls supply and AC staff escorting trains At first place, the activities of bed rolls supply and AC Staff escorting trains should

not have been entrusted to private vendors and the jobs should have been retained with the department as outsourcing these activities is leading to lack of security of travelling public and is giving scope to anti-social elements, unauthorised hawkers to entrain the coaches and helpless Ticket Checking Staff have not been able to control mainly due to unbearable workload being handled by them. 8.

Miscellaneous

8.1

The existing defective policies in respect of ticket fare needs to be reviewed. For

example a platform ticket costs Rs. 5/- whereas minimum fare for a journey of 20 km has been fixed at Rs. 2/-. 8.2

The Railway projects where the expected rate of return is less than 23% may be

shelved in the interest of Railways. 3   

 

*****  

4   

Task Force to give suggestions.pdf

Page 3 of 5. Task Force to give suggestions.pdf. Task Force to give suggestions.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Task Force to give ...

566KB Sizes 0 Downloads 248 Views

Recommend Documents

Agenda - Blue Ribbon Task-Force
Oct 1, 2015 - Follow-‐up Data – from September 9 meeting. Abby Javurek-‐Humig – Dir. ... Teacher Recruitment/Retention. 1:40-‐2:45. Small Group ...

Agenda - Blue Ribbon Task-Force
Oct 1, 2015 - Of Accountability and Assessment DOE. 9:50-‐11:00. Funding Model Based on Teacher/Student Ratio. Tami Darnall – Dept. of Education, ...

School District Boundary Task Force
School District Boundary Task Force. Study Assignment. In certain areas of the state, the battle over what are known as “minor boundary changes” for school.

School District Boundary Task Force
A request was made for the department to gather information about how other ... Disclaimer: Staffing of the task force by the Department of Education and ...

Agenda - Blue Ribbon Task-Force
Sep 9, 2015 - Dr. Melody Schopp -‐ Secretary, Department of Education. Follow-‐up Data –Teacher Pipeline from August 19 meeting. 11:10-‐11:20. Break.

Order Task Force to facilitate and expedite.PDF
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Order Task ...

Immigration Task Force Report and Recommendations_Mayor ...
presentations.!This!center!will not!only!link!immigrants!to!services,!but!will also!connect! the!larger!community!within!Cincinnati!and!beyond.!!The!center!will ...

Internet Engineering Task Force (IETF) - RFC Editor
It represents the consensus of the IETF community. It has received public ... of this document, any errata, and how to provide feedback on it may be obtained at.

Blue Ribbon Education Funding Task Force AGENDA
Oct 29, 2015 - Teacher Recruitment/Retention. • Innovation Learning. • Shared Services. • Accountability. 4:15 – 4:30. Final Report Process. Final Comments.

Disabled Parking Task Force report to the Legislature.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Disabled Parking Task Force report to the Legislature.pdf. Disabled Parking Task Force report to the Legisla

Wildfire Task Force Report.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Wildfire Task ...

CPSunshine Task Force Report Final.pdf
opportunity to protect access to air and sunlight, mitigate the impact on infrastructure, eliminate. tax loopholes, and bring much needed transparency in the land ...

Internet Engineering Task Force (IETF) - RFC Editor
Verisign. Category: Standards Track. W. Kumari. ISSN: 2070-1721. Google. P. Hoffman. ICANN. April 2017. Signaling Trust Anchor Knowledge in DNS Security Extensions (DNSSEC). Abstract. The DNS Security Extensions (DNSSEC) were developed to provide ori

Philadelphia ACE Task Force Framework.pdf
healing, thereby creating higher functioning individuals and better adaptive responses to stress. The implementation of a trauma-informed approach can also ...

Data Reporting Task Force Report and Recommendations.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Data Reporting ...

Blue Ribbon Education Funding Task Force AGENDA
Blue Ribbon Education Funding Task Force. AGENDA. October 29, 2015 9:30 a.m. – 4:30 p.m. CST ... Revenue Sources. 12:30-1:15. Working Lunch. 1:15– 4:15.

The ACM Java Task Force
Aug 25, 2006 - document does not attempt to cover every detail of the varstructurery to defend the decisions that went into the overall ..... formed from bits of string, or images taken from magazines. In the acm.graphics ...... To create an image, y

Core Overexcitation Requirements Task Force -
Oct 23, 2006 - periods of heavy load ... should be present that the 130ºC limit is based on mineral oil ... The note concerning mineral oil was added as a.

150220 FGS Remitt Task Force FINAL2.pdf
remittances, in the context of formalizing the Somali financial sector. This. will allow the creation of a sustainable solution and a national financial. infrastructure ...

Force-Field Compensation in a Manual Tracking Task
Jun 17, 2010 - role in study design, data collection and analysis, decision to publish, or preparation ... manipulation of objects or tools, thus interacting with the.

Task Force Games - Central Casting - Heroes of Legend.pdf ...
Page 3 of 100. Page 3 of 100. Task Force Games - Central Casting - Heroes of Legend.pdf. Task Force Games - Central Casting - Heroes of Legend.pdf. Open.

Blue Ribbon Task Force on Teachers and Students AGENDA
Jul 7, 2015 - Mike holds a bachelor's degree from Michigan State University, a ... public administration from The Ohio State University and a master's degree ...