RFI

Skyline High School Additions and Renovations Project # 1720200 7777 Forney Road Dallas, Texas 75227

Telephone:

RFI #: 032

December 29, 2010

Fax:

Date Created:

12/21/2010

Date Required: 12/28/2010

TO: Brent Kline

FROM: Michael Ward

Jacobs & Associates Architecture

Turner Construction Company

3737 Mapleshade Lane Plano, TX 75075

2001 N. Lamar, Suite 100 Dallas, TX 75202

Phone: 972-331-5699

Fax: 972-769-9634

Subject Cooling Tower Basin Agitator

Phone: 214.269.3309

Discipline Mechanical

Fax: 214.269.3315

Category Plan/Spec Discrepancies

Drawing References:

Spec Section References:

Dwg No. Rev No Revision Date Title

Sketch References:

Question: Please see the attached pricing and letter from Lassiter Inc. regarding the cooling tower basin agitator and advise. Cost Impact: Yes Schedule Impact: TBD Suggestion:

Answer:

Date Answered:

Signature: Cc:

Company Name AECOM B&H Engineers Jacobs & Associates Architecture Turner Construction Company Turner Construction Company

Date: Contact Name Gale Roberge James Barron Brent Kline Amelia Harlow William Tate

Copies 1 1 1 1 1

Fax Number 817-317-7781 972-899-0363 972-769-9634 214-721-8490 817-865-4011

Notes email email email email email

TCCo TCCO - RFI Individual Printout_V4.rpt RPT Revised: 9/16/2009

Turner Construction Company Page 1 of 1

.. .. .. .. .

December 10, 2010

Mr. Michael Ward Turner Construction Company 2001 North Lamar, Suite 100 Dallas, TX 75202 Subject: DISD BP023 – Skyline High School Additions and Renovations Re: PCR #8 – Cooling Tower Basin Water Agitator Michael, The attached pricing and shop drawing for the cooling tower basin agitator represents our proposed solution to obtain coverage for the concrete condenser water basin not shown on the contract drawings. Drawing sheet M1.1E2.2 shows the side centrifugal strainer station (CP-1) with an “L” shaped supply line and 3 nozzles extending into the ROTC section of the building. Clearly the background for this drawing is incorrect. This drawing also shows a short run of piping on the suction side of CP-1. Both of these service lines are referenced to note ten (10) re-stated below for ease of reference. “Provide 6” supply & return riser & distribution manifold/eductors per manufacturers recommendations for centrifugal strainer station” Based on the drawings and the now known size of the condenser water basin we believe the design showing a single manifold and 3 nozzles will not be sufficient to properly agitate the condenser water making the sediments water borne for the centrifugal strainer station. In compliance with the above note we are supplying PVC materials for the submerged manifolds and Pep Filters Interceptor sweeper heads in accordance with the manufacturers recommendations. Please forward this information to the Engineer of Record to gain approval for our proposed layout thus incorporating the layout into the design of the system. Should the Engineer of Record take exception to our layout please have them provide a design that adequately provides coverage for the condenser water basin. Sincerely,

Hal L. Ingram Construction Manager

............................

Lassiter Inc.

Change No.

8

6993 Fm 987 Terrell, TX 75160 972-962-7805 fax 972-962-7905

CHANGE ORDER Customer Turner Construction Company Date 12/10/2010 2001 N Lamar, Ste 100 Order No. 8 Dallas State ZIP 75202 Rep 972-668-9340 FOB Re: DISD BP 23 PCR 8 - Cooling Tower Basin Water Agetator

Name Address City Phone

Item

Description

QTY.

UNIT

LABOR

LABOR

MAT'L

MAT'L

SUB

SUB

UNIT

TOTAL

UNIT

TOTAL

UNIT

TOTAL

TOTAL

1

Delete Manifold per Contract Docs.

(8.0)

mh

$39.96

-$319.68

$3.99

-$31.92

$0.00

$0.00

-$351.60

2

Delete Manifold per Contract Docs.

(8.0)

mh

$29.60

-$236.80

$2.96

-$23.68

$0.00

$0.00

-$260.48

3

Delete Eductors per Contract Docs

(0.5)

mh

$39.96

-$19.98

$3.99

-$2.00

$0.00

$0.00

-$21.98

4

Delete Eductors per Contract Docs

(0.5)

mh

$29.60

-$14.80

$2.96

-$1.48

$0.00

$0.00

-$16.28

5

Delete Manifold material

(1.0)

ls

$0.00

$0.00

$464.17

-$464.17

$0.00

$0.00

-$464.17

6

Delete Eductors materials

(3.0)

ea

$0.00

$0.00

$111.91

-$335.73

$0.00

$0.00

-$335.73

7

Install Manifolds per Shop Drawing

24.0

mh

$39.96

$959.04

$3.99

$95.76

$0.00

$0.00

$1,054.80

8

Install Manifolds per Shop Drawing

24.0

mh

$29.60

$710.40

$2.96

$71.04

$0.00

$0.00

$781.44

9

Install Eductors per Shop Drawing

10.5

mh

$39.96

$419.58

$3.99

$41.90

$0.00

$0.00

$461.48

10

Install Eductors per Shop Drawing

10.5

mh

$29.60

$310.80

$2.96

$31.08

$0.00

$0.00

$341.88

11

Manifold materials per Shop Drawing

1.0

ls

$0.00

$0.00

$832.62

$832.62

$0.00

$0.00

$832.62

12

Eductors per Shop Drawing

1.0

ls

$0.00

$0.00

$2,350.00

$2,350.00

$0.00

$0.00

$2,350.00

13

Confined Space Sentry Equipment

(0.2)

wk

$0.00

$0.00

$2,400.00

-$480.00

$0.00

$0.00

-$480.00

14

Confined Space Sentry Equipment

0.9

wk

$0.00

$0.00

$2,400.00

$2,064.00

$0.00

$0.00

$2,064.00

15

Warehouse Forklift

0.0

wk

$0.00

$0.00

$550.00

$0.00

$0.00

$0.00

$0.00

16

AT Forklift

0.0

wk

$0.00

$0.00

$1,875.00

$0.00

$0.00

$0.00

$0.00

21

As-Builts/Close-Out

4.0

mh

$50.00

$200.00

$0.00

$0.00

$0.00

$0.00

$200.00

22

Punch List

2.0

mh

$50.00

$100.00

$0.00

$0.00

$0.00

$0.00

$100.00

23

Warranty

2.0

mh

$50.00

$100.00

$0.00

$0.00

$0.00

$0.00

$100.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$2,208.56 $0.00 $4,147.42 $0.00 $0.00 Sub Totals Labor Burden $905.51 Total Labor $3,114.07 --------------------------------------------------------------------> 8.25% Taxes On Materials $311.38 $4,458.80 ----------------------------------> Total Materials Mark-up M/L ------------> Sub Total $0 Mark-up Sub Total Change

$6,355.98

37

PCR # 8

$3,114.07 $4,458.80 $757.29 $0 $0.00 $8,330.16

Page 1

3

M1.1E1-1

M1.1E1-1

Dallas Independent School District Bid Package # 23 Skyline High School Additions and Renovations

2

CONDENSER WATER BASIN/SUMP PIPING PLAN 1 1/4" = 1'-0"

Level 2 10' - 0"

Level 1 0' - 0"

4

CONDENSER WATER BASIN ISOMETRIC VIEW

CONDENSOR WATER BASIN ELEVATION VIEW 2 1/4" = 1'-0"

Level 2 10' - 0"

REVISIONS 1

Level 1 0' - 0"

2 3 4 5 6 7 8 9

CONDENSOR WATER BASIN ELEVATION VIEW 3 1/4" = 1'-0"

10 DATE :

12/8/2010 4:01:09 PM

SCALE :

1/4" = 1'-0"

BOILER ROOM CONDENSOR WATER SUMP/BASIN MECHANICAL PLAN SHEET

M1.1E1-1

Filtration Solutions Filtration, Separation and Adsorption Technologies

InterSeptor Series Sweeper Jet Systems Patent Pending

PEP introduces the newest sweeper jet designed specifically for cooling tower basins. In order for cooling tower filters to do an effective job removing solids contaminants from the cooling tower basin, solids must be directed toward the filter inlet. PEP’s new InterSeptor Sweeper Jet nozzles have a uniquely designed elliptical discharge outlet that directs basin water toward the filter inlet in a flat fan pattern. The elliptical pattern sweeps a much greater path width, achieving a significant reduction in stagnant areas between nozzles. By directing solids toward the filter system suction intake, an InterSeptor Sweeper Jet system is a cost effective method for preventing build-up of dirt, scale, airborne debris, sediment and other contaminants in cooling tower basins, sumps and machinery reservoirs. Using the venturi principle, Interceptor Sweeper Jets create a negative pressure region at the nozzle outlet, thereby inducing ambient water into the elliptical discharge. For every gallon of water pumped through the nozzle, five gallons of water are produced at the sweeper jet’s elliptical discharge. This permits use of a smaller pump to deliver the volume of water required for effective sweeping of solids to the filter inlet. InterSeptor Sweeper Jets are installed into a pipe

that runs along the cooling tower basin bottom. Clamp-on swivel mounts are available to direct the sweeping path into hard to reach areas and to accommodate irregular shaped basins. PEP designs sweeper jet systems tailored to the given application. Basin size and shape, liquid depth, competing flow characteristics, solids loading and other site specific criteria are examined for optimal flow and cleaning results. From there, PEP determines the correct sweeper jet size, quantity and placement. An InterSeptor Sweeper Jet system combined with a properly sized and fully integrated filtration system will assure cleaner water, reduced plugging and fouling, and improved heat transfer efficiency. Suspended particulate removal also optimizes chemical usage. With experience spanning over a quarter century, PEP Filters is a pioneer and industry leader in the design and manufacture of liquid / solids separation and filtration systems for commercial, industrial and municipal applications. PEP’s product line includes a wide range of multimedia filter systems, bag and cartridge filter systems and centrifugal separators. Activated carbon, organo clay and other media specific materials are also available for specialized applications.

PEP ISJ Sweeper Jet Sizing

Typical Sweeper Jet Installation

Sweeper Jet Selection Criteria For effective solids sweeping to the filter inlet piping, typically allow one gallon per minute of flow to the sweeper jets for every one square foot of cooling tower basin area. Sweeper jet spacing is typically 8 to 10 inches. Example: Basin area = 96 ft2 96 ft2 x 1 gpm/ft2 = 96 gpm to sweeper jet nozzles. For ISJ-250 sweeper jet rated at 5 gpm, 96 gpm/5 gpm per nozzle = 20 nozzles.

Sweeper Jets (typical) Filter inlet piping

SMF-30 Filter @ 96 gpm

Cooling Tower Basin (8 ft. long x 12 ft. wide)

For ISJ-375 sweeper jet rated at 8 gpm, 96 gpm/8 gpm per nozzle = 12 nozzles. Contact PEP for sweeper jet layout recommendations on a specific basin geometry.

PEP Filters • 322 Rolling Hill Road • Mooresville, NC 28117 • 800-243-4583 • www.pepfilters.com 704-662-3133 (Outside USA)

Fax 704-662-3155 rev. 01/02

6029 W. Campus Circle #100 Irving, Texas 75063 Ph: (972) 570-4700 Fax: (972) 570-4207

QUOTATION December 9, 2010 To: Lassiter, Inc Attn: Hal Ingram

2951 Northern Cross Blvd #201 Fort Worth, Texas 76137 Ph: (817) 281-6165 Fax: (817) 577-9787

Mechanical Engineer: B & H Engineers, Inc. Project: DISD BP #23 – Skyline Center PRICING SUMMARY DESCRIPTION

QTY

TAGGING

PEP InterSeptor Series nozzles

63

none NET PRICE

TOTAL PRICE

$2,350

Above price includes freight. Installation not included. Stan Perry Texas AirSystems, Inc

Page 1 of 1

12/10/2010

Quotation

NATIONAL WHOLESALE SUPPLY 2140 Franklin Dr Mesquite, TX 75150 972-288-1550 Fax 972-288-1755

EXPIRATION DATE

QUOTE NUMBER

01/23/2011

S1120345 PAGE NO.

NATIONAL WHOLESALE SUPPLY 2140 Franklin Dr Mesquite, TX 75150 972-288-1550 Fax 972-288-1755

1 of 1

SHIP TO:

QUOTE TO:

LASSITER, INC 6993 FM 987 TERRELL, TX 75160

CUSTOMER NUMBER

LASSITER INC - SKYLINE HS BP#23 7777 FORNEY RD DALLAS, TX 75227

CUSTOMER PO NUMBER

SALESPERSON

JOB NAME / RELEASE NUMBER

11567

WILLIAM BUTCHEE

WRITER

SHIP VIA

TERMS

SHIP DATE

FREIGHT ALLOWED

ROBERT MCCOY

BID

NET 10TH PROX

12/09/2010

No

ORDER QTY

2ea 4ea 2ea 1ea 1ea 1ea 2ea 40ft 80ft

DESCRIPTION

3 PVC SCH40 TEE 401-030 3 PVC SCH40 90 ELL 406-030 406-030 4 PVC SCH40 SLIP CAP 447-040 6 PVC SCH40 TEE 401-060 6 X 4 PVC SCH40 BUSHING SXS 437-532 4 X 3 PVC SCH40 BUSHING SXS 437-422 6 SCH80 PVC VANSTONE FLANGE 854-060 6" PVC SCH40 PIPE PLAIN END 3" PVC SCH40 PIPE PLAIN END

UNIT PRICE

9.120/ea

18.24

6.217/ea

24.87

6.943/ea

13.89

55.534/ea

55.53

16.709/ea

16.71

6.749/ea

6.75

49.000/ea

98.00

9.154/ft 2.906/ft

366.17 232.46

Subtotal S&H Charges Amount Due

Printed By: MCCROB on 12/9/2010 9:32:03 AM

EXT PRICE

832.62 0.00 832.62

RFI 032 Cooling Tower Basin Agitator.pdf

RFI 032 Cooling Tower Basin Agitator.pdf. RFI 032 Cooling Tower Basin Agitator.pdf. Open. Extract. Open with. Sign In. Main menu.

726KB Sizes 4 Downloads 171 Views

Recommend Documents

Cooling Tower Question and Answers.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Cooling Tower ...

pdf-146\an-introduction-to-cooling-tower-water-treatment ...
Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. pdf-146\an-introduction-to-cooling-tower-water-treatment-by-j-paul-guyer.pdf. pdf-146\an-introductio

032.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 032.pdf. 032.pdf.

032-041 vol 3.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 032-041 vol 3.

RFI Protez Aziendale 2014.pdf
Page 1 of 4. PRESIDENTE FS. DIREZIONE CENTRALE AUDIT. AMMINISTRATORE DELEGATO. DIREZIONE CENTRALE STRATEGIE, PIANIFICAZIONE E.

Acuerdo 032 de 1988.pdf
Page 2 of 15. Page 2 of 15. Page 3 of 15. Acuerdo 032 de 1988.pdf. Acuerdo 032 de 1988.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Acuerdo 032 de 1988.pdf.

Audio Netwoking and RFI Simplified.pdf
Sign in. Page. 1. /. 4. Loading… Page 1 of 4. Page 1 of 4. Page 2 of 4. Page 2 of 4. Page 3 of 4. جمـــزؤة : الــكهــــــربـــاء ) 3 ثانوي إعدادي ( من اعداد : 3. Page 3 of 4.

RFI 011 Response.pdf
Page 1 of 1. Page 1 of 1. RFI 011 Response.pdf. RFI 011 Response.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying RFI 011 Response.pdf.

032-038 vol 12.pdf
There was a problem loading more pages. Retrying... 032-038 vol 12.pdf. 032-038 vol 12.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying 032-038 ...Missing:

024-032 vol 11.pdf
This article reflects the history of exploration and studies conducted in the "Sima ... 2 Department of Electronics and Information Technology ... 024-032 vol 11.pdf.

032-040 vol 8.pdf
information, disorderly, exists. In the next installment we will analyze the contributions of later stages. PALABRAS CLAVE: History, Speleology, Argentina.

032 Power Chord Alterations.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 032 Power ...

032 - Measurment Conversion of units.pdf
2007A KS2 Q4. 2004A KS2 Q16. Page 3 of 4. 032 - Measurment Conversion of units.pdf. 032 - Measurment Conversion of units.pdf. Open. Extract. Open with.

024-032 vol 11.pdf
zigzagueante La Cueva de los Murciélagos de Zuheros “Carretera de la Cueva” (CP-247). Su está calificada como Bien de Interés Cultural (BIC) trazado le fue ...

022-032 Bahasa Melayu SJK.pdf
Page 2 of 27. 022-032/1 BAHASA MELAYU SJK. Bahasa Melayu SJK 1 Kupasan Mutu Jawapan UPSR 2014. INSTRUMEN PENTAKSIRAN. Kod Mata ...

ONC Interoperability RFI FIN.pdf
Response: As we stated before, ONC's authority under the HITECH Act only extends to certified EHR. technology; therefore, we believe that in this case, the ...

OG_JBCFY15-16 RFI 10.18_final.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item.

AESD RFI RESPONSE_RFQ_AOR (REQUEST FOR ...
AESD RFI RESPONSE_RFQ_AOR (REQUEST FOR QUALIFICATIONS) (6).pdf. AESD RFI RESPONSE_RFQ_AOR (REQUEST FOR QUALIFICATIONS) (6).pdf.

Water Cooling System
customers of for niche markets at a cost, efficiency and speed close to those of mass .... new communication tools such as the Internet and cell phones and will be .... Schedule the design project/Plan of action (Possible use of 7M&Pand time.

TOWER - WORD.pdf
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. TOWER ...

tower - af -
Reticulated gas system. Laundromats ... Fiber to Home (FTTH) system for telephone connectivity ... CCTV monitoring in basements car park and at entry levels in ...