STATE OF MINNESOTA  

Minnesota Pollution Control Agency  

INDUSTRIAL DIVISION  PUBLIC NOTICE OF INTENT TO ISSUE   NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/  STATE DISPOSAL SYSTEM (SDS) PERMIT MN0070262   

Public Comment Period Begins:  Public Comment Period Ends:   

December 26, 2012  January 25, 2013           

Name and Address of Permittee:  Facility Name and Location:  Recovery Technology Solutions  Recovery Technology Solutions  7700 Equitable Dr Ste 205  284th Street East  Eden Prairie, MN  55344  SE1/4 of the NW1/4 Sec. 5, T112N, R18W     Randolph, Dakota County, Minnesota      Receiving Water:  Chub Creek [Class 2B, 3C, 4A, 4B, 5&6    Description of Permitted Facility  Recovery Technology Solution (RTS) is proposing construction of a new industrial facility to be located in the city of  Randolph  Great  Western  Industrial  Park.    The  proposed  facility  will  be  a  recycled  asphalt  shingle  (RAS)  asphalt  extraction plant with a processing capacity of 200 tons per day of RAS.    There are a number of processes contributing to the overall wastewater discharge from the proposed new facility.   Raw well water will be used in the rotochopper cooling/dust control process.  Water will be added to the RAS  during grinding to reduce minimize heat from friction within the machine and for dust control.  Water for use in  the boiler and cooling towers is pretreated through a sand filter followed by purification to remove naturally  occurring materials in a reverse osmosis system.  The resulting water stream is routed directly to the cooling  towers, or softened before use in the boiler.    There permittee proposes a total facility discharge from water treatment and cooling processes and the extraction  skim pit at an average rate of 30,340 gallons per day.  The permittee proposes a new discharge to Chub Creek via  an underground pipe paralleling the Chicago and Northwestern Railroad tracks (from the facility to surface waters  is ≈1.16 miles).  The location of the facility and route to receiving water are shown on the attached Topographical  Map.   

Page 2 of 4  Permit MN0070262     

  Effluent limitations for the proposed discharges (including stormwater associated with an industrial activity) are  technology‐based and water quality‐based for protecting of a receiving stream with a fishable/swimmable  beneficial use. The technology‐based effluent limitation for Toluene must be met prior to mixing with total facility  waste streams (water treatment and cooling processes).  The thermal limitation, which is water quality‐based, can  be meant following co‐mingling with all waste streams. Because this is a new discharge upstream of a waterbody  listed as impaired for nutrients (phosphorus), RTS has entered into a trade agreement with the city of Northfield to  offset the low levels of phosphorus found in a groundwater source.     Preliminary Determination on the Draft Permit  The Minnesota Pollution Control Agency (MPCA) Commissioner has made a preliminary determination to issue this  NPDES/SDS permit for a term of approximately five years.      A draft permit is available for review at the MPCA office at the St. Paul address listed below and on‐line at  http://www.pca.state.mn.us/news/data/index.cfm?PN=1.    A copy of the draft permit will be mailed to you if the MPCA receives your written or oral request at this office. If  you have questions about this draft permit or the Commissioner's preliminary determination, please contact  Deborah Idzorek at 651‐757‐2704.    Written Comments  You may submit written comments on the conditions of the draft permit or on the Commissioner’s preliminary  determination.      Written comments must include the following:    1.  A statement of your interest in the permit application or the draft permit.  2.  A statement of the action you wish the MPCA to take, including specific references to sections of the draft  permit that you believe should be changed.  3.  The reasons supporting your position, stated with sufficient specificity as to allow the Commissioner to  investigate the merits of your position.    Petition for Public Informational Meeting  You also may request that the MPCA Commissioner hold a public informational meeting. A public informational  meeting is an informal meeting that the MPCA may hold to solicit public comment and statements on matters  before the MPCA, and to help clarify and resolve issues.    A petition requesting a public informational meeting must include the following information:    1.  A statement identifying the matter of concern.  2.  The information required under items 1 through 3 of “Written Comments,” identified above.  3.  A statement of the reasons the MPCA should hold a public informational meeting.  4.  The issues that you would like the MPCA to address at the public informational meeting.    Petition for Contested Case Hearing  You also may submit a petition for a contested case hearing. A contested case hearing is a formal evidentiary  hearing before an administrative law judge. In accordance with Minn. R. 7000.1900, the MPCA will grant a petition 

Page 3 of 4  Permit MN0070262     

to hold a contested case hearing if it finds that: (1) there is a material issue of fact in dispute concerning the  application or draft permit; (2) the MPCA has the jurisdiction to make a determination on the disputed material  issue of fact; and (3) there is a reasonable basis underlying the disputed material issue of fact or facts such that the  holding of the contested case hearing would allow the introduction of information that would aid the MPCA in  resolving the disputed facts in making a final decision on the draft permit. A material issue of fact means a fact  question, as distinguished from a policy question, whose resolution could have a direct bearing on a final MPCA  decision.    A petition for a contested case hearing must include the following information:    1. A statement of reasons or proposed findings supporting the MPCA decision to hold a contested case hearing  according to the criteria in Minn. R. 7000.1900, as discussed above.  2. A statement of the issues proposed to be addressed by a contested case hearing and the specific relief  requested or resolution of the matter.    In addition and to the extent known, a petition for a contested case hearing should also include the following  information:    1. A proposed list of prospective witnesses to be called, including experts, with a brief description of proposed  testimony or summary of evidence to be presented at a contested case hearing.  2. A proposed list of publications, references, or studies to be introduced and relied upon at a contested case  hearing.  3. An estimate of time required for you to present the matter at a contested case hearing.    MPCA Decision  You may submit a petition to the Commissioner requesting that the MPCA Citizens’ Board (Board) consider the  permit issuance. To be considered timely, the petition must be received by the MPCA by 4:30 p.m. on the date the  public comment period ends, identified on page 1 of this notice. Under the provisions of Minn. Stat. § 116.02,  subd. 6(4), the decision whether to issue the permit and, if so, under what terms will be presented to the Board for  decision if: (1) the Commissioner grants the petition requesting the matter be presented to the Board; (2) one or  more Board members request to hear the matter before the time the Commissioner makes a final decision on the  permit; or (3) a timely request for a contested case hearing is pending. You may participate in the activities of the  Board as provided in Minn. R. 7000.0650.    The written comments, requests, and petitions submitted on or before the last day of the public comment period  will be considered in the final decision on this permit. If the MPCA does not receive written comments, requests, or  petitions during the public comment period, MPCA staff as authorized by the Board, will make the final decision on  the draft permit.    Comments, petitions, and/or requests must be submitted in writing on or before the end date of the public  comment period identified on page 1 of this notice to:    Deborah Idzorek, 5th Floor  Minnesota Pollution Control Agency  520 Lafayette Road N  St. Paul, MN  55155‐4194   

Page 4 of 4  Permit MN0070262     

   

Proposed Facility Location and Route to Receiving Water  Proposed  Site Location

 Cre C hub

ek

Discharge  Point SD 001

         

Intent to Issue NPDES and SDS Permit to Recovery Technology ...

Dec 26, 2012 - There are a number of processes contributing to the overall wastewater discharge from the proposed new facility. Raw well water will be used ...

1MB Sizes 0 Downloads 185 Views

Recommend Documents

Intent to Issue NPDES and SDS Permit to Recovery Technology ...
Dec 26, 2012 - The proposed facility will be a recycled asphalt shingle (RAS) asphalt ... http://www.pca.state.mn.us/news/data/index.cfm?PN=1. A copy of the draft permit will be mailed to you if the MPCA receives your written or oral request ...

Letter of Intent to Continue Homeschooling
Submit information for a Letter of Intent to Continue Homeschooling to the superintendent's office in the school district where the ... information using this suggested form or a written or electronic format of your choosing. ... Phone, including.

The Intent to Live
Scaramucci Is Hosting an Online Event Because America Hasn t Seen the Last ... This isn’t your typical Uber is a shitty company story either If these claims ...

Stress, Burnout, Job Satisfaction, and Intent to Leave ...
and Sellnow's study found that tournament scheduling (hosting and traveling) contributed ... removed because of the lack of a website or coach contact information, leaving a mass e- mail list of 347. ... 24), seven and nine years (n = 22), and 10 and

Letter of Intent to Continue Homeschooling
Do NOT mail to the Minnesota Department of Education. Complete the information using this suggested form or a written or electronic format of your choosing.

Intent to Run Form (Spring '17).pdf
Eligible Ineligible. Advisor Signature: Date: Page 3 of 3. Intent to Run Form (Spring '17).pdf. Intent to Run Form (Spring '17).pdf. Open. Extract. Open with. Sign In.

INTENT TO RETURN for 2018-2019 School Year Child's Name ...
There are hundreds of people waiting to get into City Neighbors Charter School. In order to know how many places we will have available in our school next.

PRSSA 2017 Regional Conference Intent to Bid Form
Jul 15, 2017 - Vice President of Events and Fundraising Bryar Keyes ([email protected]). National President Andrew Cook ([email protected]).

intent to move a column 2017-2018.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. intent to move a ...

(SDS OFFICE)
Jul 18, 2016 - The Mathematics Teachers Association of the Philippines (MTAP) will be offering the ... (Write the name of Centers with the names of Coordinator) ... Call attention of any trainer who does not come on time or fails to attend to ...

audio-visual intent-to-speak detection for human ...
IBM T.J. Watson Research Center. Yorktown ... image. The second step is an audio-visual speech event detection that combines both visual and audio indi-.

Intent to Run Form (Spring '17).pdf
electorate as to the identity of the candidate will be accepted, and no ... Return this completed form to 5261A Talley by Monday, February 13th at 5:00p.m.

audio-visual intent-to-speak detection for human-computer interaction
to detect a user's intent to speak to a computer, by ... Of course this is not a natural and convenient thing to do for the user. .... A good candidate thresh-.

American Freedom Party Notification of Intent to ... - State of California
Aug 21, 2015 - ... CA 95814 | Tel 916.657.2166 | Fax 916.653.3214 | www.sos.ca.gov ... to use when sending this information to the CalVoter database. Please ...

Combining Source- and Localized Recovery to Achieve ...
response, special civilian or military operations) call for efficient reliable multi- ..... The way recovery requests and replies (or retransmissions) are routed has signif- ..... ceedings of the third annual ACM/IEEE international conference on Mobi

GoG request to issue 2018 bond and GDN.pdf
GoG request to issue 2018 bond and GDN.pdf. GoG request to issue 2018 bond and GDN.pdf. Open. Extract. Open with. Sign In. Details. Comments. General ...

Attachment C - Notice of Intent to Submit an Application.pdf ...
or provide critical system supports. (To be eligible for funding under this category, you must check one of the boxes. below.) The proposed Project is available to the CoC for combining (“bundling with Permanent Supportive Housing or. Rapid Rehousi

Notice of Intent to Sue Letter-Detroit Renewable Power.pdf ...
Notice of Intent to Sue Letter-Detroit Renewable Power.pdf. Notice of Intent to Sue Letter-Detroit Renewable Power.pdf. Open. Extract. Open with. Sign In.

American Freedom Party Notification of Intent to ... - State of California
Aug 21, 2015 - County Clerk/Registrar of Voters (CC/ROV) Memorandum #15097. TO: All County Clerks/Registrars of Voters. FROM: /s/ Jennifer Luckie-Bratt.