BENGUET ELECTRIC COOPERATIVE, INC. 4 South Drive, Baguio City
NOTICE OF SCHEDULED POWER INTERRUPTION Please be informed that the BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) is scheduling Electric Service Interruption on the following date/s and time:
DATE
Mar 5 Mon
Mar 6 Tue
Mar 7 Wed
TIME
9AM to 5PM
9AM to 5PM
9AM to 5PM
FEEDER
EQUIP'T REF. OF DE-ENERGIZED AREA
Feeder 11
B013110/B031829 Sectionalizer/Trans
Feeder 05
Mar 9 Fri
9AM to 5PM
9AM to 5PM
PURPOSE
EST. NO. OF CONS. AFFECTED
Baguio City: Bareng Drive - Bakakeng Norte/Sur
- Installation of intermediate primary pole. - Retirement of rental 3-25 kVA distribution transformers. - Installation of 3-50 kVA distribution transformers. - Right of Way (ROW) clearing.
BC04076 Trans Cut-out
Baguio City: Parts of Lower Brookside and parts of Honeymoon Holyghost
- Replacement of G.I. poles (rehabilitation) - Right of Way (ROW) clearing.
Feeder 09
B004468 Trans Cut-out
Tublay: Parts of Tuel
- Reconductoring of secondary lines. - Right of Way (ROW) clearing.
20
Feeder 04
B032838 Trans Cut-out
Baguio City: Upper Km. 3 – Asin
- Relocation of secondary pole. - Right of Way (ROW) clearing.
75
Baguio City: Parts of Pinsao Proper (Tam-awan) La Trinidad: Parts of Puguis (Longlong Road, BatoLonglong to Talingguroy)
- Conversion of line from 1-phase to 3-phase. - Extension of primary line - Installation of sole use distribution transformers - Right of Way (ROW) clearing.
1,265
- Retirement 3-25 kVA distribution transformers. - Installation of 3-50 kVA distribution transformers. - Right-of-Way (ROW) clearing.
30
Feeder 04
Feeder 08
B002730 Long-long Recloser
TB02665 Tuba: Parts of Poblacion TB (Sto. Tomas, Relay Cabuyao Sectionalizer Station, Cabuyao)
85
154
Feeder 04
B011190 Trans Cut-out
Baguio City: Sadanga Village – Pinsao Proper
- Installation of intermediate secondary pole - Right-of-Way (ROW) clearing.
Circuit 01
KP00098 Sectionalizer
Kapangan: Taba-ao, Cuba, Boklaoan, Balacbac and Beling-Belis Kibungan: Sagpat, Lubo and Poblacion KB
- Relocation of primary line. - Replacement of rotten primary poles. - Right-of-Way (ROW) clearing.
Feeder 11
BC10935/B004823 Trans Cut-outs
Baguio City: Acapulco and El Gobernador – Lucnab
- Conversion of kWh meters from 3-wire to 2-wire - Reconductoring of secondary lines. - Right of Way (ROW) clearing.
Baguio City: Parts of Upper and Middle Quezon Hill
- Reconfiguration of primary assembly - Relocation of communal transformer. - Right of Way (ROW) clearing.
367
- Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing.
144
Feeder 04 Mar 8 Thu
AREAS AFFECTED
B032122 Zarate Sectionalizer
LT01667 Feeder 04 Talinguroy Sectionalizer La Trinidad: Talinguroy - Puguis
103 1,336 24
Feeder 11
IT03556 Trans Cut-out
Itogon: Bagto – Ucab
- Correction of secondary line clearance - Right-of-Way (ROW) clearing.
93
Feeder 03
BC05322 Trans Cut-out
Baguio City: Cypress – Irisan
- Rerouting of secondary lines. - Right-of-Way (ROW) clearing.
90
- Tree cutting. - Right-of-Way (ROW) clearing.
1,803 152
Feeder 08
B000619 Bakakeng Recloser
Baguio City: Green Summerville Subdivision, Richview Square, Old Site Bakakeng, parts of Bakakeng Norte/Sur,
Feeder 08
BC01201 Trans Cut-out
Baguio City: Parts of Sto. Nino Subdivision – Bakakeng Central
- Relocation of secondary pole. - Right-of-Way (ROW) clearing.
Feeder 11
IT00606 Trans Cut-out
Itogon: Carayan and Baayan – Ucab
- Reconductoring of secondary lines - Right of Way (ROW) clearing
9AM Mar 10 LT01667 - Conversion of line from 1-phase to 3-phase. to Feeder 04 Talinguroy Sectionalizer La Trinidad: Talinguroy – Puguis - Right of Way (ROW) clearing. Sat 5PM NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698 APPROVED FOR PUBLIC ANNOUNCEMENT:
MELCHOR S. LICOBEN Manager, Network Services Department cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders radio room/isd/nnrsd/file/comrel/NGCP
Scheduled Power Interruption: March 5-10, 2018.pdf
Right of Way (ROW) clearing. Mar 10. Sat. 9AM. to. 5PM. LT01667. Talinguroy Sectionalizer La Trinidad: Talinguroy â Puguis - Conversion of line from 1-phase to 3-phase. - Right of Way (ROW) clearing. Page 1 of 1. Scheduled Power Interruption: March 5-10, 2018.pdf. Scheduled Power Interruption: March 5-10, 2018.pdf.
2 days ago - disconnect switch. c) Commissioning / Energization of 69 kV Breaker. and associated power equipment at Hedcor. Ampuhaw tapping point by HEDCOR Inc. - Other corrective / preventive maintenance works. at La Trinidad Substation. Whole of La
Mar 12, 2018 - This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENECO poles. 2. Always consider all lines energized
Page 1 of 1. BENGUET ELECTRIC COOPERATIVE, INC. South Drive, Baguio City. NOTICE OF POWER INTERRUPTION. DATE TIME FEEDER AREAS AFFECTED PURPOSE. FEEDER 4 Relocation of Secondary Pole 18. FEEDER 11 Replacement of Rotten Poles 194. Secondary Line Recon
Jan 27, 2018 - Try one of the apps below to open or edit this item. Scheduled Power Interruption: Jan. 22-27, 2018.pdf. Scheduled Power Interruption: Jan.
Whoops! There was a problem loading more pages. Whoops! There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. Scheduled Power Interruption: February 12-16, 2018.p
Always consider all lines energized. Power maybe restored earlier than the scheduled time. For more information please contact the following nos.: 637-4400 local 605 to 607 / 09088657202 / 09175921698. APPROVED FOR PUBLIC ANNOUNCEMENT: MELCHOR S. LIC
Feb 19, 2018 - Baguio City: Ambiong BC, Paltingan to Ambiong. Road. La Trinidad: Ambion LT, Gulon to LTWD Pumping. Station, San Marco Subdivision, SLU Subdivision,. PAG-IBIG Subdivision, Parts of Balili LT (Mamaga -. Km. 3). - Relocation of 2 primary
cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big ... on the following date/s and time: EQUIP'T REF. OF. DE-ENERGIZED. AREA.
... City Market, Maharlika Building, Tiongsan. Harrison, Carantes, Lower Mabini, Diego Silang St.,. Calderon St., Harrizon Road, SSS, Right Side of Session. Road going up. -Installation of Load Break Switch. -Replacement of Distribution. Transformers
20 Nov 2017 - Tuba: Tadiangan, Nangalisan, San Pascual. -Installation of Addiional Feeder. -Relocation of Primary Poles. -Right-of-Way Clearing. B001395. Trans Cut-out. Baguio City: Parts of Parapad, North Sanitary Camp. (near Piraso Resort). Page 1
Manager, Network Services Department. cc: all local Radio & TV stations, Telephone ... Distribution Transformer. B001527 ... 6-10, 2017.pdf. Scheduled Power ...
Apr 16, 2018 - Block 1). - Conversion of secondary lines from L-L to L-G. - Conversion of kWh meters from 3-W to 2-W. - Installation of CT rated kWh check meter. IT00970. Trans Cut-out Itogon: Parts of Poblacion IT (Parts of Goldfield) - Secondary li
May 21, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected ... BENGUET ELECTRIC COOPERATIVE, INC. ... equipment, protections, statistical meters, ... Scheduled Power Interruption: May 21-25, 2018.pdf.
There was a problem previewing this document. Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. 201801 Scheduled Interruption: Jan. 29 - Feb. 2, 2018.pdf. 201801 Scheduled Interruption: Jan. 29 - Feb. 2,
Apr 30, 2018 - cc: all local Radio & TV stations, Telephone & Cable Companies, all affected big loaders. radio room/isd/nnrsd/file/comrel/NGCP. BENGUET ...
Feb 26, 2018 - Feeder 11 Rehabilitation of line 300. NOTES: 1. This also serves as notice to all concerned Cable & Communication Companies to inspect and institute necessary safety measures/actions. on their cables/lines attached on the affected BENE