,< < <
-.
E< H
PNOC - Co.rpq
PNOC EXPLORATION CORPORATION Building 1, Energy center, Rizal Drive, Bonifacio Globatcity, Taguig city, Metro Manita
nE EEgy
oirect
riner8i"f-[fi ]:.tIj,i133)
840- 1 6 1 e
NOTICE OF NEGOTIATED PROCUREMENT (Small Value Procurement) PNOC Exploration Corporation (PNOC EC), through its 2017 Corporate Budget intends to apply
the sum of One Hundred Twenty Thousand Pesos (PhP120,OOO.OO[ inclusive oi'ail applicable taxes and other charges, being the Approved Budget for the-Contract (ABC) to payments under the contract for the Media Monitoring Services. Proposals received in excess
of the ABC shall be automatically rejected at bid opening. Please refer to the attached Term of Reference for the details.
Proposals (including conformed Terms of Reference) must be submitted to procurement Section, PNOC EC Bldg. 1 Energy Center, Rizal Drive, Bonifacio Gtobal City, Taguig City on or before May 15, 2017 not later than 1:00 P.M. or via fax at (02) 840-16t9 attenjion to Ms. Rodelina C. Bartolome or email at
[email protected]. Late proposals shall not be
accepted.
Contract Duration Penalty
One (1) year Failure to deliver the services when due will authorize our company to impose penalty equivalent lo 1110 of 1o/o of the total value of the total undelivered services for each day of delay of the services.
Bidders are required to submit photocopies and original (for verification) of the following
documents not later than five (5) days after the closing of bid submission. 1. Mayor's permit - current and valid 2. Ph|IGEPS Reg. Number 3. lncome Business Tax Return - latest 4. BIR Certificate of Registration 5. Notarized Omnibus Sworn Statement (see attached)
procurement p0ect is posted in our website at www.onoc-ec.com.ph and in the PhiIGEPS website at www.philgeps.gov.ph. Details of the procuremenl pro.lect may be downloaded by interested bidders free of charge from the said websites. This_
PNOC EC reserves the right to accept or reject any proposal, to annul the negotiation process, a1d to reject all proposals at any time, without thereby incurring any liability to the affected bidders. PNOC EC assumes no responsibility whatsoever to compensate or indemnifiT bidders for any expenses incurred in the preparation of the bid.
KT AK TCB/ARD
K6ttt'//
, RAYMUNDO
B. SAVELLA Chairman Bids and Awards Committee
TERMS OF REFERENCE
Media Monitoring Services for PNOC EC
A.
Scope of Work
L. On a daily basis, the contractor
will monitor pre-selected broadsheets, tabloids and magazines in the lookout for any news, features, advertisements, and all other articles with direct mention of PNOC and its subsidiaries and all other stories relevant to PNOC's operations. The selected articles shall be categorized as follows: PNOC EC News - news with direct mention of PNOC Exploration Corporation PNOC News - news with direct mention of PNOC (mother company), and PNOC Renewables Corporation Energy lndustry News - all news related to energy industry such as, but not limited to news on the following: (This category will be further subdivided into the following categories) Oi! and Natural Gas - includes news related to: Upstream oil and gas
a. b.
c.
i.
,/ ,/ ,/
Downstream petroleum Exploration projects of other companies involving oil and natural gas Crude oil performance CNG (Compressed NaturalGas) LPG (Liquified Petroleum Gas) Coal Mining, Trading and Marketing- all news concerning coal Renewable & Alternative Energy - includes news related to renewable energy and alternative energy such as: Geothermalenergy
,/ '/ ,/
ii. iii.
,/ ,/ ,/ ,/ ,/ r' ,/ ,/
iv.
Nuclear energy Solar energy Wind energy Biofuels Ethanols Biodiesel/Biogas Petrochemicals Petrochemicals - all news involving petrochemicals or byproducts of
v.
crude oil Power and Electricity
vi.
-
TransCo, etc. Energy lndustry Players such as: Petron
,/ ,/ ./ ./ r'
Shell
Caltex Fit
oit
Seaoil
/
Ftying V
all news involving power rates, NAPOCOR,
-
all news involving energy industry players
d.
Other Relevant News - all news concerning Governance Commission for GOCC's (GCG), Government Owned and Controlled Corporations (GOCCs), civil service issuances, SEC issuances, DENR announcements, environmental news and others that have or will have impact on the operations of PNOC and its subsidiaries
*All scanned news articles must have a header indicating the publication, date and page of the article
2. The contractor
shall scan all identified articles and upload them to a dedicated online site, grouped per category (i.e. 5 categories mentioned in no. 1). Uploading shall start not later than 7 AM. Uploaded materials shall automatically become accessible for PNOC EC employees in the website. These news items shall be made accessible in this website for at least 1 month.
3.
On a daily basis, not later than 8 AM, the contractor shall send an email to an unlimited number of PNOC officers and employees containing a list of all picked out articles grouped per category (referred to as Daily Summary). A click on each item shall direct the recipient to the scanned article in the contractor's website.
4.
On a daily basis, the contractor will also monitor pre-selected TV and radio programs in the lookout for direct mentions of PNOC and its subsidiaries. A listing of such program segments shall be emailed to PNOC EC's PR group within 24 hours after the broadcast. PNOC EC shall have the option to purchase a recording of these programs.
5. Within five days from the end of every month, the contractor
shall submit to PNOC
EC 3
sets of compact discs containing scanned images of all collected articles for the month.
B.
Monitored Media
L. Print L. Broadsheets a. Business Mirror b. BusinessWorld
c. Daily Tribune d. Malaya e. Manila Bulletin f. Manila Standard Today g. Manila Times h. Philippine Daily lnquirer i. Philippine Star
2.
Tabloids a. Abante b. Abante Tonite c. Balita d. People's Journal
Major
e. f. g. h.
3.
People's Tonite Pilipino Star Ngayon Taliba Tempo
Magazines
a. b.
BizNews Asia
Enterprise
c. Entrepreneur d. News Break e. Panorama f. Philippine Graphic g. Philippine Free Press h. Philippine Tattler i. Starweek j. Sunday lnquirer
2
2. TV
L. 2. 3.
ABC 5
-
Sentro, The Big News ABS CBN 2 - Magandang Umaga Bayan, lnsider, Bandila, TV Patrol World ANC 2L - Business Nightly, The World Tonight GMA 7 - Unang Hirit, Saksi, 24 Oras IBC 13 - IBC Express Balita, IBC Headliners, IBC News Tonight
4. 5. 6. NBN 4 -Teledyaryo 7. QTV 11- Balitanghali, News on Q 8. Studio 23 - Breakfast, News Central 9. CNN Philippines - morning and evening news service 3.
Radio (AM)
1.
2. 3.
-
Balitang Todo-Todo, Big Time Balita, Buena Manong Balita, Metro Balita, Super Balita sa Hapon, Super Balita Panggabi DZMM - Balita Ngayon, Todo Balita, Radyo Patrol Balita, Tambalang Failon at Sanchez, Dos Por Dos, Todo Todo Walang preno DZRH - Balitang Bayan, Balitang Tatsulok, Radyo Hataw, News Central Balita, DZBB
Tomorrow News Tonite
C,
Features of the Online Facility
L. As discussed in the scope of work, news clippings will be scanned and uploaded
to the contractor's online facility. ln this online facility, news clippings shall be grouped per
2.
category. Each item should indicate the name of the publication, and name of the reporter and
position in the publication.
3. The website shall be accessible by an unlimited 4.
number of PNOC employees through the provision of a common username and password. The website shall allow searches of archived news clippings according to the following parameters: a. Title of news article Name of industry player mentioned in the news article (even if not mentioned in the
b.
c. D.
title) Other categorization as deemed applicable by the contractor
Billing and Payment
L.
The contractor shall bill PNOC EC every 5th day of the month and PNOC EC shall pay for the services rendered and completed within 30 days from receipt of the invoice.