Division of Professions and Occupations State Electrical Board

ELECTRICAL PERMIT APPLICATION  Original permit #___________________  Add Fee for permit #___________________

 Trim for original permit # ________________ Associated Solar Permit # ________________

Work Performed by:  Electrical Contractor (reg. #)_______________  Homeowner * (see clause below)  Non-licensed contractor (well pump installer, fire alarm installer, etc.) Complete this form. Incomplete applications will be returned for missing information. Permit applicant mailing address:

Job Site / Property address: If a designated numbered address is not available use lot, block, filing, subdivision or GPS coordinates. Attach a map.

Name _____________________________________________________ Company / contractor OR Homeowner* __________________________________________________________ Address __________________________________________________________ City State Zip Code

_________________________________________________________ Property Owner _________________________________________________________ Job Address

Phone # (________)_________________________________

_________________________________________________________ City (that mail is postmarked from) County Job site contact phone number (required)_______________________

Cell # (_________)__________________________________

Directions: ________________________________________________

Fax # (_________)__________________________________ Must have a separate (dedicated) phone line for fax

_________________________________________________________ Power Supplier__________________________________________________

Email: ____________________________________________________

Check mark (√ ) ALL boxes that best describe the electrical installation. Describe work below:  New  Remodel  Addition

 Residential  Commercial  Solar A/C only

 New Service or service remodel  Temporary construction service only  Manufactured/Modular/Mobile Home

 Requesting Extended Permit – Installation will take longer than 12 months, attach explanation.  Other (describe installation)__________________________________________________________________________

Briefly describe work being performed: * HOMEOWNER CLAUSE: The Colorado Revised Statutes provide a homeowner the opportunity to perform the electrical installation provided the following conditions are true: You are the property owner and this property is not for sale, resale, or is not rental property. You reside or intend to reside at this property as your sole place of residence. You are doing the permitted work yourself and have a reasonable enough knowledge of electrical codes for a proper installation. By my signature below I attest the above statements are true. I understand that my homeowners insurance may not cover damages to my home due to construction accidents. SIGNATURE: ____________________________________ Date ____________ Fee enclosed $ ______________ By Contractor or authorized representative; Homeowner * Fee calculated from page 2 MAKE CHECKS PAYABLE TO: STATE OF COLORADO – Do not staple the check to the application. NOTE: MAILED OR HAND-DELIVERED PERMITS MAY TAKE 5-7 WORKING DAYS TO PROCESS AFTER RECEIPT AND WILL BE MAILED, EMAILED, OR FAXED ACCORDING TO THE INFORMATION PROVIDED. PLEASE ENSURE THAT THE FEE IS CORRECT. PERMITS EXPIRE ONE YEAR FROM THE DATE ISSUED. NO REFUNDS WILL BE PROCESSED AFTER SIX MONTHS OF PERMIT ISSUE DATE. The content of this application must not be changed under penalty of Colorado Law.

1560 Broadway, Suite 1350 Denver, Colorado 80202 Phone 303.894.2300 Fax 303.894.2310 www.dora.state.co.us V/TDD 711

ELECTRICAL PERMIT FEES Fee Schedule effective: February 15, 2017 (Solar Permits are on a Separate Form)

Fees are computed according to the appropriate chart below Fees are based on A, B, C, or D below. Do not use more than one table to determine your fee. If a permit is not filed in advance of the commencement of an installation, the inspection fee will be double, as prescribed by CRS 12-23-117(3). Temporary construction meters require a separate permit application from any other activity. Trim permit. If a permit expires after the rough-in inspection has been completed, inspected, and approved by the electrical inspector, but before the final inspection is approved, a TRIM permit must be obtained. The fee is based on the valuation of the electrical remaining work to be inspected. Minimum fee is $135.

A. Residential Electrical Only Installation: (new, remodel, addition) (round sq. ft. up to next 100 for calculation) Residential Installation – Based on enclosed living area only Equal to or less than 1000 square feet 1,001 square feet but equal to or less than 1,500 square feet 1,501 square feet but equal to or less than 2,000 square feet Greater than 2001 square feet ($270 + ($13.50 x each additional 100 sq. ft.)) Example: (2235 sq. ft.) first 2000 sq. ft. = $270 + 300 (235 rounded up to next 100) x $13.50 = $310.50

FEE $135

Living Area:

$202 $270

B. Commercial and other fees: Including some residential installations that are not based on square footage (not living area, i.e. garage, shop, etc.). Fees in this section are calculated from the total cost to customer (contract price), including electrical materials, items and labor- whether provided by the contractor or the property owner. Valuation of Installation – (Based on cost to customer of labor, material and items) Equal to or less than $2000 = $135 (base fee) Greater than $2001 add $13.50 per thousand of job valuation (always round up the next $1,000) to the Base Fee ($135) EXAMPLE: The cost of the installation is $5,150 (round up to $6,000) (6 x $13.50 = $81) The base fee (shown above): $135 + (6 x $13.50) $81 = $216.00 total fee

Fee $135

$135 $67.50

C. Mobile/Modular/Manufactured Home set (per unit) D. Temporary heat release

RE-INSPECTION FEE ($50): A re-inspection fee may be assessed when additional inspections are required when the job is not ready for inspection (if 5 or more correction items are cited), access is not provided, violations from the last inspection are not completed, etc.

Permit fees are reviewed occasionally and may be adjusted as necessary. PLEASE NOTE: Applicants should be prepared to do the following: • Use the online permit system to request an inspection when the job is ready. • Ensure that the work is completed within the time limitation of the permit. • Install electrical according to the currently adopted edition of the Colorado Electrical Code (NEC). • Request an electrical inspection prior to covering and a final inspection prior to occupancy.

Square footage: _________ (Residential use only - see Section A above)

OR

Cost of electrical work: $ __________

OR

C or D Above : $ __________

(Calculated from information above, Section B)

(Round to next highest $1.000.00)

Total fee enclosed $__________

Fees are based on operating expenses from the previous year and are subject to change each year

1560 Broadway, Suite 1350 Denver, Colorado 80202 Phone 303.894.2300 Fax 303.894.2310 www.dora.state.co.us V/TDD 711

Electrical Permit Application.pdf

... and Occupations. State Electrical Board. Page 1 of 2 ... Page 2 of 2. Electrical Permit Application.pdf. Electrical Permit Application.pdf. Open. Extract. Open with.

86KB Sizes 0 Downloads 209 Views

Recommend Documents

Mechanical Electrical Plumbing MEP - Building Permit Application.pdf ...
Page 1 of 1. Mechanical Electrical Plumbing MEP - Building Permit Application.pdf. Mechanical Electrical Plumbing MEP - Building Permit Application.pdf. Open.

PERMIT FEES
PERMIT FEES. Total Valuation. Fee x 0.65. $1.00 to 1,100.00. $ 36.00. $1,101.00 to 1,200.00. $ 38.50. $1,201.00 to 1,300.00. $ 41.25. $1,301.00 to 1,400.00.

CITY OF MESQUITE PERMIT #
Unit. Owner. Phone Number ( ) ... Use □ Single Family Detached □ Single Family Attached □ Multi-Family ... Permittee is to build according to above description and to the approved plans and specifications of the Building Code and to submit.

Wall/Fence Permit Process
Permit Package includes but is not limited to: 1. 2 site plans showing location of wall on property. 2. 2 engineered wall details or 1 copy of City Wall Standards. 3. 1 soils report (if required for retaining wall). 4. 1 signed permit application. 5.

Permit Applicaton.pdf
Applicant Name: Business Name: Email: Phone Number: Project Address: Block: Lot: Project Valuation: $ Project Sq. Ft : A/C:______ Non-A/C:______.

Temporary Use Permit
:​______ ​Zip:​______. Phone: Fax: E-Mail Address: Applicant:​ Name:​. Address: City: State: ______ Zip: ______. Phone:​. ​Fax: E-Mail Address: Contact Person and Information: Date of Event and time: ... Business License Verification: F

Business Permit Form.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Business Permit ...

Permit Re-App1_typer.pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying.

HVAC permit application.pdf
Yayasan Masjidillah Indonesia, Karang Menjangan 110, Surabaya, 60286. Kontak : Sdr. Nur Q, 0857-33-484-101. Email : [email protected]. Website : http://sites.google.com/site/masjidillah. Blog : masjidillah.wordpress.com. Page 3 of 1,072. HVAC per

Permit-Application-UMN.pdf
RIGHTS OF SUBJECTS OF DATA. NOTE: This section is to be completed by the residency program in Minnesota, only following completion of. the foregoing ...

Parking Permit Master.pdf
Parent Signature_____________________________________ Date_________________. Revised 5/9/16. Page 2 of 2. Parking Permit Master.pdf. Parking ...

Solar Permit Application.pdf
Page 1 of 2. 1560 Broadway, Suite 1350 Denver, Colorado 80202 Phone 303.894.2300. Fax 303.894.2310 www.dora.state.co.us V/TDD 711. SOLAR PERMIT ...

Permit-Application-UMN.pdf
DEP/LINE #. PERMIT #:. APPROVAL DATE: PREV APP DATE: PREV APP DATE: INSTRUCTIONS TO APPLICANT. Minnesota Statute 147.0391 RESIDENCY ...

Animal Permit Form.pdf
Page 1 of 1. Animal Permit Form.pdf. Animal Permit Form.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Animal Permit Form.pdf. Page 1 of 1.

Permit-Application-UMN.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

Business Permit Form.pdf
Sign in. Loading… Whoops! There was a problem loading more pages. Retrying... Whoops! There was a problem previewing this document. Retrying.

Plumbing-Permit-Application.pdf
Sign in. Page. 1. /. 2. Loading… Page 1 of 2. Page 1 of 2. Page 2 of 2. Page 2 of 2. Plumbing-Permit-Application.pdf. Plumbing-Permit-Application.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Plumbing-Permit-Application.pdf. Page 1

Residential Accessory Building Permit Process
Residential Accessory Building. Permit Process. 10 to 21 business days. * Permit Package includes but is not limited to: 1. 1 permit application with all required ...

Work permit packet.pdf
Page 3 of 4. Work permit packet.pdf. Work permit packet.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Work permit packet.pdf.

Parking Permit Master.pdf
Page 1 of 2. Pomona High School – Parking Permit Agreement. APPLICATION FOR SCHOOL PARKING LOT ACCESS 2016-2017. I agree to the terms and ...

Permit Application Checklist.pdf
The Designer that prepares the permit drawings is responsible to ensure that they provide ... Permit Application Checklist.pdf. Permit Application Checklist.pdf.

Grading Permit Process
Permit Package includes but is not limited to: 1. 2 Sets of approved Civil Plans or 2 Grading Plans signed by City Engineer and Building Official. 2. CC Desert Conservation Program Mitigation Fee Form (Tortoise Form). 3. 1 permit application with all

Student Vehicle Permit form.pdf
Whoops! There was a problem loading this page. Retrying... Student Vehicle Permit form.pdf. Student Vehicle Permit form.pdf. Open. Extract. Open with. Sign In.

Work Permit application Historic Preservation Commission.pdf ...
plans. The Designer's/Architect's/Engineer's name, address, phone number, and State License Number. (if applicable, see next page) shall be noted on the ...