Cobb Galleria Signage

PROJECT NAME

Ø 270'-0"

Signage Study at Cobb Galleria Atlanta, GA

33'-2" 10.0°

CLIENT

Cobb-Marietta Coliseum & Exhibit Hall Authority

3'-1"

48'-0"

LOGO OPTION A

25'-0"

191 Peachtree Street NE

100'-0"

Setback Line

Setback Line

Scale: 1/32” = 1’-0”

Suite 2400

Illuminated LED display (3-sided) Content wraps return on side facing I-285

404-237-0276 (F)

60’-0” above Galleria Dr. ensures sign is not obstructed by pedestrian bridge

© 2017 COOPER CARRY, INC.

Custom fabricated aluminum sign cabinet with welded and smoothed seams on sign face, smooth all welds and fill all gaps prior to painting to appear seamless

Property Line (GDOT ROW)

60'-0"

NORTH ELEVATION (I-285 Southbound)

Halo illuminated, dimensional letters Opaque faces with contrasting returns

~14'-0"

Concealed interior structure embeds into foundation to be designed by fabricator’s engineer and detailed in shop drawings once concept is detailed

404-237-2000 (T) www.coopercarry.com

PRINCIPAL

Angelo Carusi PROJECT MANAGER

Stephen Carlin DESIGNER

Bobbi Sweeney PHASE

Recessed base - concrete or frame clad with aluminum skin TBD by fabricator’s engineer and detailed for approval

~60'-0"

Atlanta, GA 30303-1770

Schematic Design PROJECT NO. M:\2017\20170284\d-10 EGD

20170284.01

1'-0" Galleria Drive

DATE

Galleria Drive

11-03-2017

~23'-0"

I-285 Access ELEVATION PAGE NUMBER

Scale: 1/16” = 1’-0”

EG-1.01

Cobb Galleria Signage

PROJECT NAME

Illuminated Accent: OPTION 2

Signage Study at Cobb Galleria Atlanta, GA CLIENT

Cobb-Marietta Coliseum & Exhibit Hall Authority

191 Peachtree Street NE Suite 2400 Atlanta, GA 30303-1770 404-237-2000 (T)

PROJECT LOGO

404-237-0276 (F) www.coopercarry.com © 2017 COOPER CARRY, INC.

PRINCIPAL

Angelo Carusi PROJECT MANAGER

Stephen Carlin DESIGNER

Bobbi Sweeney PHASE

Schematic Design PROJECT NO. M:\2017\20170284\d-10 EGD

20170284.01 DATE

11-03-2017

Pattern created from logo mark

Inspiration reference PAGE NUMBER

EG-1.05

Cobb Galleria Signage OPTION 2

1'-2"

15'-0" 10'-0"

Letter faces are in same plane as dynamic display, return color contrasts with face

Ø 270'-0"

Cable-mullion system (or similar) holds glass panels

33'-2"

11'-6"

Plan View

10'-0"

Interior support columns to be sized and placed by fabricator’s engineer Access panels for maintenance

10.0° Custom frit pattern created from logo mark is etched into glass LED lighting illuminates translucent white acrylic panels behind glass (colors can be changed seasonally or animated as desired)

PROJECT NAME

15'-0" 2'-6"

Signage Study at Cobb Galleria Atlanta, GA

6'-0" CLIENT

Cobb-Marietta Coliseum & Exhibit Hall Authority

1'-4"

48'-0"

8'-0"

191 Peachtree Street NE

25'-0" Halo illuminated, dimensional letters Opaque faces with contrasting returns

Atlanta, GA 30303-1770

Illuminated LED display (3-sided) Content wraps return on side facing I-285

www.coopercarry.com

404-237-2000 (T) 404-237-0276 (F)

© 2017 COOPER CARRY, INC.

Digital content wraps corner of screen return

100'-0"

60’-0” above Galleria Dr. ensures sign is not obstructed by pedestrian bridge

PRINCIPAL

Angelo Carusi

Custom pattern created from logo mark

Custom fabricated aluminum sign cabinet with welded and smoothed seams on sign face, smooth all welds and fill all gaps prior to painting to appear seamless

60'-0" (above Galleria Drive)

Suite 2400

PROJECT MANAGER

Stephen Carlin

Cable-mullion system (or similar) holds glass panels with custom frit pattern etched into glass

Concealed interior structure embeds into foundation to be designed by fabricator’s engineer and detailed in shop drawings once concept is detailed

4'-0" 8'-0"

Recessed base - concrete or frame clad with aluminum skin TBD by fabricator’s engineer and detailed for approval

DESIGNER

Bobbi Sweeney

LED lighting (colors can be changed seasonally or animated as desired) to illuminate tranlucent acrylic panels behind glass

PHASE

Schematic Design PROJECT NO. M:\2017\20170284\d-10 EGD

20170284.01

Ground lighting concealed in landscaping to wash face of sign at night

1'-0"

DATE

11-03-2017

Galleria Drive Concealed access door to allow for maintenance personnel to enter and ascend via internal ladder PAGE NUMBER

SOUTH ELEVATION (I-285 Northbound) Scale: 1/16” = 1’-0”

EAST (Galleria Drive)

NORTH ELEVATION (I-285 Southbound)

WEST (I-285)

EG-1.06

Final Marquee Rendering Nov 14.pdf

Cobb Galleria. Atlanta, GA. CLIENT. Cobb-Marietta. Coliseum & Exhibit. Hall Authority. 191 Peachtree Street NE. Suite 2400. Atlanta, GA 30303-1770. 404-237-2000 (T). 404-237-0276 (F) ... with face. Digital content wraps corner. of screen return ... Main menu. Displaying Final Marquee Rendering Nov 14.pdf. Page 1 of 3.

1MB Sizes 0 Downloads 186 Views

Recommend Documents

CA-Final-Nov-16-Ammendment.pdf
applicable in place of “Overview of International Accounting Standards (IAS) / International Financial Reporting. Standards (IFRS), Interpretations by ...

Birthday Marquee Info.pdf
There was a problem previewing this document. Retrying... Download. Connect more ... Birthday Marquee Info.pdf. Birthday Marquee Info.pdf. Open. Extract.

FINAL REVISED TAXI FARE NOV. 2017.pdf
REVISED TAXI FARE (INTER-DISTRICT OR LONG DISTANCE): ALL DZONGKHAGS AND LOCAL ROUTES. (REVISED ON ..... ROUTE:SAMDRUPJONGKHAR- CHORTENKORA................................................................................................................

Invitation to Tender PO NEGROS ORIENTAL final nov 23.pdf ...
Akhir September, Skema Pajak Toko Online Selesai. Whoops! There was a problem loading this page. Retrying... Whoops! There was a problem loading this page. Retrying... Invitation to Tender PO NEGROS ORIENTAL final nov 23.pdf. Invitation to Tender PO

PEI version final (nov 2016)_impresa(1).pdf
... básica es 77,4% y el de media es 71,5%. Entre el. 60% y el 80 % de nuestros alumnos son prioritarios, y se encuentran. en situación de vulnerabilidad social.

ANREP Final Draft Nov 3.pdf
... of solar, wind, hydro, geothermal, and biomass that can. provide a secure and sustainable source of energy supply. These renewable energy resources have.

ANREP Final Draft Nov 3.pdf
Rehabilitation and Development. 8. Da Afghanistan Breshna Sherkat (DABS). 9. Renewable Energy Coordination Committee. 10. National Environmental Protection Agency/NEPA Islamic Republic of Afghanistan. 11. USAID. 12. GiZ ESRA. Page 3 of 27. ANREP Fina

CA Final Advanced Management Accounting (AMA) Paper Nov 2015 ...
Page 3 of 16. CA Final Advanced Management Accounting (AMA) Paper Nov 2015.pdf. CA Final Advanced Management Accounting (AMA) Paper Nov 2015.pdf.

CA final IDT Flow charts Nov 2015.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. CA final IDT ...

Final Newsletter - Westphalia - Nov 14 2016.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Final Newsletter ...

FINAL REVISED TAXI FARE NOV. 2017.pdf
(REVISED ON NOVEMBER, 2017). Page 2 of 90. Contents. ROUTE: TRONGSA-PHUENTSHOLING. ... ROUTE: DAGA DZONG-DAMPHU. ...... 50. Page 4 of 90. FINAL REVISED TAXI FARE NOV. 2017.pdf. FINAL REVISED TAXI FARE NOV. 2017.pdf. Open. Extract. Open with. Sign In.

CA Final all Accounting Standards Summary for Nov 2015..pdf ...
CA Final all Accounting Standards Summary for Nov 2015..pdf. CA Final all Accounting Standards Summary for Nov 2015..pdf. Open. Extract. Open with. Sign In.

CP-Final-AEJ-Nov-2014.pdf
control continues to be used in investigations of behavioral patterns and psychological treatments. For example,. Burger (1992) depicts the desire for control as an important factor within various phenomena such as achievement,. psychological adaptat

FINAL SCHEDULE - Girls WSYL - Nov 19.pdf
D4 West Suburban Dream Banks C8 LockDown 6Niego Niego 3:00 PM D4 v D5 D11 v D14 E8 v E10 C5 v C9. D5 IL X-Citement 6/7 Hillman C9 LockDown 7IVY ...

Adobe Training Photoshop CS6 Basics Working with Marquee ...
Adobe Training Photoshop CS6 Basics Working with Marquee Selections.pdf. Adobe Training Photoshop CS6 Basics Working with Marquee Selections.pdf.

volume rendering pdf
Page 1 of 1. File: Volume rendering pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. volume rendering pdf. volume ...

RENDERING GERRYMANDERING IMPOTENT
Specifically, the Democrats. (3.6) min dn. [Fd (dn)(dn − (−1)) + (1 − Fd (dn)) (rn − (−1))] ,. 8I'll discuss alternative obejective functions when examining the reform. 9Perhaps such candidates have trouble amassing the support needed to ma

pdf rendering engine
... was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. pdf rendering engine.

sketchup rendering tutorial pdf
File: Sketchup rendering tutorial pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. sketchup rendering tutorial pdf.

Importance Sampling for Production Rendering - Semantic Scholar
in theory and code to understand and implement an importance sampling-based shading system. To that end, the following is presented as a tutorial for the ...