For More Question Papers Visit - www.pediawikiblog.com 10EC54

USN Fifth Semester B.E. Degree Examination,

June/July

2017

co m

Microwaves and Radar Time: 3 hrs.

Max. Marks: 100

Note: 1. Answer FIVEfull

questions, selecting at least TWO questions from each part. 2. Usage of Smith chart is permitted. PART-A Define standing wave ratio. Why the high value Deduce the expression for reflection co-efficient load impedance (ZL)' A transmission line of 100m length and a terminated by a load ZL = 100 - j200 ohms. impedance and also admittance at 25m from the

2

a.

(07 Marks)

What are microwave iso lators? Explain the operation of a Faraday rotation ferrite isolator. List applications of an isolator. (10 Marks) What are cavity resonators? What applications do they have? (05 Marks) With the aid of neat sketch, explain the operation of a two-hole wave guide directional coupler. (05 Marks)

w

ik

b. c.

a.

With the aid of energy band diagram, explain two-valley model theory for Gunn diodes.

b.

A typical n-type GaAs Gunn diode has the following parameters: Threshold field Eth 2800V/cm Applied field E 3200V/cm Device length L 10 urn Doping concentration no 2 x 1014 cm-3 Operating frequency f 10 GHz i) Compute the electron drift velocity ii) Calculate the current density iii) Estimate the negative electron mobility Draw the schematic of an IMPATT diode and explain the its operation.

di a

(07 Marks)

(06 Marks) (07 Marks)

w

c.

.p e

3

(08 Marks)

characteristic impedance of 100 ohms is Using the Smith chart, determine the line load end at a frequency of 10MHz.

ib

c.

of SWR is undesirable? (05 Marks) when the transmission line is terminated by

g.

a. b.

lo

1

a.

b.

What are S - parameters of two part network? Why these parameters are preferred to Z and Y parameters for operation in microwave frequencies? (08 Marks) State the properties of S - parameters. Prove the unitary property of S - parameters.

c.

Write the S - matrix for E - plane Tee.

a. b. c.

Write note on : Hybrid - Tee and its applications Mircrowave attenuator Coaxial connectors

w

4

(08 Marks) (04 Marks)

~

w

o Z

C

~ o

0-



PART-B 5

(08 Marks) (05 Marks) (07 Marks)

1 of2

For More Question Papers Visit - www.pediawikiblog.com

For More Question Papers Visit - www.pediawikiblog.com

lOEC54

8

m

co

strip in order to have a characteristic

strip line. (08 Marks) parallel strip lines? (05 Marks) the conductor and dielectric losses of a (07 Marks)

Derive the radar range equation as governed by the minimum receivable echo power.

b. c.

List the applications of Radar. (05 Marks) Draw a functional block diagram of a pulsed radar- and describe the function of each block.

a. b. c.

ib

a.

ik

7

oxide Beo) and a thickness d of 4mm. Compute: i) The required width 'w' of the conducting impedance of 50n ii) The strip line capacitance iii) The strip line inductance iv) The phase velocity of the wave in the parallel What are the advantages of coplanar strip lines over Derive the expression for attenuation constants for parallel strip line at microwave frequencies.

g.

b. c.

A lossless parallel strip line has a conducting strip width W. The substrate dielectric separating the two conducting strips has a relative dielectric constant Erd of 6 (Beryllium

lo

a.

With the aid of neat block diagram, explain the operation of an MTI system. What is blind speed? Describe digital MTI system.

w

6

w

w

w

.p

ed

ia

*****

20f2

For More Question Papers Visit - www.pediawikiblog.com

(08 Marks)

(07 Marks) (08 Marks) (05 Marks) (07 Marks)

Microwaves July 2017 (2010 Scheme).pdf

Explain the operation of a Faraday rotation ferrite isolator. List applications of an isolator. (10 Marks) ... What are S - parameters of two part network? Why these ...

2MB Sizes 10 Downloads 230 Views

Recommend Documents

Fluid Mechanics July 2017 (2010 Scheme).pdf
mothers for daughters is that which forevermoreshall bethe United States needs to limit theamount ofimmigrants it lets in every day, week,. month,and year. In trap wetrust.HighHeelsand LowLifes 2001.Whitecollar s01e07.65730397309. Symantecendpoint pr

July 2010.pdf
Page 1 of 56. Serious & complex Crown Court cases. • Court of Appeal cases. • Confiscation & Proceeds of Cr. •. •. •. •. •. • ime Act Proceedings. Members of the VHCC Panel. SERIOUS AND. COMPLEX CRIME. PRISON LAW. TEL : 08458 73 73 33

Environmental Engg 1 July 2017 (2010 Scheme).pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Main menu. Whoops! There was a problem previewing Environmental Engg 1 July 2017 (2010 Scheme).pdf. Retrying

Electrical Power Utilization July 2017 (2010 Scheme).pdf
Page 2 of 2. For More Question Papers Visit - www.pediawikiblog.com. For More Question Papers Visit - www.pediawikiblog.com. www.pediawikiblog.com. Page 2 of 2. Main menu. Displaying Electrical Power Utilization July 2017 (2010 Scheme).pdf. Page 1 of

Computer Networks 2 July 2017 (2010 Scheme).pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Main menu.

Operations Management July 2017 (2010 Scheme).pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Main menu.

Microwaves & RF
Silicon Labs, STMicroelectronics, SiTime. Corp., Linear Technology Corp., Mobius. Microsystems, and Vectron International. (see the table). Ecliptek (www.ecliptek. com), for example, has improved the long-term frequency stability and ther- mal hyster

2010 FORD IRONMAN USA, LAKE PLACID Sunday, July 25th 2010 ...
Jul 25, 2010 - 9:59:40 Loverich, Jacob STATE COLLEGE. PA. USA M30-34 ..... 10:13:42 Krebs, Andrew STATE COLLEGE. PA ...... MELBOURNE BEA. FL.

July 2017
Jul 1, 2017 - 6:00-8:00 pm [12U and. 14U]. Coach Brian Workout. 2nd St, Cat. City. 6:00-8:00 [12U and. 14U]. Field Practice. I St Park, Yucaipa. 6:00-8:30 pm. [12U and 14U]. 23. 24. 25. 26. 27. 28. 29. 12U TBD. Ohana Tiger Friendly,. Whitter [14U]. C

MICROWAVES AND RADAR.pdf
power of the reflected signal at the radar with a 20 m2 target at 5.556 Km. Given Ae = 9 m2. Also derive the necessary formula. 12. 8. a) With the help of a block ...

July 2017 Recruitment.pdf
Company No. 8252639 | Charity No. 114990. Page 3 of 3. July 2017 Recruitment.pdf. July 2017 Recruitment.pdf. Open. Extract. Open with. Sign In. Main menu.

July 2017 Bulletin.pdf
Central Coast Gang Show 22. Mad Hatter's (High) Tea Party 23. Contents, continues. Photos from M.O.S.C.. Page 3 of 23. July 2017 Bulletin.pdf. July 2017 ...

July 2017 Newsletter.pdf
Page 1 of 12. NAFUSA Update. JULY 2017. Greetings! NAFUSA Update is published monthly. NAFUSA's website can be. accessed directly from this newsletter. New articles are posted to the website. during the month. You may also subscribe to NAFUSA email u

Date : July 13, 2017 - NSE
Jul 13, 2017 - For the purpose of trading on the system, the security shall be identified only by its designated codes and ... Email: [email protected].

Design of Machine 1 July 2017 (2010 Scheme).pdf
Fenwick, Annie Jarman, Dennis George, Dennis Arthur &. Malcolm Woods, Emily Mary Casbon, William Jabez & Ethel. Dawes, Moses Edmund, Gladys, Hilda, Cecil, Reginald and. Marie Heaton wherever they have been reborn. Page 4 of 8. Main menu. Displaying D

July 2017 calendar UV61 July 8-30.pdf
Zoo/Balboa Park. 27 Knott's Berry Farm 28 Departure 29. 30 31. Page 1 of 1. July 2017 calendar UV61 July 8-30.pdf. July 2017 calendar UV61 July 8-30.pdf.

Geo Technical Engg 1 July 2017 (2010 Scheme).pdf
Explain the suitability of variable head permeameter test and also derive the expression used. to find the coefficient of permeability. (06 Marks). c. For a field pumping test a well was ... www.pediawikiblog.com. www.pediawikiblog.com. Page 2 of 2.

Embedded Computing Systems July 2016 (2010 Scheme).pdf ...
Embedded Computing Systems July 2016 (2010 Scheme).pdf. Embedded Computing Systems July 2016 (2010 Scheme).pdf. Open. Extract. Open with. Sign In.

Computer Graphic & Visualization July 2016 (2010 Scheme).pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Computer ...

Electrical Engineering Materials July 2014 (2010 Scheme).pdf ...
There was a problem loading this page. Retrying... Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Main menu. Whoops! There was a problem previewing

Energy Audit & Demand Side Management July 2014 (2010 Scheme ...
Energy Audit & Demand Side Management July 2014 (2010 Scheme).pdf. Energy Audit & Demand Side Management July 2014 (2010 Scheme).pdf. Open.

Power System Operation & Control July 2015 (2010 Scheme).pdf ...
Whoops! There was a problem loading this page. Retrying... Main menu. Displaying Power System Operation & Control July 2015 (2010 Scheme).pdf. Page 1 of ...

Data Compression July 2016 (2010 Scheme).pdf
Highlight the various distortion criterions used in lossy compression schemes. (04 Marks). Data Gompression. Note: Answer FIVE.full questions, selecting.

Material Science and Metallurgy July 2016 (2010 Scheme).pdf ...
... Visit - www.pediawikiblog.com. www.pediawikiblog.com. Page 1 of 1. Main menu. Displaying Material Science and Metallurgy July 2016 (2010 Scheme).pdf.