©2014 by the National Economic and Development Authority All rights reserved. Any part of this book may be used and reproduced, provided that proper acknowledgement is made. Eastern Visayas Updated Regional Development Plan 2014-2016 RESULTS MATRICES Published by: National Economic and Development Authority Regional Office VIII Government Center, Palo, Leyte Tel: +63 53 323 3092 [email protected] http://nro8.neda.gov.ph

Eastern Visayas Updated Regional Development Plan 2014-2016

RESULTS MATRICES

Foreword This Eastern Visayas Updated Regional Development Plan (RDP) 2014-2016 Results Matrices (RM) is a companion document of the Updated Regional Development Plan (RDP) of Eastern Visayas. This has been prepared based on the belief that a good plan is one that enables its users to know whether it is achieving the desired results. It should be inherent upon any plan to be accompanied by a tool for monitoring and evaluation (M&E). Otherwise, the plan is just an ambiguous collection of wishes. The RM then serves as a tool for periodic measurement of the results of the implementation of the RDP. It will help us answer very important questions in planning – Are we achieving our goals and objectives? If yes, how far or near are we from the ideal conditions we described in the RDP? Then, at the end of the Plan period, can we claim that our efforts have translated to a better life for our people? This document is aligned with the President’s Social Contract with the Filipino People and guided by the Updated Philippine Development Plan (PDP) 2014-2016. Hence, it also contains results/core indicators in the Updated PDP Results Matrices 2014-2016. This is necessary as the RDP is presupposed to contribute to the attainment of the national goals of poverty reduction and inclusive growth. Like the Updated RDP, this Updated RM is a product of collaborative efforts. A series of sectoral consultations through interagency workshops and meetings were conducted, wherein technocrats from the different line agencies and private sector representatives had the opportunity to give their inputs. The baseline data and targets were initially provided by the authorized agencies. These were validated during the Sectoral Committee (SecCom) meetings of the Regional Development Council (RDC) VIII. The RDC-SecCom endorsed RM was actually due for deliberation by the Full Council of the RDC VIII in its last quarter meeting in 2013. Unfortunately, that meeting did not materialize when Supertyphoon Yolanda hit the region on November 8, 2013. Nevertheless, it was approved for adoption during the March 10, 2014 RDC VIII Executive Committee meeting through RDC VIII ExCom Resolution No. 5, s. 2014 and subsequently confirmed by the RDC VIII Full Council during its March 25, 2014 through RDC VIII Resolution No. 11, s. 2014. The RM is not a static document. In the course of the annual monitoring of RDP implementation, it might be necessary to adjust some of the targets. Hence, it will be subject to continuous updating and enhancement. The enthusiastic support shown by the officers and members of the RDC Sectoral Committees is hereby acknowledged, for without it, this RM would not have been made possible. However, we should remember that the RM is not an end in itself. It is just a tool for knowing whether or not we are in the right development path and how far or near are we from our target destination.

It is hoped that the cooperation of all stakeholders and keyplayers displayed during the preparation of this document will be brought to a level of commitment so that the hard work by which it was produced will not be futile. The sustained cooperation of everyone concerned is vital in pursuing our goals of reducing poverty and achieving inclusive growth.

ATTY. BONIFACIO G. UY Regional Director, NEDA VIII and Vice-Chair/Acting Chair, RDC VIII

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

Republic of the Philippines REGIONAL DEVELOPMENT COUNCIL Eastern Visayas (Region VIII)

6

Excerpts from the Minutes of the Regional Development Council VIII-Executive Committee (RDC VIII-ExCom) Meeting held on 10 March 2014 at Tierra de Milagros Resort, Brgy. Arado, Palo, Leyte RDC VIII-ExCom Resolution No. 5, Series of 2014 APPROVING AND ADOPTING THE UPDATED REGIONAL DEVELOPMENT PLAN - RESULTS MATRICES 2014-2016 WHEREAS, the Results Matrices (RM) serve as an instrument designed to highlight the achievement of results at the different levels in the implementation of the eight strategic development themed or chapters of the Updated Regional Development Plan (RDP) 2014-2016; WHEREAS, all the RDC VIII sectoral committees acting as planning committees jointly conducted a series of planning sessions/workshops participated in by interagency technical planning officers to undertake the validation process and jointly adopted and endorsed to the Full Council their respective strategic outcomes or chapter results matrices of the updated RDP; WHEREAS, the revalidated RMs contain a statement of results to be achieved for each strategic theme/chapter of the updated RDP, indicators with baseline information and end-of-plan targets, and responsible agencies; WHEREAS, the updated RDP RMs also contain results indicators (or Core Indicators) of the updated Philippine Development Plan Results Matrices (PDP RMs) 2014-2016, which were adopted or mirrored in the region to track all development activities in the region that shall contribute to the highest-order objective that is linked to the National Government’s goal of “Inclusive Growth and Poverty Reduction”. NOW THEREFORE, be it RESOLVED, as it is hereby RESOLVED, to approve and adopt the updated Regional Development Plan - Results Matrices (RDPRM) 2014-2016.

UNANIMOUSLY APPROVED, this 10th day of March, Two Thousand and Fourteen, at Palo, Leyte, Philippines.



Certified true and correct:



















ERNESTO T. OCTAVIANO RDC Acting Secretary

Attested/Approved: DIRECTOR BONIFACIO G. UY RDC Vice-Chairperson and Presiding Officer

Republic of the Philippines REGIONAL DEVELOPMENT COUNCIL Eastern Visayas (Region VIII)

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

7

Excerpts from the Minutes of the Regional Development Council (RDC) VIII Meeting held on 25 March 2014 at Tierra de Milagros Resort, Brgy. Arado, Palo, Leyte RDC VIII Resolution No. 11-A, Series of 2014 CONFIRMING THE APPROVAL OF THE UPDATED REGIONAL DEVELOPMENT PLAN - RESULTS MATRICES 2014-2016 WHEREAS, the Results Matrices (RM) serve as an instrument designed to highlight the achievement of results at the different levels in the implementation of the eight strategic development themed or chapters of the Updated Regional Development Plan (RDP) 2014-2016; WHEREAS, all the RDC VIII sectoral committees acting as planning committees jointly conducted a series of planning sessions/workshops participated in by interagency technical planning officers to undertake the validation process and jointly adopted and endorsed to the Full Council their respective strategic outcomes or chapter results matrices of the updated RDP; WHEREAS, the revalidated RMs contain a statement of results to be achieved for each strategic theme/chapter of the updated RDP, indicators with baseline information and end-of-plan targets, and responsible agencies; WHEREAS, the updated RDP RMs also contain results indicators (or Core Indicators) of the updated Philippine Development Plan Results Matrices (PDP RMs) 2014-2016, which were adopted or mirrored in the region to track all development activities in the region that shall contribute to the highest-order objective that is linked to the National Government’s goal of “Inclusive Growth and Poverty Reduction”; WHEREAS, the RDC VIII-Executive Committee approved and adopted the updated Regional Development Plan - Results Matrices (RDP-RM) 2014-2016 thru RDC VIII-ExCom Resolution No. 5, Series of 2014. NOW THEREFORE, be it RESOLVED, as it is hereby RESOLVED, to approve and adopt the updated Regional Development Plan - Results Matrices (RDPRM) 2014-2016.

UNANIMOUSLY APPROVED, this 25th day of March, Two Thousand and Fourteen, at Palo, Leyte, Philippines.



Certified true and correct:



















ERNESTO T. OCTAVIANO RDC Acting Secretary

Attested/Approved: DIRECTOR BONIFACIO G. UY RDC Vice-Chairperson and Presiding Officer

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

Table of Contents

8

Foreword RDC VIII Resolutions List of Abbreviations and Acronyms Executive Summary



9 11

Strategic Outcomes, Core and Critical Indicators, Assumptions, Risks, and Annual and End-of-Plan Targets Chapter 1: Macroeconomy

13

Chapter 2: Competitive and Sustainable Agriculture and Fisheries

18

Chapter 3: Competitive Trade, Industry, and Services

29

Chapter 4: Accelerating Infrastructure Development

34

Chapter 5: Creating Productive Human Resource

44

Chapter 6: Good Governance and the Rule of Law

54

Chapter 7: Peace and Security

61

Chapter 8: Conservation, Protection and Rehabilitation of the Environment and Natural Resources

66



List of Abbreviations and Acronyms A & D Alienable and Disposable AFP Armed Forces of the Philippines AHFF Agriculture, Hunting, Fisheries and Forestry ALS Alternative Learning System BFAR Bureau of Fisheries and Aquatic Resources BN Business Name BOD Biological Oxygen Demand BPLS Business Permit and Licensing System CAA Conflict-Affected Area CAAP Civil Aviation Authority of the Philippines CCT Conditional Cash Transfer CHED Commission on Higher Education CICT Commission on Information and Communications Technology CIS Communal Irrigation System CLEEP Continuing Labor and Employment Education Program CMTS Cellular Mobile Telephone System CSE Crime Solution Efficiency DA Department of Agriculture DepEd Department of Education DILG Department of the Interior and Local Government DILP DOLE Integrated Livelihood Program DOLE Department of Labor and Employment DOST Department of Science and Technology DOT Department of Tourism DOTC Department of Transportation and Communications DPWH Department of Public Works and Highways DRR-CCA Disaster Risk Reduction and Climate Change Adaptation DSWD Department of Social Welfare and Development

DTI Department of Trade and Industry ECC Environmental Compliance Certificate EMB Environmental Management Bureau ERDB Ecosystems Research and Development Bureau EV Eastern Visayas FDP Full Disclosure Policy FMS Forest Management Services GIWR Gross Irrigation Water Requirement GOCCs Government-Owned and Controlled Corporations GRDP Gross Regional Domestic Product GVA Gross Value Added HH Household ICT-BPM Information and Communications Technology Business Process Management ISO International Organization for Standardization KALAHI-CIDSS Kapit-bisig Laban sa Kahirapan-Comprehensive and Integrated Delivery of Social Services LEP Ladderized Education Program LGPMS Local Governance Performance Management System LGU Local Government Unit LTO Land Transportation Office LWUA Local Water Utilities Administration MDG Millennium Development Goals MGB Mines and Geosciences Bureau MRF Materials Recovery Facility MSMEs Micro, Small and Medium Enterprises MT metric ton NAPC National Anti-Poverty Commission NAR National Arterial Road NAT MPS National Achievement Test Mean Percentage Score NEA National Electrification Administration

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

9

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

10

NGA National Government Agency NHA National Housing Authority NHIP National Health Insurance Program NICCEP National Industry Cluster Capacity Enhancement Program NIPAS National Integrated Protected Areas NIS National Irrigation System NNC National Nutrition Council NRW Non-Revenue Water NSCB National Statistical Coordination Board NSR National Secondary Road NWRB National Water Resources Board OFW Overseas Filipino Workers OPAPP Office of the Presidential Adviser on Peace Process OPI Overall Performance Index OSH Occupational Safety and Health OSY Out-of-School Youth PAMANA Payapa at Masaganang Pamayanan Program PCA Philippine Coconut Authority PhilFIDA Philippine Fiber Industry and Development Authority PMO Port Management Office PNP Philippine National Police PopCom Population Commission PPA Philippine Ports Authority PWCZMS Protected Areas, Wildlife and Coastal Zone Management Services RBCO River Basin Control Office RBO River Basin Organization RDIP Regional Development Investment Program RDP Regional Development Plan RM Results Matrices RORO Roll-on/roll-off SHFC Social Housing Finance Corporation SRA Sugar Regulatory Administration SSF Shared-Service Facility SUCs State Universities and Colleges

TAV TB TSP TVET WatSan

Training and Advisory Visit Tubercle Bacillus (Tuberculosis) Total Suspended Particles Technical and Vocational Education and Training Water and Sanitation

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

Executive Summary

11

The Eastern Visayas Updated Regional Development Plan 2014-2016 Results Matrices, together with the Updated Regional Development Investment Program, are the two companion documents of the Updated RDP 2014-2016. As expressed in the updated Plan, the societal goal of the region is to attain a “Better Economy and Lessened Poverty” through agri-business, tourism, and information and communications echnology development. All development activities in the region shall contribute to the highest-order objective that is linked to the national societal goal of Inclusive Growth, defined as sustained growth that create jobs, draws the majority into the economic and social mainstream, and continuously reduces mass poverty. The Updated RM has been designed so as to highlight the achievement of results at the different levels of implementation of the eight strategic development themes or chapters of the Updated RDP. These are on macroeconomy; trade, industry and services; agriculture and fisheries; infrastructure; human resource; peace and security; governance and the rule of law; and environment. As such, matrices describing the desired results for each of these themes/chapters are shown in this document. The matrices contain indicators with baseline data, annual and end-of-plan targets from 2014 to 2016, as well as the names of agencies responsible for the attainment of those targets. The statements of results contain the national societal goal, sector and/or subsector/intermediate outcomes that would allow for subsequent performance assessment and measurement. The progress of RDP implementation will be monitored on the basis of target outputs and outcomes/impacts, indicated by year and value. The baseline data are also reflected per indicator to establish the level of performance at which we started, thus provide a benchmark for changes before and after the period of the Updated RDP. The responsible agency or agencies for each of the desired outcome and output are the ones responsible for reporting progress. This Updated RM covers the remaining three years of the Plan period – 2014 to 2016. It also contains results indicators (dubbed as Core Indicators) of the Updated Philippine Development Plan Results Matrix (PDP-RM) 2014-2016 adopted or mirrored in the region. The rest of the result indicators (tagged as Critical Indicators) are solely or unique for Eastern Visayas Region. Development results, or simply results, are the outputs, outcomes, or impacts of a development intervention. Outputs are the products, capital goods, and services that result from a development intervention. Outcomes are the likely or achieved short-term or medium-term effects of those outputs. These are the observable behavioral and institutional changes, usually resulting from coordinated short-term investments in individual and organizational capacity building for key development stakeholders. Impacts are the positive and negative primary and secondary

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

12

long-term effects – both intended and unintended, directly or indirectly – of development interventions. The transition of development results from outputs to outcomes, specifically from the completion of outputs to the achievement of impact, is then a change in developmental condition, as depicted in the results chain.1

Results Chain

2

1 United Nations Development Program (UNDP), 2002. Results Based Management: Concepts and Methodology. 2 Desarollo International Consult, Inc. 2012. Results-Based Monitoring and Evaluation Workshop.

1

Macroeconomy

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

13

Eastern Visayas Updated Regional Development Plan – RESULTS MATRICES 2014-2016

14 14

Strategic Outcomes Sector Outcomes 1. High and sustained economic growth achieved 2. Employment increased 3. Poverty incidence among population and families reduced

Core and Critical Indicators and Annual and End-of-Plan Targets 1. GRDP growth rate increased from 1.80% in 2011 to a range of 4.61%-5.61% in 2016 2. Average real per capita GRDP growth in constant 2000 prices increased from PhP36,784 in 2011 to PhP41,257.76 in 2016 3. AHFF sector output increased from PhP31.10 B in 2011 to a range of PhP69.7 B – PhP78.4 B for the period 2014-2016 4. AHFF sector growth rate in real terms increased to a range of 4.37% - 5.61% for the period 2014-2016 5. Industry output increased from PhP66.7 B in 2011 to a range of PhP69.7 B – PhP78.4 B for the period 2014-2016 6. Industry sector growth rate in real terms increased to a range of 4.49% - 5.57% for the period 2014-2016 7. Services output increased from PhP54.1 B in 2011 to a range of PhP56.6 B – PhP63.7 B for the period 2014-2016 8. Services sector growth rate in real terms increased to a range of 4.53% - 5.63% for the period 2014-2016 9. Value of exports increased from USD730 B in 2011 by 5.0% for the period 2014-2016 10. Employment generation increased by 3% for the period 2014-2016 11. Underemployment rate decreased to as low as 20% in 2016 12. Average labor productivity increased by 4.2% for the period 2014-2016 13. Poverty incidence among population reduced to 21.60% in 2016 14. Annual family income increased from PhP160,000 in 2009 to PhP232,000 in 2016 15. Inflation rate kept low and stable within a range of 3%-5% annual average for the period 2014-2016 16. Gini coefficient maintained within a range of 0.3932-0.4074 in 2016

Assumptions 1. Good governance is practiced by local government units 2. Political stability that would attract investments is sustained 3. Financial and real property position of the region is strategic 4. Manufacturing ventures are increasing 5. Crucial infrastructure support to the agriculture and fishery sector is established 6. More IT parks are established and accredited 7. Capacities of LGUs to build resilient communities and adapt to climate change are enhanced

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

15

Risks 1. High vulnerability to disasters and climate change 2. Lack of political will 3. Economic crisis

*

*Defined as “sustained growth that create jobs, draws the majority into the economic and social mainstream, and continuously reduces mass poverty.” (PDP 2011-2016)

Eastern Visayas Updated Regional Development Plan – RESULTS MATRICES 2014-2016

16 14

Objectives/Results

Indicators/Unit

Baseline Year Value

Societal Goal: Inclusive growth and poverty reduction Sector Outcomes: High and sustained economic growth achieved GRDP growth rate (%) 2011

Employment increased

Average real per capita GRDP in constant 2000 prices (PhP) AHFF output (billion PhP) AHFF growth rate in real terms (%) Industry output (billion PhP) Industry growth rate real terms (%) Services output (billion PhP) Services sector growth rate real terms (%) Value of exports (million US$) Employment generation (magnitude) Underemployment rate (%)

2014

Targets 2015

2016

1.8

4.46-5.4

4.54-5.54

4.61-5.61

2011

36,784.00

38,218.58

39,709.10

41,257.76

2011

31.10

32.46-32.77

33.93-34.58

35.49-36.52

2011

0.70

4.37-5.37

4.52-5.52

4.62-5.62

2011

66.70

69.69-70.36

72.85-74.25

76.17-78.38

2011

0.40

4.49-5.49

4.52-5.52

4.57-5.57

2011

54.10

56.55-57.09

59.15-60.28

61.88-63.68

2011

4.10

4.53-5.53

4.59-5.59

4.63-5.63

2012

730.00

741.68

753.55

767.11

2012

143,700

145,137

146,588

148,054

2011

24.00

23.00

21.00

20.00

Implementing Agencies

All government agencies, LGUs, private sector, and industry champions

Eastern Visayas Updated Regional Development Plan – RESULTS MATRICES 2014-2016

17 Objectives/Results

Indicators/Unit

Baseline Year Value

Societal Goal: Inclusive growth and poverty reduction Sector Outcomes: Poverty incidence among population and families reduced Labor Productivity (PhP) 2011

Poverty incidence among population (%) Annual family income (PhP) Inflation Rate (%) Gini Coefficient

88,268.00

2014

Targets 2015

2016

89,503.75

90,756.80

92,027.40

2012

45.40

23.50

22.60

21.60

2009

160,000.00

184,000.00

208,000.00

232,000.00

2012

3.0

3.0-5.0

3.0-5.0

3.0-5.0

2009

0.4841

0.3932-0.4074

0.3932-0.4074

0.3932-0.4074

Implementing Agencies

All government agencies, LGUs, private sector, and industry champions

2

Competitive and Sustainable Agriculture and Fisheries

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

19

Strategic Outcomes Sector Outcomes 1. 2. 3. 4.

Growth in agriculture and fisheries (A&F) sector increased Food sufficiency attained Agriculture and fisheries resilience to climate change increased Household income from agriculture and fisheries increased

Core and Critical Indicators and End-of-Plan Targets 1. Food subsistence incidence decreased from 23% in 2012 to 11.7% in 2016 2. Rice self-sufficiency ratio increased from 96.56% in 2012 to 114% in 2016 3. Yield of major commodities increased: • Palay from 3.12 MT/ha in 2012 to 4.41 MT/ha in 2016 • Banana from 12.11 MT/ha in 2012 to 14.44 MT /ha in 2016 • Coconut from 1.26 MT /ha in 2012 to 2.19 MT /ha in 2016 4. Volume of production of major commodities increased: • Palay from 1.014 MMT in 2012 to 1.295 MMT in 2016 • Banana from 0.190 MMT in 2012 to 0.232 MMT in 2016 • Coconut from 0.457 MMT in 2012 to 0.517 MMT in 2016 5. Average income of families in the A&F sector increased to a range of 2%-4% for the period 2014-2016 6. Net-profit cost ratio for major commodities increased: • Palay from 0.47% in 2012 to 0.71% in 2016 • Banana from 1.38% in 2012 to 1.64% in 2016 • Coconut from 0.93% in 2012 to 0.97% in 2016 7. Net-profit cost ratio for livestock and poultry increased: • Hog from 0.13% in 2012 to 0.15% in 2016 • Chicken from 0.16% in 2012 to 0.29% in 2016 8. Value of A&F production losses and damages due to weather and climate-related disaster reduced – decreasing per year from 18% in 2010

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

20

Assumptions 1. Peace and order situation is stable and continues to support the growth of the agriculture and fisheries sector 2. Industry clustering strategy and value chain development are implemented and supported by the national and local governments and the private sector 3. International standards are complied with and critical export barriers are removed 4. Farmers are adopting new technology innovations and cooperate with the government on initiatives towards increasing and sustaining crop insurance coverage 5. National government efforts continue to be converged

Risks 1. High vulnerabilty to disasters and climate change 2. Infestation of diseases 3. Socio-cultural factors among farmers and fisherfolks • Resistance to modern farming practices • Indolence

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

21

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

22

Objectives/ Results

Indicators/Unit

Baseline Year

Societal Goal: Inclusive growth Regional Goals: Economic growth and poverty reduction Sector Outcomes Growth in AHFF output (billion PhP) 2011 agriculture and fisheries increased Food sufficiency attained

Food subsistence incidence (%) Rice self-sufficiency index (%)

2012 (1st Semester) 2012

Value

Targets 2015

2014

Implementing Agencies

2016

31.10

38.40

38.40

38.40

23.00

12.70

12.20

11.70

96.56

105.00

109.00

114.00

Yield of major commodities (MT/ha) Palay

All government agencies, LGUs, private sector, and industry champions

DA

DA

Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Banana (Saba) Eastern Visayas Leyte

2012 2012 2012 2012 2012 2012 2012

3.52 4.01 4.55 4.55 2.60 2.70 2.69

4.21 4.36 5.14 4.78 3.29 4.07 3.61

4.31 4.43 5.24 4.92 3.41 4.16 3.70

4.41 4.48 5.26 4.97 3.54 4.31 3.89

2012 2012

12.11 18.19

13.22 19.86

13.81 20.73

14.44 21.57

Southern Leyte

2012

7.54

8.28

8.67

9.09

Biliran

2012

11.96

13.05

13.63

14.24

Samar Eastern Samar Northern Samar

2012 2012 2012

28.31 3.53 3.00

30.99 3.83 3.29

32.40 4.00 3.45

33.93 4.17 3.62

DA

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

23

Objectives/ Results

Indicators/Unit Coconut (Copra) Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Sugarcane Cane production (ton cane/ ha) Sugar production (Lkg/ha) Sugar production (Lkg/ton cane) Corn Pineapple Mango Coffee Cacao Vegetables Eggplant Tomato Cabbage Cauliflower Volume of production of major commodities (MT) Palay

Baseline Year

Value

Targets 2015

2014

Implementing Agencies

2016

PCA 2012 2012 2012 2012 2012 2012 2012

1.26 1.22 1.14 0.87 1.77 1.34 1.22

1.56 1.45 1.47 1.24 2.00 1.70 1.50

1.87 1.68 1.81 1.63 2.24 2.07 1.79

2.19 1.92 2.16 2.03 2.48 2.46 2.09 SRA

2012

55

60

65

75

2012 2012

111.65 2.03

123.60 2.06

135.20 2.08

157.50 2.10

2012 2012 2012 2012 2012

1.58 12.79 38.55 1.13 0.86

1.78 29.20 40.11 1.18 0.89

1.88 37.50 40.91 1.2 0.91

1.98 45.70 5.10 0.9 0.70

2012 2012 2012 2012

6.40 6.55 6.68 5.46

6.66 6.81 12.30 9.20

6.79 6.95 15.20 11.00

11.60 13.80 18.00 12.90

DA DA DA DA DA DA

DA

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

24

Objectives/ Results

Indicators/Unit Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Banana (Saba) Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Coconut (Copra) Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Abaca Eastern Visayas Leyte Southern Leyte

Baseline Year 2012 2012 2012 2012 2012 2012 2012

Value 1,014,122 537,378 96,633 67,597 143,468 57,024 112,021

2014 1,222,818 584,811 111,796 71,122 188,952 103,598 162,538

Targets 2015 1,254,400 594,933 113,912 73,222 196,846 106,510 168,977

2016 1,294,977 604,248 115,255 74,425 205,492 115,470 180,086

Implementing Agencies

DA 2012 2012 2012 2012 2012 2012 2012

190,845 29,886 39,713 11,252 99,760 2,502 7,732

210,384 32,927 43,784 12,405 109,985 2,758 8,525

220,902 34,573 45,973 13,025 115,484 2,896 8,951

231,947 36,302 48,272 13,676 121,258 3,041 9,398 PCA

2012 2012 2012 2012 2012 2012 2012

457,487 145,227 39,767 21,391 64,333 94,734 92,035

487,487 154,750 42,375 22,793 68,552 100,946 98,071

502,488 159,513 43,679 23,495 70,661 104,052 101,088

517,488 164,274 44,983 24,196 72,770 107,159 104,106 PhilFIDA

2012 2012 2012

20,026 7,427 3,502

23,165 8,579 4,054

24,342 9,027 4,257

25,559 9,479 4,469

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

25

Objectives/ Results

Indicators/Unit Biliran Samar Eastern Samar Northern Samar Sugarcane Cane production (ton) Sugar production (Lkg) Volume of production in fisheries (MT) Bangus Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Seaweeds Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Mussels

Baseline Year 2012 2012 2012 2012

Value 127 1,375 400 7,196

2014 147 1,591 463 8,330

Targets 2015 154 1,671 486 8,747

Implementing Agencies

2016 162 1,754 511 9,184

SRA 2012 2012

478,500 971,355

534,000 1,100,040

585,000 1,216,800

675,000 1,417,500

BFAR 2013 2013 2013 2013 2013 2013 2013

13,560 2,271 610 29 5,146 4,892 612

14,238 2,385 641 30 5,403 5,137 642

14,950 2,504 673 31 5,674 5,394 674

15,697 2,629 706 33 5,957 5,664 708 BFAR

2012 2012 2012 2012 2012 2012 2012 2012

40,733 21,541.62 1.66 0.10 6,560.68 12,326.83 301.87 6,809.70

58,406 30,910.00 2.39 0.17 9,390.00 17,671.00 432.00 7,507.69

67,211 35,570.00 2.75 0.20 10,805.00 20,336.00 497.00 7,883.08

76,018 40,231.00 3.11 0.23 12,221.00 23,000.00 563.00 8,277.23

BFAR

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

26

Objectives/ Results

Indicators/Unit Invetory of livestock and poultry Hog (heads) Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Carabao (heads) Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Cattle (heads) Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar

Baseline Year

Value

2014

Targets 2015

2016

Implementing Agencies DA DA

2012 2012 2012 2012 2012 2012 2012

449,174 256,596 34,890 11,223 44,979 36,634 64,852

487,647 307,905 31,207 11,954 44,079 26,693 65,809

494,962 312,524 31,675 12,133 44,740 27,094 66,796

502,387 317,212 32,150 12,315 45,412 27,500 67,798 DA

2012 2012 2012 2012 2012 2012 2012

289,590 155,043 17,648 4,302 39,922 28,206 44,469

288,680 154,401 16,771 4,220 40,344 25,883 47,061

293,011 156,717 17,023 4,283 40,949 26,272 47,767

297,405 159,068 17,278 4,347 41,563 26,666 48,483 DA

2012 2012 2012 2012 2012 2012 2012

21,168 9,679 3,420 1,492 795 2,776 3,006

23,284 11,232 3,455 1,740 811 2,753 3,293

23,632 11,400 3,507 1,766 823 2,794 3,342

23,987 11,571 3,560 1,793 835 2,836 3,392

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

27

Objectives/ Results

Agriculture and fisheries’ resilience to climate change increased Incomes in agriculture and fisheries increased

Indicators/Unit Goat (heads) Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Chicken (birds) Eastern Visayas Leyte Southern Leyte Biliran Samar Eastern Samar Northern Samar Value of A&F production losses and damages due to weather and climate-related disasters (%)

Average income of families in A&F (%)

Baseline Year

Value

2014

Targets 2015

2016

Implementing Agencies DA

2012 2012 2012 2012 2012 2012 2012

56,847 25,048 5,654 14,019 2,186 5,166 4,774

55,252 25,759 4,264 12,512 2,265 5,357 5,095

56,082 26,145 4,328 12,700 2,299 5,438 5,172

56,923 26,537 4,393 12,890 2,334 5,519 5,250 DA

2012 2012 2012 2012 2012 2012 2012 2010

2,208,850 992,134 341,885 129,255 342,727 138,500 264,349 18.00

3,717,896 2,486,324 373,765 122,648 308,053 151,190 275,916 decreasing

3,773,665 2,523,619 379,371 124,488 312,674 153,458 280,055 decreasing

3,830,269 2,561,474 385,062 126,355 317,364 155,759 284,255 decreasing

2009

17,582 (in PhP)

2.00-4.00

2.00-4.00

2.00-4.00

All government agencies, LGUs, SUCs, private sector, and industry champions All government agencies, LGUs, private sector, and industry champions

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

28

Objectives/ Results

Indicators/Unit Net profit cost ratio for major commodities (%) Palay Banana Coconut Sugarcane Net profit cost ratio for livestock and poultry (%) Hog Chicken Net profit cost ratio for fishery (%) Bangus (Cage) Bangus (Pond)

Baseline Year

Value

Targets 2015

2014

Implementing Agencies

2016

2012 2012 2012 2012

0.47 1.38 0.93 0.04

0.65 1.48 0.91 0.22

0.68 1.56 0.93 0.27

0.71 1.64 0.97 0.32

2012 2012

0.13 0.16

0.14 0.29

0.15 0.29

0.15 0.29

DA DA PCA SRA DA

BFAR 2012 2012

0.47 1.17

0.52 1.29

0.55 1.35

0.58 1.42

3

Competitive Trade, Industry and Services

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

29

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

30

Strategic Outcomes Sector Outcomes 1. Diversified and competitive agri-industry 2. Highly developed tourism 3. Viable ICT-BPM

Core and Critical Indicators and End-of-Plan Targets 1. 2. 3. 4. 5. 6.

Number of MSME jobs created increased from 10,334 in 2011 to 11,896 in 2016 Number of LGUs with streamlined BPLS increased from 77 in 2012 to 143 in 2016 Domestic sales of MSMEs increased from PhP293 M in 2011 to PhP420 M in 2016 Number of business name (BN) registrations increased from 9,399 in 2011 to 10,000 in 2016 Visitor arrivals increased from 207,417 in 2010 to 705,699 in 2016 Visitor receipts increased: • Foreign from PhP175 M in 2010 to PhP787 M in 2016 • Local from PhP2,156 M in 2010) to PhP10,864 M in 2016 7. Number of accredited primary (accommodation) tourism establishments increased from 10 in 2012 to 97 in 2016 8. ICT-BPM revenue increased from PhP355 M in 2010 to PhP3,580 M in 2016 9. Number of ICT-BPM centers/facilities (parks) increased from 1 in 2010 to 3 in 2016 10. Number of ICT-BPM jobs increased from 1,485 in 2010 to 21,000 in 2016

Assumptions 1. 2. 3. 4. 5. 6.

Political climate is stable and supportive of the trade and marketing initiatives of the business sector Peace and order situation is stable to promote private sector confidence National government continually supports research and development of new value-adding products and implementation of major programs like the NICCEP Capacity building programs are sustained and the necessary infrastructure support to the development of tourism destination programs are provided LGUs and national government provide opportunities for capacity building and credit access to develop MSMEs International standards are complied with and export barriers are removed

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

Risk 1. Peace and order problem 2. Inadequate supply of raw materials and other production inputs 3. Disaster vulnerability

31

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

32

Objectives/Results

Indicators/Unit

Baseline Year

Societal Goal: Inclusive growth Regional Goals: Economic growth and poverty reduction Sector Outcomes: Diversified and MSMEs jobs created 2011 competitive agri(number) industry Business Name (BN) 2011 registrations (number) BN processing time 2011 (minutes) LGUs with streamlined 2012 BPLS (number) Domestic sales of MSMEs 2011 (PhP) Assisted MSMEs (number) 2011 Compliance to Fair Trade 2011 law (%) Consumer complaints 2011 resolved (%) Shared-service facility 2011 (number) Highly developed Visitors/tourists arrivals: tourism Foreign tourists 2010 Local tourists 2010 Visitors/tourists receipts: Foreign tourists (million 2010 PhP) Local tourists (million 2010 PhP)

Value

Targets 2015

2014

Implementing Agencies

2016

10,334

10,199

11,015

11,896

DTI

9,399

9,500

9,785

10,000

DTI

15

15

15

15

DTI

77

99

121

143

DILG/DTI

293.16

360.29

389

420

DTI

3,603 99

5,228 99

5,647 99

6,098 99

DTI DTI

98

98

98

98

DTI

26

26

26

26

DTI

16,069 191,348

41,255 569,982

44,040 612,731

47,013 658,686

DOT DOT

175.00

505.00

540.00

787.00

DOT

2,156.00

6,879.00

7,395.00

10,864.00

DOT

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

33

Objectives/Results

Highly Developed Tourism

Viable ICT-BPM

Indicators/Unit Tourism establishments: Accommodation establishments (number) Tourist transport (number) Travel & tours (number) Frontliners (number) Accredited primary tourism establishments (number) Accommodation establishments (number) Tourist transport (number) Travel & tours (number) Frontliners (number) Other tourism establishments (number) Arrivals of excursionists/ day visitors: Foreign visitors (number) Local visitors (number) ICT-BPM revenue (million PhP) ICT-BPM parks (number) ICT-BPM locators (number) In ICT Park Outside ICT Park ICT-BPM jobs (number)

Baseline Year

Value

Targets 2015

2014

Implementing Agencies

2016

2012

439

461

484

508

DOT

2012

2

2

3

3

DOT

2012 2012

10 1

11 1

12 2

13 2

DOT DOT

2012

10

88

92

97

DOT

2012

1

1

1

2

DOT

2012 2012 2012

4 0 0

5 1 5

7 2 7

7 2 7

DOT DOT DOT

2011 2011 2010

7,284 157,134 355

8,860 195,207

9,458 209,848

10,096 225,587 3,580

DOT DOT

2010 2010 2010 2010 2010

1 9 7 2 1,485

3 11 9 2 21,000

DOST, DTI DOST, DTI

4

Accelerating Infrastructure Development

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

35

Strategic Outcomes Intermediate Outcomes 1. 2. 3. 4.

Performance of agri-business, tourism and ICT improved Access to social goods and services improved Environmental quality improved Resilience to climate change and disaster risk vulnerability decreased

Sector Outcome Quality, adequacy and accessibility of infrastructure facilities and services

Core and Critical Indicators and End-of-Plan Targets 1. Percentage of paved national arterial roads (NAR) increased from 99.4% in 2012 to 100% in 2014 2. Percentage of paved national secondary roads (NSR) increased from 88.22% in 2012 to 100% in 2016 3. Percentage of permanent bridges along NAR increased from 98.53% in 2012 to 100% in 2014 4. Percentage of permanent bridges in good condition along NAR increased from 56.53% in 2012 to 100% in 2016 5. Cargo throughput increased from 1.942 MMT in 2012 to 2.625 MMT in 2016 6. Number of passengers increased from 2.667 M in 2012 to 3.549 M in 2016 7. Number of vessels increased from 12,614 in 2012 to 14,519 in 2016 8. Passenger seating capacity in port terminal buildings increased from 1,890 in 2012 to 2,000 in 2016 9. Annual domestic passenger traffic increased from 1.255 M in 2012 to 1.823 M in 2016 10. Annual domestic cargo traffic increased from 7.605 M kg in 2012 to 11.042 M kg in 2016 11. Annual domestic flights increased from 16,854 in 2012 to 24,470 in 2016 12. Proportion of population with access to potable water (Levels I and II) increased from 49% in 2011 to 88% by end of 2015 (MDG target) 13. Percentage of population with access to basic sanitation (e.g. sanitary toilets) increased from 65% in 2011 to 90% in 2016 14. Percentage of irrigated farmlands over total area of irrigable farmlands increased from 56% in 2012 to 62% in 2016

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

36

15. Cropping intensity (based on 2 cropping seasons per crop year) improved: • National Irrigation Systems (NIS) from 180% in 2012 to 192% in 2016 • Communal irrigation Systems (CIS) from 115% in 2012 to 150% in 2016 16. Rice sufficiency index increased from 96.56% in 2012 to 114% in 2016 17. Palay yield per hectare increased from 3.45 MT/ha to 4.42 MT/ha in 2016 18. Distribution loss maintained at a level not exceeding the ERC-approved distribution systems loss cap: • Transmission <= 8.5% • Distribution (ECs) <=13.0% 19. Percentage of households/barangays/sitios electrified increased: • Households from 81% in 2012 to 90% in 2016 • Barangays from 99.97% in 2012 to 100% in 2016 • Sitios from 71% in 2012 to 80% in 2016 20. Cellular mobile telephone system (CMTS) coverage in cities/municipalities increased from 90% in 2012 to 100% in 2016 21. Percentage of public schools with broadband Internet connection increased: • Elementary Schools from 10.91% in 2012 to 100% by 2016 • Secondary Schools from 38.93% in 2012 to 100% by 2016 22. Percentage of National Government Agencies (NGAs), Government-Owned and Controlled Corporations (GOCCs), local government units (LGUs), and state universities and colleges (SUCs) with web/Internet presence increased/maintained: • NGAs and GOCCs with at least Stage 1 from 80% in 2012 to 100% by 2016 • LGUs with at least Stage 1: • Provinces from 66.67% in 2012 to 100% in 2016 • Cities from 71.43% in 2012 to 100% in 2016 • Municipalities from 20% in 2012 to 100% in 2016 • SUCs with at least Stage 1 maintained at 100% 23. Percentage of public schools with ideal classroom-to-pupil ratio of 1:45 increased: • Elementary from 81.26% in 2012 to 100% in 2016 • Secondary from 43.44% in 2012 to 100% in 2016 24. Percentage of public schools with ideal water and sanitation (WatSan) facilities-to-school children ratio of 1:50 increased: • Elementary and Secondary from 24.18% in 2012 to 100% by 2016

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

37

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

38

Objectives/Results

Indicators/Units

Societal Goal: Inclusive growth Regional Goals: Economic growth and poverty reduction Intermediate Outcomes: Performance of agri- Refer to Chapter 2: Competitive and business, tourism and Sustainable Agriculture and Fisheries, ICT improved and Chapter 3: Competitive Trade, Industry, and Services Access to social goods Refer to Chapter 5: Creating Productive and services improved Human Resource Environmental quality Refer to Chapter 8: Conservation, improved Protection and Rehabilitation of the Environment and Natural Resources Resilience to climate Refer to Chapter 8: Conservation, change increased Protection and Rehabilitation of the and disaster risk Environment and Natural Resources vulnerability decreased Sector Outcome Quality, adequacy TRANSPORT and accessibility of infrastructure facilities and services enhanced Average travel time in key corridors by road/RORO (hours) Phil-Japan Friendship Highway (Maharlika Highway), along TaclobanAllen-Matnog Route Phil-Japan Friendship Highway (Maharlika Highway), along TaclobanSan Ricardo-Lipata, Surigao Route

Baseline Year

Value

Targets 2015

2014

Implementing Agencies

2016

2012

9

8

7

7

DPWH/DOTC/ PPA

2012

7

6.5

6

6

DPWH/DOTC/ PPA

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

39

Objectives/Results

Indicators/Unit

Baseline 8

7.5

Targets 2015 7

2012

7

6.5

6

6

2012

7

6.5

6

6

2012 2012

22 28

22 24

20 22

18 20

PPA PPA

2012 2012 2012 2012

1.942 2.677 12.614 1890

2.147 2.941 13.219 2000

2.374 3.231 13.854 2000

2.625 3.549 14.519 2000

PPA PPA PPA PPA

2012

0

0

0

1

PPA

2012

0

0

0

1

PPA

2012 2012 2012

3.5 3 3

3 2.5 2.5

2.5 2 2

2.5 2 2

Tacloban-Ormoc-Cebu City Route

Year 2012

Tacloban-Palompon-Bogo, Cebu Route Tacloban-Sogod-Bato-Jubay, Bohol Route Water Transport Average service time of vessel by PMO (hours) Tacloban PMO Ormoc PMO Cargo throughput (million MT per annum) Philippine Ports Authority (PPA) Ports Passengers (number in million) Vessels (number in thousand) Passenger capacity in port terminal buildings (number) Ports certified to ISO standards on selected process (number) Ports handling foreign vessels with minimum draft of (-)10m (number) Land Transport Average travel time to key towns/cities (hours) Tacloban City-Naval, Biliran Tacloban City-Ormoc City Tacloban City-Baybay City

Value

2014

Implementing Agencies

2016 7

DPWH/DOTC/ PPA DPWH/DOTC/ PPA DPWH/DOTC/ PPA

DPWH DPWH DPWH

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

40

Objectives/Results

Indicators/Unit Tacloban City-Maasin City via Sogod, Southern Leyte Tacloban City-Catbalogan City Tacloban City-Calbayog City Tacloban City-Catarman, Northern Samar via San Isidro Tacloban City-Catarman, Northern Samar via Lope de Vega Tacloban City-Borongan City via South Samar Coastal Road Tacloban City-Borongan City via BurayTaft Road National Roads and Bridges Road density (kilometer/sq. kilometer) Total length of national roads (kilometer) Length of paved national arterial road (kilometer) Length of paved national secondary road (kilometer) Length of permanent bridges along national arterial roads (linear meter) Number of permanent bridges in good condition along national arterial roads Motor Vehicle Registered Number of Registered Motor Vehicle For-Hire vehicles (number in thousand) Private vehicles (number in thousand)

Baseline 4.5

4

Targets 2015 3.5

2012 2012 2012

3 5 7

2.5 4 6.5

2012

6

2012

Year 2012

Value

2014

Implementing Agencies

2016 3.5

DPWH

2 3.5 6

2 3.5 6

DPWH DPWH DPWH

5.5

5

5

DPWH

6

5

4.5

4

DPWH

2012

6

5

4.5

4

DPWH

2012 2012

0.107 2,453.530

0.107 2,453.530

0.107 2,453.530

0.107 2,453.530

DPWH DPWH

2012

1,413.79

1,422.37

1,422.37

1,422.37

DPWH

2012

909.70

950.20

990.70

1,031.16

DPWH

2012

33,588

34,089

34,089

34,089

DPWH

2012

489

685

775

865

DPWH

2012

16.348

18.390

19.126

19.890

LTO

2012

139.627

151.021

157.063

163.344

LTO

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

41

Objectives/Results

Indicators/Unit Air Transport Annual domestic passenger traffic (number in thousand) Weight of annual domestic cargo traffic (million kilogram) Annual domestic flights (number in thousand) WATER RESOURCES River basin organizations (RBOs) institutionalized proportional to the number of priority basins (number) River basin master plans developed (number) Water Supply Population with access to potable water (Levels I & II) (%)* Households Level III connection (number) Households with 24/7 water supply service (number) Non-revenue water (%) Sanitation, Sewerage, & Septage Population with access to basic sanitation, i.e. sanitary toilets (%)* Households practicing septage management (%) Irrigation Irrigated farmlands over total area of irrigable farmlands (%)

*MDG Target

Baseline Year

Value

Targets 2015

2012

Implementing Agencies

2016

2012

1,255.701

1,506.841

1,657.525

1,823.277

CAAP

2012

7.605

9.126

10.038

11.042

CAAP

2012

16.854

20.224

22.246

24.470

CAAP

2010

0

0

0

1

NWRB/DENR/ RBCO

2010

0

0

0

1

NWRB/DENR/ RBCO/DPWH

2011

49

86

88

88

2010

85,064

93,900

96,250

98,660

2010

85,065

93,900

96,250

98,660

NAPC/DOH/ DILG/ LGUs/ DSWD LWUA/WDs/ LGUs LWUA/WDs

2012

38.00

32.00

29.00

25.00

LWUA/WDs

2011

65.00

80.00

83.80

90.00

2011

65.00

80.00

84.00

90.00

DOH/ DILG/ LGUs DOH/ DILG/ LGUs

2012

56.00

58.00

60.00

62.00

DA/NIA

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

42

Objectives/Results

Indicators/Unit Cropping intensity (based on 2 cropping seasons per crop year) National Irrigation Systems (%) Communal Irrigation Systems (%) Gross Irrigation Water Requirement for palay (cu. m/ha/year)

Baseline Year

Value

2014

Targets 2015

2016

Implementing Agencies

2012 2012 2012

180.00 115.00 36,288

185.00 138.00 31,104

190.00 145.00 27,648

192.00 150.00 22,464

DA/NIA DA/NIA DA/NIA

Irrigated farmlands over total area of irrigable farmlands (%) ENERGY Capacity (MW) Transmission loss (%) Distribution loss of ECs (%) Households electrified ( %) Barangays electrified (%)

2012

56.00

58.00

60.00

62.00

DA/NIA

2012 2012 2012 2012 2012

588 <=8.50 <=13.00 90.00 100.00

588 <=8.50 <=13.00 90.00 100.00

588 <=8.50 <=13.00 90.00 100.00

DOE NGCP NEA/ECs NEA/ECs NEA/ECs

Sitios electrified (%)

2012

588 <=8.50 <=13.00 81.00 99.97 (of 4,372) 71.00 (of 8,043)

74.00

77.00

80.00

NEA/ECs

2012

90.00

100.00

100.00

100.00

CICT/NTC

2012 2012 2012

10.91 38.93 80

40.61 65.37 90

70.30 92.01 95

100.00 100.00 100.00

DepEd DepEd CICT/NCC

INFORMATION AND COMMUNICATIONS TECHNOLOGY CMTS coverage in cities/municipalities (%) Public schools with broadband Internet connection Elementary Schools (%) Secondary Schools (%) NGAs and GOCCs with Stage 1 web/ Internet presence (%)

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

43

Objectives/Results

Indicators/Unit LGUs with Stage 1 web/Internet presence (%) Cities Provinces Municipalities SUCs with Stage 1 web/Internet presence (%) SOCIAL INFRASTRUCTURE Solid Waste Management Material Recovery Facilities established (number) Solid waste diversion rate (%) Education Public schools with ideal classroom-topopulation ratio of 1:45 (%) Elementary Secondary Public schools with ideal WATSAN facilities to schoolchildren ratio of 1:50 (% and number) Elementary and Secondary

Baseline Year

Value

Targets 2015

2014

Implementing Agencies

2016

2012 2012 2012

71.43 66.67 20.00

85.71 83.33 50.00

100.00 100.00 75.00

100.00 100.00 100.00

LGUs LGUs LGUs

2012

100.00

100.00

100.00

100.00

SUCs

2010

10.00

17.00

19.00

21.00

LGUs/EMB

2010

33.00

45

48

50

2012

81.26 (2,961) 43.44 (212)

87.51 (3,189) 62.30 (304)

93.77 (3,417) 81.15 (396)

100.00 (3,644) 100.00 (488)

DepEd

24.18 (999)

62.12 (2,043)

74.73 (3,088)

100.00 (4,132)

DepEd

2012

2012

NSWMC

DepEd

5

Creating Productive Human Resource

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

45

Strategic Outcomes Sector Outcome Productive human resource in support of agri-business, tourism, and ICT developed Sub-sector Outcomes 1. Access to quality health and nutrition services improved 2. Access to quality education and training improved 3. Access to quality shelter and social protection services improved

Core and Critical Indicators and End-of-Plan Targets 1. Maternal mortality rate per 100,000 livebirths decreased from 79% in 2011 to 50% in 2016 2. Infant mortality rate per 1,000 livebirths decreased from 40% in 2011 to 17% in 2016 3. TB mortality rate per 100,000 population decreased from 24.13% in 2011 to <2% in 2016 4. TB cure rate increased from 84% in 2011 to 100% in 2016 5. Prevalence of underweight preschoolers decreased from 15.70% in 2010 to 9.50% in 2016 6. Prevalence of underweight school children decreased from 16.90% in 2009 to 8.50% in 2016 7. Simple literacy rate increased from 93.6% in 2008 to 100% in 2016 8. Functional literacy rate increased from 72.9% in 2008 to 76.9% in 2016 9. Net enrolment rate in elementary increased from 90.44% in SY 2011-2012 to 100% in 2016 10. Net enrolment rate in secondary increased from 48.47% in SY 2011-2012 to 71.97% in 2016 11. Completion rate in elementary increased from 65.58% in SY 2011-2012 to 82.54% in 2016 12. Completion rate in secondary increased from 65.92% in 2011-2012 to 96.51% in 2016 13. Percentage of poor families covered by the National Health Insurance Program (NHIP) increased from 53% in 2008 to 100% in 2016 14. Enrolment rate of poor families covered by the NHIP increased from 74% in 2010 to 100% in 2016

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

46

Assumptions 1. 2. 3. 4. 5.

Access to quality health and nutrition services is improved Families/households cooperate in the implementation of health programs Access to quality education and training is improved Business environment is stable Investments are increasing

Risks 1. Emergence of new diseases/new strain of existing diseases 2. Political instability 3. Economic crisis

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

47

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

48

Objectives/Results

Indicators/Unit

Baseline Year Value

Targets 2015

2014

Societal Goal: Inclusive growth Regional Goals: Economic growth and poverty reduction Sector Outcome: Productive human resource in support of agri-business, tourism and ICT developed Sub-sector Outcomes: Access to quality Maternal mortality rate 2011 79 59 health and nutrition (per 100,000 livebirths) services improved Pregnant women with 4 2011 77.30 80.00 pre-natal check-ups (%) Under-five mortality 2011 53 28 (per 1,000 livebirths) Infant mortality rate 2011 40 20 (per 1,000 livebirths) HIV prevalence rate 2011 0.259 0.259 among 15-22 years old (%) TB prevalence rate (per 2011 181 168 100,000) TB case detection rate 2011 58.75 85.00 (%) TB cure rate (%) 2011 84.00 85.00 Contraceptive prevalence rate in all methods (%) Proportion of population HH with access to safe water (%)

Implementing Agencies

2016

52

50

DOH, PHIC, LGUs, and private sector

85.00

90.00

26.7

25.5

19

17

0.259

0.259

DOH, PHIC, LGUs, and private sector DOH, NNC, LGUs, and private sector DOH, NNC, LGUs, and private sector DOH, POPCOM, LGUs, and private sector

163 85.00 100.00

2011

27.00

35.00

45.00

2011

71.30

81.00

86.50

159 DOH, LGUs, and private sector 85.00 DOH, LGUs, and private sector 100.00 DOH, LGUs, and private sector 65.00 DOH, POPCOM, LGUs, and private sector 88.00 DOH, LGUs, and private sector

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

49

Objectives/Results

Access to quality education and training improved

Indicators/Unit Proportion of population HH with access to sanitary toilets facilities (%) Prevalence of underweight children under 5 years of age (%) Prevalence of underweight preschoolers (%) Prevalence of underweight school children (%) Proportion of households with per capita intake below 100% dietary energy requirement (%) Simple literacy rate (%)

Functional literacy rate (%) Ratio of literate females to males 15-20 years old Total enrolment in kindergarten (number) Total enrolment in elementary (number) Total enrolment in secondary (number)

Baseline Year Value 2011 65.00

80.00

Targets 2015 83.80

2014

Implementing Agencies

2016

90.00 DOH, LGUs, and private sector

2009

21.00

11.40

10.50

9.50

NNC

2010

15.70

11.40

10.90

9.50

NNC

2009

16.90

11.06

9.78

8.50

NNC

2008

66.70

41.33

37.10

32.87

NNC

2008

93.60

96.80

100.00

100.00

DepEd

2008

72.90

74.90

75.90

76.90

DepEd

2008

1.03

1.03

1.00

1.00

DepEd

20122013 20122013 20122013

105,626

106,506

107,386

108,266

DepEd

725,501

731,547

737,593

743,639

DepEd

337,506

340,319

343,132

345,945

DepEd

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

50

Objectives/Results

Indicators/Unit Net enrolment rate in elementary (%) Net enrolment rate in secondary (%) Completion rate in elementary (%) Completion rate in secondary (%) Cohort survival rate in elementary (%) Cohort survival rate in secondary (%) Dropout rate in elementary (%) Dropout rate in secondary (%) Achievement rate (NAT MPS) in elementary (%) Achievement rate in secondary (%) Trainings for teachers in the K to 12 Program (number) Teachers with training on K to 12 Program (number) OSY who took ALS program (number) ALS graduates (number)

*Kindergarten teachers

Baseline Year Value 201190.44 2012 201148.47 2012 201165.58 2012 201165.92 2012 201167.07 2012 201168.84 2012 20118.13 2012 20114.68 2012 201176.95 2012 201155.38 2012 20111* 2012

95.22

Targets 2015 97.61

2016 100.00

58.65

64.52

71.97

DepEd

74.06

78.3

82.54

DepEd

79.76

87.74

96.51

DepEd

76.91

81.83

86.76

DepEd

73.04

79.00

87.36

DepEd

4.07

2.04

0.00

DepEd

2.34

1.17

0.00

DepEd

83.49

86.76

90.03

DepEd

67.20

73.11

79.02

DepEd

5**

7***

9****

DepEd

2014

Implementing Agencies DepEd

20112012

301

9,345

9,389

9,433

DepEd

20112012 20112012

30, 835

31,999

32,264

32,528

DepEd

27, 511

27,740

27,970

28,199

DepEd

** Grades 2 and 8 Teachers

*** Grades 3 and 9 Teachers

**** Grades 4 and 10 Teachers

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

51

Objectives/Results

Access to shelter security improved

Indicators/Unit TVET enrollees (number) TVET graduates (number) TVET graduates assessed (number) TVET graduates certified (number) Certification rate in TVET graduates (%) New programs/ qualifications created/ registered relevant to the industry needs (number) Faculty in higher education with Master’s Degree (%) Higher education institutions with ladderized education program (%) DOST scholarship examinees (number) DOST scholarship qualifiers (number) Municipalities with DOST scholarship applicants (number) Housing targets

Baseline Year Value 2012 41,524

2014 42,776

Targets 2015 44,059

2016 46,262

Implementing Agencies TESDA

2012

36,713

38,498

39,650

41,636

TESDA

2012

29,584

30,176

31,081

32,635

TESDA

2012

27,901

26,555

27,351

28,719

TESDA

2012

94

88

88

88

TESDA

2012

43

43

43

43

TESDA

2009

35.04

100.00

100.00

100.00

CHED

2012

90.00

90.00

90.00

90.00

CHED/TESDA

2012

2,517

2,915

3,206

3,527

DOST

2013

139

172

181

190

DOST

2013

88

92

97

102

DOST

2010

22.4

20.15

21.4

22.78

NHA and SHFC

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

52

Objectives/Results

Access to quality social protection services improved

Indicators/Unit Share of socialized housing to housing target (%) Poor households covered by CCT (number) CCT beneficiaries (number) Completed sub-projects under KALAHI-CIDSS (number) Informal sector workers, unemployed persons, minimum wage earners, and OFWs and families with capacity building services for livelihood under the DILP (number) Jobseekers placed in local employment (number) Workers, jobseekers/ students reached through CLEEP, TAV, OSH and other productivity trainings (number) Poor senior citizens covered by social pension under the Senior Citizen's Law (number)

Baseline Year Value 2010 18.58

Targets 2015

2014

Implementing Agencies

2016

71.6

73.2

74.78

NHA and SHFC

2012

298,773

298,773

298,773

298,773

DSWD

2012

221,550

221,550

221,550

221,550

DSWD

2012

276

415

415

415

DSWD

2012

3,118

1,550

1,600

1,650

DOLE

2012

18,548

12,760

14,036

15,440

DOLE

2012

12,271

8,503

9,353

10,289

DOLE

2012

14,294

29,239

34,239

39,239

DSWD and LGUs

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

53

Objectives/Results

Indicators/Unit Poor families covered by the National Health Insurance Program (%) Enrolment rate of poor families covered by the NHIP (%)

Baseline Year Value 2008 53.00

2010

74.00

2014 100.00

Targets 2015 100.00

2016 100.00

PHIC and LGUs

100.00

100.00

100.00

PHIC and LGUs

Implementing Agencies

6

Good Governance and the Rule of Law

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

55

Strategic Outcomes Sector Outcome 1. Effective, transparent, participative and accountable governance practiced 2. Access to justice enhanced Sub-sector Outcomes 1. 2. 3. 4.

Public services delivered effectively with greater transparency and accountability Business-friendly environment enhanced Democratic institutions strengthened Rule of law strengthened

Core and Critical Indicators and End-of-Plan Targets 1. Number of LGUs with streamlined Business Permits and Licensing System increased from 77 in 2012 to 143 in 2016 2. Number of LGUs with Seal of Good Housekeeping increased: • Provinces from 3 in 2011 to 6 in 2016 • Cities from 2 in 2011 to 7 in 2016 • Municipalities from 24 in 2011 to 136 in 2016 3. Number of LGUs reaching the benchmark rating of 4 (High) on the state of local governance per performance area increased: • Administrative Governance • Provinces from 3 in 2011 to 6 in 2016 • Cities from 7 in 2011 to 7 in 2016 • Municipalities from 42 in 2011 to 109 in 2016 • Social Governance • Provinces from 3 in 2011 to 6 in 2016 • Cities from 3 in 2011 to 7 in 2016 • Municipalities from 72 in 2011 to 130 in 2016 • Economic Governance • Provinces from 5 in 2011 to 6 in 2016 • Cities from 4 in 2011 to 6 in 2016 • Municipalities from 44 in 2011 to 79 in 2016 • Environmental Governance

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

56

• Provinces from 4 in 2011 to 6 in 2016 • Cities from 5 in 2011 to 7 in 2016 • Municipalities from 88 in 2011 to 109 in 2016 • Valuing Fundamentals of Good Governance • Provinces from 5 in 2011 to 6 in 2016 • Cities from 4 in 2011 to 7 in 2016 • Municipalities from 89 in 2011 to 109 in 2016 4. Number of LGUs compliant to Full Disclosure Policy maintained/increased: • Provinces from 6 in 2012 to 6 in 2016 (maintained) • Cities from 6 in 2012 to 7 in 2016 • Municipalities from 135 in 2012 to 136 in 2016 5. Number of LGUs with OPI of 4 valuing fundamentals of government under LGPMS increased: • Provinces from 5 in 2012 to 6 in 2016 • Cities from 6 in 2012 to 7 in 2016 • Municipalities from 102 in 2012 to 109 in 2016 6. Speedy resolution of cases: • Number of cases disposed within the reglementary period (timeliness) increased from 218 in 2012 to 290 in 2016 • Percentage of cases disposed increased by an average of 10% from 2014 to 2016

Assumptions 1. Duty bearers have high integrity to implement and sustain reforms for the performance area in administrative governance and development in economic, social and environment sectors 2. Stability of budgetary revenue and expenditure shares to provide state entitlements to claim holders is maintained 3. LGUs and regulatory NGAs adopt measures to reduce signatories/procedural steps in the issuance of permits and other government transactions 4. Citizens and state have high respect for institutions that govern them to effect the rule of law and control of corruption (e.g. judiciary, auditing, police, etc.) 5. Stakeholders have a collective voice through involvement in planning and delivery of services in order to promote participation and transparency 6. Government agencies and instrumentalities dutifully adhere to the requirements of RA 9184 or the Government Procurement Reform Act

Risks 1. Government agencies are indifferent to the length and complexity of public transactions 2. Loss of confidence by the public in the government 3. Anti-corruption programs/measures are ignored or circumvented by unscrupulous public officials

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

57

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

58

Objectives/Results

Indicators/Unit

Baseline Year

Value

Societal Goal : Inclusive growth Regional Goals: Economic growth and poverty reduction Sector Outcome: Effective, transparent, participative and accountable governance practiced Sub-sector Outcomes: Public services delivered LGUs compliant to FDP effectively with greater (number) transparency and accountability Provinces (number) 2012 6 Cities (number) 2012 6 Municipalities (number) 2012 135 LGUs with OPI of 4 on Valuing 2012 Fundamentals of Governance under LGPMS Provinces (number) 2012 5 Cities (number) 2012 6 Municipalities (number) 2012 102 Business-friendly LGUs with streamlined BPLS 2012 77 environment and (number) democratic institutions strenghtened Agencies with CSC Seal of 2012 33 Excellence (number) LGUs reaching the benchmark rating of 4 (High) on the state of local governance per performance area under LGPMS (number)

Targets 2015

2014

Implementing Agencies

2016

DILG

6 7 136

6 7 136

6 7 136 DILG

5 6 104 99

6 7 106 121

6 7 109 143

DILG/DTI

33

33

33

CSC

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

59

Objectives/Results

Indicators/Unit

Baseline Year

Value

Targets 2015

2014

Implementing Agencies

2016

Administrative Governance Provinces (number)

DILG and LGUs 2011

3

4

5

6

Cities (number) Municipalities (number) Social Governance

2011 2011

7 42

7 50

7 84

7 109

Provinces (number) Cities (number) Municipalities (number) Economic Governance

2011 2011 2011

Provinces (number) Cities (number) Municipalities (number) Environmental Governance

2011 2011 2011

Provinces (number) Cities (number) Municipalities (number) Valuing Fundamentals of Good Governance Provinces (number) Cities (number) Municipalities (number) LGUs with Seal of Good Housekeeping (number) Provinces (number)

DILG and LGUs 3 3 72

4 4 86

5 5 120

6 7 130 DILG and LGUs

5 4 44

5 4 45

6 5 54

6 6 79 DILG and LGUs

2011 2011 2011

4 5 88

4 5 90

5 6 100

6 7 109 DILG and LGUs

2011 2011 2011

5 4 89

6 5 90

6 6 108

6 7 109 DILG

2011

3

4

5

6

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

60

Objectives/Results

Indicators/Unit

Cities (number) Municipalities (number) Sector Outcome: Access to justice enhanced Rule of law strengthened Speedy disposition of cases: Cases disposed within the reglementary period (number) Cases disposed (%)

Baseline Year 2011 2011

Value

Targets 2015

2014

Implementing Agencies

2016

2 24

3 32

5 104

7 136

2012

218

240

264

290

Ombudsman

2012

*

10.00

10.00

10.00

Ombudsman

*No baseline value since Ombudsman started raffling cases only in 2012

7

Peace and Security

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

61

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

62

Strategic Outcomes Sector Outcome Peaceful, just and safe environment conducive for local economic development Sub-sector Outcomes 1. Sustained peace and order condition with reduced crime incidence and increased police-to-population ratio 2. Armed conflict effectively addressed and peace and social cohesion strengthened 3. Concerns of women and children in armed conflict effectively addressed

Core and Critical Indicators and End-of-Plan Targets 1. 2. 3. 4. 5. 6. 7.

Crime volume reduced by 60% in 2016 from the 2012 level Crime solution efficiency (CSE) rate increased from 35.81% in 2012 to 70% in 2016 Police-to-population ratio improved from 1:668 in 2012 to 1:500 in 2016 Strength and capability of insurgents reduced to 25% in 2016 from the 2011 level CAAs reduced from 136 barangays in 2011 to 0 in 2016 Number of conflict-affected areas (CAAs) granted support through PAMANA increased from 0 in 2011 to 136 in 2016 Number of (CAAs) with abused women and children reduced from 136 in 2011 to 0 in 2016

Assumptions 1. 2. 3. 4. 5. 6. 7. 8.

National and local governments are committed to pursue peace and development efforts National and local governments have the sustained capacity to implement the peace and development agenda The military and law enforcers maintain integrity and enjoy the trust and confidence of the people Respect for ceasefire on the sides of the government and the CPP-NPA-NDF is present while peace negotiation is ongoing Local stakeholders are supportive of the peace process and peace building activities Pursuit of law and order is sustained by the police Ex-combatants enjoy infrastructure support, social services and livelihood Implementing partners that can provide technical and financial assistance on sustainable agriculture-based livelihood and enterprise/skills development are present 9. Efforts of the DepEd to include peace concepts and initiatives in school curricula are sustained 10. Full commitment and support of LGUs and disaster response mechanisms are present

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

63

Risks 1. Emergence of new diseases/new strain of existing diseases 2. Peace and development efforts are not successfully pursued by government, causing dissatisfaction among groups involved in the peace process and leading to recurrence of conflict and absence of peace and order 3. Fiscal difficulties that will constrain government (agencies and LGUs) from providing resources for peace and development efforts 4. Abuse of human rights by uniformed personnel, which will diminish civilian trust in and cooperation with the military and the police 5. Continued violent and destructive conflicts, even if peaceful negotiated settlement of conflicts is being pursued 6. Political differences among key actors (LGUs and target communities), which may hamper peace building activities 7. Funding constraints that will hinder police visibility, mobility, and communication, thereby resulting in rise of criminality 8. Ex-combatants rejoin armed groups (despite provision of infrastructure support, social services and economic stability) due to political climate or ideology 9. Fiscal and security factors hindering the involvement of implementing partners 10. Fiscal constraints posing as a constraint in the provision of materials and trainings needed to mainstream peace concepts and initiatives in school curricula, which will result in non-inclusion of peace concepts from the lowest level of education 11. Fiscal difficulties that may reduce LGU and agency assistance and support

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

64

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

65

Objectives/Results

Indicators/Unit

Baseline Year Value

2014

Societal Goal: Inclusive Growth Regional Goals: Economic growth and poverty reduction Sector Outcome: Peaceful, just and safe environment conducive for local economic development Sub-sector Outcomes: Sustained peace and Crime incidence (%) 2012 4,420 60% order condition with (number) reduced crime incidence and increased police-topopulation ratio Crime solution efficiency rate (%) 2012 35.81 50.00 Police-to-population ratio 2012 1:668 1:600 Armed conflicts effectively Barangays/CAAs (number) 2011 136 51 addressed and peace and social cohesion strengthened Barangays/CAAs granted support 2011 0 26 through PAMANA (number of barangays) Concerns of women and CAAs with abused women and 2011 136 51 children in armed conflict children (number) effectively addressed

Targets 2015

Implementing Agencies

2016

50%

40%

PNP

60.00 1:550 26

70.00 1:500 0

PNP PNP AFP

51

136

26

0

AFP, OPAPP

AFP

8

Conservation, Protection and Rehabilitation of Environment and Natural Resources

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

67

Strategic Outcomes Sector Outcome Environmental sustainability Sub-sector Outcomes 1. Healthy ecosystems sustained 2. Environmental quality improved 3. Climate change and disaster risk vulnerability reduced

Core and Critical Indicators and Annual and End-of-Plan Targets 1. 2. 3. 4. 5. 6. 7. 8. 9.

Proportion of land area covered by forest increased from 12% (514,261 has) in 2010 to 21% (785,828 has) in 2016 Forest production areas rehabilitated and maintained increased from 9,353 has in 2011 to 19,018 has in 2016 Mangrove areas rehabilitated and maintained increased from 400 has in 2011 to 500 has. in 2016 Extinction of threatened species of wild flora and fauna prevented by 50% in 2016 BOD level according to usage of other priority rivers already within the water quality criteria of DENR increased by 5 rivers yearly until 2016 Water quality of priority river systems under the Linis Estero/Adopt-a-Waterbody Program improved by 21 waterbodies yearly until 2016 Total suspended particulates (TSP) level below 90 ug/Ncm in Tacloban City sustained until 2016 Number of MRFs established increased from 10 in 2010 to 21 in 2016 LGUs capacitated on climate change adaptation: • Number of LGUs with geo-hazard maps indicating landslide and flood-prone areas increased from 8 in 2010 to 16 yearly until 2016 10. Climate change-resilient, eco-efficient and environment-friendly industries and services and sustainable towns and cities developed, promoted and sustained through 120 projects issued with ECCs yearly until 2016

Assumptions 1. 2. 3. 4.

National and local government support to environmental preservation goals is sustained Civil society organizations are actively participating in environmental preservation and conservation Existing environmental laws and policies are strictly enforced Sufficient technical experts (e.g. geologists, foresters, etc.) to carry out the mandates of the DENR and its attached agencies are present and provision of adequate equipment and paraphernalia for environmental management capacity building programs on Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA) are sustained

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

68

Risks 1. Priority activities of other sectors lead to further degradation of the environment and natural resources 2. Heightened exposure of the region to impacts of climate change 3. Change in political leadership, which may lead to change in priorities

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

69

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

70

Objectives/Results

Indicators/Unit

Baseline Year

Societal Goal: Inclusive Growth Regional Goals: Economic growth and poverty reduction Sector Outcome: Environmental sustainability Sub-sector Outcomes: Healthy ecosystems Proportion of land area 2010 sustained covered by forest (% and ha) Forest production 2011 areas rehabilitated and maintained (ha) Mangrove areas 2011 rehabilitated and maintained (ha) Population of threatened species (number): Philippine Eagle 2010 (number) Philippine Cockatoo 2010 (number) Tarsier (number) 2010

Value

Target 2015

2014

Implementing Agencies

2016

12% (514,261)

14% (585,378)

18% (675,844)

21% (785,828)

DENR-FMS

9, 353

19, 159

18, 750

19, 018

DENR-FMS

400

2, 061

599

500

DENR-FMS

DENR PAWCZMS 2

2

2

2

10

10

10

10

20

20

20

20

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

71

Objectives/Results

Indicators/Unit Terrestrial, inland water, coastal and marine areas important for biodiversity and ecosystem services effectively and equitably managed through NIPAS and other effective area-based conservation measures or modalities Terrestrial areas effectively managed through NIPAS Sites (number) Area (ha) Marine areas effectively managed through NIPAS Sites (number) Area (ha) Critical habitat effectively managed pursuant to the Wildlife Act (number) Enforcement of environmental laws Notice of Violation issued (number)

Baseline Year

Value

Targets 2015

2014

Implementing Agencies

2016

DENR PAWCZMS

2010 2010

5 347,496

5 347,396

5 347,496

5 347,496

2010 2010 2010

3 106,440 3

3 106,440 3

3 106,440 3

3 106,440 3

DENR/EMB/ MGB/FMS/ PAWCZMS 2010

50

55

55

55

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

72

Objectives/Results

Environmental quality improved

Indicators/Unit Cease and Desist Orders issued (number) Cases filed (number) Beneficiaries with secured land tenure in public agricultural A&D land (number) Beneficiaries with secured land tenure in residential land (number) Rivers monitored for BOD level (number) LGUs monitored with increased solid waste diversion rate (number) Beach resorts and marine resource management projects with ECCs/CNCs and other clearances issued (number of projects) Water bodies monitored under the Linis Estero/ Adopt of Waterbody Program (number) Bathing beaches frequently visited by local and foreign tourists monitored (number)

Baseline Year 2010

Value

Targets 2015

2014

Implementing Agencies

2016

5

10

10

10

2010 2010

10 12, 500

12 11, 422

13 11, 422

14 11, 422

DENR-LMS

2010

6, 627

6, 627

7, 621

8, 764

DENR-LMS

2010

5

5

5

5

DENR - EMB

2010

9

14

14

14

DENR - EMB

2010

3

12

13

14

DENR - EMB/ BFAR

2011

2010

12

21 21 (17 existing and 4 new adopted) 5

5

21

5

EMB / LGUs

5

EMB / LGUs

Eastern Visayas Updated Regional Development Plan RESULTS MATRICES 2014-2016

73

Objectives/Results

Climate change and disaster risk vulnerabilty reduced

Indicators/Unit Total suspended particulates (TSP) level in Tacloban (ug/Ncm) MRFs established (number) Bagacay Mine rehabilitation: Structural engineering established (%) Mined-out area (ha.) Revegetated/ Maintained (%) Climate change resilient, eco-efficient and environmentfriendly industries and services and sustainable towns and cities developed, promoted and sustained (number of projects issued with ECC) LGUs capacitated on climate change adaptation: LGUs with geohazard maps, indicating landslide and floodprone areas

Baseline Year 2010

Value <=90

2010

10

Targets 2015

2014

Implementing Agencies

2016

<=90

<=90

<=90

DENR - EMB

17

19

21

LGUs / EMB MGB/ERDB/ERDS

2010

50.00

95.00

100.00

100.00

MGB-CO

2010 2010

50 71.00

70 100.00

70 100.00

70 100.00

MGB-R8, ERDB ERDS R8

2012

120

120

120

120

2011

8

16

16

DENR - EMB

16 DENR-MGB, LGU

Eastern Visayas Updated Regional Development Plan 2014-2016 RESULTS MATRICES Published by: National Economic and Development Authority Regional Office VIII Government Center, Palo, Leyte Tel: +63 53 323 3092 [email protected] http://nro8.neda.gov.ph

Updated EVRDP-Results Matrices 2014-2016.pdf

described in the RDP? Then, at the end of the Plan period, can we claim that our efforts have translated to a better life for our people? This document is aligned ...

3MB Sizes 1 Downloads 153 Views

Recommend Documents

POSITIVE DEFINITE RANDOM MATRICES
We will write the complement of α in N as c α . For any integers i .... distribution with n degrees of freedom and covariance matrix , and write . It is easy to see that ...

Matrices
Matrix • Two-dimensional rectangular array of real or complex numbers. • Containing a certain number “m” of rows and a certain number of “n” columns.

Part B: Reinforcements and matrices
market. Thus both matrix types will be studied. Moulding compounds will be briefly overviewed. For MMCs and CMCs, processing methods, types of materials, ...... A major application is garden decks (USA), picture frames and the ...... Primary processi

Part B: Reinforcements and matrices
Polymeric Matrix Composites (PMCs), Metal Matrix Composites (MMCs) and Ceramic. Matrix Composites (CMCs) will be discussed. For PMCs, synthetic and natural fibres as well as mineral particulate reinforcements will be studied. Polymeric matrices both,

OSR Dungeon Encounter Matrices Alpha.pdf
99 Vapor Rat Tome of Horrors Complete. 100 Yienhool Swords & Wizardry Monster Book. Whoops! There was a problem loading this page. Whoops! There was ...

Multiplying Matrices Practice Worksheet.pdf
Multiplying Matrices Practice Worksheet.pdf. Multiplying Matrices Practice Worksheet.pdf. Open. Extract. Open with. Sign In. Main menu. Displaying Multiplying ...

Shrinkage Estimation of High Dimensional Covariance Matrices
Apr 22, 2009 - Shrinkage Estimation of High Dimensional Covariance Matrices. Outline. Introduction. The Rao-Blackwell Ledoit-Wolf estimator. The Oracle ...

On inversion of Toeplitz matrices - ScienceDirect.com
Comparison of the latter two theorems reveals that in Theorem 1.3 triangular .... [4] G. Heinig, On the reconstruction of Toeplitz matrix inverses from columns ...

Matrices and Linear Algebra -
Of course you can call the help on-line also by double clicking on the Matrix.hlp file or from the starting ...... The matrix trace gives us the sum of eigenvalues, so we can get the center of the circle by: n. A ...... g (siemens) electric conductan

CMV MATRICES WITH SUPER EXPONENTIALLY ...
The open unit disk in the complex plane is denoted by D. 2. ...... There is also a related inverse problem of constructing/recovering a CMV matrix from a.

Matrices and Linear Algebra -
MATRIX addin for Excel 2000/XP is a zip file composed by two files: ..... For n sufficiently large, the sequence {Ai} converge to a diagonal matrix, thus. [ ]λ. = ∞. →.

FINITE GAP JACOBI MATRICES: AN ...
Mathematics 253-37, California Institute of Technology, Pasadena, CA 91125. E-mail: ..... Rather, its fundamental group, π1, is isomorphic to Fℓ, the free non-.

Product of Random Stochastic Matrices and ... - IDEALS @ Illinois
As a final application for the developed tools, an alternative proof for the second .... This mathematical object is one of the main analytical tools that is frequently ...

Effect of Noise Covariance Matrices in Kalman Filter - IJEECS
In the Kalman filter design, the noise covariance matrices. (Q and R) are .... statistical variance matrix of the state error, the optimality of the Kalman filter can be ...

Extremum of Circulant type matrices: a survey
Mar 15, 2008 - Study of the properties of the eigenvalues of random matrices emerged first from data analysis and then from ..... helps to visualize the general non-Gaussian case. 3.1 Spectral radius and ..... a measurable map. N : (Ω,F,P) ...

Linear Operators on the Real Symmetric Matrices ...
Dec 13, 2006 - Keywords: exponential operator, inertia, linear preserver, positive semi-definite ... Graduate Programme Applied Algorithmic Mathematics, Centre for ... moment structure and an application to the modelling of financial data.

Matrices, Vector Spaces, and Information Retrieval - SIAM epubs
Key words. information retrieval, linear algebra, QR factorization, singular value ... meanings: a bank can be a section of computer memory, a financial ... how using the factorization to reduce the rank of the matrix can help to account for.

Nonlinear System Modeling with Random Matrices ...
Computer Engineering, Virginia Polytechnic Institute and State University, ..... Remark: Supported by rigorous mathematical proofs, the ..... 365 – 376, 2007.