Generated by COMcheck-Web Software

Envelope Compliance Certificate 2006 IECC Section 1: Project Information Project Type: New Construction Project Title : University of Kentucky Funkhouser Bldg. 105 Renovation Construction Site:

Owner/Agent:

Lexington, Kentucky 40506

Designer/Contractor:

Katie Bluhm University of Kentucky Lexington, Kentucky 40506

Katie Bluhm Lexington, Kentucky 40506 [email protected]

Section 2: General Information Building Location (for weather data): Climate Zone: Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 50 degrees F):

Lexington-Fayette, Kentucky 4a 4783 3754

Activity Type(s) School/University

Floor Area 1400

Section 3: Requirements Checklist Envelope TBD: No envelope assemblies specified

Climate-Specific Requirements: Component Name/Description

Gross Area Cavity or Perimeter R-Value

Cont. R-Value

Proposed U-Factor

Budget U-Factor

(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.

Air Leakage, Component Certification, and Vapor Retarder Requirements:



1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance with the manufacturer's installation instructions.

❑ ❑ ❑

2. Windows, doors, and skylights certified as meeting leakage requirements.

❑ ❑

5. No roof insulation is installed on a suspended ceiling with removable ceiling panels.

❑ ❑

7. Cargo doors and loading dock doors are weather sealed.



9. Building entrance doors have a vestibule equipped with closing devices. Exceptions:

3. Component R-values & U-factors labeled as certified. 4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R-value without compressing the insulation. 6. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. 8. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an appropriate air-tight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material.

Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft. in area.



10.Vapor retarder installed.

Project Title: University of Kentucky Funkhouser Bldg. 105 Renovation Data filename:

Report date: 10/05/09 Page 1 of 7

Generated by COMcheck-Web Software

Interior Lighting Compliance Certificate 2006 IECC Section 1: Project Information Project Type: New Construction Project Title : University of Kentucky Funkhouser Bldg. 105 Renovation Construction Site:

Owner/Agent:

Lexington, Kentucky 40506

Designer/Contractor:

Katie Bluhm University of Kentucky Lexington, Kentucky 40506

Katie Bluhm Lexington, Kentucky 40506 [email protected]

Section 2: General Information Building Use Description by:

Activity Type

Activity Type(s) School/University

Floor Area 1400

Section 3: Requirements Checklist Interior Lighting:



1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts 1680

Proposed Watts 1272

Complies YES

Controls, Switching, and Wiring:



2. Independent controls for each space (switch/occupancy sensor). Exceptions: Areas designated as security or emergency areas that must be continuously illuminated.

❑ ❑ ❑

Lighting in stairways or corridors that are elements of the means of egress. 3. Master switch at entry to hotel/motel guest room. 4. Individual dwelling units separately metered. 5. Each space provided with a manual control to provide uniform light reduction by at least 50%. Exceptions: Only one luminaire in space; An occupant-sensing device controls the area; The area is a corridor, storeroom, restroom, public lobby or sleeping unit.



Areas that use less than 0.6 Watts/sq.ft. 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions:



Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. 7. Photocell/astronomical time switch on exterior lights. Exceptions:



Lighting intended for 24 hour use. 8. Tandem wired one-lamp and three-lamp ballasted luminaires (No single-lamp ballasts). Exceptions: Electronic high-frequency ballasts; Luminaires on emergency circuits or with no available pair.

Section 4: Compliance Statement

Project Title: University of Kentucky Funkhouser Bldg. 105 Renovation Data filename:

Report date: 10/05/09 Page 2 of 7

Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2006 IECC requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist.

Name - Title

Signature

Project Title: University of Kentucky Funkhouser Bldg. 105 Renovation Data filename:

Date

Report date: 10/05/09 Page 3 of 7

Generated by COMcheck-Web Software

Interior Lighting Application Worksheet 2006 IECC Section 1: Allowed Lighting Power Calculation A Area Category School/University

B Floor Area (ft2)

C Allowed Watts / ft2

1400

D Allowed Watts (B x C)

1.2

1680

Total Allowed Watts =

1680

Section 2: Proposed Lighting Power Calculation A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast School/University (1400 sq.ft.) Linear Fluorescent: A: Parabolic Louver / 48in. T8 32W / Electronic

B C D Lamps/ # of Fixture Fixture Fixtures Watt. 3

12

106

E (C X D)

1272

Total Proposed Watts =

1272

Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero, the building complies. Total Allowed Watts = Total Proposed Watts = Project Compliance =

1680 1272 408

Interior Lighting PASSES: Design 24% better than code.

Project Title: University of Kentucky Funkhouser Bldg. 105 Renovation Data filename:

Report date: 10/05/09 Page 4 of 7

Generated by COMcheck-Web Software

Exterior Lighting Compliance Certificate 2006 IECC Section 1: Project Information Project Type: New Construction Project Title : University of Kentucky Funkhouser Bldg. 105 Renovation Construction Site: Lexington, Kentucky 40506

Owner/Agent:

Designer/Contractor:

Katie Bluhm University of Kentucky Lexington, Kentucky 40506

Katie Bluhm Lexington, Kentucky 40506 [email protected]

Section 2: Exterior Lighting Area/Surface Power Calculation A Exterior Area/Surface

B Quantity

C Allowed Watts / Unit

D Tradable Wattage

E F Allowed Proposed Watts Watts (C x D)

Total Tradable Watts* = 0 0 Total Allowed Watts = 0 Total Allowed Supplemental Watts** = 0 * Wattage tradeoffs are only allowed between tradable areas/surfaces. ** A supplemental allowance equal to 5% of total allowed wattage may be applied toward compliance of both non-tradable and tradable areas/surfaces.

Section 3: Exterior Lighting Fixture Schedule A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast

B C D Lamps/ # of Fixture Fixture Fixtures Watt.

E (C X D)

Total Tradable Proposed Watts =

0

Section 4: Requirements Checklist Lighting Wattage:



1. Within each non-tradable area/surface, total proposed watts must be less than or equal to total allowed watts. Across all tradable areas/surfaces, total proposed watts must be less than or equal to total allowed watts. Compliance: No exterior fixtures are defined.

Controls, Switching, and Wiring:

❑ ❑

2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting. 3. All lighting fixtures are controlled by a photosensor or astronomical time switch that is capable of automatically turning off the fixture when sufficient daylight is available or the lighting is not required. Exceptions: Covered vehicle entrance/exit areas requiring lighting for safety, security and eye adaptation.

Exterior Lighting Efficacy:



4. All exterior building grounds luminaires that operate at greater than 100W have minimum efficacy of 60 lumen/watt. Exceptions: Controlled by motion sensor or exempt from consideration under the provisions of Section 505.6.2.

Exterior Lighting TBD: No exterior lighting fixtures specified

Project Title: University of Kentucky Funkhouser Bldg. 105 Renovation Data filename:

Report date: 10/05/09 Page 5 of 7

Generated by COMcheck-Web Software

Mechanical Compliance Certificate 2006 IECC Section 1: Project Information Project Type: New Construction Project Title : University of Kentucky Funkhouser Bldg. 105 Renovation Construction Site: Lexington, Kentucky 40506

Owner/Agent: Katie Bluhm University of Kentucky Lexington, Kentucky 40506

Designer/Contractor: Katie Bluhm Lexington, Kentucky 40506 [email protected]

Section 2: General Information Building Location (for weather data): Climate Zone: Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 50 degrees F):

Lexington-Fayette, Kentucky 4a 4783 3754

Section 3: Mechanical Systems List Quantity System Type & Description

Section 4: Requirements Checklist

Project Title: University of Kentucky Funkhouser Bldg. 105 Renovation Data filename:

Report date: 10/05/09 Page 6 of 7

Generated by COMcheck-Web Software

Mechanical Requirements Description 2006 IECC

Project Title: University of Kentucky Funkhouser Bldg. 105 Renovation Data filename:

Report date: 10/05/09 Page 7 of 7

Envelope Compliance Certificate -

Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the ... Doors that open directly from a space less than 3000 sq. ft. in area. u 10.

120KB Sizes 1 Downloads 210 Views

Recommend Documents

Envelope Compliance Certificate -
No roof insulation is installed on a suspended ceiling with removable ceiling panels. u 6. Stair, elevator ... Master switch at entry to hotel/motel guest room. u 4.

Envelope Compliance Certificate -
Oct 5, 2009 - Envelope Compliance Certificate. 2006 IECC. Section 1: Project Information. Project Type: New Construction. Project Title : University of ...

Envelope Compliance Certificate -
Lighting in stairways or corridors that are elements of the means of egress. u 5. Master switch at entry to hotel/motel guest room. u 6. Individual dwelling units ...

Certificate
*This certificate is applicable for the key components, assets and locations as described in the scoping section on the back of this certificate, with regard to the specific requirements for information security as stated in the 'Google ISO 27001 Imp

mini envelope template.pdf
www.naturescorridor.blogspot.com. Mini. Envelope. Templates. Page 1 of 1. mini envelope template.pdf. mini envelope template.pdf. Open. Extract. Open with.

EIFS - BC Building Envelope Council
Oct 15, 2013 - EIFS is a high performance cladding… □ By the time ... CMHC & NRC's Rainscreen Testing. 0.2 L/min ... Control the application conditions. 3.

Certificate
Oct 31, 2017 - Based on certification examination in conformity with defined requirements in. ISO/IEC 17021-1:2015 and ISO/IEC 27006:2015, the Information Security. Management System as defined and implemented by. Google LLC* located in Mountain View

Certificate
Oct 31, 2017 - of America. Ø San Francisco (CA), United. States ... Ø Gurgaon, India. Ø San Bruno (CA), United States ... Ø Sao Paulo, Brazil. Ø Thornton (CO) ...

2015_tiny envelope template.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 2015_tiny ...

How to address envelope PS.pdf
How to address envelope PS.pdf. How to address envelope PS.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying How to address envelope PS.pdf.

CREATE AND PRINT AN ENVELOPE
Mail Merge is used to create form letters, mailing labels, envelopes, or catalogs. The .... Create a full page of address labels with the following information:.

Energy Efficiency - BC Building Envelope Council
•Canadian Commission on Building and Fire Codes (NRC). •Canadian standard developed with input from ... •Controls and system maintenance vs. envelope ...

certificate - GitHub
Feb 20, 2016 - Hans de Bruijn. Professor of Policy Analysis and Management. Faculty of Technology, Policy and Management. Delft University of Technology.

Constrained-envelope digital-communications transmission system ...
Jun 14, 2010 - Macedo et al, Coded OFDM for Broadband Indoor Wireless Systems,. 1997, IEEE ..... It is an advantage of the present invention that a circuitry.

Treasure Hunt Envelope Tags.pdf
Page 1 of 1. Tape to Envelope 1, which has card 2 inside (to be taped by the fountain):. Before opening this envelope for your next clue,. you must sing I am a ...

Constrained-envelope digital-communications transmission system ...
Jun 14, 2010 - *Feb. 5, 2013. (54) CONSTRAINED-ENVELOPE. DIGITAL-COMMUNICATIONS. TRANSMISSION SYSTEM AND METHOD. THEREFOR. (75) Inventors: Ronald D. McCallister, Scottsdale, AZ. (US); Bruce A. Cochran, Mesa, AZ. (US); Bradley P. Badke, Chandler, AZ.

Computing Compliance
Jun 13, 2009 - twist, and the meaning of a sentence is taken to be its potential to change ... section 4 presents a sound and complete algorithm for computing ...

compliance department - NSE
May 19, 2016 - Step 5 : In the above screen, the Member Code & the Member name will ... Enter the email id, wherein the Exchange can inform you regarding ...

Reporting Compliance
28 Claims, 2 Drawing Sheets. Preferred Neighbour. Reporting Mode. NETWORK. BCCH System Information. Alternative Neighbour. Reporting Compliance.

Computing Compliance
(up to logical equivalence) that are compliant with ϕ. Such an algorithm forms the basis for ... Definition 1. dnf(ϕ) is recursively defined as follows: 1. dnf(p) = p.

Tax, Compliance & Investigations - WTS
Jun 10, 2015 - tax and business decisions of a domestic company have ..... definition of compliance in their business .... Degree of internationalisation (2013)1.

pledge side envelope 2014.pdf
prizes from other local area attractions. Top amount gets first choice, second highest gets second pick, etc. 100% of profits STAY at Windy Ridge! Thank You!

Bernie Donation Envelope - Back.pdf
Loading… Page 1. Whoops! There was a problem loading more pages. Retrying... Bernie Donation Envelope - Back.pdf. Bernie Donation Envelope - Back.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Bernie Donation Envelope - Back.pdf.

lego invitation envelope emmett.pdf
Loading… Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... lego invitati ... pe emmett.pdf. lego invitatio ... ope emmett.pdf. Open. Extract. Open with.