April 2, 2013 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE -- PNO-IV-13-002 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region IV, Arlington, Texas, staff on this date. Facility Arkansas Nuclear One, Units 1 and 2 Entergy Russellville, Arkansas Dockets: 05000313; 05000368 License Nos. DPR-51; NPF-6

Licensee Emergency Classification X Notification of Unusual Event Alert Site Area Emergency General Emergency Not Applicable

SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 2, NOTIFICATION OF UNUSUAL EVENT DESCRIPTION: On March 31, 2013, at approximately 7:50 a.m. (CDT), Arkansas Nuclear One (ANO), Unit 1 which was in a refueling outage, lost offsite power and ANO Unit 2 experienced a reactor trip after a 600 ton generator stator fell onto the turbine deck and then approximately 30 feet onto the train bay floor. The electrical non-vital busses supplying offsite power to Unit 1 were damaged, and some of the fire suppression system piping was damaged. The falling stator and crane components caused the supply breaker to Unit 2 reactor coolant pump B to open. The loss of reactor coolant pump B resulted in a Unit 2 reactor trip, which had been operating at 100 percent power. Both units are stable and remain shutdown. The licensee reported that one worker was killed and eight others were injured when the main generator stator fell. Seven workers have been treated and released from a hospital, while one remains hospitalized. With the loss of offsite power to Unit 1, both Unit 1 emergency diesel generators (EDGs) started and loaded onto their electrical busses. Decay heat removal was quickly restored. The Unit 1 emergency diesel generators continue to supply power to the vital electrical busses. At 9:22 a.m. (CDT), offsite power to Unit 2 from startup transformer 3 was lost because water from a fire main caused a short circuit. ANO Unit 2 EDG 2 started and energized the train B vital electrical bus, while train A vital and non-vital electrical busses were re-energized from startup transformer 2. The supply breaker from startup transformer 3 failed because of water intrusion stemming from damaged fire suppression system piping. Operators cooled down Unit 2 to hot shutdown. At 10:44 a.m. (CDT), the licensee declared a Notification of Unusual Event because the failure of the supply breaker may have been caused by an explosion in the breaker cubicle. The event was terminated at 6:21 p.m. because the affected electrical bus was not energized and there was no other damage. The fire suppression system to ANO Unit 1 is shutdown due to the damage to the fire water system piping. Damaged portions of the ANO Unit 2 fire protection system have been isolated. Additional fire water pumps have been positioned to provide fire water if necessary. The licensee has established fire watches in the auxiliary buildings of both units.

PNO-IV-13-002

-2-

The licensee informed the State of Arkansas Department of Health of the Notification of Unusual Event at 10:48 a.m. (CDT). The licensee has issued a press release. The NRC resident inspectors responded to ANO, and are monitoring the licensee’s actions. Two additional inspectors were dispatched to the site. The Region IV office received initial notification of this occurrence by telephone from the Senior Resident Inspector on March 31, 2013, at 8:25 a.m. (CDT). This information presented herein has been discussed with the licensee and is current as of 5:30 p.m. (CDT) on April 1, 2013. CONTACTS: Don Allen, Branch Chief, 817-528-3439 Fred Sanchez, Senior Resident Inspector, ANO ADAMS ACCESSION NUMBER: ML13092A024

PNO-IV-13-002 Arkansas Nuclear One, Unit 2, Notification of ... - NRC

Apr 2, 2013 - after a 600 ton generator stator fell onto the turbine deck and then approximately 30 feet onto the train bay floor. The electrical non-vital busses ...

51KB Sizes 0 Downloads 131 Views

Recommend Documents

PNO-IV-13-002 Arkansas Nuclear One, Unit 2, Notification of ... - NRC
Apr 2, 2013 - Site Area Emergency. General Emergency ... after a 600 ton generator stator fell onto the turbine deck and then approximately 30 feet onto.

San Onofre Nuclear Generating Station, Unit 2 - Request for ... - NRC
Dec 26, 2012 - predictive signal processing was the best method for monitoring ... of FEI or actual tube vibration, including a list of other methods (e.g., time domain ..... NAME. JRHali*. JBurkhardt. (SFigueroa for)*. DBroaddus. (BBenney for).

San Onofre Nuclear Generating Station, Unit 2 - Request for ... - NRC
Dec 26, 2012 - SCE's CAL response for SONGS Unit 2 and has determined that ... 4-12, appears to state that tube-to-tube wear (TIW) growth rates are .... of FEI or actual tube vibration, including a list of other methods (e.g., time domain.

UNIT 2 ACTIVITY 3
Can move many passengers plus cargo. Used mostly for fun. 82 ... 6. The has wings and no. 5. The has a motor and no motor. A towplane helps it become airborne. wings. Only a few of ..... Lift Versus Weight 2" x 10" paper strips. Grades 1-3.

Arkansas Services
science (CS) education using data from 18,938 surveys collected in 2014–2015 and 2015–2016 from U.S. K–12 school principals. These data are from a multi-year Google-Gallup study of U.S. K–12 students, parents, teachers, principals, and superi

Arkansas Services
Demand for CS education among parents in your school is (%) ...High. Demand for CS education among students in your school is (%) ...High. 9. 5. 14. 11. 8. 15. Support for CS (average % positive). CS education is currently a top priority for my schoo

NRC VI.pdf
Whoops! There was a problem loading more pages. Retrying... NRC VI.pdf. NRC VI.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying NRC VI.pdf.

ARKANSAS TRAVELER.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. ARKANSAS ...

NRC VI.pdf
there is no room for improvement. Second, the fairness measures are interrelated and ... NRC VI.pdf. NRC VI.pdf. Open. Extract. Open with. Sign In. Details.

Unit 2 Superconductors
Dipole Calculations. Top = access to Analyze Dipole procedure. Bottom = input for the calculations. Next Page = output results for Field ...

unit 2 personal selling - eGyanKosh
The Scope of Activities in Sales Situations 2.8 Summary. 2.9. Key Words ... order to use it properly, sales representative acts as a consultant to consumer, to.

unit 2 integration.pdf
Sep 6, 2017 - PERATURAN DIRJEN DIKTI PEDOMAN OPERASIONAL. Desember 2014. Page 3 of 4. unit 2 integration.pdf. unit 2 integration.pdf. Open.

Course 2 Unit 1 Practice
Explain how you would divide a mixed number by a fraction. 13. John cut a 4 ft long piece of lumber into shorter pieces to repair his deck. He cut three pieces each. 3. 4 ft long, and two pieces each. 1. 2 ft long. How much ... SpringBoard Course 2,

Unit 2 - Fair Haven Schools
Date. Time. Crack the Muffin Code ... of boxes possible, what is a code Daniel would never write on an order slip? Explain. ... Set a timer for 3 minutes. Roll the ...

Course 1 Unit 2 Practice
Robert lives at 5th Street and 8th Avenue. a. Write each location as an ordered pair. b. What is the distance between Jeremy's home and Adriana's home? c.

Course 1 Unit 2 Practice
SpringBoard Course 1, Unit 2 Practice. LeSSon 7-1. 1. Model with mathematics. Identify the integer at each point. a. 28 b. 0 c. 10 d. 8 e. 25 f. 11. 2. Write the opposite of each integer. a. 1 b. 228 c. 0 d. 2(27) e. |2100| f. 23. 3. Write an integer

Unit 2 Vocab.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Unit 2 Vocab.pdf.

unit 2 2marks_NoRestriction.pdf
f4A4 -th. y'd'g I L-'X, " { oi (e'4>. x'

unit 2 personal selling - eGyanKosh
Page 2 ... Orientation of Indian Consumers are such that they want the best value for .... stresses approach to right person (decision maker), making a smooth ...

Unit 2 - Fair Haven Schools
1 or 2 sets of double-9 dominoes or Math Masters, pages 394–396 .... You will need this information to learn about the sizes of families in your class. How many ...

Notification-14-Rapid-Ord-Unit-Tradesman-Mate-Fireman-Posts.pdf ...
Page 5 of 6. Notification-14-Rapid-Ord-Unit-Tradesman-Mate-Fireman-Posts.pdf. Notification-14-Rapid-Ord-Unit-Tradesman-Mate-Fireman-Posts.pdf. Open.

Middle School Measurement Unit One
Precision (degree of uncertainty). • Rounding to the nearest hundredth (why?) • Conversions: ... rulers, measuring cups, scales, etc. but do provide other non- traditional benchmarks such as smaller string length, .... o What decimal place did yo