Invitation for Bids Date:

2 December 2015

Loan No. and Title:

3141-UZB: Takhiatash Power Plant Efficiency Improvement Project

Contract No. and Title:

JSC Takhiatash TPP/ICB-2015-1 Construction of two combined cycle gas turbine units with the capacity of 230-280 MW at Takhiatash TPP

Deadline for Submission of Bids:

2 March 2016, 10.30 hours (Tashkent local time GMT +5:00)

1. The Republic of Uzbekistan has received a loan from the Asian Development Bank (ADB) towards the cost of Takhiatash Power Plant Efficiency Improvement Project. Part of this loan will be used for payments under the contract named above. Bidding is open to Bidders from eligible source countries of the ADB. This Contract will be jointly financed by Asian Development Bank and Uzbekistan Fund for Reconstruction and Development (UFRD). The eligibility rules and procedures of ADB will govern the bidding process. 2. JSC “Takhiatash TPP” of Joint Stock Company (JSC) Uzbekenergo (the Employer) invites sealed bids from eligible bidders for the construction and completion of “Construction of two combined cycle gas turbine units with the capacity of 230-280 MW at Takhiatash TPP” (the Facilities). International competitive bidding will be conducted in accordance with ADB's "Two-Stage" Bidding Procedure and is open to all Bidders from eligible countries as described in the Bidding Documents. 3.

Qualification requirements include: i. ii.

iii.

All pending litigation shall be treated as resolved against the Bidder and so shall in total not represent more than fifty (50) percent of the Bidder’s net worth. The Bidder must have average annual turnover of US$200 million calculated as total certified payments received for contracts in progress or completed, within the last three (3) years (calendar year 2012, 2013 and 2014). In case of a JV, one partner must have an average annual turnover of USD80 million and each partner must have an average annual turnover of US$50 million, within the last three (3) years and all partners combined are required to meet the aggregate average annual turnover requirement. The Bidder must demonstrate access to, or availability of, financial resources such as liquid assets, unencumbered real assets, lines of credit, and other financial means, other than any contractual advance payments to meet: (i) the cash flow requirement of US$48 million, and (ii) the overall cash flow requirements for this contract and its current works commitment. In case of a JV, one partner with access to, or availability of financial resources of at least US$19,2 million, each partner is required to meet US$12 million and all partners combined are required to meet the aggregate cash flow requirement;

iv.

Experience under contracts in the role of contractor or management contractor for at least the last five (5) years prior to the bid submission deadline. In case of a JV, each partner must meet the requirement. Participation as contractor or management contractor in at least two (2) contracts within the last ten (10) years, each with a value of at least US$384 million that have been successfully completed and that are similar to the proposed plant and services. These contracts must have been done outside of the bidder’s home country. In case of a JV, all partners combined must meet the requirement. The Bidder must have experience of decommissioning of at least one thermal power plant of a minimum of 25MW within the last five (5) years. In case of a JV, at least one of the partners must meet the requirement. The Bidder must meet the following key experience requirement: (i) satisfactory service of proposed model gas turbine generators in at least three (3) different projects over a minimum period of five (5) years (ii) successfully completed the construction of at least two (2) combined cycle power plant of a minimum of 300 MW during the last ten (10) years as EPC Main Contractor. In case of a JV, all partners combined must meet the requirement. The Bidder must have experience as EPC Main Contractor in at least one of the following countries: Afghanistan, Turkmenistan, Kazakhstan, Uzbekistan, Georgia, Armenia, Pakistan, Tajikistan, Kyrgyz, Azerbaijan, Armenia or Turkey. In case of a JV, at least one of the partners must meet the requirement.

v.

vi.

vii.

viii.

4.

To obtain further information and inspect the bidding documents, Bidders should contact: Alisher Yunusov, Head of PMU JSC “Takhiatash TPP” of Joint Stock Company (JSC) Uzbekenergo, 6 Istiqlol St., Tashkent, 100000, Republic of Uzbekistan. Phone: (+99871) 2363452 fax (+99871) 2363452 E-mail: [email protected] It is compulsory to duplicate correspondence to: [email protected]

5. In order to participate in the Bidding the eligible bidders shall purchase the Bidding Documents in English from the Employer and should:  

write to address above requesting the bidding documents for Contract No JSC “Takhiatash TPP”/ICB-2015-1 “Construction of two combined cycle gas turbine units with capacity of 230-280 MW at Takhiatash TPP” pay a non-refundable fee of $ 500 (five hundred) US dollars or equivalent amount in national currency at the rate of Central Bank of Republic of Uzbekistan on the day of payment by bank transfer to the following account of JSC “Uzbekenergo”: JSC “Uzbekenergo” For local currency (Central Bank exchange rate) Adress: 6 Istiqlol street, Tashkent Tel.:236-34-52 Accoung №:20210000900117832001 JSCB "Uzpromstroybank", Tashkent MFO: 00440 TRN: 200523134 INOTP: 97300

US dollar account Account: 20210840700117832004 UzPSB SWIFT UJSIUZ22 CHIPS UID 353886 MFO 00440 TRN 200523134 Correspondent Bank: CITIBANK N.A. NewYork USA SWIFT CITIUS 33 Account: 3611-4296 Indicate in details: ADB contract number JSC “Takhiatash TPP”/ICB2015-1 6.

First stage bids should be presented to:  

to the address indicated in the paragraph 4 above. on or before the deadline: Date: 2 March 2016 Time: 10:30 (Tashkent local time GMT +5:00)

Bids will be opened immediately after the deadline in the presence of bidders’ representatives who choose to attend.

Takhiatash Power Plant Efficiency Improvement Project - Asian ...

Dec 2, 2015 - million, and (ii) the overall cash flow requirements for this contract and its ... In order to participate in the Bidding the eligible bidders shall ...

221KB Sizes 0 Downloads 204 Views

Recommend Documents

Jamshoro Power Generation Project - Asian Development Bank
Feb 1, 2016 - The Jamshoro Power Company Limited (JPCL) (the “Employer”) invites sealed bids from eligible Bidders from the ADB member countries for ...

Jamshoro Power Generation Project - Asian Development Bank
Feb 1, 2016 - Generation Project and it intends to apply part of this loan to ... The Jamshoro Power Company Limited (JPCL) (the “Employer”) invites sealed ...

Madhya Pradesh Energy Efficiency ... - Asian Development Bank
Feb 29, 2016 - Madhya Pradesh Energy Efficiency Improvement Investment Program ... procedure and is open to all bidders from eligible source countries. 4.

Madhya Pradesh Energy Efficiency ... - Asian Development Bank
Feb 29, 2016 - Name of Divisions. Bid. Submission / ... Website: www.mpez.co.in ... www.mpez.co.in which will be available in PDF file from 22 February 2016.

project report on hydro power plant pdf
plant pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. project report on hydro power plant pdf. project report on hydro ...

Loan No. 2830-IND: Madhya Pradesh Energy Efficiency Improvement ...
Jul 20, 2015 - Madhya Pradesh Energy Efficiency Improvement Investment Program – Tranche 2 and it is intended that part of the proceeds of this loan to ...

Loan No. 2830-IND: Madhya Pradesh Energy Efficiency Improvement ...
Jul 20, 2015 - Madhya Pradesh Energy Efficiency Improvement Investment Program – Tranche 2 and it is intended that part of the proceeds of this loan to ...

Power and Efficiency Worksheet.pdf
There was a problem previewing this document. Retrying... Download. Connect more ... Power and Efficiency Worksheet.pdf. Power and Efficiency Worksheet.

POWER PLANT ENGINEERING.pdf
Alternate power sources. Solar power, geothermal, tidal and wind power. Page 1. POWER PLANT ENGINEERING.pdf. POWER PLANT ENGINEERING.pdf.

Power and Efficiency Notes.pdf
Power and Efficiency Notes.pdf. Power and Efficiency Notes.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Power and Efficiency Notes.pdf.

Power Plant Engineering -
difference of at least a few degrees is required for any effective heat transfer to take place. ... metallurgical limit), and its critical pressure is only about 18 MPa.

Renewable Energy Sector Project - Asian Development Bank
Jan 22, 2016 - bidders from eligible source countries of ADB and eligible for ... Part 2 – Mangaia hybrid renewable energy system, comprising solar plant,.

Exporting and Plant-Level Efficiency Gains: It's in ... - Semantic Scholar
This argument has been made by theoretical contributions in the spirit of Grossman and Helpman (1991) and is supported by a plethora of case studies in the ...

Exporting and Plant-Level Efficiency Gains: It's in the Measure
we compute plant-product level marginal cost as an efficiency measure that is not .... product level, as discussed in Section 2.5), and (ii) when using reported ... tariffs over time and across 4-digit sectors is sufficient to yield a strong first st

water treatment plant project report.pdf
Modified. Created. Opened by me. Sharing. Description. Download Permission. Main menu. Displaying water treatment plant project report.pdf. Page 1 of 47.

Supercritical Coal-Fired Power Plant
new materials and designs help drive higher efficiency levels and ease of ... In other words, supercritical power plants are highly efficient plants with best .... 5. http://saferenvironment.wordpress.com/2008/12/29/%E2%80%98supercritical-.

power plant book pdf
Page 1 of 1. File: Power plant book pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. power plant book pdf. power plant book pdf. Open. Extract. Open with. Sign In. Main menu. Displaying power plant book pdf. Pa

water treatment plant project report.pdf
6.6 MAINTENANCE AND OPERATION . .... Marshall Islands and Tonga. During the SOPAC 27th Annual ... Page 3 of 47. water treatment plant project report.pdf.

thermal power plant diagram pdf
File: Thermal power plant diagram pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. thermal power plant diagram pdf.

geothermal power plant pdf
Retrying... Download. Connect more apps... Try one of the apps below to open or edit this item. geothermal power plant pdf. geothermal power plant pdf. Open.

geothermal power plant pdf
File: Geothermal power plant pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. geothermal power plant pdf. geothermal ...

thermal power plant instrumentation pdf
Page 1 of 1. File: Thermal power plant. instrumentation pdf. Download now. Click here if your download doesn't start automatically. Page 1 of 1. thermal power ...