BENGUET ELECTRIC COOPERATIVE, INC. 4 South Drive, Baguio City

NOTICE OF SCHEDULED POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:

DATE TIME FEEDER

Feeder 05 Apr 9 Mon

9AM to 5PM

Circuit 01 Feeder 13 Feeder 13

Apr 10 Tue

9AM to 5PM

Feeder 05 Feeder 09 Feeder 05 Circuit 02 Feeder 08

Apr 11 Wed

Apr 12 Thu

Apr 13 Fri

Apr 14 Sat

9AM to 5PM

9AM to 5PM

9AM to 5PM

9AM to 5PM

EQUIP'T REF. OF DE-ENERGIZED AREA BC13249 Engr's Hill Sectionalizer KP00804 Trans Cut-out TB02257 Trans Cut-out B004673 Communal Sectionalizer B001421 Trans Cut-out B025793/B029321 Sectionalizers BC00160 Trans Cut-out KB00175 Sectionalizer BC03253 Trans Cut-out

AREAS AFFECTED

PURPOSE

EST. NO. OF CONS. AFFECTED

Baguio City: Engineer's Hill, Marcoville, parts of Cabinet Hill and parts of DPS Compound

- Extension of primary line. - Relocation of 3 primary poles due to road widening.

Kapangan: parts of Cayapes (Solidet)

- Replacement of rotten secondary poles. - Right-of-Way (ROW) clearing.

34

Tuba: Parts of Twin Peaks

- Relocation of secondary pole. - Right-of-Way (ROW) clearing.

76

Baguio City: San Vicente

- Relocation of primary pole. - Right-of-Way (ROW) clearing.

1,109

Baguio City: Parts of Ambiong BC (Busol)

- Relocation of secondary pole. - Right-of-Way (ROW) clearing.

83

La Trinidad: Parts of Shilan (Pagal and Mega Realm Subdivision) Baguio City: Parts of San Antonio Village, parts of Lopez Jaena and parts of North Central Aurora Hill Buguias: Parts of Cabuguisan, Natubleng Kabayan: Parts of Pacso (Abayan and Mangkiw)

- Relocation of primary poles. - Right-of-Way (ROW) clearing.

180

- Replacement of rotten primary pole. - Secondary line uprating

283

- Relocation of 6 primary poles due to road widening. - Right-of-Way (ROW) clearing.

Baguio City: Parts of Bakakeng Central (The Podium) - Transformer optimization from 3-37.5 kVA to 3-25 kVA.

591

70 1

Feeder 08

BC03228 Trans Cut-out

Baguio City: Parts of Sto. Tomas Proper (Teacher's Village) and Parts of Bakakeng Central (Bengao adjacent Teachers Village)

Feeder 11

BC10928 Trans Cut-out

Baguio City: Parts of Lucnab (Purok 2)

- Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W - Installation of CT rated kWh check meter.

Feeder 08

B004512 Trans Cut-out

Tuba: Parts of Poblacion TB (Bontiwey, Milo Subdivision)

- Rerouting of secondary lines. - Right-of-Way (ROW) clearing.

Feeder 08

B023174 Sectionalizer

Tuba: Bilis, Taloy Norte

- Replacement of rotten primary pole - Right-of-Way (ROW) clearing.

24

Kabayan: Kabayan Central, Duacan

- Replacement of rotten primary pole. - Right-of-Way (ROW) clearing.

316

Baguio City: Parts of Bakakeng Norte/Sur (Ciudad Grande Phase 2)

- Replacement of rotten secondary pole - Right-of-Way (ROW) clearing.

Circuit 02 Feeder 13

Batengan Sectionalizer B027891 Trans Cut-out

- Relocation of secondary pole. - Right-of-Way (ROW) clearing.

69 68 107

58

Feeder 08

B028800 Sectionalizer

Baguio City: Parts of Bakakeng Norte/Sur (Richview Square Subdivision) Parts of Bakakeng Central (Lower - Massive Right-of-Way (ROW) clearing. Kitma) and parts of SLU-SVP (Old Site)

Feeder 11

IT00606 Trans Cut-out

Itogon: Parts of Ucab (Carayan and Ba-ayan)

- Secondary line rehabilitation - Right-of-Way (ROW) clearing.

Feeder 04

B002730 Longlong Recloser

Baguio City: Parts of Pinsao Proper (along Longlong Rd) La Trinidad: Parts of Puguis (Longlong, Bato, Talingguroy)

- Relocation of 2 primary poles due to road widening. - Right-of-Way (ROW) clearing.

Feeder 13

BC13245 Sectionalizer

Baguio City: Upper Dagsian

- Replacement of rotten primary pole - Right-of-Way (ROW) clearing.

75

TB01117 Tuba: Nangalisan, San Pascual, Parts of Tadiangan Tadiangan Recloser Sablan: Parts of Bayabas

- Relocation of primary pole. - Extension of 3-phase lines. - Reconductoring of secondary lines. - Right-of-Way (ROW) clearing.

811

Feeder 03

NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:

MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/comrel/NGCP

493 59 1,205

Scheduled Power Interruption: April 9-14, 2018.pdf

4 days ago - Page 1 of 1. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 05 591. Circuit 01 34. Feeder 13 76. Feeder 13 1,109. Feeder 05 83. Feeder 09 180. Feeder 05 283. Circuit 02 70. Feeder 08 - Transformer optimization from 3-37.5 kVA to 3-25 ...

98KB Sizes 1 Downloads 227 Views

Recommend Documents

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: April 16-21, 2018.pdf
Apr 16, 2018 - Block 1). - Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W. - Installation of CT rated kWh check meter. IT00970. Trans Cut-out Itogon: Parts of Poblacion IT (Parts of Goldfield) - Secondary li

Scheduled Power Interruption: April 23-28, 2018.pdf
Page 1 of 5. NOTICE OF SCHEDULED POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. Feeder 07 25. Dalicno 90. Feeder 08 88. Circuit 01 26. Feeder 13 1,740. 27,929. Feeder 04 130. Feeder 03 20. Feeder 07 160. Circuit 04 493. Feeder 07 90. 18

Scheduled Power Interruption: Oct. 23-27, 2017.pdf
Page 1 of 1. BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City. NOTICE OF POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. FEEDER 4 Relocation of Secondary Pole 18. FEEDER 11 Replacement of Rotten Poles 194. Secondary Line Recon

Scheduled Power Interruption: Jan. 22-27, 2018.pdf
Jan 27, 2018 - Try one of the apps below to open or edit this item. Scheduled Power Interruption: Jan. 22-27, 2018.pdf. Scheduled Power Interruption: Jan.

Scheduled Power Interruption: February 12-16, 2018.pdf
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Scheduled Power Interruption: February 12-16, 2018.p

Scheduled Power Interruption: April 30-May 04, 2018.pdf
Apr 30, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders. radio room/isd/nnrsd/file/comrel/NGCP. BENGUET ...

Scheduled Power Interruption: Nov. 27-Dec. 1.pdf
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC

Scheduled Power Interruption: Feb. 19-23, 2018.pdf
Feb 19, 2018 - Baguio City: Ambiong BC, Paltingan to Ambiong. Road. La Trinidad: Ambion LT, Gulon to LTWD Pumping. Station, San Marco Subdivision, SLU Subdivision,. PAG-IBIG Subdivision, Parts of Balili LT (Mamaga -. Km. 3). - Relocation of 2 primary

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ... on the following date/s and time: EQUIP'T REF. OF. DE-ENERGIZED. AREA.

Scheduled Power Interruption: Nov. 13-18, 2017.pdf
... City Market, Maharlika Building, Tiongsan. Harrison, Carantes, Lower Mabini, Diego Silang St.,. Calderon St., Harrizon Road, SSS, Right Side of Session. Road going up. -Installation of Load Break Switch. -Replacement of Distribution. Transformers

Scheduled Power Interruption: May 15-19, 2018.pdf
4 days ago - Right-of-Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: May 15-19, 2018.pdf. Scheduled Power Interruption: May 15-19, ...

Scheduled Power Interruption: March 19-23, 2018.pdf
2 days ago - disconnect switch. c) Commissioning / Energization of 69 kV Breaker. and associated power equipment at Hedcor. Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works. at La Trinidad Substation. Whole of La

Scheduled Power Interruption: March 12-16, 2018.pdf
Mar 12, 2018 - This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized

Scheduled Power Interruption: Oct. 9-13, 2017.pdf
BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City ... Subdivision, Camp 7, Kennon road, Pias, Youngland, Lower. Liwanag, Loakan Proper ...

Scheduled Power Interruption: March 5-10, 2018.pdf
Right of Way (ROW) clearing. Mar 10. Sat. 9AM. to. 5PM. LT01667. Talinguroy Sectionalizer La Trinidad: Talinguroy – Puguis - Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: March

Scheduled Power Interruption: Nov. 20-24, 2017.pdf
20 Nov 2017 - Tuba: Tadiangan, Nangalisan, San Pascual. -Installation of Addiional Feeder. -Relocation of Primary Poles. -Right-of-Way Clearing. B001395. Trans Cut-out. Baguio City: Parts of Parapad, North Sanitary Camp. (near Piraso Resort). Page 1

Scheduled Power Interruption: Nov. 6-10, 2017.pdf
Manager, Network Services Department. cc: all local Radio & TV stations, Telephone ... Distribution Transformer. B001527 ... 6-10, 2017.pdf. Scheduled Power ...

Scheduled Power Interruption: May 21-25, 2018.pdf
May 21, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected ... BENGUET ELECTRIC COOPERATIVE, INC. ... equipment, protections, statistical meters, ... Scheduled Power Interruption: May 21-25, 2018.pdf.

201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf ...
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. 201801 Scheduled Interruption: Jan. 29 - Feb. 2,

Scheduled Power Interruption: Oct. 30-Nov. 4, 2017.pdf
SUB EST. UNDELIVERED FEEDER DE-ENERGIZED PURPOSE. AREA ... cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ...

Scheduled Power Interruption: Feb 26-Mar 2, 2018.pdf
Feb 26, 2018 - Feeder 11 Rehabilitation of line 300. NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENE

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N

Are provisions of Scheduled Castes and the Scheduled Tribes.pdf ...
Page 1 of 56. vikrant 1/56 906APL6732016+1.odt. IN THE HIGH COURT OF JUDICATURE AT BOMBAY. CRIMINAL APPELLATE JURISDICTION. CRIMINAL APPLICATION NO. 673 OF 2016. Dr. Satish Balkrishna Bhise. Age : 63 yrs. Occ. Retired Principal,. Residing at A/202, N