..

~

PROCEDINGS OF THE STATE PROJECT DIRECTOR (FAC) SARVASHIKSHA ABHIY AN (SSA), ANDHRA PRADESH, HYDERABAD Present: Shri Ram Shankar Naik, LA.S., Rc. No. 2247/ APSSA/OSC/ A I0/20 14

Dated -11-2014

Sub:- APSSA, Hyderabad- OSCActivities -JBMV Programme-Preparation of Micro plans and Rectification of errors noticed in the data entry-Nomination of one designated officer at Mandai level for coordinating and carrying out the data entry into the Micro Plan Web portal-Certain Instructions-Issued--Reg. Ref:- This office Proceedings of even no., dated 13-11-2014 *****

All the Project Officers are aware that the "Janmabhoomi Maa Vooru" programme was conducted in two spells in the months of October and November, 2014 and Micro plan data were collected on important parameters of core departments for each OP/Ward. As regards OSC, information was collected on important items, like "Children never enrolled" and "Children dropped out". In this regard, it is observed that in spite of repeated instructions, the data entry was not properly done at mandai level, giving rise to several errors and inconsistencies in the Micro plans and District Status Reports. Even the "edit" option could not be utilized effectively for rectification of errors. While furnishing Child-wise data, Adhar numbers and mobile numbers were recorded only for 20% of children listed. Still variations persist and no consistency is observed in the District-wise status reports, Micro plan reports (obtained from the jbmv.ap.gov.in website) and the consolidated information furnished by the District Project Offices which led to an impression that no proper check was carried out by the officers who are at the helm to determine the accuracy and quality of data. The above reports are attached, herewith, for ready reference. All the Project Officers are, therefore, requested to critically examine the data so far entered in the Micro plans by comparing with the available data collected through different sources and take speedy measures to rectify all the errors and remove inconsistencies for preparation of Micro Plans at OP/Ward level. In the process, the Project Officers need to consult and coordinate with the MRO, MPDO at mandai level and CPO at District level. They also need to lay stress on the following important points in order to make the exercise a meaningful one.' i)

Planning of re-visits to G.Ps/Wards for collecting data gaps and missing

information:

.

All available resources are required to be pooled up at the mandai level to take up this exercise on priority. ii)

Recording of Child-wise Adhar card number and Contact Number: In case of non-availability of Adhar card, Ration card or Election ID may be used. In case, mobile number of the Parent or any other family member is not available,

.- ---~

-2mobile number of close relatives/field functionaries like School teacher, HM, AWW, who are closely associated with data collection and can furnish the details of the child may be co~sidered for the purpose. iii)

Completion of data entry: In a meeting held at the Planning Department of A.P. Secretariat on 14-11-2014, it was informed that the data so far entered at the mandai level will be frozen shortly, i.e., in 3-4 days' time in order to have a final assessment before taking up further follow up action. Therefore, the data entry should be completed at any cost before the dead line., t-t--)

~ H.-ft~).of4 .

iv)

Analysis and accuracy of the data: The data thus entered is required to be analysed carefully for its accuracy and certified by the officers concerned. As this is going to be the final data and will be used by the SSA and other agencies for planning and policy fonnulation in the annual plans, the P.Os need to obtain the required certificates from the MEOs concerned.

v)

Nomination of "Micro plan monitoring officer" at the mandai level: In continuation of the instructions issued vide proceedings cited under reference, all the P.Os are requested to nominate the MEOs at mandai level and to forward their user names and mobile numbers to this office for taking further necessary action.

It is reiterated that only accurate. qualitative and verifiable data need to be entered in the Micro plans which fonns the basis for all its future endeavours. All the Project Officers are, therefore, requested to follow the instructions scrupulously and strive for expeditious rectification of errors noticed in the data entry in respect of OSC parameters and send their "Action taken reports" soon to the undersigned.

R To All the Project Officers in the State Copy to the District Collectors concerned Copy to the District Educational Officersconcerned Copy to the Commissioner& Director of School Education,A.P.

c.~r7 to c.Dtry

~\,

~~~

~~-0'-~v1

~dlo-tg~

PIa..-""~~

~ ,~

bM

~ROJECT

~~

DIRECTOR

~! 'r ~'\l'

L11

Sp..;::.8-f ~t.J-

J', ~

Aa

,

~

!~e..~

Janmabhoomi-Maa Micro Plan Report on Education s. No

Nameof the District

Vooru (Rural) as on 15.11.2014

Children 6-14 Children 6-14years Children 6-14 ' Never Enrolled years years Dropped Out

1

Srikakulam

171840

1174

14

2

Vizianagaram

241732

182

283

3

Visakhapatnam

255259

0

14

4

East Godavari

416946

303

164

5

West Godavari

371196

4100

67

6

Krishna

296665

2730

115

7

Guntur

367389

330

638

8

Prakasam

291998

3984

725

9

Nellore

238512

1165

1354

10 Chittoor

386276

61

230

11 Kadapa

237033

0

295

12 Anantapur

320131

4532

122

13 Kumool

367389

330

638

3962366

18891

4659

Total

Janmabhoomi-Maa

Vooru

Micro Plan Report on Education (Urban) as on 15.11.2014

S. No

Name ofthe District

Children 6-14 Children 6:14 Children 6-14years Never Enrolled years years Dropped Out

1

Srikakulam

7013

0

0

2

Vizianagaram

51027

0

23

3

Visakhapatnam

47654

0

20

4

East Godavari

97512

238

35

5

West Godavari

54485

1499

20

6

Krishna

114448

388

23

7

Guntur

121669

88

119

8

Prakasam

59096

2023

1

9

Nellore

43588

36

208

10 Chittoor

100555

1

28

11 Kadapa

106010

0

8

12 Anantapur

78215

1095

5

13 Kumool

99831

0

17

981103

5368

507

Total

Janmabhoomi-Maa

Vooru

Consolidated Format Submitted by the DPOs as on 15.11.2014 S.No

Nameof the District

Never Enrolled

Drop out

Total

Aadhaar Enrolled

Mobile Numbers

.

1

Srikakulam

1

11

12

7

9

2

Vizianagaram

3

383

386

-

-

3 Visakhapatnam

8

61

69

32

\6

4 East Godavari

-

184

184

70

3

5 WestGodavari

-

3

3

3

3

6 Krishna

-

117

117

43

8

7 Guntur

1

505

506

150

219

8 Prakasam

-

2618

2618

-

-

Nellore

3

282

285

150

84

10 Chittoor

1

248

249

182

224

11 Kadapa

0

65

65

52

22

9

12 Anantapur

13 Kurnool Total

-

32

32

23

-

199

199

-

-

17

4708

4725

712

588

Comparitive Statement as on 15.11.2014

Category

Micro Plan Data as per JBMV Website

Brief District-wise Status Report as per JBMV Website

Consolidated formats submitted by DPOs

Never Enrolled

Drop out

Never Enrolled

Drop out

Never Enrolled

Drop out

Rural

19155

4246

2215

4904

x

x

Urban

5368

507

17015

1344

x

x

Total

24523

4753

19230

6248

17

4708

information -

Nov 15, 2014 - observed in the District-wise status reports, Micro plan reports ... website) and the consolidated information furnished by the District Project Offices which led to an impression that no proper check was carried out by the officers ...

2MB Sizes 5 Downloads 130 Views

Recommend Documents

INFORMATION
Jan 1, 2018 - loop from the Wooden Boat Centre to Petty Sessions, passing many heritage ... of tour guide maps. Partners. The project owner is the Franklin.

Information reproducing system, information recording medium, and ...
Dec 12, 1996 - read by a code reading section. The binariZing section has a. G06K 9/38. (2006.01) reference dot detection section, a dot area measuring ...

Personal Information Personal Information Education ...
Phone number of the school: 249830690. Your grades: four 2s, three 10s ... Ability to word with computers: Internet Explorer, Microsoft Word,. Microsoft Excel ...

The Information Economy and Information and ... - IJEECS
Abstract—Information is a key strategic asset and Information assets are perhaps the most important type of asset in the knowledge-based economy. The Information economy mainly defined by the extension of information and communication technologies.

Discussion of Information Issues- Information Standards.pdf ...
Library Standards, presented by the Association for Library Collections and Technical Services. (ALCTS) and the National Information Standards Organization ...

Information Technology and Management Information Systems ...
Information Technology and Management Information Systems Winter 2011.pdf. Information Technology and Management Information Systems Winter 2011.pdf.

man-129\information-technology-vs-information-systems.pdf ...
man-129\information-technology-vs-information-systems.pdf. man-129\information-technology-vs-information-systems.pdf. Open. Extract. Open with. Sign In.

The Information Economy and Information and ... - IJEECS
[9] Rodolfo Noel S. Quimbo, 2003, Legal and Regulatory Issues in the. Information Economy, e-ASEAN Task Force. [10] The Information Policy Institute, 2010, ...

Background Information Ministry Information
As you may be aware, the Pogson's have been called to serve in Germany with Black Forest Academy and Janz Team Ministries. We have rented out our house in California in preparation for the move to Germany. God has been so faithful through this journe

Sharing Your Information - Information Governance.pdf
Sharing Your Information - Information Governance.pdf. Sharing Your Information - Information Governance.pdf. Open. Extract. Open with. Sign In. Main menu.

SERVICE INFORMATION
eTEK [ ] TECHNICIAN [ ]. Enclosed herewith is the fixed menu pricing for Warranty/Pre-Sale / Goodwill and Accident/Insurance. Body/Paint repairs jobs carried ...

Supporting Information
Jul 13, 2010 - macaque brain consists of 95 vertices and 2,402 edges [1], where the network models brain regions as vertices and the presence of long dis-.

Supporting Information
Jul 13, 2010 - brain regions, lack of acronym field in the connectivity database, the ..... 2. while (some vertex in (Vk+1, Ek+1) has degree less than k + 1). (a) Set mk .... Goodale MA, Mansfield RJ (MIT Press, Cambridge, MA), pp 549-586. 18.

SERVICE INFORMATION
Door Hinge cover - One. 190. 200. 300. 150. 160. 240. 130. 130. 200. Spare wheel cover. 190. 700. 1000. 150. 560 ... Tools & Equipment Cell. & - Maximum ...

Supporting Information
Oct 26, 2010 - between 0.3 and 1.0 mL of an aqueous colloidal dispersion. (4 g∕L) of partially doped polyaniline nanofibers was mixed with. 3 mL of DI water.